Audio Sessions. Session 3 PRECONSTRUCTION. Construction Contract Administration Education Program

Size: px
Start display at page:

Download "Audio Sessions. Session 3 PRECONSTRUCTION. Construction Contract Administration Education Program"

Transcription

1 Audio Sessions Session 3 PRECONSTRUCTION Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course This presentation is protected by US and International copyright laws. Reproduction, distribution, display and use of this presentation without written permission of the speaker and is prohibited AIA is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. 2 1

2 Learning Objectives To introduce preconstruction submittals To explain the basic elements of construction agreements To become familiar with the purpose and content of a notice to proceed To explore the purpose of preconstruction meetings To be able to recognize the importance of record keeping and reporting To explain field offices and temporary facilities and controls To gain an insight into the role authorities with jurisdiction 3 Session Outline STUDY GUIDE: Subject Matter Area No. 3-5% PRECONSTRUCTION A. Preconstruction Submittals 1. Certificate of insurance 2. Surety bonds 3. Subcontractor lists and product lists 4. Schedules a. Construction progress schedule b. Submittal schedule c. Schedule of values B. The Construction Agreement 1. Who prepares and executes the construction agreement 2. Basic elements of the construction agreement C. Notice to Proceed 1. Purpose 2. Content D. Preconstruction Meetings 1. Purpose and participants 2. Procedural meeting 3. Site mobilization meeting Continued on following slide 4 2

3 E. Record Keeping and Reporting Session Outline STUDY GUIDE: Subject Matter Area No Project record keeping 2. A/E s documentation 3. Additional documentation F. Establishing a Field Office G. Temporary Facilities and Controls H. Authorities Having Jurisdiction PRECONSTRUCTION Continued from previous slide 5 PRECONSTRUCTION STUDY GUIDE AREA NO

4 PRECONSTRUCTION SUBMITTALS STUDY GUIDE: Submit Matter Area No. 3 - A. 1. Certificate of insurance 2. Surety bonds 3. Subcontractor lists and product lists 4. Schedules a. Construction progress schedule b. Submittal schedule c. Schedule of values 7 Preconstruction Submittals Generally, no work begins until required preconstruction submittals have been Submitted by Contractor Reviewed by A/E and Owner Process begins when Contractor receives notice to proceed

5 Certificates of Insurance Owner establishes project requirements for insurance in consultation with Legal counsel Insurance advisors Requirements for insurance specified in General conditions Supplementary conditions Before beginning work at site, Contractor and Owner exchange certificates of insurance verifying coverage Certificates of Insurance Figures 3.4 and

6 Surety Bonds Bonds provide assurance to Owner if Contractor Becomes financially incapable of making payments Cannot fulfill contract obligations Cannot complete contract Surety will assume Contractor s role Bonds are not insurance Advantages of bonding Protection of suppliers and subcontractors from nonpayment Protection of Owner against mechanic s liens Subcontractor Lists and Product Lists Standard general conditions typically Require Contractor to submit list of proposed subcontractors Some Owners may require list to be submitted with bid or proposal If Owner objects to any proposed subcontractor A/E notifies Contractor of objection Changes of subcontractors may entitle Contractor to change contract sum if there are additional costs Standard general conditions typically stipulate that Contractor will not be forced to use a subcontractor of which Contractor has an objection

7 Subcontractor Lists and Product Lists Product lists may be required As a means for A/E to verify Contractor will use only specified products or approved substitutions Valuable to Contractor in verifying that suppliers and subcontractors use products complying with specified requirements Product lists are not to be used for proposed substitutions Subcontractor Lists and Product Lists Figure

8 Construction Progress Schedule Type of schedule depends on Project delivery method Project extent Contracts Construction Progress Schedule Important aspects of schedules Contract time Milestone events and dates Start and completion dates of major activities of construction Submittal review and approval dates Coordination requirements and interrelationship of activities Related construction activities Lead time necessary to obtain products and equipment activity durations Frequency of updates Types of reports required Project cost and manpower

9 Construction Progress Schedule Types of schedule formats Bar charts - Graphic display of major activities - Form of bars overlaid on a calendar Network analysis diagram - Time analysis of network of activities - Arranged in a critical path that establishes optimum sequence and duration of operations between first and last event A/E reviews schedule to determine If schedule meets specified time requirements If sufficient time has been allowed for processing submittals Owner determines whether schedule meets requirements Construction Progress Schedule Figure

10 Construction Progress Schedule Schedule should be updated on regular basis to account for work completed and modifications Concealed and unknown conditions Delays Other circumstances that affect project Updated schedule may be a prerequisite to certifications for payment Some contracts only allow schedule changes by change order Submittal Schedule Submittal schedule may be required to be incorporated into construction progress schedule Required submittals are included in project manual Products cannot be ordered or fabricated prior to A/E approval

11 Important considerations Submittal Schedule Time frame when products are needed Time necessary to produce and deliver products to site Lead time to prepare submittal Time required for - Contractor to review submittal - A/E to review submittal Number of subcontractors affected by information contained in submittal Time necessary to correct and resubmit if original submittal is not approved Grouping or bundling of related submittals Schedule of Values Standard general conditions typically stipulate submittal before work begins or first application for payment Prepared by Contractor for use as basis of application for payment A/E reviews schedule of values Contract sum is broken down into smaller, measurable portions that A/E and Owner are able to Observe Measure Use to determine percent of completion

12 Schedule of Values Important to establish Contractor s overhead and profit listed with each item or listed separately Providing general conditions line is helpful Should be equal to Contractor s daily project overhead cost over time frame of project Establishes basis of cost for time extensions Amounts should accurately reflect value of work Front end loading is a deceptive technique which raises mobilization costs, supervision, or early work activities to improve Contractor s cash flow As construction progresses, schedule should be updated to include amounts approved by change order Schedule of Values Standard general conditions and Division 01 Specify how schedule of values is to be prepared Usually values are itemized by specification section Itemization can follow any form specified Aids in review of information required by contract documents Allows for prompt and accurate processing of later applications for payment Separation of work activities into separate labor and material categories Makes for easier review Allows for easier processing

13 Schedule of Values Figure THE CONSTRUCTION AGREEMENT STUDY GUIDE: Submit Matter Area No. 3 - B. 1. Who prepares and executes the construction agreement 2. Basic elements of the construction agreement 26 13

14 Who Prepares and Executes the Construction Agreement Anyone can prepare a construction agreement however, there should be a meeting of the minds between the parties before execution Depending on project type and requirements, any of following are possible Prepared by A/E using standardized forms Prepared by Owner using standardized forms or Owner s nonstandardized forms Prepared by Contractor using standardized forms or Owner s nonstandardized forms Owner and Contractor are only parties to a construction agreement 27 Basic Elements of the Construction Agreement Preamble Identification of parties Identification of other parties Contract documents Scope of work Date of commencement of the work Date of substantial completion of the work Project Delivery 5.5 Liquidated damages Incentives, bonuses, and penalties Contract sum Adjustment of contract sum Unit prices Payment procedures Due dates for payments Work completed Materials and equipment stored off-site Continued on following slide 28 14

15 Basic Elements of the Construction Agreement Cutoff date Payment at substantial completion Due date for final payment Progress payments and retainage Miscellaneous provisions Termination or suspension Signatures Continued from previous slide Project Delivery NOTICE TO PROCEED STUDY GUIDE: Submit Matter Area No. 3 - C. 1. Purpose 2. Content 30 15

16 Notice to Proceed Project time limit provisions can be established by Date of commencement stated in agreement Notice to proceed Notice to Proceed Typically there is a period of time after Owner-Contractor agreement is executed in which Contractor obtains certificates of insurance, surety bonds, and other required documents Once documents have been received and accepted by Owner, Owner may issue notice to proceed that Establishes date construction is authorized to begin May include number of days or date of substantial completion Directs Contractor to begin project

17 Notice to Proceed Figure PRECONSTRUCTION MEETINGS STUDY GUIDE: Submit Matter Area No. 3 - D. 1. Purpose and participants 2. Procedural meeting 3. Site mobilization meeting 34 17

18 Purpose Preconstruction Meeting Important for introducing project team Establishing ground rules for communication Explaining administrative process Participants Owner and advisors A/E and consultants Contractor and major subcontractors Types Procedural meeting Site mobilization meeting Procedural Meeting Held before construction begins Important for establishing desired attitude and direction for entire construction process

19 Procedural Meeting Purpose is to review and clarity administrative procedures Communication Submittals Testing and inspections Responsibilities and duties Schedule of values Payment process Progress schedule Modification procedures Critical issues Long lead items Requirements for quality assurance and quality control Substitutions Maintaining record documents Project meetings Sustainability requirements Maintaining construction tolerances Site Mobilization Meeting Held at project site Addresses issues about site use For sustainable projects, address allowable uses and limitations on site use If project involves remodeling, renovation, alterations, or an addition, use of facility and adjacent facilities can be significant issues If Owner will continue to use existing facilities affected by the work, consideration for access and use by public may be critical

20 Considerations Site Mobilization Meeting Access to site Environmental controls Material storage Identification of benchmarks Layout of work Use of site and existing facilities by Contractor and Owner Occupancy and use by Owner, tenants, and the public Separation of work areas Maintenance of site - Traffic control - Cleaning - Trash removal Work hours Noise control Protection of existing materials to remain in place Use of existing utilities Project phasing and sequencing 39 RECORD KEEPING AND REPORTING STUDY GUIDE: Submit Matter Area No. 3 - E. 1. Project record keeping 2. A/E s documentation 3. Additional documentation 40 20

21 Record Keeping and Reporting Documentation created by construction contract administration is effective for Communication Historical record of construction stage activity Aid in future recollection of construction activity Project Record Keeping During construction, there is an ongoing stream of information among participants Timely responses to inquires are crucial To successful completion With minimum of difficulties Use of standardized forms facilitates and expedites the documentation process

22 A/E s Documentation Field observation reports Correspondence Meeting minutes Communication reports (telephone and meeting) Submittals Test reports Payment requests and certifications Schedules Requests for interpretation, clarification, or information Proposal requests and change order requests Contract document modifications Additional Documentation Oral conversations should be documented Documentation of oral exchange of information allows participants to review what was said and to revise or object to recorder s understanding No objection to documented discussions usually means acceptance future misunderstandings and faded memories are avoided

23 ESTABLISHING A FIELD OFFICE STUDY GUIDE: Submit Matter Area No. 3 - F. 45 Establishing a Field Office Specifications usually require facility Structurally sound, weathertight structure Heated and air conditioned Electrical outlets Data communications outlets Toilet facilities Could be space in existing facility Could be lease space in adjacent facility

24 TEMPORARY FACILITIES AND CONTROLS STUDY GUIDE: Submit Matter Area No. 3 - G. 47 Includes Temporary Facilities Project office trailers Storage trailers for tools, equipment, and material Testing facilities Other storage facilities Among first items moved onto construction site Parts of existing buildings may be used for facility alteration projects

25 Includes Sanitation facilities Electrical power Water Telephone services Installation usually scheduled as soon as possible after temporary facilities are in place Temporary Utilities Includes Temporary Controls Sediment or erosion controls Pest control Controlled access Temporary controls direct or eliminate undesirable issues during project, but are removed when work is complete

26 AUTHORITIES HAVING JURISDICTION STUDY GUIDE: Submit Matter Area No. 3 - H. 51 Authorities Having Jurisdiction Federal, state, county, and city authorities Oversight of safety and welfare of public they serve Verify that code and ordinance requirements have been met Performs reviews of contract documents before issuing building permits Performs inspections at project site

27 Authorities Having Jurisdiction If authorities discover work not in conformance Work will not be approved Contractor will correct non-complying work Authorities will inspect corrected work, and if in compliance will approve If rejected work complies with contract documents, Contractor may be entitled to change order to correct defective work Contractor may be responsible for correcting work at no additional cost, if Contractor knew work to be contrary to applicable regulations and codes Review Outline STUDY GUIDE: Subject Matter Area No. 3 PRECONSTRUCTION A. Preconstruction Submittals 1. Certificate of insurance 2. Surety bonds 3. Subcontractor lists and product lists 4. Schedules a. Construction progress schedule b. Submittal schedule c. Schedule of values B. The Construction Agreement 1. Who prepares and executes the construction agreement 2. Basic elements of the construction agreement C. Notice to Proceed 1. Purpose 2. Content D. Preconstruction Meetings 1. Purpose and participants 2. Procedural meeting 3. Site mobilization meeting Continued on following slide 54 27

28 E. Record Keeping and Reporting Review Outline STUDY GUIDE: Subject Matter Area No Project record keeping 2. A/E s documentation 3. Additional documentation F. Establishing a Field Office G. Temporary Facilities and Controls H. Authorities Having Jurisdiction PRECONSTRUCTION Continued from previous slide 55 28

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)

More information

Document A201 TM 2007 SP

Document A201 TM 2007 SP AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status

More information

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3

More information

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,

More information

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

Session 10 and 11 EXECUTING THE WORK & CLAIMS AND DISPUTES

Session 10 and 11 EXECUTING THE WORK & CLAIMS AND DISPUTES Audio Sessions Session 10 and 11 EXECUTING THE WORK & CLAIMS AND DISPUTES Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 www.csinet.org This presentation

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): A201 conversion Michigan State University East Lansing, MI THE OWNER:

More information

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address) Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Pre-Construction and Construction Management at Risk Services Lafayette

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) THE ARCHITECT: (Name, legal

More information

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. 2.2.2

More information

Document A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor

Document A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor TM Document A201CMa General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor 1992 for the following PROJECT: (Name and location or address): Interior Finish

More information

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3 JUNE 23, 2016 ATTENTION ALL PROPONENTS: IFB F2015017 B-WING RENOVATIONS IFB F2015007 9C OFFICES BUILD OUT Addendum 3 The purpose of this Amendment is to advise all offertories of the following: 1. In Project

More information

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner: Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor) OREGON STATE UNIVERSITY CM/GC CONTRACT (Construction Manager/General Contractor) THE CONTRACT IS BETWEEN: OWNER: Oregon State University And CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (referred to as Contractor

More information

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of South Carolina Division of Procurement Services, Office of the State Engineer Version of Document A201 2007 General Conditions of the Contract for Construction This version of AIA Document A201 2007 is

More information

20% of the Fee and 80% of the Liability: Navigating the Minefield of Construction Contract Administration

20% of the Fee and 80% of the Liability: Navigating the Minefield of Construction Contract Administration 20% of the Fee and 80% of the Liability: Navigating the Minefield of Construction Contract Administration RLI Design Professionals Design Professionals Learning Event DPLE 272 August 5, 2015 RLI Design

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: Proposed Renovations to a Portion of the Township Municipal Building 175 West Valley Forge Road King

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS 702 KAR 4:160 KENTUCKY DEPARTMENT OF EDUCATION REQUEST FOR PROPOSALS for CONSTRUCTION MANAGEMENT SERVICES School District: Project: Boyle County Boyle County Middle School RFP Date: June 20 30, 2016 CONTENTS

More information

AIA Document A103 TM 2007

AIA Document A103 TM 2007 AIA Document A103 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work plus a fee without a Guaranteed Maximum Price AGREEMENT made as of the

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: for: (Name and location or address) Work for The University of Tennessee Section 00 72 13 2017 THE OWNER:

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 510 STANDARD AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND CONSTRUCTION MANAGER (Where the Basis of Payment is the Cost of the Work) This document was developed through a collaborative

More information

STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN

STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN THE DEKALB COUNTY BOARD OF EDUCATION AND THE CONSTRUCTION MANAGER Construction

More information

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) STATE OF VERMONT STANDARD FORM GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) The following general conditions are for use with DESIGN BUILD construction contracts with the State of Vermont,

More information

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor Document A104 2017 Standard Abbreviated Form of Agreement Between Owner and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk CMAA Document CMAR-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk 2004 EDITION This document is to be used in connection with CMAA Standard Form of Contract

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 200 STANDARD AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND CONTRACTOR (Where the Contract Price is a Lump Sum) This document was developed through a collaborative effort of entities

More information

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT ATTACHMENT A AIA DOCUMENT B141 1987 EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT Winston-Salem/Forsyth County Board of Education June 15-2015 Revised Edition for Project: Architect: Amendments,

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 750 STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR This document was developed through a collaborative effort of entities representing a wide cross-section of the construction

More information

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project Document B108 2009 Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.) Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

AIA A201 General Conditions of the Contract for Construction

AIA A201 General Conditions of the Contract for Construction AIA A201 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Capital Improvement Plan Primary School THE OWNER: (Name and address) Hallsville R-IV

More information

Attachment 1. University System of New Hampshire USNH General Conditions of the Contract for Design-Build Version 1.3 TABLE OF ARTICLES

Attachment 1. University System of New Hampshire USNH General Conditions of the Contract for Design-Build Version 1.3 TABLE OF ARTICLES Attachment 1 University System of New Hampshire USNH General Conditions of the Contract for Design-Build Version 1.3 TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION APPLICATIONS FOR PAYMENT

DIVISION 1 - GENERAL REQUIREMENTS SECTION APPLICATIONS FOR PAYMENT DIVISION 1 - GENERAL REQUIREMENTS SECTION 01027 APPLICATIONS FOR PAYMENT I. GENERAL This section specifies administrative and procedural requirements governing Contractor Applications For Payment. II.

More information

AIA Document A701 TM 1997

AIA Document A701 TM 1997 Instructions to Bidders AIA Document A701 TM 1997 for the following PROJECT: (Name and location or address) Implementation of Master Plan Projects Phase I Genesee Community College One College Road Batavia,

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE

More information

General Conditions of the Contract for Construction

General Conditions of the Contract for Construction ATTACHMENT F CENTRAL NEW MEXICO COMMUNITY COLLEGE General Conditions of the Contract for Construction TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5.

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

Owner and Design-Builder

Owner and Design-Builder for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 29 THE OWNER: (Name and address) Example, THE DESIGN-BUILDER: (Name and address) Nielsen Environmental 8484 Wilshire Blvd Suite

More information

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual Project No. 9574-2018 Issued 7/19/2017 Washington State University Facility Services, Capital Terre View Research

More information

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents:

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: A101-2017: Standard Form of Agreement Between Owner and Contractor where

More information

Document A Exhibit A

Document A Exhibit A Design-Build Amendment Document A141 2014 Exhibit A This Amendment is incorporated into the accompanying AIA Document A141 2014, Standard Form of Agreement Between Owner and Design-Builder dated the day

More information

Document A133 TM. AGREEMENT made effective as of the day of in the year (In words, indicate day, month and year.)

Document A133 TM. AGREEMENT made effective as of the day of in the year (In words, indicate day, month and year.) Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

SECTION GENERAL CONTRACTOR/CONSTRUCTION MANAGER (GC/CM) AGREEMENT TABLE OF CONTENTS ARTICLE 1 DEFINITIONS... 2

SECTION GENERAL CONTRACTOR/CONSTRUCTION MANAGER (GC/CM) AGREEMENT TABLE OF CONTENTS ARTICLE 1 DEFINITIONS... 2 SECTION 00 50 00 GENERAL CONTRACTOR/CONSTRUCTION MANAGER (GC/CM) AGREEMENT TABLE OF CONTENTS ARTICLE 1 DEFINITIONS... 2 ARTICLE 2 THE CONTRACT DOCUMENTS... 3 ARTICLE 3 WORK OF THIS CONTRACT... 4 ARTICLE

More information

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor Document A104 TM 2017 Standard Abbreviated Form of Agreement Between Owner and Contractor AGREEMENT made as of the Twenty Eighth day of June in the year Two Thousand Eighteen (In words, indicate day, month

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition)

GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition) GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition) TABLE OF CONTENTS ARTICLE 1...1 General Provision...1 1.1 Definitions...1 1.2 Execution, Correlation

More information

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope TM Document A107 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN

More information

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated: Document A142 2014 Standard Form of Agreement Between Design-Builder and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Design-Builder: (Name,

More information

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) this Agreement; (2) the prime Contract, consisting of the Agreement between the Owner and Contractor and the other Contract

More information

Washington University in St. Louis

Washington University in St. Louis Washington University in St. Louis Construction Terms and Conditions A. AGREEMENT. The Purchase Order, these Terms and Conditions, any special conditions, Owner s Policies, Design Standards and Insurance

More information

Tri-Cities Academic Building Washington State University Richland, WA Project Manual

Tri-Cities Academic Building Washington State University Richland, WA Project Manual Tri-Cities Academic Building Washington State University Richland, WA Project Manual Project No. 8589-2016 Issued 9/25/2018 Washington State University Facility Services, Capital Tri-Cities Academic Building

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

ADVERTISEMENT FOR BIDS CSD NO. 158 BID # B CONSOLIDATED SCHOOL DISTRICT # ELEMENTARY SCHOOLS CARPET INSTALLATION

ADVERTISEMENT FOR BIDS CSD NO. 158 BID # B CONSOLIDATED SCHOOL DISTRICT # ELEMENTARY SCHOOLS CARPET INSTALLATION ADVERTISEMENT FOR BIDS CSD NO. 158 BID #2011-29B CONSOLIDATED SCHOOL DISTRICT #158 2011 ELEMENTARY SCHOOLS CARPET INSTALLATION Consolidated School District #158 will receive single prime sealed bids for

More information

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition)

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition) Document #: 861154 GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO for SOLE SOURCE CONTRACTS (2004 Archdiocese Edition) 86 Document #: 861161 TABLE OF CONTENTS ARTICLE

More information

Construction Management-at-Risk Agreement

Construction Management-at-Risk Agreement This ( Agreement ), by and between the Lone Star College ( LSC or Owner ) and ( Construction Manager ), referred to as Party individually or Parties collectively, shall become effective upon the date this

More information

THE CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA, INC. CMAA Document CMAR-1 (2004 Edition)

THE CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA, INC. CMAA Document CMAR-1 (2004 Edition) THE CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA, INC. CMAA Document CMAR-1 (2004 Edition) Standard Form of Agreement Between Owner and Construction Manager (Construction Manager At-Risk) This document

More information

B. The Bid is made in compliance with the Bidding Documents.

B. The Bid is made in compliance with the Bidding Documents. SECTION 002113 INSTRUCTIONS TO BIDDERS ARTICLE 1 DEFINITIONS 1.1 Definitions set forth in the General Conditions of the Contract for Construction, AIA Document A201, or in other Contract Documents are

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AS MODIFIED BY OWNER AGREEMENT made as of the day of in the year (In words,

More information

2. Do you have any final geotechnical report for the proposed property? Yes, See attached. More to come.

2. Do you have any final geotechnical report for the proposed property? Yes, See attached. More to come. Request for Proposals (RFP) for Construction Management at Risk Services for Austin Road Master Planning Including New East Barrow High School Phase 1 Project Addendum #1 Dated 9.24.2018 Page 1 See questions

More information

AIA Document B141 TM 1997 Part

AIA Document B141 TM 1997 Part 1 AIA Document B141 TM 1997 Part Standard Form of Agreement Between Owner and Architect with Standard Form of Architect's Services TABLE OF ARTICLES 1.1 INITIAL INFORMATION 1.2 RESPONSIBILITIES OF THE

More information

Document A Exhibit A Determination of the Cost of the Work

Document A Exhibit A Determination of the Cost of the Work Document A121 2014 Exhibit A Determination of the Cost of the Work THE OWNER: (Name, legal status, address and other information) THE CONTRACTOR: (Name, legal status, address and other information) This

More information

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address)

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address) Document A134 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price AGREEMENT

More information

Document A701 TM. Instructions to Bidders

Document A701 TM. Instructions to Bidders Instructions to Bidders Document A701 TM 1997 for the following PROJECT: (Name and location or address) St. Croix Regional Education District Technology Bid Package St. Croix River Educational District

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) Austin Community College District 9101

More information

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT This Construction Management-at-Risk Agreement ( Agreement ) is entered into effective as of XXXXX (the Effective Date ), by and between City of South Padre Island,

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

AIA Document B101 TM 2007

AIA Document B101 TM 2007 AIA Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.)year) BETWEEN the Architect s client

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent CMAA Document A-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent 2013 EDITION This document is to be used in connection with the Standard Form of

More information

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Contractor Address Address City, Zip Work Phone Number: Cell Phone Number:

More information

stipulated price contract

stipulated price contract 2 2 stipulated price contract 2 0 0 8 Apply a CCDC 2 copyright seal here. The application of the seal demonstrates the intention of the party proposing the use of this document that it be an accurate and

More information

AIA Document B101 TM 2007

AIA Document B101 TM 2007 AIA Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AS MODIFIED BY OWNER AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect

More information

Document C132 TM. Standard Form of Agreement Between Owner and Construction Manager as Adviser

Document C132 TM. Standard Form of Agreement Between Owner and Construction Manager as Adviser Document C132 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Adviser AGREEMENT made as of the 14th day of July in the year 2014 (In words, indicate day, month and year.) BETWEEN

More information

University System of New Hampshire General Conditions of the Contract for Construction

University System of New Hampshire General Conditions of the Contract for Construction University System of New Hampshire General Conditions of the Contract for Construction TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5. SUBCONTRACTORS

More information

DOCUMENT SCHEDULING OF WORK PART 1 GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS

DOCUMENT SCHEDULING OF WORK PART 1 GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS DOCUMENT 01 32 13 PART 1 GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS All Contract Documents should be reviewed for applicable provisions related to the provisions in this document, including without limitation:

More information

This Webcast Will Begin Shortly

This Webcast Will Begin Shortly This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: splemoderator@smartpros.com Thank You! 1 KEY ISSUES IN NEGOTIATING

More information

Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM

Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM TM Document A101 1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the day of March in the year of 2007 (In words, indicate

More information

General Conditions of the Contract for Construction

General Conditions of the Contract for Construction ALBUQUERQUE PUBLIC SCHOOLS of the Contract for Construction 2008 Edition rev. 1 TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5. SUBCONTRACTS 6. CONSTRUCTION

More information

1 Exam Prep Business and Finance Practice Test 10

1 Exam Prep Business and Finance Practice Test 10 1 Exam Prep Business and Finance Practice Test 10 1. What is an advantage of a bad debt reserve? A. it reduces tax liability for earned profit B. it increases assets C. it increases profits D. it simplifies

More information

Construction Phase Services: Pitfalls, Perils and Payment. RLI Design Professionals Design Professionals Learning Event DPLE 147 May 18, 2016

Construction Phase Services: Pitfalls, Perils and Payment. RLI Design Professionals Design Professionals Learning Event DPLE 147 May 18, 2016 Construction Phase Services: Pitfalls, Perils and Payment RLI Design Professionals Design Professionals Learning Event DPLE 147 May 18, 2016 RLI Design Professionals is a Registered Provider with The American

More information

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR CMAA Document CMAR-3 General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR 2004 EDITION This document is to be used in connection with the Standard Form of Agreement

More information

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Agenda Item: Action Consent BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER OWNER: Palm Beach State College 4200 Congress Avenue Lake Worth, FL 33461 CONSTRUCTION MANAGER: Date Table

More information

Request For Proposal. For Construction Management Services. For The. Benton County Jail and Sheriff s Office

Request For Proposal. For Construction Management Services. For The. Benton County Jail and Sheriff s Office For For The Issue Date: June 1, 2018 Due Date: June 25, 2018 by 10:00 a.m. Central Time Submit RFP to: Benton County Commission c/o Michelle McLerran Kreisler P.O. Box 1238 316 Van Buren Warsaw, Missouri

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pre-Construction and Construction Phase Services FP&M Project No, CP00Error! Bookmark not defined. AGREEMENT made by and between the Board of Regents, State

More information

This page intentionally blank. VTSV MBR System Procurement Bid Set - 11/28/ Notice to Proceed. Copyright 2013 National Society of

This page intentionally blank. VTSV MBR System Procurement Bid Set - 11/28/ Notice to Proceed. Copyright 2013 National Society of This page intentionally blank. VTSV-16-0220 MBR System Procurement Bid Set - 11/28/2016 00550 - Notice to Proceed. Copyright 2013 National Society of Professional Engineers for EJCDC. All rights reserved.

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS All University of Alabama Solicitations are made upon and subject to the following conditions, if applicable, unless otherwise noted in the Solicitation: 1.0 Definitions 1.1 The

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SECTION 109 MEASUREMENT AND PAYMENT

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SECTION 109 MEASUREMENT AND PAYMENT SECTION 102.01 PREQUALIFICATION OF BIDDERS of the Specifications is amended as follows: The eighth paragraph is replaced by the following: When the Contractor's actual progress is more than 10 percent

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PROJECT NAME AND LOCATION: Project Name Campus Name Campus Address CONSTRUCTION MANAGER: Contractor Name Address ARCHITECT-ENGINEER:

More information

Document A701 TM. Instructions to Bidders. for the following PROJECT: (Name and location or address)address): Orig A

Document A701 TM. Instructions to Bidders. for the following PROJECT: (Name and location or address)address): Orig A Instructions to Bidders Document A701 TM 1997 for the following PROJECT: (Name and location or address)address): Orig A701-1997 THE OWNER: (Name, legal status and address)(name and address): THE ARCHITECT:

More information

Document A107 TM. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A107 TM. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope Document A107 TM 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN

More information

EASTERN OREGON UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

EASTERN OREGON UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor) EASTERN OREGON UNIVERSITY CM/GC CONTRACT (Construction Manager/General Contractor) THIS CONTRACT IS BETWEEN: OWNER: Eastern Oregon University And CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (referred to as

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS

TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year «2017» (In words, indicate day,

More information

AIA Document A107 TM 2007

AIA Document A107 TM 2007 AIA Document A107 TM 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope NOTE: THIS IS A DRAFT DOCUMENT ONLY AND REMAINS SUBJECT TO FURTHER REVISION BY NAVY FEDERAL

More information