Green Building Can Have Your Organization Seeing Red If You re Not Involved From the Start

Size: px
Start display at page:

Download "Green Building Can Have Your Organization Seeing Red If You re Not Involved From the Start"

Transcription

1 MAY 10, 2013 GREENER ON THE OTHER SIDE: A FINANCIAL OFFICER S ROLE IN MITIGATING RISK This article first appeared in the January/February 2013 issues of Building Profits, the official magazine of the Construction Financial Management Association. Green Building Can Have Your Organization Seeing Red If You re Not Involved From the Start by Carl Bloomfield, AAI, Producer, Jim Marquet, Producer, David S. Merker, SSMBB, LEED Green Associate, Account Manager As sustainability standards and expectations are heightened across the country, construction firms are increasingly seeking sustainable projects that will either build to Leadership in Energy & Environmental Design (LEED ) standards or achieve certification. Participation in green-built projects reflects positively on a firm s commitment to supporting the environment, opens doors for future green construction opportunities and offers the allure of increased profitability. While the benefits to the environment, community and construction firm are undisputed, there are significant risk exposures lurking just beneath the grass-covered surface. To achieve optimum return on investment, construction firms need to mitigate the inherent risks associated with sustainable building, and CFOs, controllers and financial managers within construction companies have a critical role to play in this endeavor. The first step in mitigating risk is to understand how the risks emanating from green building differ from those emanating from traditional building. From pollution and environmental hazards associated with brownfield sites to the unique safety

2 considerations surrounding vegetative roofs and the use of untested sustainable materials, it is evident that green-built and LEED-certified projects are fraught with risks that are not usually at issue in traditional projects. By paying careful attention to the additional risks involved in green building, financial officers can help provide stronger assurance that their firm s investment in a project is protected. Take a Seat In order to achieve the best possible ROI on a green building project, financial officers need to be even more involved with the project stakeholders than on a traditional building project. It s imperative that the financial officer has a seat at the decision-making table. With the right knowledge, financial officers can increase the profitability of a green-built project tremendously while reducing the firm s exposure to risk if they are involved in the firm s planning, bidding, negotiating process as well as the insurance and safety program. Get a Road Map Whether the project is being built to achieve LEED certification or to LEED standards, it s necessary that the financial officer has a clear view of the hurdles on the horizon. Insist on a Design Charrette -an initial collaborative session during which your firm s contractors and engineers meet with the architect and project owner to discuss potential solutions to the design challenges they foresee. More importantly, it allows everyone who participates to be a mutual author of the project s plan. The outcome of this session will be your road map to ensure seamless collaboration between your firm and the other parties involved so performance goals are achieved efficiently and your firm is compensated as agreed upon. As a financial manager, if you receive bid documents with no Design Charrette included, consider it a major red flag. The Charrette is critical to identifying the sustainable concepts and strategies as well as aligning your construction firm, the owner and the architect without it, the contractor is bidding blindly. If the bid documents don t include a Charrette, take charge. Although it is atypical for

3 If the bid documents don t include a Charrette, take charge. Although it is atypical for the financial manager to initiate a Charrette, it is a critical first step to ensuring a healthy ROI. As a financial officer, you should feel empowered to immediately facilitate a meeting with the owner and design professionals so that all parties agree on expectations as it relates to the construction firm. Overall, LEED requirements do bring out the best in integrating the owner, designer and contractor, however you must be diligent in initiating such collaboration early on in the bid process to adequately manage expectations and ensure your firm s responsibilities. Mind the Low Bid When it comes to increasing profits in a LEED-registered project, there are many unforeseen costs not associated with traditional building that are often overlooked. The lowest subcontractor bid can look tempting, but a savvy financial officer must conduct a comprehensive assessment of all the non-traditional costs before accepting such a bid. If a subcontractor s bid has not accounted for things such as the increased cost of materials, equipment that meets functional performance specifications outlined in the design or the time and cost of performing functional testing on materials and equipment to ensure they will perform as designed, do not accept it, as it will later become a burden to your firm s profitability. In addition to accounting for such costs, you must ensure that subcontractors have the necessary experience to meet the demands of the LEED checklist. The last thing you want is an inexperienced subcontractor laying down carpet without first following the appropriate off-gas procedures; an oversight like that could cost you air quality credits that would have been earned otherwise. Avoid the Blame Game If not properly managed, green-build projects can be cost prohibitive, but fortunately, special attention to the contract can significantly enhance your firm s profit margin. In order for the project owner to capitalize on tax credits or other cash-flow opportunities such as surplus energy sell-off or increased occupancy rates, specific performance

4 requirements within the design may be required. Unless these metrics and standards are clearly defined in the contract, the construction firm could be held responsible for not meeting expectations. A thorough review of the bid documents and agreement on the clarifying particulars are critical from the outset; this should include a detailed assessment of all materials used and contractual obligations for each. With so many new materials being used in green-build projects, from vegetative roof membrane to low-voc flooring adhesive, it is easy to find your construction firm in the middle of a blame game with the product manufacturer. To avoid this finger-pointing and the resulting claims that could follow, be sure that your contract clearly defines your installation obligations versus product warranties. Amend Express Warrenties Standard LEED contract templates will include the terms: declare, affirm or certify, which imply that your construction firm warrants or guarantees that its work will achieve a level of performance (i.e., LEED standard). Since such claims are nondefensible, every General and Professional Liability policy will contain a standard exclusion for Express Warranties/Guarantees, raising concern over insurability of the contract. In order to reduce your firm s exposure, avoid signing warranties/guarantees in contracts. Instead, have the contract amended to include Rating Satisfaction language that clarifies that your firm will endeavor to design/build to a performance standard. The endeavor to language is less stringent. Adhere to the Timeline Realization of tax credits and satisfactory completion of LEED documentation often contain a milestone or deadline component. As the financial officer, it is your responsibility to ensure that these milestones are incorporated into your firm s overall project plan for example, failure to satisfy application requirements for the Final Credit Certificate prior to its expiration date, such as obtaining a certificate of occupancy, would disqualify the project owner from obtaining the credit. As a result,

5 damage claims against your construction firm for both negligence and breach of contract may be the owner s only recourse to obtain financial compensation for the lost tax credits. Not Your Standard Builder s Risk Policy With green-built projects, there are several components that need to be addressed within the insurance program, and properly identifying those components and the ways the risks can be mitigated is vital. Although every insurance program is unique, the most common components to be addressed in addition to your standard property and casualty coverages include Builder s Risk and Professional Liability coverage. Green construction has created new property exposures that are not adequately covered by a traditional Builder s Risk policy. In general, there are no standard Builder s Risk policies in the marketplace, but there are several green construction enhancements that are becoming more popular and readily available. Some carriers have developed Green Building Coverage endorsements, and other carriers have developed a Green Builder s Risk form. These forms and endorsements include coverage for things such as: the increased cost of removing debris following a loss to a recycling facility instead of a landfill the increased cost to restore indoor air quality following a loss the cost to recertify a building to the level it was prior to a loss the increased cost of having to purchase electricity from the power grid versus the renewable energy source that has been damaged during the course of construction Many of the coverages will be provided with a sublimit of insurance, which may be significantly less than your actual exposure, so it is important that these limits be reviewed carefully.

6 Delay in Completion Coverage Another Green Building Coverage enhancement available in the marketplace is Delay in Completion coverage. This enhancement provides coverage for the loss of net income due to the delay caused by having to recertify a building s green status. This enhancement may also cover the loss of energy- generating income or the surplus power that could have been resold to the power grid during the delay period had a loss not occurred. Professional Liability Coverage Another vital coverage for any contractor who actually designs green systems is Professional Liability coverage. Your standard General Liability policy only provides coverage for Bodily Injury, Property Damage, Personal and Advertising Injury. General Liability policies do not provide coverage for Economic Losses that could arise out of a Green Building not performing how it was designed to perform. For example, if a contractor makes a design modification to the hot water circulating system, resulting in increased utility and operating expenditures, it could lead to an economic loss type claim. A Professional Liability policy does provide coverage for this type of scenario. Builder s Risk and Professional Liability policies are critical components to any sound insurance program for a building contractor. A thorough review of all the terms and conditions of these policies should be performed by your insurance broker prior to beginning construction to ensure that you are appropriately covered. Although these coverages are not unique to Green Construction, there are specific exposures unique to Green Construction that need to be addressed in traditional insurance policies. In addition, consultation with your firm s insurance broker and legal counsel regarding any specialized indemnification and/or satisfaction of insurance requirements is always encouraged to reduce your firm s overall liability exposure. Safety Concerns The stringent LEED credit system offers contractors the guidance they need to

7 produce a sustainable facility, but with those credits also come safety concerns that must be addressed in order to avoid costly insurance claims. Be sure to get your insurance broker and safety consultant involved early in the process. By informing them of the green design elements planned for your project, your firm s safety consultant can provide adequate training, and your firm s broker can supplement your own training and leverage the resources that your insurance company can bring to the table. In particular, there are four (4) loss control considerations that you should discuss with your insurance broker and safety consultant: 1. Site Selection To obtain maximum Site Sustainability credits, project owners often seek out locations that have been declared brownfield sites (abandoned or underused industrial and commercial facilities available for reuse) and also sites with consideration to proximity to mass transportation, population density and accommodations for electric vehicles and bicyclists. The development of brownfields may be complicated by real or perceived environmental contamination. The land is often contaminated by low concentrations of hazardous compounds such as lead, polychlorinated biphenyls (PCBs), mercury, hydrocarbons and asbestos. Additionally, such sites often pose unique pollution exposures created by working near subways, railroads and waterways. Because site selection hazards are almost always present, construction firms need to evaluate the numerous insurance products available in the current marketplace to address environmental liabilities arising from projects constructed on remediated properties. Various forms of coverage can be pursued to insure against existing and unknown pollution conditions as well as pollution conditions arising out of the construction work being performed. Each of these insurance products deserves consideration depending on the specifics of the work and the selected project site.

8 2. Material Reuse Credits are offered for reuse of building materials, which often require some of the materials to be abated of lead paint in the case of reusing steel beams or exposed wooden beams, or stripped of hazardous compounds such as mercury in the case of reused electrical devices. Your insurance broker can advise your firm on best practices and ACGIH & OSHA standards for protecting employees during this phase of construction. 3. Vegetative Roofing Vegetative roofs are an ideal way to maximize LEED credits for reducing heat island effects, utilizing maximum green space and capturing and reusing rain water. However, vegetative roofs also present a unique condition for worker-fall protection during construction. The lack of exposed concrete and steel on a rooftop creates new challenges in providing construction workers with fall-arrest anchor points, as well as falling-object protection for those below. 4. Indoor Air Quality (IAQ) Control During the final phases of construction and just prior to occupancy, the U.S. Green Building Council (USGBC) and Sheet Metal and Air Conditioning Contractors National Association (SMACNA) place minimum expectations for continuous air exchanges. This challenge creates new demands of ventilation during final construction activities, such as painting, drywall and plastering, floor and carpet installation and waterproofing. While such activities may not have posed concern under traditional building conditions, the progressive LEED requirements for ventilation may now present your firm with a new series of occupational health concerns. 5.Trust a Green Team It s true what they say: it s not always greener on the other side. Green-built and LEED-certified projects can have your company seeing red if you don t take the

9 precautions necessary to mitigate risk. While the additional work to satisfy the requirements of a sustainable project may at first be daunting, the ultimate rewards can be considerable. It is vital that the financial officer for the construction firm be actively involved in both the planning and bidding process and in the insurance/safety program. A thorough review of the contract and incorporation of the aforementioned items within your project management system can reduce your liability exposures considerably. And consultation with your insurance broker and legal counsel regarding any specialized indemnification and/or satisfaction of insurance requirements is always encouraged to reduce your overall liability exposure. Brokers who understand the risks associated with green-built construction are better equipped to structure the insurance coverages for these projects. As one example, Builder s Risk policies do not automatically cover some of the unique aspects of a LEED project, such as the loss of earnings from an inability to achieve energy credits or sell off surplus energy due to a loss or the additional soft costs associated with rebuilding to LEED standards. Keeping your broker informed on the extent of these projects will result in a more comprehensive insurance program to address these green-specific exposures. CARL BLOOMFIELD, AAI Producer cbloomfield@grahamco.com The Graham Building Philadelphia, PA, JAMES P. MARQUET Vice President jmarquet@grahamco.com The Graham Building Philadelphia, PA, DAVID S. MERKER, SSMBB, LEED GREEN ASSOCIATE Account Manager dmerker@grahamco.com The Graham Building Philadelphia, PA,

GREY AREAS FOR GREEN CONSTRUCTION

GREY AREAS FOR GREEN CONSTRUCTION STRATEGIC OUTCOMES PRACTICE TECHNICAL ADVISORY BULLETIN December 2009 GREY AREAS FOR GREEN CONSTRUCTION Green certainly is in: 75% of CEOs would build green facilities despite the credit crisis, according

More information

AIA Document A101 TM 2017 Exhibit A

AIA Document A101 TM 2017 Exhibit A AIA Document A101 TM 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of «November» in the year «2017» (In

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01 2.01 GENERAL This section contains general compliance and safety planning information to be used by design professionals and contractors in the design and construction of University facilities. The criteria

More information

L O S S C O N T R O L

L O S S C O N T R O L L O S S C O N T R O L CONTRACTORS' ADVISORY INFORMATION GENERAL AND SUBCONTRACTORS INDEMNITY AND INSURANCE AGREEMENTS INTRODUCTION To meet the needs of many of our Producers or Agents who have developed

More information

Construction Contracting. Agents and Vendors. Contractual Relationships. Agents and Vendors. Agents and Vendors. Outline

Construction Contracting. Agents and Vendors. Contractual Relationships. Agents and Vendors. Agents and Vendors. Outline Construction Contracting Institute for Facilities Management Outline 1. Contractual Relationships 2. Delivery Approaches 3. Bidding & Award Don Guckert The University of Iowa Agents and Vendors Contractual

More information

Subcontractor Qualification Statement

Subcontractor Qualification Statement Subcontractor Qualification Statement Trade: Legal Name of Firm: Address: No. & Street City State Zip Mailing Address: If different from above address E-mail address: Telephone #: Fax #: Website: Type

More information

Document A201 TM 2007 SP

Document A201 TM 2007 SP AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status

More information

9/7/2011. A Greening World. NSPE Code of Ethics for Engineers. The commitment and desire to build green or sustainable projects continues to grow

9/7/2011. A Greening World. NSPE Code of Ethics for Engineers. The commitment and desire to build green or sustainable projects continues to grow A Greening World The commitment and desire to build green or sustainable projects continues to grow National Society of Professional Engineers in its Code of Ethics for Engineer supports sustainable growth

More information

Environmental Risk & Insurance Discussion

Environmental Risk & Insurance Discussion Gallagher Environmental Practice Environmental Risk & Insurance Discussion For Real Estate Developers, Investors, Owners and Managers JULY 2017 Did You Know... Over 80% of Gallagher Real Estate clients

More information

AIA Document A101 TM 2017 Exhibit A

AIA Document A101 TM 2017 Exhibit A AIA Document A101 TM 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of in the year (In words, indicate

More information

City of Anderson Community Development Department 601 South Main Street, SC Phone (864) Fax (864)

City of Anderson Community Development Department 601 South Main Street, SC Phone (864) Fax (864) City of Anderson Community Development Department 601 South Main Street, SC 29624 Phone (864) 231-2223 - Fax (864) 231-7627 Request for Proposal for Cost Estimating for Demolitions NOTICE IS HEREBY GIVEN

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Standard Form of Agreement Between Contractor and Subcontractor GENERAL TERMS AND CONDITIONS ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) these General Terms and Conditions,

More information

INSURANCE SCHEDULE F

INSURANCE SCHEDULE F Trade Contractors, Subcontractors or Sub-Subcontractors INSURANCE SCHEDULE F Class A: Asbestos Removal Asphalt Paving Concrete Construction Managers Cranes Culverts Decking Demolition Deconstruction Earthwork

More information

CONTRACTOR-CONTROLLED INSURANCE PROGRAMS

CONTRACTOR-CONTROLLED INSURANCE PROGRAMS THE ESSENTIAL GUIDE TO CONTRACTOR-CONTROLLED INSURANCE PROGRAMS How general contractors can use CCIPs for savings and safety Contractor-Controlled Insurance Programs Contractor-controlled insurance programs,

More information

Global Property Construction

Global Property Construction Global Property Construction Overview From Ground-Breaking to Sky-Scraping Every stage of a construction project, from planning and design to final inspections and operation, is accompanied by numerous

More information

Green Building: Design and Construction Contract Issues

Green Building: Design and Construction Contract Issues May 8, 2012 Practice Groups: Construction and Engineering Real Estate Investment, Development and Finance Green Building: Design and Construction Contract Issues By Gregory R. Andre Green Buildings feature

More information

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)

More information

REPORT 2014/015 INTERNAL AUDIT DIVISION. Audit of selected guaranteed maximum price contracts in the Office of Capital Master Plan

REPORT 2014/015 INTERNAL AUDIT DIVISION. Audit of selected guaranteed maximum price contracts in the Office of Capital Master Plan INTERNAL AUDIT DIVISION REPORT 2014/015 Audit of selected guaranteed maximum price contracts in the Office of Capital Master Plan Overall results relating to the audit of selected guaranteed maximum price

More information

Managing Risk in Innovative Designs. RLI Design Professionals DPLE 172 April 17, 2019

Managing Risk in Innovative Designs. RLI Design Professionals DPLE 172 April 17, 2019 Managing Risk in Innovative Designs RLI Design Professionals DPLE 172 April 17, 2019 RLI Design Professionals is a Registered Provider with The American Institute of Architects Continuing Education Systems.

More information

SUSTAINABLE DESIGN Legal Implications and Liability Risks for Engineers

SUSTAINABLE DESIGN Legal Implications and Liability Risks for Engineers SUSTAINABLE DESIGN Legal Implications and Liability Risks for Engineers Paul M. Mannix, Esquire Wayman, Irvin & McAuley SUSTAINABLE DESIGN Leadership in Energy and Environmental Design (LEED) Green Globes

More information

MCGOUGH STANDARD INSURANCE REQUIREMENTS

MCGOUGH STANDARD INSURANCE REQUIREMENTS MCGOUGH STANDARD INSURANCE REQUIREMENTS B1. Insurance. Prior to commencing any Subcontract Work hereunder, the Subcontractor shall procure, maintain and pay for insurance of the type and with the minimum

More information

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i INSURANCE AND INDEMNIFICATION MANUAL Supplement to Policy 560 Table of Contents.1 INTRODUCTION... 1.2 EXHIBIT I INSURANCE AND INDEMNITY REQUIREMENTS FOR CONSTRUCTION AND SERVICE CONTRACTS... 1 2.1 INDEMNIFICATION/HOLD

More information

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018 SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018 The cornerstone of a successful contractual risk transfer program is a consistent approach to Subcontractor Insurance Compliance. Structuring the Subcontractor

More information

Liability Issues Arising from LEED/Sustainable Services. Kerry Gosse NLAA, CAHP,MRAIC

Liability Issues Arising from LEED/Sustainable Services. Kerry Gosse NLAA, CAHP,MRAIC Liability Issues Arising from LEED/Sustainable Services Kerry Gosse NLAA, CAHP,MRAIC LEED Requirements Design Phase Application Meeting Prerequisites Applying Standards Missing Points Designer Contractor

More information

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS CONTENTS I. Scope II. Review of Contract Documents III. Responsible Business Practices IV. Schedules and Time of Completion V. Plans, Specifications,

More information

VALUE FOR MONEY ASSESSMENT TORONTO SOUTH DETENTION CENTRE M AK I N G P R O J E C T S H AP P EN: TORONTO SOUTH DETENTION CENTRE - P AG E 1 -

VALUE FOR MONEY ASSESSMENT TORONTO SOUTH DETENTION CENTRE M AK I N G P R O J E C T S H AP P EN: TORONTO SOUTH DETENTION CENTRE - P AG E 1 - VALUE FOR MONEY ASSESSMENT TORONTO SOUTH DETENTION CENTRE - P AG E 1 - - P AG E 2 - - P AG E 3 - - P AG E 4 - - P AG E 5 - ARTIST S RENDERING OF THE TORONTO SOUTH DETENTION CENTRE Image Courtesy of Integrated

More information

PROFESSIONAL LIABILITY UPDATE

PROFESSIONAL LIABILITY UPDATE PROFESSIONAL LIABILITY UPDATE A Loss Prevention Newsletter for the Design Profession MSP PL 11/01: OCIPS: How Much Protection Do They Provide for a Design Professional? November, 2001 Owner-Controlled

More information

REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS

REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS Contact: Sarah Merriman Town Clerk/Select Board Assistant Town of Middlesex 5 Church Street Middlesex,

More information

Contractor Health and Safety Code of Practice. Updated June 4, 2018

Contractor Health and Safety Code of Practice. Updated June 4, 2018 Contractor Health and Safety Code of Practice 2018 Updated June 4, 2018 Updated June 4, 2018 TABLE OF CONTENTS A. DEFINITIONS...3 B. PURPOSE...7 C. STRATEGIC ALIGNMENT...7 D. REGULATORY CONSIDERATIONS...7

More information

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE 1. DEFINITIONS 1 2. COMPOSITION OF THE ARCHITECT-ENGINEER 1 3. INDEPENDENT CONTRACTOR 1 4. RESPONSIBILITY OF THE ARCHETECT-ENGINEER

More information

Aon Risk Solutions THE USE OF CONTRACTUAL INDEMNITY AND ENVIRONMENTAL INSURANCE TO INCREASE CERTAINTY IN CONTAMINATED PROPERTY TRANSACTIONS

Aon Risk Solutions THE USE OF CONTRACTUAL INDEMNITY AND ENVIRONMENTAL INSURANCE TO INCREASE CERTAINTY IN CONTAMINATED PROPERTY TRANSACTIONS Aon Risk Solutions THE USE OF CONTRACTUAL INDEMNITY AND ENVIRONMENTAL INSURANCE TO INCREASE CERTAINTY IN CONTAMINATED PROPERTY TRANSACTIONS Table of Contents Introduction... 1 Overarching Environmental

More information

EXHIBIT B. Insurance Requirements for Construction Contracts

EXHIBIT B. Insurance Requirements for Construction Contracts EXHIBIT B Insurance Requirements for Construction Contracts Contractor shall procure and maintain for the duration of the contract, and for 3 years thereafter, insurance against claims for injuries to

More information

ProNetwork News. Risk Management Tools for the Design Professional. Insurance coverage on construction projects. December 2017 Vol. VII No.

ProNetwork News. Risk Management Tools for the Design Professional. Insurance coverage on construction projects. December 2017 Vol. VII No. December 2017 Vol. VII No. 6 Eric A. Moore, CIC, LIC Moore Insurance Services, Inc. emoore@mooreinsuranceservices.com www.mooreinsuranceservices.com (517) 439-9345 Bricker & Eckler LLP Bricker & Eckler

More information

Great American Environmental Insider

Great American Environmental Insider Great American Environmental Insider Greetings! I am excited to introduce you to our newly developed publication, Environmental Insider. Environmental Insider is a quarterly newsletter that features interesting

More information

ENVIRONMENTAL INSURANCE: INSURANCE AS A MEANS OF TRANSFERRING RISKS IN ENVIRONMENTAL LIABILITY TRANSFERS

ENVIRONMENTAL INSURANCE: INSURANCE AS A MEANS OF TRANSFERRING RISKS IN ENVIRONMENTAL LIABILITY TRANSFERS ENVIRONMENTAL INSURANCE: INSURANCE AS A MEANS OF TRANSFERRING RISKS IN ENVIRONMENTAL LIABILITY TRANSFERS Tanya C. O Neill Foley Lardner LLP Milwaukee, Wisconsin This article is the third in a trilogy of

More information

ROOFING CONTRACTOR QUESTIONNAIRE Ed. 9-09

ROOFING CONTRACTOR QUESTIONNAIRE Ed. 9-09 ROOFING CONTRACTOR QUESTIONNAIRE Ed. 9-09 Applicant Name: Mailing Address: Location: Web Address: Agent s Name: Address: Proposed Effective Date: From: To: 12:01 A.M. Standard Time at the address of the

More information

RICE UNIVERSITY SHORT FORM CONTRACT

RICE UNIVERSITY SHORT FORM CONTRACT RICE UNIVERSITY SHORT FORM CONTRACT This Rice University Short Form Contract (this Contract ) is entered into by and between WILLIAM MARSH RICE UNIVERSITY, a Texas non-profit corporation (the University

More information

DISTRESSING ASSETS: LENDERS AND ENVIRONMENTALLY-IMPACTED COLLATERAL. By: John Slavich

DISTRESSING ASSETS: LENDERS AND ENVIRONMENTALLY-IMPACTED COLLATERAL. By: John Slavich DISTRESSING ASSETS: LENDERS AND ENVIRONMENTALLY-IMPACTED COLLATERAL By: John Slavich This article will focus on the complicating issues that arise for lenders when property held as collateral is, or is

More information

ENVIRONMENTAL INSURANCE AN OVERVIEW AUGUST 2017

ENVIRONMENTAL INSURANCE AN OVERVIEW AUGUST 2017 ENVIRONMENTAL INSURANCE AN OVERVIEW AUGUST 2017 Insurance 101 The Stats 14% The Stats >50% Historical Review History of the Environmental Movement and Cornerstone Regulations that lead to Environmental

More information

Risk, Insurance and Green Buildings

Risk, Insurance and Green Buildings Risk, Insurance and Green Buildings Surplus Line Association of California May 2018 COURSE OBJECTIVES Learn about and understand the following: What is a green building What is a sustainable business Green

More information

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016 CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco Contract No. 2784 Pier 23 Roof Repair ADDENDUM No. 1 Issued: December 16, 2016 The following clarifications, changes, additions or deletions are incorporated

More information

Where Builders Risk Meets Personal Lines

Where Builders Risk Meets Personal Lines Where Builders Risk Meets Personal Lines Presenter Introduction Mary Stiglic, CIC, Marketing Manager More than 18 years experience with builders risk Licensed property and casualty agent Holds CIC designation

More information

17501 East 17th Street, Suite 100 Tustin, CA (714) Fax: (714)

17501 East 17th Street, Suite 100 Tustin, CA (714) Fax: (714) Real Estate Advisor MARCH APRIL 2017 REIT this way New landscape for real estate investment trusts (REITs) What kind of insurance does the project need? Consider alternative financial metrics NOI doesn

More information

How To Minimize the Environmental Liability of Construction Contractors

How To Minimize the Environmental Liability of Construction Contractors Page 1 of 13 How To Minimize the Environmental Liability of Construction Contractors The Practical Real Estate Lawyer, Vol. 8, No. 3, May 1992, by Robert A. Rubin and John E. Osborn Legislation, Regulation

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

BLUEPRINT CONSTRUCTION: A MARKET DEFINED BY CHANGE, COMPETITION, COLLATERAL AND CONTRACTS CONSTRUCTION PRACTICE

BLUEPRINT CONSTRUCTION: A MARKET DEFINED BY CHANGE, COMPETITION, COLLATERAL AND CONTRACTS CONSTRUCTION PRACTICE CONSTRUCTION PRACTICE BLUEPRINT May 2010 www.willis.com CONSTRUCTION: A MARKET DEFINED BY CHANGE, COMPETITION, COLLATERAL AND CONTRACTS The insurance industry continues to compete for construction business

More information

REAL ESTATE INSURANCE

REAL ESTATE INSURANCE REAL ESTATE INSURANCE REAL ESTATE TESTED, INSURANCE APPROVED Real estate comes in all shapes and sizes. So does risk. At Conner Strong & Buckelew our professionals know the real estate industry from top

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE

More information

The Ten Commandments of Design Professionals. Contracts (Vol.1) By Matthew C. Ryan. December 2018 Volume 8 / Issue 4.

The Ten Commandments of Design Professionals. Contracts (Vol.1) By Matthew C. Ryan. December 2018 Volume 8 / Issue 4. BluePrint For Design Professionals The Ten Commandments of Design Professionals Contracts (Vol.1) By Matthew C. Ryan The last two-plus decades have seen a massive rise in the importance of contracts in

More information

STRATEGIC DECISION CRITERIA ANALYSIS FOR BROWNFIELDS REDEVELOPMENT. Coleman, Andrew J.¹ Marimpietri, Tony², and Osmond, Glenn 3

STRATEGIC DECISION CRITERIA ANALYSIS FOR BROWNFIELDS REDEVELOPMENT. Coleman, Andrew J.¹ Marimpietri, Tony², and Osmond, Glenn 3 STRATEGIC DECISION CRITERIA ANALYSIS FOR BROWNFIELDS REDEVELOPMENT Coleman, Andrew J.¹ Marimpietri, Tony², and Osmond, Glenn 3 ¹Electric Power Research Institute, 3420 Hillview Avenue, Palo Alto, CA 94304

More information

Insurance Issues in Commercial Leasing Albert L. Sica, Esq.

Insurance Issues in Commercial Leasing Albert L. Sica, Esq. Insurance Issues in Commercial Leasing by Albert L. Sica, Esq. The ALS Group Edison, New Jersey 177 178 Insurance Issues in Commercial Leasing Presented by: Albert L. Sica Managing Principal The ALS Group

More information

CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services)

CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services) CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services) This AGREEMENT is made and entered into this day of in the year 20 ( EFFECTIVE DATE ), between the Los Alamitos

More information

2010 INSURANCE MANUAL

2010 INSURANCE MANUAL 2010 INSURANCE MANUAL All required insurance shall be in a form, amount, content and written by companies acceptable to the Georgia Department of Community Affairs (DCA). For identification purposes, all

More information

I SIGNED THAT? SCARY STORIES & SOLUTIONS

I SIGNED THAT? SCARY STORIES & SOLUTIONS I SIGNED THAT? SCARY STORIES & SOLUTIONS Contract Clauses and Practices That Impact Your Insurance Costs and Bottom Line Geoffrey S. Gavett Gavett, Datt & Barish, P.C. Presented by Chesapeake Region Safety

More information

ENVIRONMENTAL, SOCIAL AND GOVERNANCE POLICY

ENVIRONMENTAL, SOCIAL AND GOVERNANCE POLICY ENVIRONMENTAL, SOCIAL AND GOVERNANCE POLICY MidOcean believes that environmental, social, and governance ( ESG ) considerations in its business decisions are essential to creating value for its shareholders

More information

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) this Agreement; (2) the prime Contract, consisting of the Agreement between the Owner and Contractor and the other Contract

More information

Mold Remediation and Clean Up of Central High School

Mold Remediation and Clean Up of Central High School GOOCHLAND COUNTY REQUEST FOR QUOTATION Mold Remediation and Clean Up of Central High School FROM: Goochland County Parks, Recreation & Facilities P.O. Box 10, 1800 Sandy Hook Road Goochland, VA 23063 Phone

More information

Environmental, Safety & Toxic Torts. Practice Overview

Environmental, Safety & Toxic Torts. Practice Overview Environmental, Safety & Toxic Torts Practice Overview Environmental, Safety & Toxic Torts Businesses today are confronted with a complex web of environmental and safety concerns, ranging from contaminated

More information

AIA, The Next Decade: Key Revisions in the 2017 Suite of Contracts Lawrence M. Dudek and Jeffrey R. Appelbaum

AIA, The Next Decade: Key Revisions in the 2017 Suite of Contracts Lawrence M. Dudek and Jeffrey R. Appelbaum AIA, The Next Decade: Key Revisions in the 2017 Suite of Contracts Lawrence M. Dudek and Jeffrey R. Appelbaum The American Institute of Architects ( AIA ) Documents Committee has produced form construction

More information

University of Maine System Supplementary Requirements to AIA Document B Standard Form of Agreement Between Owner and Architect

University of Maine System Supplementary Requirements to AIA Document B Standard Form of Agreement Between Owner and Architect APPENDIX A University of Maine System Supplementary Requirements to AIA Document B102 2007 Standard Form of Agreement Between Owner and Architect NOTE: B102 2007 AS MODIFIED WITH UNIVERSITY OF MAINE SYSTEM

More information

Presenting a live 90-minute webinar with interactive Q&A. Today s faculty features:

Presenting a live 90-minute webinar with interactive Q&A. Today s faculty features: Presenting a live 90-minute webinar with interactive Q&A Structuring Environmental Site Access Agreements: Avoiding Costly Pitfalls Drafting and Negotiating Scope of Work, Duration, Insurance and Other

More information

INVITATION TO BID ROOF REPLACEMENT PROJECT CENTRAL ELEMENTARY SCHOOL 750 TOMLINSON AVENUE MOUNDSVILLE, WV 26041

INVITATION TO BID ROOF REPLACEMENT PROJECT CENTRAL ELEMENTARY SCHOOL 750 TOMLINSON AVENUE MOUNDSVILLE, WV 26041 INVITATION TO BID ROOF REPLACEMENT PROJECT CENTRAL ELEMENTARY SCHOOL 750 TOMLINSON AVENUE MOUNDSVILLE, WV 26041 1 APRIL 5, 2017 TABLE OF CONTENTS Introduction.3 1.0 General..4 2.0 Scope of Work..5 3.0

More information

Project & Construction Management (PCM) Manage project goals, costs, decisions, and risks right from Day 1

Project & Construction Management (PCM) Manage project goals, costs, decisions, and risks right from Day 1 (PCM) Manage project goals, costs, decisions, and risks right from Day 1 plan early and confirm often DEFINE GOALS PREPARE A PLAN MEASURE RESULTS (PCM) proven results Plan early and continuously monitor

More information

COMMERCIAL RESTORATION HELPING CLIENTS IN THEIR TIME OF NEED

COMMERCIAL RESTORATION HELPING CLIENTS IN THEIR TIME OF NEED COMMERCIAL RESTORATION HELPING CLIENTS IN THEIR TIME OF NEED WWW.COUSINORESTORATION.COM Emergency Response Planning SPECIALIZED IN COMMERCIAL PROPERTY We will work alongside you to create an Emergency

More information

Construction of the Leased Premises

Construction of the Leased Premises Construction of the Leased Premises Pre-Construction Requirements Construction Start The Tenant is required to commence construction no later than fourteen days after receipt by the Tenant of approved

More information

RISK MANAGEMENT ANNUAL REPORT

RISK MANAGEMENT ANNUAL REPORT RISK MANAGEMENT ANNUAL REPORT AUGUST 2016 FISCAL YEAR ENDED JUNE 30, 2016 MISSION AND VISION Risk Management s mission is to be a resource for the MCCCD Governing Board and employees and to assist them

More information

June 10, Lake Street Parking Structure Evaluation Carl Walker, Inc. Proposal #N Dear Mr. Altenburg,

June 10, Lake Street Parking Structure Evaluation Carl Walker, Inc. Proposal #N Dear Mr. Altenburg, Mr. Tod Altenburg Chief School Business Official 201 North Scoville Avenue Oak Park, Illinois 60302 Re: Carl Walker, Inc. Proposal #N1-16-115 Dear Mr. Altenburg, Carl Walker is pleased to submit this proposal

More information

HOME REMODELING CONTRACT

HOME REMODELING CONTRACT HOME REMODELING CONTRACT TIME AND MATERIALS In consideration of the mutual covenants and obligations, this Home Remodeling Contract (the Contract ) is made as of the date set forth below, by and among

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) THE ARCHITECT: (Name, legal

More information

PROJECT DOCUMENTATION AND CONSTRUCTION DEFECT CLAIMS

PROJECT DOCUMENTATION AND CONSTRUCTION DEFECT CLAIMS Workshop W2 Wednesday, November 20 9:00 10:15 a.m. and 10:45 a.m.-noon PROJECT DOCUMENTATION AND CONSTRUCTION DEFECT CLAIMS Presented by Michael Koppang Director Construction Claims Travelers Insurance

More information

Insurance Requirements. The Bidder shall be required to procure, at its sole cost and expense, all insurance required by this Attachment.

Insurance Requirements. The Bidder shall be required to procure, at its sole cost and expense, all insurance required by this Attachment. GROUP 31503 BITUMINOUS CONCRETE HOT MIX ASPHALT VPP PAGE 1 of 7 Insurance Requirements The Bidder shall be required to procure, at its sole cost and expense, all insurance required by this Attachment.

More information

The Sustainability Edge in Real Estate Investing

The Sustainability Edge in Real Estate Investing The Sustainability Edge in Real Estate Investing Commercial real estate can have a significant impact on the environment and an increasing number of real estate industry professionals are incorporating

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR GREEN INFRASTRUCTURE PLAN

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR GREEN INFRASTRUCTURE PLAN REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR GREEN INFRASTRUCTURE PLAN CITY OF SAN MATEO, CALIFORNIA PUBLIC WORKS DEPARTMENT 330W. 20 TH AVENUE SAN MATEO, CA 94403 The City of San Mateo hereby requests

More information

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address) Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University

More information

C O N S T RU C T I N G YO U R S E RV I C E T E A M

C O N S T RU C T I N G YO U R S E RV I C E T E A M CONSTRUCTION INSURANCE & SURETY B ONDS B U I LT F O R C O N S T R U C T I O N At Conner Strong, we know construction; it s that simple. After all, we ve been leaders in the field for many years and our

More information

Principal risks and uncertainties

Principal risks and uncertainties Principal risks and uncertainties Strategic report Principal risks are a risk or a combination of risks that, given the Group s current position, could seriously affect the performance, future prospects

More information

New York Project Specific Application For Insurance

New York Project Specific Application For Insurance New York Project Specific Application For Insurance 1. Named Insured(s): 2. Name of Principal(s): 3. 4. Project Name: 5. Project Address: 6. Project Start Date: Project Completion Date: 7. Project Website:

More information

Railroad DOT Mitigation Strategies (R16) Master Project Agreement

Railroad DOT Mitigation Strategies (R16) Master Project Agreement Railroad DOT Mitigation Strategies (R16) Master Project Agreement The master project agreement includes standard legal provisions that are common to nearly all projects and incorporates them into one overall

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: for: (Name and location or address) Work for The University of Tennessee Section 00 72 13 2017 THE OWNER:

More information

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3

More information

What is Your Acceptable Level of Workers Compensation Risk?

What is Your Acceptable Level of Workers Compensation Risk? October 2013 A PMA Companies Thought Leadership Publication What is Your Acceptable Level of Workers Compensation Risk? Knowing this answer and targeting your loss prevention program around it can transform

More information

Document A Exhibit A Insurance and Bonds

Document A Exhibit A Insurance and Bonds Document A101 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of in the year (In words, indicate day, month

More information

PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS

PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS The individual or entity seeking to enter into a contract with the Philadelphia Redevelopment Authority or who is entering into a contract with

More information

Supplementary General Conditions to Contract General Conditions for Design-Bid-Build Minor Projects TYPE Contract MIN RENUMBER

Supplementary General Conditions to Contract General Conditions for Design-Bid-Build Minor Projects TYPE Contract MIN RENUMBER Supplementary General Conditions to Contract General Conditions for Design-Bid-Build Minor Projects TYPE Contract MIN 15-800 RENUMBER 1. Article 2.01, Contractor s License; delete and replace with the

More information

Preventing Skyrocketing Environmental Liabilities

Preventing Skyrocketing Environmental Liabilities Preventing Skyrocketing Environmental Liabilities Presented by: Ernie Salas Western Regional Manager, ACE Environmental Risk ACI-NA Insurance & Risk Management Conference January 11, 2007 Las Vegas, Nevada

More information

Environmental Pollution and Casualty Exposures

Environmental Pollution and Casualty Exposures Environmental Pollution and Casualty Exposures CAS-6956-032718 Environmental Pollution and Casualty Exposures ABOUT EnviroPACE SM is intentionally designed to provide enhanced CGL coverage combined with

More information

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,

More information

Debbie Sines Crockett CHEFFY PASSIDOMO ATTORNEYS AT LAW Tampa & Naples, Florida

Debbie Sines Crockett CHEFFY PASSIDOMO ATTORNEYS AT LAW Tampa & Naples, Florida 2017 Risk Management Conference Airport Council International North America Friday, January 13, 2017 Debbie Sines Crockett DSCrockett@NaplesLaw.com CHEFFY PASSIDOMO ATTORNEYS AT LAW Tampa & Naples, Florida

More information

Dear Subcontractor, Please find enclosed the following items for your review and acceptance:

Dear Subcontractor, Please find enclosed the following items for your review and acceptance: Dear Subcontractor, Savant Construction is in the process of updating our current data base of subcontractors. Our goal is to verify that all subcontractors providing bids have the ability to meet all

More information

Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION

Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION Applicants Instructions: Answer all questions. If the answer to any question is NONE, please state NONE. Application must be signed and

More information

PROGRAMMED MAINTENANCE Planned Maintenance Program

PROGRAMMED MAINTENANCE Planned Maintenance Program PROGRAMMED MAINTENANCE Planned Maintenance Program Proposal Number: H-62-ALLS PM Prepared for: Allstate Insurance 4699 Salem Ave. Dayton, OH 45416 Prepared by: Acme Industrial Mechanical, Inc 9823 Main

More information

City of Spartanburg Procurement and Property Division Post Office Drawer 1749, SC P (864) F (864)

City of Spartanburg Procurement and Property Division Post Office Drawer 1749, SC P (864) F (864) City of Spartanburg Procurement and Property Division Post Office Drawer 1749, SC 29304-1749 P (864)-596-2049 F (864) 596-2365 Legal Notice Request Proposal for Removal of Asbestos Materials October 30,

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Document A401 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN the Contractor: (Name, legal

More information

Guidance for Provision 11 Insurance, closure plan, and financial responsibility

Guidance for Provision 11 Insurance, closure plan, and financial responsibility Guidance for Provision 11 Insurance, closure plan, and financial responsibility This addendum replaces all previous guidance for Provision 11, including that in the full R2-2013 Guidance document that

More information

Real Property Services Questions and Answers Posted to DASNY.org 2/21/19

Real Property Services Questions and Answers Posted to DASNY.org 2/21/19 1. The RFP does not include the insurance provisions mentioned as an attachment. Could you direct me to where I can find the insurance provisions so that our risk management department can review? Please

More information

LIABILITY AND INSURANCE IN A FARM LEASE. Liability and Insurance in a Farm Lease

LIABILITY AND INSURANCE IN A FARM LEASE. Liability and Insurance in a Farm Lease Liability and Insurance in a Farm Lease i Liability and Insurance in a Farm Lease A Guide for Landowners and Tenants Mike Ghia, Land for Good Thanks to Carl Wyman of Wyman Insurance Agency, Weathersfield,

More information

2011 AGM SHAREHOLDERS QUESTIONS & COMMENTS

2011 AGM SHAREHOLDERS QUESTIONS & COMMENTS IAG encouraged shareholders to ask questions of, or make comments to, the board and management in advance of the 2011 Annual General Meeting (AGM), via a form included with the 2011 Notice of Meeting.

More information

AGREEMENT FOR CONSTRUCTION PROJECT MANAGEMENT SERVICES

AGREEMENT FOR CONSTRUCTION PROJECT MANAGEMENT SERVICES AGREEMENT FOR CONSTRUCTION PROJECT MANAGEMENT SERVICES THIS AGREEMENT is made by and between the School District, a political subdivision of the State of California ("DISTRICT"), and, a California corporation,

More information

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents:

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: A101-2017: Standard Form of Agreement Between Owner and Contractor where

More information