ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1

Size: px
Start display at page:

Download "ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1"

Transcription

1 ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1 ADDENDUM NO. 1 APRIL 4, 2019 The following items shall take precedence over referenced to counterparts in the specifications, contract drawings and any other documents in conflict herewith. Item No. 1 REFER to the Specifications and Contract Documents, Wage Rate Determination General Determination. Include the attached General Decision No. LA190004, dated 1/18/2019. This decision supersedes any other federal wage decision regarding this project. Please consider it when preparing your bid. Item No. 2 Item No. 3 Item No. 4 Received by: Signed: Company: The attached minutes of the mandatory Pre-bid Meeting Minutes are hereby included in this addendum. REFER to the Specifications and Contract Documents, Supplemental Geotechnical Engineering Analyses, p. 3. Note that the geotechnical recommendations states that The temporary earthen cofferdam should be constructed using the same material and compaction recommendations given in our referenced report. For clarification, this means that all material used in constructing the temporary earthen cofferdam must be select borrow from off site the same material as specified for construction of the levee repairs. The only difference is that for the cofferdam, the pay items are lump sum for construction and lump sum for removal, with some unit price items for spoil material spread on site and spoil material hauled to LDEQ approved landfill (see notes on plans). REFER to the Specifications and Contract Documents, Louisiana Uniform Public Work Bid Form. DELETE the Bid Form and SUBSTITUTE the attached, revised Bid Form. Note that the units and quantity for Item 21, Spoil Material Hauled to LDEQ Approved Landfill, have changed. Units will be ton (Contractor will furnish tickets from the official scales used to weigh the trucks). Dated: FAX THIS SIGNED PAGE TO DOMINGUE, SZABO & ASSOCIATES, INC. AT ; OR RESPOND TO ACKNOWLEDGING RECEIPT OF ADDENDUM End of Addendum No. 1 ABCD END OF ADDENDUM NO Addendum No. 1

2 1 of 5 4/1/2019, 9:35 AM General Decision Number: LA /18/2019 LA4 Superseded General Decision Number: LA State: Louisiana Construction Type: Heavy Counties: Allen, Assumption, Avoyelles, Beauregard, Bienville, Caldwell, Cameron, Catahoula, Claiborne, Concordia, De Soto, East Carroll, East Feliciana, Evangeline, Franklin, Grant, Iberia, Iberville, Jackson, Jefferson Davis, La Salle, Lincoln, Madison, Morehouse, Natchitoches, Pointe Coupee, Red River, Richland, Sabine, St Helena, St Mary, Tangipahoa, Tensas, Union, Vermilion, Vernon, Washington, West Carroll, West Feliciana and Winn Counties in Louisiana. HEAVY CONSTRUCTION PROJECTS (includes water wells, water & sewer lines, and flood control; excludes elevated storage tanks) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at Modification Number Publication Date 0 01/04/ /18/2019 ELEC /03/2018 ASSUMPTION AND ST. MARY (Northeast of Atchafalaya River) PARISHES Rates Fringes ELECTRICIAN...$ ELEC /04/2017 BIENVILLE, CLAIBORNE, DE SOTO, NATCHITOCHES (Northeast of the

3 2 of 5 4/1/2019, 9:35 AM Red River), and RED RIVER PARISHES Rates Fringes ELECTRICIAN Lineman and Heavy Equipment Operator...$ ELEC /01/2018 CALDWELL, EAST CARROLL, FRANKLIN, JACKSON, LINCOLN, MADISON, MOREHOUSE, RICHLAND, TENSAS, UNION, and WEST CARROLL PARISHES Rates Fringes ELECTRICIAN...$ % ELEC /01/2018 AVOYELLES, CATAHOULA, CONCORDIA, EVANGELINE, GRANT, LA SALLE, NATCHITOCHES (Southwest of Red River), SABINE, VERNON, AND WINN PARISHES Rates Fringes ELECTRICIAN...$ %+7.65 ELEC /01/2018 ALLEN, BEAUREGARD, CAMERON, IBERIA, JEFFERSON DAVIS, ST. MARY (Southwest of Atchafalaya River), AND VERMILION PARISHES Rates Fringes ELECTRICIAN...$ * ELEC /31/2018 EAST FELICIANA, IBERVILLE, POINTE COUPEE, ST. HELENA, AND WEST FELICIANA PARISHES Rates Fringes ELECTRICIAN...$ ELEC /29/2018 TANGIPAHOA and WASHINGTON PARISHES Rates Fringes ELECTRICIAN...$ %+8.93 SULA /19/2004 Rates Fringes CARPENTER (including formsetting/formbuilding)...$

4 3 of 5 4/1/2019, 9:35 AM Laborers: Common...$ Pipelayer...$ PIPEFITTER (excluding pipelaying)...$ Power equipment operators: Backhoe/Excavator...$ Boring Machine...$ Bulldozer...$ Crane...$ Dragline...$ Front End Loader...$ Mechanic...$ Trackhoe...$ Tractor...$ Water Well Driller...$ Truck drivers: Dump...$ Water...$ WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

5 4 of 5 4/1/2019, 9:35 AM Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM /01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers indicates the local union number or district council number where applicable, i.e., Plumbers Local The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA /13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH /29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/cba rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be:

6 5 of 5 4/1/2019, 9:35 AM * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC ) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC ) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION

7 PRE-BID MEETING Minutes Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1 The meeting was convened at 2:00 p.m. on Wednesday March 27, 2019, at City Hall, 457 E. Main Street, Room 300, New Iberia, Louisiana. The following were discussed: 1. A Sign in Sheet was available and the list of attendees is attached to these minutes. 2. Minutes of this Pre-bid meeting will be sent to attendees, plan holders, and a copy will be attached to the forthcoming addendum which will also be available at the City s online electronic bidding site. 3. Owner: The Owner is the City of New Iberia and Iberia Parish Sewerage District No. 1 o Vince Palumbo (Wastewater Director for City of New Iberia) o Anita Boudreaux (Executive Director for IPSD #1) [not present] o Barry Segura (representing IPSD #1 o Mayor Freddie DeCourt (Mayor of the City of New Iberia) [present for part of the meeting] 4. Engineers: Domingue, Szabo & Associates, Inc. o George G. Glaubrecht general construction administration o Beau Desormeaux general construction administration o Bill Allain Electrical Engineer [not present] o Shaun Simon Eustis Engineering (geotechnical engineers) [not present] 5. Bid Date: Sealed bids will be received by the City of New Iberia, Louisiana, at City Hall, 457 E. Main Street, Room 300, New Iberia, Louisiana until 2:00 pm on Wednesday, April 10, Contract Time: 365 Calendar Days from Notice to Proceed (Section 00500). Liquidated Damages $1,260 per calendar day (Article 31, Section 00700). Contract provides for additional days if days lost are in excess of anticipated lost days listed in the contract. 7. Scope of work - The work consists of the earthwork repair of existing equalization pond embankments, temporary cofferdams, piping modifications, access roadway work, dewatering, pumping, electrical modifications, and associated work. 8. Engineer s Estimate for Construction - $3,595, Prior Approval of Products: Prior approval must be requested a minimum of seven (7) working days prior to bid opening in accordance with Louisiana Revised Statutes 38:2295. Hard copies of all information is required (Fax submittals are not acceptable; pdf by is acceptable but engineer not Page 1 of 4 S:\ \ \ Pre-bid Meeting Minutes.docx

8 responsible for not receiving spam filters, etc.). Each submittal must show specific model numbers, options, and features, which clearly establish full compliance with the project specifications (and drawings as applicable). All such requests are logged, filed, and responded to either by inclusion in a prior approval addendum or rejection and response explaining the rejection. 10. Access to Site and Site Security: Coordinate with City of New Iberia and/or IPSD #1. In general, access to the site will be via Cotton St. for construction equipment. 11. Staging/Storage: Coordinate with City of New Iberia and/or IPSD #1 12. Permits The Contractor is responsible for obtaining all necessary permits to construct the project. Vince Palumbo will check on whether Iberia Parish will require any permits from the Parish. An item regarding this will be included in the addendum if necessary. 13. Addendum Items to be issued before 2 pm April 5, Wage rate determination will be included in the addendum. 15. Contractors must review and follow all requirements in the specifications relative to MBE/WBE participation. Discussion of project: 1. Access Cotton St. 2. Limitations on traffic notes on plans regarding restriction of construction equipment and construction traffic 3. Dewatering and maintenance of dewatering was discussed. Contractor will have to provide dewatering of his own in addition to use of the Owner s pump station. Use of Owner s pump station will have to be coordinated with Owner. {Once cofferdam is built, Contractor is responsible for dewatering his work area and coordinating such work with the Owner. Initial dewatering will be by Owner to the extent that their pump station can dewater the basin. Further dewatering to allow for the planned construction will be the responsibility of the Contractor; e.g., there may be puddles of water that cannot get to the pump station after most of the water is removed.} 4. Scheduling and maintenance of WWTP plant operations was discussed. Contractor will be restricted as to pumping water back into the WWTP based on capability of the WWTP to treat flow without failing treatment limits. 5. Deposition of sludge at landfill was discussed see notes on plans. Special licenses are required for the haulers and material must go to approved landfill for this specific material. 6. Engineer said that contractors must pay attention to measurement and payment clauses in the contract. For example, material hauled to landfill is paid for by cubic yard truck measure, but contractors must include all costs associated with this item removal, dewatering, testing, hauling, tipping fees at landfill, etc. 7. No burning or disposal of tree removal on site will be permitted. 8. Location for on site spoil deposition was discussed and is shown on plans. Page 2 of 4 S:\ \ \ Pre-bid Meeting Minutes.docx

9 9. Gas pipelines were discussed. Permits from the gas line companies will be required and all pertinent requirements of those permits must be included in the bids. The ownership of the pipelines should be confirmed with Louisiana One Call since the names shown on the plans were the owners at some time, but ownership may have changed in recent times. 10. Electrical and Aerators and Lighting were discussed. A question was asked as to re-use of existing materials and what would happen if they were already damaged. Engineer said that pre-existing condition should be documented by Contractors and any observed potential problems brought to Engineer s attention prior to re-installation (to avoid disputes after the fact and/or change orders regarding whether items were previously in bad condition or whether the damage was caused by the contractor during this project). All old conduit, wire, etc. to be removed, replaced with new materials. 11. A question was asked regarding whether electrical conduit runs could be bored or would they have to be trenched. Engineer said the method was not specified, but either would be acceptable. If trenching is used, proper compaction will be enforced. 12. Coordination with geotechnical consultants will be required during construction (for establishing the limits of excavation, reconstruction, traffic restrictions, etc.). 13. Once cofferdam is constructed, it will not be available for use for construction traffic. 14. In general, Contractors cannot use the repaired levees for construction traffic. Contractors will have to make temporary construction roads, ramps, and other means of avoiding use of repaired levees for construction traffic, since there is concern for making the existing levee deterioration even worse with such traffic. 15. Monthly progress meetings will be held and weather and working day reports will be reviewed and agreed upon on a monthly basis. 16. Payments will be made by the City of N.I. and they will be reimbursed by IPSD #1 in accordance with their intergovernmental agreement. 17. Contractors asked whether Builder s Risk Insurance was required. Per the General Conditions, Article 6, Builder s Risk Insurance is required. Engineers checked with the City s agent (Brown & Brown) prior to issuance of specifications and were instructed by the City to keep the requirement for this insurance for this project. 18. There was some discussion regarding the temporary sheeting item. Engineer stated that it was anticipated that some sheeting as such might be required in the vicinity of the existing pump station in order to assist in protecting that structure during the construction required under this contract. 19. The bench construction dimensions shown on the plan were discussed. There is some flexibility and, subject to concurrence of the geotechnical engineers, modifications that will produce the same final results will be considered and allowed. Page 3 of 4 S:\ \ \ Pre-bid Meeting Minutes.docx

10 20. A contractor questioned whether the concrete was reinforced. Engineer stated that the concrete pads under the valves in the basin were plain concrete but Contractors should check specifications to see if fibers or other such reinforcing were required. 21. A contractor asked if the posts, valves, etc. were to remain permanently. Engineer responded that most improvements are permanent. The cofferdam will be required to be removed as will temporary sheeting. 22. The articulating block mat used to protect the cofferdam during construction will be removed when the cofferdam is removed and re-used on a part of the basin slopes. This is included in the contract. 23. {The Owner will have to coordinate site security and access to the fenced area of the plant with the contractor}. 24. Once the meeting was adjourned, several contractors, the Owner s representatives, and the Engineers visited the site of the project. 25. On site a question was asked as to whether the Contractor could use available electricity. Engineer replied that Contractor would have to make arrangements with the utility and have his own meter (pay his own electrical utility costs). These minutes are a general summary of topics discussed at the subject meeting. Comments in brackets {}were not necessarily discussed in the meeting, but were added to these minutes for information. Any comments, requested revisions, or omissions should be brought to the attention of George G. Glaubrecht with Domingue, Szabo & Associates, Inc., and should be submitted in writing. Revised minutes will be issued if significant revisions or additions are required. Minutes of the Pre-Bid meeting will be sent to official plan holders and attendees who signed the sign in sheet at the meeting. The meeting ended around 3:00 p.m. Sincerely, DOMINGUE, SZABO & ASSOCIATES, INC. ^ George G. Glaubrecht, P.E. Enclosures Page 4 of 4 S:\ \ \ Pre-bid Meeting Minutes.docx

11

12

13 TETE BAYOU WWTP EQUALIZATION BASIN LEVEE REPAIRS (2019) For the CITY OF NEW IBERIA & IBERIA PARISH SEWERAGE DISTRICT NO. 1 TO: REVISED LOUISIANA UNIFORM PUBLIC WORK BID FORM City of New Iberia, LA City Hall 457 E. Main Street New Iberia, LA (Owner to provide name and address of owner) BID FOR: Tete Bayou WWTP Equalization Basin Levee Repairs (2019) (Owner to provide name of project and other identifying information) The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Domingue, Szabo & Associates, Inc. and dated: January, 2019 (Owner to provide name of entity preparing bidding documents.) Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the Designer has assigned to each of the addenda that the Bidder is acknowledging). TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated Base Bid * but not alternates) the sum of: Dollars ($ ) ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description. Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of: N/A Dollars ($ ) Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of: N/A Dollars ($ ) Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of: N/A Dollars ($ ) NAME OF BIDDER: ADDRESS OF BIDDER: LOUISIANA CONTRACTOR S LICENSE NUMBER: NAME OF AUTHORIZED SIGNATORY OF BIDDER: TITLE OF AUTHORIZED SIGNATORY OF BIDDER: SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **: DATE: ADDENDUM No. 1

14 * The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed. ** If someone other than a corporate officer signs for the Bidder/Contractor, a copy of a corporate resolution or other signature authorization shall be required for submission of bid. Failure to include a copy of the appropriate signature authorization, if required, may result in the rejection of the bid unless bidder has complied with La. R.S. 38:2212(A)(1)(c) or RS 38:2212(O). BID SECURITY in the form of a bid bond, certified check or cashier s check as prescribed by LA RS 38:2218.A is attached to and made a part of this bid. ADDENDUM No. 1

15 TO: City of New Iberia, LA City Hall 457 E. Main Street New Iberia, LA (Owner to provide name and address of owner) REVISED LOUISIANA UNIFORM PUBLIC WORK BID FORM UNIT PRICE FORM BID FOR: Tete Bayou WWTP Equalization Basin Levee Repairs (2019) (Owner to provide name of project and other identifying information) UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures. DESCRIPTION: þ Base Bid or q Alt.# Mobilization and General Conditions 1 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Preservation and Restoration of Private Property 2 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Clearing 3 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Compacted Aggregate (no. 610 limestone), per ton Ton DESCRIPTION: þ Base Bid or q Alt.# Limestone for Maintenance (no. 610 limestone) 5 50 Ton DESCRIPTION: þ Base Bid or q Alt.# Limestone for Stability Berm (no. 57) 6 5,800 Ton DESCRIPTION: þ Base Bid or q Alt.# Geotextile Fabric 7 50,189 Square Yard ADDENDUM No. 1

16 DESCRIPTION: þ Base Bid or q Alt.# Excavation 8 24,000 Cubic Yard DESCRIPTION: þ Base Bid or q Alt.# Embankment for Levee Reconstruction 9 40,000 Cubic Yard DESCRIPTION: þ Base Bid or q Alt.# Hydroseeding 10 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Temporary Signs and Barricades 11 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Formed Concrete 12 6 Cubic Yard DESCRIPTION: þ Base Bid or q Alt.# Unformed Concrete 13 5 Cubic Yard DESCRIPTION: þ Base Bid or q Alt.# Fill-Crete 14 5 Cubic Yard DESCRIPTION: þ Base Bid or q Alt.# Temporary Cofferdam Installation 15 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Temporary Cofferdam Removal 16 1 Lump Sum ADDENDUM No. 1

17 DESCRIPTION: þ Base Bid or q Alt.# Outfall Extension Piping, Valves, Fittings & Appurtenances (Installed) 17 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Removal and Replacement of Aerators, Electrical Panels, Poles, Conduit, & Wiring 18 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Temporary Support, Modifications, Reconstruction at Basin Outfall Pump Station 19 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Spoil Material Spread on Site 20 35,000 Cubic Yard DESCRIPTION: þ Base Bid or q Alt.# Spoil Material Hauled to LDEQ Approved Landfill 21 9,860 Tons DESCRIPTION: þ Base Bid or q Alt.# Erosion Control Measures 22 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Grade & Shape Earthen Access Drive & Ditches 23 1 Lump Sum DESCRIPTION: þ Base Bid or q Alt.# Rip Rap 24 1 Lump Sum ADDENDUM No. 1

18 DESCRIPTION: þ Base Bid or q Alt.# Temporary Sheeting 25 5,000 Square Foot Wording for DESCRIPTION is to be provided by the Owner. All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner ADDENDUM No. 1

19 BID BOND FOR TETE BAYOU WWTP EQUALIZATION BASIN LEVEE REPAIRS (2019) Date: KNOW ALL MEN BY THESE PRESENTS: That of, as Principal, and, as Surety, are held and firmly bound unto the City of New Iberia, Louisiana (Obligee), in the full and just sum of five (5%) percent of the total amount of this bid, including all alternates, lawful money of the United States, for payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally firmly by these presents. Surety represents that it is listed on the current U. S. Department of the Treasury Financial Management Service list of approved bonding companies as approved for an amount equal to or greater that the amount for which it obligates itself in this instrument or that it is a Louisiana domiciled insurance company with at least an A - rating in the latest printing of the A. M. Best's Key Rating Guide. If surety qualifies by virtue of its Best's listing, the Bond amount may not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide. Surety further represents that it is licensed to do business in the State of Louisiana and that this Bond is signed by surety's agent or attorney-in-fact. This Bid Bond is accompanied by appropriate power of attorney. THE CONDITION OF THIS OBLIGATION IS SUCH that, whereas said Principal is herewith submitting its proposal to the Obligee on a Contract for: TETE BAYOU WWTP EQUALIZATION BASIN LEVEE REPAIRS (2019) NOW, THEREFORE, if the said Contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing and give a good and sufficient bond to secure the performance of the terms and conditions of the Contract with surety acceptable to the Obligee, then this obligation shall be void; otherwise this obligation shall become due and payable. PRINCIPAL (BIDDER) SURETY BY: AUTHORIZED OFFICER-OWNER-PARTNER BY: AGENT OR ATTORNEY-IN-FACT(SEAL) ADDENDUM No. 1

Alabama State Port Authority. Description

Alabama State Port Authority. Description Project Name Location Alabama State Port Authority Addendum to Specification Booklet Automotive RO/RO Terminal Site Demolition Package Mobile, AL Project # 10615 TASK # 2 Addendum #3 Date: January 7, 2019

More information

Construction Types: Heavy (Heavy and Sewer and Water Line) HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Construction Types: Heavy (Heavy and Sewer and Water Line) HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines) General Decision Number: VA170046 01/06/2017 VA46 Superseded General Decision Number: VA20160046 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) County: Franklin County in Virginia.

More information

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King George, Lancaster, Middlesex,

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King George, Lancaster, Middlesex, General Decision Number: VA180023 01/05/2018 VA23 Superseded General Decision Number: VA20170023 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King

More information

Solicitation FA441718R0003 Attachment 3

Solicitation FA441718R0003 Attachment 3 Solicitation FA441718R0003 Attachment 3 General Decision Number: FL180262 01/12/2018 FL262 Superseded General Decision Number: FL20170262 State: Florida Construction Type: Building County: Okaloosa County

More information

ATTACHMENT E INSURANCE REQUIREMENTS

ATTACHMENT E INSURANCE REQUIREMENTS ATTACHMENT E INSURANCE REQUIREMENTS Professional Liability LHA and its affiliates must be named as an Additional Insured and be a Certificate Holder. This is required for vendors who render observational

More information

https://www.wdol.gov/wdol/scafiles/davisbacon/fl263.dvb?v=0

https://www.wdol.gov/wdol/scafiles/davisbacon/fl263.dvb?v=0 Page 1 of 6 General Decision Number: FL180263 01/05/2018 FL263 Superseded General Decision Number: FL20170263 State: Florida Construction Type: Building County: Orange County in Florida. BUILDING CONSTRUCTION

More information

DOCUMENT 00050 GENERAL 1.1 Introduction. Pursuant to Government Code Chapter 2267, subchapter D the City of Conroe hereby solicits Competitive Sealed Bids for approximately 12,000 linear feet of clearing

More information

LOUISIANA UNIFORM PUBLIC WORK BID FORM

LOUISIANA UNIFORM PUBLIC WORK BID FORM LOUISIANA UNIFORM PUBLIC WORK BID FORM TO: Jefferson Parish Sheriff s Office 1233 Westbank Expressway, Room 411 Harvey, LA 70058 (Owner to provide name and address of owner) BID FOR: (Owner to provide

More information

DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1

DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1 DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1 General Decision Number: GA160129 02/26/2016 GA129 Superseded General Decision Number: GA20150129 State: Georgia Construction Type: Building County:

More information

San Juan County, New Mexico

San Juan County, New Mexico San Juan County, New Mexico General Decision Number: NM170015 02/24/2017 NM15 Superseded General Decision Number: NM20160015 State: New Mexico Construction Type: Heavy County: San Juan County in New Mexico.

More information

Prevailing Wage Rates (No Fringes)

Prevailing Wage Rates (No Fringes) Prevailing Wage (No Fringes) General Decision Number: TX150302 07/31/2015 TX302 Superseded General Decision Number: TX20140302 State: Texas Construction Type: Building County: Hardin County in Texas. BUILDING

More information

wage determination 2018 General Decision Number: PA /07/2018 PA33 Superseded General Decision Number: PA State: Pennsylvania

wage determination 2018 General Decision Number: PA /07/2018 PA33 Superseded General Decision Number: PA State: Pennsylvania General Decision Number: PA180033 09/07/2018 PA33 Superseded General Decision Number: PA20170033 State: Pennsylvania Construction Type: Residential County: Allegheny County in Pennsylvania. RESIDENTIAL

More information

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington, Clarke, Culpeper,

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington, Clarke, Culpeper, General Decision Number: VA180035 06/15/2018 VA35 Superseded General Decision Number: VA20170035 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington,

More information

Winnebago County Housing Authority

Winnebago County Housing Authority Oshkosh/Winnebago County Housing Authority Cumberland Court Housing Commission P.O. BOX 397, OSHKOSH, WI 54903-0397 OSHKOSH: (920) 424-1450 FAX: (920) 424-1474 June 1, 2016 County REQUEST FOR PROPOSAL:

More information

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2 TABLE OF CONTENTS General Requirements Total Pages Table of Contents 3 List of Drawings 1 Procurement Requirements Advertisement for Bids 2 Instruction for Procurement Instructions to Bidders 8 Procurement

More information

Invitation to Bid Hogan House Historic Painting Project

Invitation to Bid Hogan House Historic Painting Project Invitation to Bid Hogan House Historic Painting Project This project is funded with Community Development Block Grant (CDBG) funds. All estimates must reflect Davis-Bacon prevailing wages. This invitation

More information

SECTION DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES

SECTION DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES September 2015 Heritage Point Apartments SECTION 000009 DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES NOTE: Project shall be constructed using the Davis Bacon Residential Prevailing Wage Rate for Luzern

More information

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $ 2018 Annual Water Distribution Leak Repairs Contract, Package 1 SAWS Job Nos. 18-0103 (O&M) and 18-1401 (CIP) Solicitation No. B-18-001-JG BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting

More information

2018 Pipelines Water and Sewer Construction Contract Pkg I

2018 Pipelines Water and Sewer Construction Contract Pkg I INVITATION FOR BID 2018 Pipelines Water and Sewer Construction Contract Pkg I Solicitation No.: CO-00157 Addendum 2 January 30, 2018 MODIFICATIONS TO THE SPECIFICATIONS 1. Bid Proposal, Page BP-1 is deleted

More information

A. Project Name: Water System Automated Meter Reading Program. B. Owner: City of Florence Alabama Water & Wastewater Department

A. Project Name: Water System Automated Meter Reading Program. B. Owner: City of Florence Alabama Water & Wastewater Department DOCUMENT 00 91 13 ADDENDUM 1 1.1 PROJECT INFORMATION A. Project Name: Water System Automated Meter Reading Program B. Owner: City of Florence Alabama Water & Wastewater Department C. Project Number: FL-1330

More information

Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501

Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501 ADDENDUM No. 3 PROJECT Pierre WWTF Improvements Project - 2017 BID DATE Time 1:30 PM, CST July 24, 2017 BID LOCATION Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501 ISSUE

More information

LOUISIANA TAX COMMISSION APPRAISALS OF PUBLIC SERVICE COMPANIES

LOUISIANA TAX COMMISSION APPRAISALS OF PUBLIC SERVICE COMPANIES LOUISIANA TAX COMMISSION APPRAISALS OF PUBLIC SERVICE COMPANIES REPORT SUPPLEMENT PERFORMANCE AUDIT SERVICES ISSUED NOVEMBER 16, 2017 LOUISIANA LEGISLATIVE AUDITOR 1600 NORTH THIRD STREET POST OFFICE BOX

More information

Mortgage Delinquency and Foreclosure Trends Louisiana Third Quarter 2010

Mortgage Delinquency and Foreclosure Trends Louisiana Third Quarter 2010 Mortgage Delinquency and Foreclosure Trends Louisiana Third Quarter 2010 This report for Louisiana is part of the Mortgage Delinquency and Foreclosure Trends series, released quarterly, which provides

More information

LOUISIANA UNIFORM PUBLIC WORK BID FORM

LOUISIANA UNIFORM PUBLIC WORK BID FORM LOUISIANA UNIFORM PUBLIC WORK BID FORM TO: St. John the Baptist Parish 1801 West Airline Hwy. Laplace, Louisiana 70068 (Owner to provide name and address of owner) BID FOR: St. John the Baptist Parish

More information

Program Recommendation

Program Recommendation Program Recommendation Congressional Appropriation Initial Allocation Administration Expenses Amount $ 437,800,000.00 $ (21,890,000.00) Assumption and Description Amount of funding HUD has appropriated

More information

The Economic Impact of Travel on Louisiana Parishes 2006

The Economic Impact of Travel on Louisiana Parishes 2006 The Economic Impact of Travel on Louisiana Parishes 2006 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the Travel Industry Association Washington, D.C. August 2007

More information

General Decision Number: CO /26/2013 CO13. Superseded General Decision Number: CO State: Colorado. Construction Type: Heavy

General Decision Number: CO /26/2013 CO13. Superseded General Decision Number: CO State: Colorado. Construction Type: Heavy General Decision Number: CO130013 07/26/2013 CO13 Superseded General Decision Number: CO20120013 State: Colorado Construction Type: Heavy Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear

More information

Delete Davis Bacon Wage Decision TX dated 9/25/2009. Add Davis Bacon Wage Decision TX dated 3/12/2010 (attached)

Delete Davis Bacon Wage Decision TX dated 9/25/2009. Add Davis Bacon Wage Decision TX dated 3/12/2010 (attached) 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM #1 To: 1003-910-13-3138 RFP for Modernization of Elevators at Various Locations Delete Davis Bacon Wage Decision

More information

Prepare + Prevent + Respond + Recover + Mitigate APPLICANT BRIEFING. Recovery_PPT_v7_2-15_4p 1

Prepare + Prevent + Respond + Recover + Mitigate APPLICANT BRIEFING. Recovery_PPT_v7_2-15_4p 1 Recovery_PPT_v7_2-15_4p 1 FEMA-4263-DR Louisiana Severe Storms and Flooding Disaster Declaration Deadline for all Parishes: May 20, 2016 Recovery_PPT_v7_2-15_4p 2 Declared Parishes- Damage must have occurred

More information

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM JUNE 30, 2017

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM JUNE 30, 2017 EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM DISTRICT ATTORNEYS RETIREMENT SYSTEM TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR'S REPORT... 1 3 EMPLOYER SCHEDULES: Schedule of Allocations...

More information

Louisiana adds jobs over the year for eighth month in a row

Louisiana adds jobs over the year for eighth month in a row 1001 North 23 rd Street Post Office Box 94094 Baton Rouge, LA 70804-9094 Office of Public Affairs (O) 225-342-3035 (F) 225-342-3743 www.laworks.net John Bel Edwards, Governor Ava Dejoie, Executive Director

More information

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM JUNE 30, 2016

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM JUNE 30, 2016 EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM DISTRICT ATTORNEYS RETIREMENT SYSTEM TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR'S REPORT... 1 3 EMPLOYER SCHEDULES: Schedule of Allocations...

More information

EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2016

EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2016 EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2016 PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA TABLE OF CONTENTS DECEMBER 31, 2016

More information

EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2015

EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2015 EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2015 PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA TABLE OF CONTENTS DECEMBER 31, 2015

More information

The Economic Impact of Travel on Louisiana Parishes 2005

The Economic Impact of Travel on Louisiana Parishes 2005 The Economic Impact of Travel on Louisiana Parishes 2005 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the Travel Industry Association Washington, D.C. October 2006

More information

The Economic Impact of Travel on Louisiana Parishes 2004

The Economic Impact of Travel on Louisiana Parishes 2004 The Economic Impact of Travel on Louisiana Parishes 2004 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the Travel Industry Association of America Washington, D.C. August

More information

The Economic Impact of Travel on Louisiana Parishes 2008

The Economic Impact of Travel on Louisiana Parishes 2008 The Economic Impact of Travel on Louisiana Parishes 2008 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the U.S. Travel Association Washington, D.C. October 2009 Preface

More information

Louisiana Assessors Retirement Fund and Subsidiary Employer Pension Report Baton Rouge, Louisiana September 30, 2018

Louisiana Assessors Retirement Fund and Subsidiary Employer Pension Report Baton Rouge, Louisiana September 30, 2018 Louisiana Assessors Retirement Fund and Subsidiary Employer Pension Report Baton Rouge, Louisiana Table of Contents Independent Auditor s Report Page 3 Employer Schedules Schedule of Employer Allocations

More information

NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC

NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION,

More information

THIS IS NOT AN ORDER REQUEST

THIS IS NOT AN ORDER REQUEST HOUSING AUTHORITY OF NEW ORLEANS PROCUREMENT AND CONTRACTS DEPARTMENT REQUEST FOR QUOTES FOR REMEDIATION AND DEMOLITION OF 3013 AND 3015 MANDEVILLE STREET 4100 TOURO STREET NEW ORLEANS, LA 70122 PHONE:

More information

Request for Proposal for the Installation of 90 Smoke Detectors at Michaels J. Day Apartments For the Watervliet Housing Authority

Request for Proposal for the Installation of 90 Smoke Detectors at Michaels J. Day Apartments For the Watervliet Housing Authority Sandra J. Beston Chairwoman Charles A. Jeseo Vice Chairman Harry J. Cushing Jeffery Czarnecki Jane Hayes Roberta Gilson Regina Warner Watervliet Housing Authority Administration Office 2400 Second Avenue

More information

Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: KTHD Congregate Fire Rehab, 502 Charley Ave.

Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: KTHD Congregate Fire Rehab, 502 Charley Ave. Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: 18-03-KTHD Congregate Fire Rehab, 502 Charley Ave. Chiloquin Oregon A. General Information: The Klamath Tribes Housing Department

More information

The City of Johnson City, Mayor Dawn Capra (date) November 17, 2016

The City of Johnson City, Mayor Dawn Capra (date) November 17, 2016 ADVERTISEMENT AND INVITATION FOR BIDS City of Johnson City Skateboard Park Texas Parks and Wildlife Department (TPWD) Small Community Skateboard Park Project # 54-000160 The City of Johnson City will receive

More information

The Economic Impact of Travel on Louisiana Parishes 2003

The Economic Impact of Travel on Louisiana Parishes 2003 The Economic Impact of Travel on Louisiana Parishes 2003 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the Travel Industry Association of America Washington, D.C. July

More information

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029 SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the

More information

CONTRACT DOCUMENTS, SPECIFICATIONS AND CONTRACT DRAWINGS FOR WBV 14c.2 LEVEE LIFT PRIOR TO ARMORING PROJECT NO

CONTRACT DOCUMENTS, SPECIFICATIONS AND CONTRACT DRAWINGS FOR WBV 14c.2 LEVEE LIFT PRIOR TO ARMORING PROJECT NO CONTRACT DOCUMENTS, SPECIFICATIONS AND CONTRACT DRAWINGS FOR WBV 14c.2 LEVEE LIFT PRIOR TO ARMORING PROJECT NO. 2018-284 ADDENDUM NO.1 DATE ISSUED: April 26 th, 2018 BID DATE: May 7 th, 2018 at 2:00 P.M.

More information

The Economic Impact of Travel on Louisiana Parishes 2002

The Economic Impact of Travel on Louisiana Parishes 2002 The Economic Impact of Travel on Louisiana Parishes 2002 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the Travel Industry Association of America Washington, D.C. January

More information

EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2013

EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA DECEMBER 31, 2013 EMPLOYER PENSION REPORT PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA BATON ROUGE, LOUISIANA PAROCHIAL EMPLOYEES RETIREMENT SYSTEM OF LOUISIANA TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR'S REPORT...

More information

STATE OF LOUISIANA CRIME VICTIMS REPARATIONS BOARD ANNUAL REPORT FISCAL YEAR 2009

STATE OF LOUISIANA CRIME VICTIMS REPARATIONS BOARD ANNUAL REPORT FISCAL YEAR 2009 STATE OF LOUISIANA CRIME VICTIMS REPARATIONS BOARD ANNUAL REPORT FISCAL YEAR 2009 (STATE EMBLEM) LOUISIANA COMMISSION ON LAW ENFORCEMENT 1885 WOODDALE BOULEVARD, SUITE 1230 BATON ROUGE, LOUISIANA 70806

More information

PROJECT NAME: SCC - Cherokee Campus Sidewalk Improvements. Table of Contents SE-310, Invitation for Construction Services...

PROJECT NAME: SCC - Cherokee Campus Sidewalk Improvements. Table of Contents SE-310, Invitation for Construction Services... TABLE OF CONTENTS 2016 Edition PROJECT NAME: SCC - Cherokee Campus - 2017 Sidewalk Improvements PROJECT NUMBER: H59-D891-01-A SECTION NUMBER OF PAGES Table of Contents... 1 SE-310, Invitation for Construction

More information

LITCHFIELD MUNICIPAL AIRPORT LITCHFIELD, ILLINOIS. Request for Bids and Specifications Sealcoating and Painting Runway 18/36 and Associated Taxiways

LITCHFIELD MUNICIPAL AIRPORT LITCHFIELD, ILLINOIS. Request for Bids and Specifications Sealcoating and Painting Runway 18/36 and Associated Taxiways LITCHFIELD MUNICIPAL AIRPORT LITCHFIELD, ILLINOIS Request for Bids and Specifications Sealcoating and Painting Runway 18/36 and Associated Taxiways Description: The Litchfield Airport Authority is accepting

More information

LOUISIANA SCHOOL EMPLOYEES RETIREMENT SYSTEM A COMPONENT UNIT OF THE STATE OF LOUISIANA

LOUISIANA SCHOOL EMPLOYEES RETIREMENT SYSTEM A COMPONENT UNIT OF THE STATE OF LOUISIANA LOUISIANA SCHOOL EMPLOYEES RETIREMENT SYSTEM A COMPONENT UNIT OF THE STATE OF LOUISIANA EMPLOYER PENSION REPORT FOR THE YEAR ENDED JUNE 30, 2017 ISSUED JANUARY 31, 2018 LOUISIANA LEGISLATIVE AUDITOR 1600

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

Payment shall be made based on the tonnage charge set forth in CONTRACTOR'S proposal.

Payment shall be made based on the tonnage charge set forth in CONTRACTOR'S proposal. Construction and Demolition Debris Disposal Addendum 1 October 16, 2018 Modify Part I, Instructions to Bidders, Section 9.00 Delete the following;: Payment shall be made based on the tonnage charge set

More information

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM JUNE 30, 2013

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM JUNE 30, 2013 EMPLOYER PENSION REPORT DISTRICT ATTORNEYS RETIREMENT SYSTEM DISTRICT ATTORNEYS RETIREMENT SYSTEM TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR'S REPORT... 1 3 EMPLOYER SCHEDULES: Schedule of Employer Allocations...

More information

TELEPHONE COMPANY AD VALOREM TAX CREDIT STATE OF LOUISIANA

TELEPHONE COMPANY AD VALOREM TAX CREDIT STATE OF LOUISIANA TELEPHONE COMPANY AD VALOREM TAX CREDIT STATE OF LOUISIANA PERFORMANCE AUDIT SERVICES ISSUED APRIL 26, 2017 LOUISIANA LEGISLATIVE AUDITOR 1600 NORTH THIRD STREET POST OFFICE BOX 94397 BATON ROUGE, LOUISIANA

More information

In This Issue. h p:// 2 Economic Comparison. 3-4 NSA State & Area Employment. 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment

In This Issue. h p://  2 Economic Comparison. 3-4 NSA State & Area Employment. 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment h p://www.laworks.net In This Issue 2 Economic Comparison 3-4 NSA State & Area Employment 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment 16 17 Unemployment Rates & Civilian Labor Force 18 Average Hours

More information

Specifications and Bid Forms for. Riprap at Bridge Berm Structure # rd Street, Yankton South Dakota, Yankton County,

Specifications and Bid Forms for. Riprap at Bridge Berm Structure # rd Street, Yankton South Dakota, Yankton County, Specifications and Bid Forms for Riprap at Bridge Berm Structure #68-134-120 44138 303 rd Street, Yankton South Dakota, Yankton County, 57078 For Yankton County Highway Department 3302 W City Limits Road

More information

Costly and Unusual: an analysis of Louisiana s Industrial Tax Exemption Program (ITEP) June togetherla.com

Costly and Unusual: an analysis of Louisiana s Industrial Tax Exemption Program (ITEP) June togetherla.com June 2016 togetherla.com Costly and Unusual: an analysis of Louisiana s Industrial Tax Exemption Program (ITEP) Appendix A: Breakdown of costs to parishes, school districts & other local bodies. Appendix

More information

LAFAYETTE, LOUISIANA, AS SHOWN ON THESE SPECIFICATIONS...

LAFAYETTE, LOUISIANA, AS SHOWN ON THESE SPECIFICATIONS... DEPARTMENT: Physical Plant/Campus REQUISITION NO. M FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, SUPERVISION, PERMITS, ETC. NECESSARY TO, LOCATED ON THE CAMPUS OF THE UNIVERSITY OF LOUISIANA

More information

Regular Plan, Plan A, & Plan B. What s inside...

Regular Plan, Plan A, & Plan B. What s inside... Member Handbook Regular Plan, Plan A, & Plan B What s inside... How does my TRSL retirement plan work? 2 What will my monthly benefit be? 4 What is service credit? 4 What is final average compensation?

More information

In This Issue. h p://www.laworks.net. 2 Economic Comparison. 3-4 NSA State & Area Employment. 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment

In This Issue. h p://www.laworks.net. 2 Economic Comparison. 3-4 NSA State & Area Employment. 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment h p://www.laworks.net In This Issue 2 Economic Comparison 3-4 NSA State & Area Employment 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment 16 17 Unemployment Rates & Civilian Labor Force 18 Average Hours

More information

In This Issue. h p:// United States Louisiana. Seasonally Adjusted. 2 Economic Comparison. 3-4 NSA State & Area Employment

In This Issue. h p://  United States Louisiana. Seasonally Adjusted. 2 Economic Comparison. 3-4 NSA State & Area Employment h p://www.laworks.net In This Issue 2 Economic Comparison 3-4 NSA State & Area Employment 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment 16 17 Unemployment Rates & Civilian Labor Force 18 Average Hours

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF DECEMBER 2016 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF DECEMBER 2016 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF DECEMBER 2016 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF NOVEMBER 2016 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF NOVEMBER 2016 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF NOVEMBER 2016 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF JUNE 2016 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF JUNE 2016 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF JUNE 2016 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF FEBRUARY 2015 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF FEBRUARY 2015 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF FEBRUARY 2015 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL

More information

In This Issue. h p://www.laworks.net. 2 Economic Comparison. 3-4 NSA State & Area Employment. 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment

In This Issue. h p://www.laworks.net. 2 Economic Comparison. 3-4 NSA State & Area Employment. 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment h p://www.laworks.net In This Issue 2 Economic Comparison 3-4 NSA State & Area Employment 5 8 Data Trends (Graphs) 9 15 Nonfarm Employment 16 17 Unemployment Rates & Civilian Labor Force 18 Average Hours

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF MARCH 2018 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF MARCH 2018 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF MARCH 2018 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL STATE 503,532 (5,532)

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF MAY 2018 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF MAY 2018 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF MAY 2018 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL STATE

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF FEBRUARY 2018 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF FEBRUARY 2018 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF FEBRUARY 2018 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL

More information

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF JULY 2018 GROSS INSUFFICIENT NET TAX REVENUE

LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF JULY 2018 GROSS INSUFFICIENT NET TAX REVENUE LOUISIANA DEPARTMENT OF REVENUE FINANCIAL SERVICES DIVISION NET RECEIPTS REPORT FOR THE MONTH OF JULY 2018 GROSS INSUFFICIENT NET TAX REVENUE COLLECTIONS REFUNDS PAYMENTS COLLECTIONS AUTOMOBILE RENTAL

More information

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER]

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER] NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS [SEPTIC to SEWER] Jewish Family Services (JFS) is seeking sealed bids for the project scope located at their address of 2100 Lee

More information

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS' RETIREMENT SYSTEM WNE30, 2017

EMPLOYER PENSION REPORT DISTRICT ATTORNEYS' RETIREMENT SYSTEM WNE30, 2017 EMPLOYER PENSION REPORT WNE30, 2017 TABLE OF CONTENTS WNE30, 2017 INDEPENDENT AUDITOR'S REPORT... 1-3 EMPLOYER SCHEDULES: Schedule of Allocations.... Schedule of Pension Amounts by.... Notes to Schedules....

More information

The Economic Impact of Travel on Louisiana Parishes 2001

The Economic Impact of Travel on Louisiana Parishes 2001 The Economic Impact of Travel on Louisiana Parishes 2001 A Study Prepared for the Louisiana Office of Tourism by the Research Department of the Travel Industry Association of America Washington, D.C. June

More information

.z:> By: Dan Tadic, P.E. Acting Public Works Director

.z:> By: Dan Tadic, P.E. Acting Public Works Director REQUEST FOR PROPOSALS SUPPLY OF HEAVY EQUIPMENT & OPERA TORS The City and Borough of Sitka will receive sealed proposals no later than 2:00:00 p.m. local time, Thursday, May 24, 2018 at the office of Public

More information

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER]

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER] NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS [SEPTIC to SEWER] Jewish Family Services (JFS) is seeking sealed bids for the project scope located at their address of 2100 Lee

More information

LOUISIANA EMPLOYMENT AND WAGES October 2002

LOUISIANA EMPLOYMENT AND WAGES October 2002 LOUISIANA EMPLOYMENT AND WAGES 2001 M.J. Mike Foster, Jr. Governor Dawn Romero Watson, Secretary Louisiana Department of Labor Raj Jindal, Assistant Secretary of Labor Office of Occupational Information

More information

THE RESTORE LOUISIANA HOMEOWNER ASSISTANCE PROGRAM

THE RESTORE LOUISIANA HOMEOWNER ASSISTANCE PROGRAM THE RESTORE LOUISIANA HOMEOWNER ASSISTANCE PROGRAM PROGRAM MANUAL June 5, 2017 LOUISIANA OFFICE OF COMMUNITY DEVELOPMENT DISASTER RECOVERY UNIT Table of Contents 1. Definitions... 1 2. Program Description

More information

WITHDRAWN BEFORE MEETING

WITHDRAWN BEFORE MEETING 1. Call to order and roll call. FINAL AGENDA STATE BOND COMMISSION MEETING OF MAY 18, 2017 8:00 A.M. - SENATE COMMITTEE ROOM E STATE CAPITOL BUILDING 2. Approval of the minutes of the May 3, 2017 meeting.

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

PROPOSAL PACKAGE INFORMATION SHEET

PROPOSAL PACKAGE INFORMATION SHEET PROPOSAL PACKAGE INFORMATION SHEET SPECIFICATION NO. 1328W LAS PALMAS WATER PIPELINE INSTALL PROJECT NOTICE TO BIDDERS: The attached Proposal Package, when completed by you and returned to this District,

More information

TABLE OF CONTENTS. TABLE OF CONTENTS... 2 to 5. INVITATION TO BID... 6 to 7 INFORMATION AVAILABLE TO BIDDERS..8. INSTRUCTIONS TO BIDDERS...

TABLE OF CONTENTS. TABLE OF CONTENTS... 2 to 5. INVITATION TO BID... 6 to 7 INFORMATION AVAILABLE TO BIDDERS..8. INSTRUCTIONS TO BIDDERS... TABLE OF CONTENTS TABLE OF CONTENTS... 2 to 5 INVITATION TO BID... 6 to 7 INFORMATION AVAILABLE TO BIDDERS..8 INSTRUCTIONS TO BIDDERS... 9 to 16 SECTION I. BIDDING AND CONTRACT DOCUMENTS REQUIRED OF ALL

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Covington Point Lift Station Improvements CCE PROJECT NO. 812-100(C) February 21, 2013 PREPARED BY: CITY OF COVINGTON 317 NORTH JEFFERSON AVENUE COVINGTON, LOUISIANA 70433 I. REQUEST

More information

PROJECT MANUAL BID FORMS. Taxiways P and P7 Drainage Improvements CONTRACT NO Issued for Bid August 25, 2014

PROJECT MANUAL BID FORMS. Taxiways P and P7 Drainage Improvements CONTRACT NO Issued for Bid August 25, 2014 PROJECT MANUAL Taxiways P and P7 Drainage Improvements CONTRACT NO. 201416594 BID FORMS Issued for Bid August 25, 2014 CITY & COUNTY OF DENVER DEPARTMENT OF AVIATION DENVER INTERNATIONAL AIRPORT BID FORMS

More information

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT Amended 6/09 APPLICABILITY: These procedures will apply where an individual desires to install or abandon a temporary monitoring

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

County of Grande Prairie No. 1 INSTRUCTIONS TO TENDERERS TENDER # La Glace Wastewater Lagoon Berm Removal and Repair

County of Grande Prairie No. 1 INSTRUCTIONS TO TENDERERS TENDER # La Glace Wastewater Lagoon Berm Removal and Repair INSTRUCTIONS TO TENDERERS TENDER # 638956 La Glace Wastewater Lagoon Berm Removal and Repair Prepared for: County of Grande Prairie No.1 Prepared by: SNC-Lavalin Inc. (SNC-Lavalin) Grande Prairie, Alberta

More information

Request for Fee Proposals (RFFP) Progressive Design-Build Services. New High School

Request for Fee Proposals (RFFP) Progressive Design-Build Services. New High School Request for Fee Proposals (RFFP) Progressive Design-Build Services New High School Issaquah School District February 12, 2018 TABLE OF CONTENTS 1. INTRODUCTION 2. PROJECT OVERVIEW 3. APPLICATION OF FEE

More information

(SECCRA) SECCRA COMMUNITY LANDFILL LONDON GROVE TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

(SECCRA) SECCRA COMMUNITY LANDFILL LONDON GROVE TOWNSHIP CHESTER COUNTY, PENNSYLVANIA SOUTHEASTERN CHESTER COUNTY REFUSE AUTHORITY (SECCRA) SECCRA COMMUNITY LANDFILL LONDON GROVE TOWNSHIP CHESTER COUNTY, PENNSYLVANIA BID SPECIFICATION PURCHASE OF REFURBISHED CATERPILLAR 826H LANDFILL COMPACTOR

More information

LONE TREE SCHOOL FLOORING REPLACEMENT

LONE TREE SCHOOL FLOORING REPLACEMENT WHEATLAND SCHOOL DISTRICT REQUEST FOR PROPOSAL LONE TREE SCHOOL FLOORING REPLACEMENT PROPOSAL DUE DATE: May 12, 2011 1:30 p.m. 1 The WHEATLAND SCHOOL DISTRICT wishes to replace flooring at its Lone Tree

More information

Importing Returns Louisiana Import File Structure

Importing Returns Louisiana Import File Structure Importing Returns Louisiana Import File Structure Importing your return is an alternative to manually selecting returns and entering data. Use the instructions below to create a comma-separated (*.csv

More information

GP-4-1 of 9 GP-4 SCOPE OF WORK

GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4 SCOPE OF WORK GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4.01 CONTRACT INTENT The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections,

More information

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project County of El Paso Purchasing Department 500 East San Antonio, Room 500 El Paso, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 ADDENDUM 1 To: From: All Interested Proposers Claudia Sepulveda, Bid Clerk/Buyer

More information

Field 6 Fence Phase 1

Field 6 Fence Phase 1 City of Bishop, California Bidding Information and Contract Documents for Field 6 Fence Phase 1 in the City of Bishop, County of Inyo, California 22 June 2017 Approved: David Grah Director of Public Works

More information

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT CPL 14064.08 BID FORM SECTION 00 300-1 BID FORM BID NUMBER: CH2019-001Dev SUBMITTAL DATE: BY: (Bidder) PROJECT DESCRIPTION: The project consists of the construction of a sidewalk and associated grading,

More information

FINAL AGENDA STATE BOND COMMISSION MEETING OF JUNE 16, :00 A.M. - SENATE COMMITTEE ROOM A STATE CAPITOL BUILDING

FINAL AGENDA STATE BOND COMMISSION MEETING OF JUNE 16, :00 A.M. - SENATE COMMITTEE ROOM A STATE CAPITOL BUILDING 1. Call to order and roll call. FINAL AGENDA STATE BOND COMMISSION MEETING OF JUNE 16, 2016 8:00 A.M. - SENATE COMMITTEE ROOM A STATE CAPITOL BUILDING 2. Approval of the minutes of the May 19, 2016 meeting.

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

NOTICE INVITING BIDS

NOTICE INVITING BIDS INDIAN WELLS VALLEY WATER DISTRICT NOTICE INVITING BIDS May 16, 2016 To: From: Re: Prospective Bidders Travis Reed, Associate Engineer Installation of Fence in Two (2) Locations. The Indian Wells Valley

More information

NOTICE INVITING BIDS

NOTICE INVITING BIDS NOTICE INVITING BIDS RECEIPT OF BIDS: Sealed Bids will be received at the office of the Central Coast Water Authority, at 255 Industrial Way, Buellton, California 93427, until 2:00 p.m. September 4, 2012,

More information