1 About the Editors ix Contributing Authors xiii Acknowledgments xvii Preface xix Acronyms and Abbreviations of Defined Terms xxii Acceleration/Constructive Acceleration....1 Acceptance Access to Site Accord and Satisfaction Additional Insured Adjudication Agency Alliancing/Alliance Agreement Alternative Dispute Resolution (ADR) American Arbitration Association (AAA) American Bar Association (ABA) American Institute of Architects (AIA) American Subcontractors Association (ASA) Americans With Disabilities Act (ADA) Arbitration Architect Architect (or Engineer) of Record As-Built Drawings/Record Drawings As-Built Schedule As-Planned Schedule Assignment Associated General Contractors of America (AGC) Associated Schools of Construction (ASC) Backcharge Bad Faith Bankruptcy Bar Chart Baseball Arbitration Best Value Procurement Betterment Rule Bid (also known as Tender) Bid Bond Bid Chiseling Bid Protest Bid Shopping (also see Shopping Bids )..26 Boiler and Machinery Insurance Bond Breach of Contract Brooks Act Build-Operate-Transfer (BOT) Contract Build-Own-Operate (BOO) Build-Own-Transfer iii
2 Builder s Risk Insurance/All-Risk Insurance Building Code Building Information Modeling (BIM) Building Permit Cardinal Change Change Directive/Construction Change Directive (CCD) Change Order Changed Conditions/Differing Site Conditions (DSC) Chapter Claim Collapsed As-Built Analysis Collateral Warranty Combined Dispute Board (CDB) Commercial General Liability (CGL or GL) Insurance Commercial Impracticability Common-Law Bond Compensable Delay Competitive Negotiation Completed Operations Coverage Computer Assisted Design (CAD) Conciliation Concurrent Delay ConsensusDOCS Consequential Damages Constructability Review Construction Documents (CDs) Construction Management (Agency) Construction Management (Agency v. At-Risk) Construction Pyramid Constructive Change Consulting Engineer Contemplated Change Notice (CCN) Contract Administration Contract Documents Contract Price/Contract Sum Contracting Officer (Federal) Contractor Contractor-Controlled Insurance Program (CCIP) Contractual Liability Coverage Correction Period Cost-Plus Contract/Cost-Reimbursable Contract CPM Schedule Critical Path Method (CPM) Daily Reports Default Defective Specification Defective Work/Defect Delay Claim Design-Bid-Build (DBB) Design-Build (DB) Design-Build-Finance-Operate-Maintain (DBFOM) Design-Build-Finance-Operate-Maintain- Transfer (DBFOMT) Design-Build-Operate (DBO) Design-Build-Operate-Maintain (DBOM) Design-Build-Own-Operate (DBOO) Design Development Documents (DDs)...60 Design Documents Design Professional Diary (of Superintendent) Dispute Adjudication Board (DAB) Dispute Review Board (DRB) Disruption/Inefficiency/Loss of Efficiency/Loss of Productivity Early Finish Early Neutral Evaluation (ENE) Easement (or Right of Way) Economic Loss Doctrine Eichleay Formula Employer Employer s Liability Insurance Engineer Engineer-Procure-Construct (EPC) Equitable Lien Escalation Estoppel Excusable Delay Expert Expert Determination Extended (or Unabsorbed) Home Office Overhead Extras/Extra Work Order False Claims Act (FCA) iv
3 Fast-Track Rules Federal Acquisition Regulation (FAR) Federal Arbitration Act (FAA) Fiduciary Final Completion Final Payment Final Release v. Partial Release Fixed-Price Contract/Lump-Sum Contract Float/Total Float/Free Float Flow-down Provision Force Account Force Majeure Foreman Fragnet Fraud/Promissory Fraud Frustration of Performance General Agreement of Indemnity (GAI) General Conditions Geotechnical Reports/Findings Guaranteed Maximum Price (GMP) Contract Hazardous Materials/Hazardous Substances Hindrance Impact Impact Claim Impacted As-Planned Analysis Implied Impossibility of Performance Incentive/Disincentive Clause Incentives Indemnify v. Hold Harmless v. Defend Indemnification Clause Indemnity Independent Contractor Infrastructure Initial Decision Maker (IDM) Insolvency Inspection Insured Integrated Project Delivery (IPD) Interference International Center for Dispute Resolution (ICDR) International Code Council (ICC) International Federation of Consulting Engineers (FIDIC) Invitation for Bids v. Request for Proposal JAMS (Judicial Arbitration and Mediation Services, Inc.) Jobsite Overhead/Field Overhead Joint and Several Liability Joint Check Agreement Joint Venture Jury Verdict Award Labor Burden Laborer Latent Ambiguity Latent Defect v. Patent Defect Lender/Construction Lender Letter of Credit (LOC or LC) Liability Insurer Lien Waiver Limitations Period Liquidated Damages Liquidation Agreement/Liquidating Agreement Log (of Superintendent) Look-Ahead Schedule/Short-Term Schedule Loss of Productivity Claim Maintenance Markup/Profit/Fee Materialmen Means and Methods Measured Mile Approach Mechanic s Lien Med-Arb Mediation Meeting Minutes Mini-Trial Mitigation of Damages Multi-Prime Contracting Mutual Mistake Named Insured National Society of Professional Engineers (NSPE) Negligence Negligent Misrepresentation v
4 No Damage-for-Delay Clause Noncompensable Delay Notice of Claim Notice of Commencement Notice to Contractor Notice to Proceed Occupational Safety and Health Administration (OSHA) Over-Inspection Owner-Controlled Insurance Program (OCIP) Parol Evidence Partnering/Partnering Agreement Pass-through Agreement (Liquidation Agreement) Patent Ambiguity Pay-if-Paid Clause v. Pay-When-Paid Clause Payment Bond (Labor and Material Payment Bond) Peer Review Pending Change Order/Change Notice/ Contemplated Change Order Performance Bond Performance Specifications Plain-Meaning Rule Precedence of Documents Prime Contract/General Contract Prime Contractor/General Contractor Privatization Procurement Professional Liability Insurance (Errors & Omissions) Program Management Progress Payment Project Engineer Project Labor Agreement (PLA) Project Manager Project Manager at-risk Project Manager Not at-risk Project Neutral Prompt Payment Proprietary Specification Public-Private Partnership (PPP) Public Works Punch List Punitive Damages Purchase Order Quantum Meruit Receiver Receivership Red Book Reimbursable Request for Equitable Adjustment (REA) Request for Information (RFI) Resident Officer in Charge of Construction (ROICC) Retainage/Retention Schedule: Project Schedule/Progress Schedule/Master Schedule Schedule of Values Schedule Updates Schematic Design Documents Scope of Work/Work Sealed Bidding Shop Drawings, Samples, Product Data Shopping Bids Silver Book Site Meeting Site Review Socioeconomic Programs/ Requirements Specifications Statute of Limitations Statute of Repose Statutory Bond Stipulated Price Contract Stop Notice Stored Materials Structured Negotiations Subcontract Subcontractor Submittals Substantial Completion Substantial Performance Rule Substitutions Sub-Subcontractor Subsurface Reports Superintendent Supplementary General Conditions Supplier vi
5 Supply Contract Surety Surety Bond Survey Suspension of Work Notice of Claim Takeover Agreement Teaming Agreement Termination for Cause Termination for Convenience Termination for Default Third-Party Beneficiary Rule Time and Material Time and Materials (T&M) Contract Time Extension Time Impact Analysis (TIA) v. Windows Analysis Tort Total Cost Method (Total Cost Approach) Total Time Approach Trade Contractor Permit Trade Permit Turnkey Unconscionability Unexcused Delay Unforeseen Condition/Unforeseen Site Condition Uniform Commercial Code (UCC) Unit Price Contract Unjust Enrichment Use Plaintiff Value Engineering Variance/Variation Waiver Waiver of Subrogation Warranty/Guarantee Warranty Period Work Authorization Working Foreman Yellow Book Your Work Exclusion vii
COPYRIGHTED MATERIAL INDEX
INDEX Abandonment, cost and damage proof, contractors, 401 Acceleration: constructive, 202-205, 248 elements of, 203, 249-250 delay causes, compensable delays, 241-245 delay causes, excusable delays, 240-241
More informationAIA CONTRACT DOCUMENTS
AIA CONTRACT DOCUMENTS A101, A102 and A201 Sanjay Kurian Becker & Poliakoff, P.A. Forms of Documents AIA A101-2007 (Lump sum) AIA A102-2007 (Guaranteed Maximum Price) AIA A201-2007 (General Conditions)
More informationCONSTRUCTION LAW AND RISK MANAGEMENT
Course Objective: CONSTRUCTION LAW AND RISK MANAGEMENT The objective of this course is to take an advanced look at the legal principles of construction law and how it applies to engineering and project
More informationSHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between
SHORT FORM STANDARD SUBCONTRACT This Agreement is made this day of, 20, between (Contractor) and (Subcontractor). The work described in Section I below shall be performed in accordance with the prime contract
More informationDocument A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition
Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)
More informationSTANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION
STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION THIS AGREEMENT made at Columbus, Ohio on by and between Lincoln Construction, Inc., hereinafter referred to as the Contractor, and, hereinafter
More informationComparing the Standard Form Design-Build Agreements: AIA, ConsensusDocs & DBIA Agreement Forms. Alison Ashford Patrick J. O Connor, Jr.
Comparing the Standard Form Design-Build Agreements: AIA, ConsensusDocs & DBIA Agreement Forms Practising Law Institute June 25, 2014 New York, New York Alison Ashford Patrick J. O Connor, Jr. Brian Perlberg
More informationSUBCONTRACT (SHORT FORM)
SUBCONTRACTOR: PHONE SUBCONTRACT (SHORT FORM) PROJECT: LOCATION: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC. (Contractor) and (Subcontractor) which are
More informationICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA
ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA A COMPARATIVE ANALYSIS OF THE 1997 CHANGES TO THE AIA GENERAL CONDITIONS TO THE CONTRACT FOR CONSTRUCTION (A201) STUART
More informationAIA Document A201 TM 1997
AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):
More informationStandard Form of Agreement Between Contractor and Subcontractor
Standard Form of Agreement Between Contractor and Subcontractor GENERAL TERMS AND CONDITIONS ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) these General Terms and Conditions,
More informationDocument A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition
Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,
More informationDocument A South Carolina Division of Procurement Services, Office of the State Engineer Version of
South Carolina Division of Procurement Services, Office of the State Engineer Version of Document A201 2007 General Conditions of the Contract for Construction This version of AIA Document A201 2007 is
More informationANNEX A Standard Special Conditions For The Salvation Army
ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,
More informationAIA Document A201 TM 2007
AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE
More informationIFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3
JUNE 23, 2016 ATTENTION ALL PROPONENTS: IFB F2015017 B-WING RENOVATIONS IFB F2015007 9C OFFICES BUILD OUT Addendum 3 The purpose of this Amendment is to advise all offertories of the following: 1. In Project
More informationRichard J. Long, P.E. and Rod C. Carter, CCP, PSP
Richard J. Long, P.E. and Rod C. Carter, CCP, PSP LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com
More informationGeneral Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE
Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3
More informationStandard Form of Agreement Between Contractor and Subcontractor
Document A401 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN the Contractor: (Name, legal
More informationAIA Document A201 TM 1997
AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): A201 conversion Michigan State University East Lansing, MI THE OWNER:
More informationConstruction Fundamentals: Avoiding Common Pitfalls
Construction Fundamentals: Avoiding Common Pitfalls Matthew M. Hoffman, Esquire Tucker Arensberg, P.C. June 21, 2017 Copyright 2016 Tucker Arensberg, P.C. All Rights Reserved. Program Standardized Contracts
More informationDocument A201 TM 2007 SP
AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status
More informationAIA Document A201 TM 2007
AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE
More informationAIA Document A201 TM 2007
AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Pre-Construction and Construction Management at Risk Services Lafayette
More informationDesigner Liability Lorman Education Services June 25, 2003
Designer Liability Lorman Education Services June 25, 2003 Brian W. Erikson Quilling, Selander, Cummiskey & Lownds, P.C. 2001 Bryan Street, Suite 1800 Dallas, Texas 75214 214-880-1844 1 Traditional Organizational
More informationDesign-Build Risk and Insurance Table of Contents
Design-Build Risk and Insurance Table of Contents Design-Build Risk and Insurance (3rd ed.) Preface About the Editor About the Authors Topical Index Chapter 1: Design-Build Construction o The Design-Build
More informationDocument A201 TM. General Conditions of the Contract for Construction
Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) Austin Community College District 9101
More informationThis Webcast Will Begin Shortly
This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: splemoderator@smartpros.com Thank You! 1 KEY ISSUES IN NEGOTIATING
More informationEquip Your Company for the New 2017 AIA A201 & ConsensusDocs Contracts:
Equip Your Company for the New 2017 AIA A201 & ConsensusDocs Contracts: What Contractors Need to Know Speakers Ron Ciotti Hinkley Allen Robert Majerus Hensel Phelps Brian Perlberg AGC 1 Statement of Purpose
More informationDocument A401 TM. Standard Form of Agreement Between Contractor and Subcontractor
Document A401 TM 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name,
More informationChapter Survey. Required Contract Elements. Offer and Acceptance
Contract Management Chapter Survey Required Contract Elements Contract Provisions Breach of Contract Boilerplate Provisions Provisions to Limit Risk What Are Recitals? Types of Construction Contracts Contracting
More informationDocument A Standard Form of Agreement Between Contractor and Subcontractor
Document A401 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name, legal
More informationDocument A401 TM. Standard Form of Agreement Between Contractor and Subcontractor
Document A401 TM 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name,
More informationDocument A201 TM. General Conditions of the Contract for Construction. (Name and location or address)
Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University
More informationEthical Contract Negotiation
Ethical Contract Negotiation Texas Society of Professional Engineers May 16, 2006 Brian W. Erikson Quilling, Selander, Cummiskey & Lownds, P.C. 2001 Bryan Street, Suite 1800 Dallas, Texas 75201 (214) 880-1844
More informationDocument A201 TM. General Conditions of the Contract for Construction
Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: Proposed Renovations to a Portion of the Township Municipal Building 175 West Valley Forge Road King
More information3/4/2016. Claims for Breach of Contract. Claims for Breach of Contract
Indiana State Bar Association BIG 10 CONSTRUCTION & SURETY LAW CLE CONSTRUCTION CONTRACTING WITHOUT BORDERS March 10, 2016 Illinois Construction Law Overview Daniel S. Brennan Laurie & Brennan LLP Two
More informationDocument A201 TM. General Conditions of the Contract for Construction
Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) THE ARCHITECT: (Name, legal
More informationThe Battle Royal: AGC Consensus Contracts vs. AIA Documents
The Battle Royal: AGC Consensus Contracts vs. AIA Documents David A. Ericksen, Esq. Severson & Werson, A Professional Corporation One Embarcadero Center, 26th Floor, San Francisco, CA 94111 Direct Line:
More informationConstruction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.
Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Contractor Address Address City, Zip Work Phone Number: Cell Phone Number:
More informationSUBCONTRACTOR AGREEMENT
SUBCONTRACTOR AGREEMENT THIS AGREEMENT MADE THIS DAY OF IN THE YEAR OF 2016 (In words, indicate day, month and year) BETWEEN DeWitt & Associates, Inc. 1256 South Barnes Springfield, Missouri 65804 AND:
More informationDocument A201 TM. General Conditions of the Contract for Construction
Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: for: (Name and location or address) Work for The University of Tennessee Section 00 72 13 2017 THE OWNER:
More informationARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES
ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) this Agreement; (2) the prime Contract, consisting of the Agreement between the Owner and Contractor and the other Contract
More informationConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR
ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Job No. [ ] Subcontract No. [ ] This Agreement is made this [ ] day of [ ], [ ], by and between CONSTRUCTOR, L&L Builders
More informationAIA Document A101 TM 2007
AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month
More informationConsensusDocs 750 vs. AIA A : Which is Best For You?
ConsensusDocs 750 vs. AIA A401 2007: Which is Best For You? Presented for the AGC NE Building Chapter by Kory George and Brian Koerwitz Woods & Aitken LLP Omaha, Lincoln, Denver, Washington D.C. kgeorge@woodsaitken.com
More informationStandard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project
Document B108 2009 Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)
More informationSAMPLE DOCUMENT SUBCONTRACT AGREEMENT
SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office and
More informationContractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.
SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office
More informationADVERTISEMENT FOR BIDS CSD NO. 158 BID # B CONSOLIDATED SCHOOL DISTRICT # ELEMENTARY SCHOOLS CARPET INSTALLATION
ADVERTISEMENT FOR BIDS CSD NO. 158 BID #2011-29B CONSOLIDATED SCHOOL DISTRICT #158 2011 ELEMENTARY SCHOOLS CARPET INSTALLATION Consolidated School District #158 will receive single prime sealed bids for
More informationDocument A401. Standard Form of Agreement Between Contractor and Subcontractor
TM Document A401 1997 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year) BETWEEN the Contractor: (Name,
More informationDocument A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor
TM Document A201CMa General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor 1992 for the following PROJECT: (Name and location or address): Interior Finish
More informationMASTER SUBCONTRACT AGREEMENT
Back s Construction, Inc. 1602 Front Street, Suite 100 San Diego, CA 92101 Phone: 619-713-2566 Fax: 619-713-0992 MASTER SUBCONTRACT AGREEMENT This subcontract made and entered into this Monday, January
More informationMASTER SUBCONTRACT AGREEMENT
MASTER SUBCONTRACT AGREEMENT This Master Subcontract Agreement ( Subcontract ), made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter
More informationGENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition)
Document #: 861154 GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO for SOLE SOURCE CONTRACTS (2004 Archdiocese Edition) 86 Document #: 861161 TABLE OF CONTENTS ARTICLE
More informationGENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition)
GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition) TABLE OF CONTENTS ARTICLE 1...1 General Provision...1 1.1 Definitions...1 1.2 Execution, Correlation
More informationThe Engineers Joint Contract Documents Committee Releases 2013 editions of the EJCDC Construction Series (C-Series) documents
FOR IMMEDIATE RELEASE The Engineers Joint Contract Documents Committee Releases 2013 editions of the EJCDC Construction Series (C-Series) documents ALEXANDRIA, Va., March 25, 2013 The Engineers Joint Contract
More informationSUBCONTRACT CONSTRUCTION AGREEMENT
SUBCONTRACT CONSTRUCTION AGREEMENT THIS SUBCONTRACT CONSTRUCTION AGREEMENT, made and executed this day of, 20, by and between SHERWOOD CONSTRUCTION, INC (hereinafter referred to as "Contractor"), and (hereinafter
More informationFIDIC CONTRACTS A COMPARATIVE. Uttam Sengupta Sr. GM Contracts & Risk Management
FIDIC CONTRACTS A COMPARATIVE Uttam Sengupta Sr. GM Contracts & Risk Management FIDIC AND INTRODUCTION TO FIDIC CONDITIONS OF CONTRACT 2 OUTLINE What is FIDIC? Characteristics of FIDIC Conditions of Contract
More informationAGC TEXT COPY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR
THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor Assumes Risk of Owner Payment) The original text
More informationGENERAL CONDITIONS TABLE OF CONTENTS
GENERAL CONDITIONS TABLE OF CONTENTS ARTICLE 1 GENERAL PROVISIONS 1.1 BASIC DEFINITIONS 1.2 OWNERSHIP AND USE OF CONTRACT DOCUMENTS 1.3 INTERPRETATION ARTICLE 2 UNIVERSITY 2.1 INFORMATION AND SERVICES
More informationSTATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)
STATE OF VERMONT STANDARD FORM GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) The following general conditions are for use with DESIGN BUILD construction contracts with the State of Vermont,
More informationWelcome to the Model Residential Owner/Design Consultant Professional Service Agreement
Welcome to the Model Residential Owner/Design Consultant Professional Service Agreement The Council for the Construction Law Section of the Washington State Bar Association prepared this Model Residential
More informationTerre View Research Facility Relocation Washington State University Pullman, WA Project Manual
Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual Project No. 9574-2018 Issued 7/19/2017 Washington State University Facility Services, Capital Terre View Research
More informationTHIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS USE OR MODIFICATION
TABLE OF CONTENTS Page Section 1. Entire Contract...... 2 Section 2. Scope... 2 Section 3. Contract Price... 2 Section 4. Payment Schedule... 2 Section 5. Time... 3 Section 6. Changes in the Work... 3
More informationGeneral Conditions of the Contract for Construction
ATTACHMENT F CENTRAL NEW MEXICO COMMUNITY COLLEGE General Conditions of the Contract for Construction TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5.
More information1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES
TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING
More informationKey Contracting Issues
Key Contracting Issues Owner & Design Professional Agreements ConsensusDocs v. AIA 1 Speakers: Timothy M. Gibbons, Esq. Chambliss, Bahner & Stophel, P.C. Chattanooga, TN Frank E. Riggs, Esq. Troutman &
More informationCLAUSE AND EFFECT BASIC CONTRACT LAW PRINCIPLES AND KILLER CONTRACT CLAUSES
CLAUSE AND EFFECT BASIC CONTRACT LAW PRINCIPLES AND KILLER CONTRACT CLAUSES Presented to: Insulation Contractors Association of America 2016 Annual Convention and Trade Show Denver, Colorado September
More informationPresenters. Hobie Frady Beason & Nally. Brad English Maynard Cooper & Gale
Presenters Brad English Maynard Cooper & Gale benglish@maynardcooper.com 256.512.5705 Hobie Frady Beason & Nally hfrady@beasonnalley.com 256.533.1720 Preserve Your Right to Obtain an Equitable Adjustment:
More informationPURCHASE ORDER DATE MISSING F Q7-645-CMR. Buyer/Contractor. Sundt Construction, Inc South 55th Street Tempe, AZ 85282
: Sundt Construction, Inc. 2620 South 55th Street Tempe, AZ 85282 P.O. Number: P.O. Date: Contractor Job No.: Prime Contract No: 121790-.001 DATE MISSING 121790 F16-15-07-Q7-645-CMR Prime Contract Date:
More informationAGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES
AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE
More informationStandard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project
Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN
More informationWashington University in St. Louis
Washington University in St. Louis Construction Terms and Conditions A. AGREEMENT. The Purchase Order, these Terms and Conditions, any special conditions, Owner s Policies, Design Standards and Insurance
More informationMitigating Risk through Construction Contracts and Claims Avoidance
Mitigating Risk through Construction Contracts and Claims Avoidance By Jeremy S. Sharon, Esq. Wright, Fulford, Moorhead & Brown, P.A. 505 Maitland Avenue, Suite 1000 Altamonte Springs, Florida 32701 (407)
More information1 Exam Prep Business and Finance Practice Test 4
1 Exam Prep Business and Finance Practice Test 4 1. All the following are normally required for a loan application except. A. an income statement B. a balance sheet C. a tax return D. retained earnings
More informationNO. XXXXX SUBCONTRACT AGREEMENT RECITALS ARTICLE I
NO. XXXXX SUBCONTRACT AGREEMENT THIS SUBCONTRACT AGREEMENT ( Subcontract ) by and between GRAMOLL CONSTRUCTION COMPANY, a Utah corporation, hereinafter referred to as "Contractor," and (SUBCONTRACTOR NAME
More informationTrade Association Form Subcontracts: The Good, The Not So Bad, And the Ugly
KILLER CONTRACT CLAUSES Donald W. Gregory, Esq. KEGLER, BROWN, HILL & RITTER Attorneys & Counselors at Law 65 E. State Street, Suite 1800 Columbus, OH 43215 (614) 462-5400 Trade Association Form Subcontracts:
More informationPROJECT SUBCONTRACT 2012 Edition
PROJECT SUBCONTRACT 2012 Edition This Subcontract has important consequences. Prior to its completion or modification, consultation with an attorney is encouraged. This Subcontract, unmodified, may not
More information4/15/2014. The Changing Landscape of Construction Projects traditional contracting collaborative approaches
Hall & Company is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned based on the completion of this program will be reported to AIA/CES for AIA
More informationSTANDARD FORM OF GENERAL CONDITIONS OF CONTRACT BETWEEN OWNER AND DESIGN-BUILDER
STANDARD FORM OF GENERAL CONDITIONS OF CONTRACT BETWEEN OWNER AND DESIGN-BUILDER Document No. 535 Second Edition, 2010 Design-Build Institute of America Washington, DC Design-Build Institute of America
More informationThe Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015
The Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015 Negotiating 8 Key Contract Clauses from the Contractor s Perspective (Part 1 of 2) 1 This is the first of a two-part overview
More informationThe "Standard" Form Contract: Exploring the Decennial 2017 Changes to the AIA Contract Forms
The "Standard" Form Contract: Exploring the Decennial 2017 Changes to the AIA Contract Forms Daniel Lund III Carys A. Arvidson February 1, 2018 CPM Conference New Orleans What happens when the construction
More informationAGC s Preliminary Commentary to the 2007 Edition of the AIA A201 General Terms and Conditions Document
AGC s Preliminary Commentary to the 2007 Edition of the AIA A201 General Terms and Conditions Document The new edition of the AIA A201 2007 edition was published on November 5 th. The 600-member AGC Board
More informationAIA Document A107 TM 1997
AIA Document A107 TM 1997 Abbreviated Standard Form of Agreement Between Owner and Contractor for Construction Projects of Limited Scope where the basis of payment is a STIPULATED SUM AGREEMENT made as
More informationConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR
ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR GENERAL INSTRUCTIONS. These instructions are solely for the information and convenience of ConsensusDocs users, and
More informationGeneral Conditions of the Contract for Construction
ALBUQUERQUE PUBLIC SCHOOLS of the Contract for Construction 2008 Edition rev. 1 TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5. SUBCONTRACTS 6. CONSTRUCTION
More informationTri-Cities Academic Building Washington State University Richland, WA Project Manual
Tri-Cities Academic Building Washington State University Richland, WA Project Manual Project No. 8589-2016 Issued 9/25/2018 Washington State University Facility Services, Capital Tri-Cities Academic Building
More informationKiller Contract Clauses. Presented by Ben Westcott Shareholder Andrews Myers, PC
Killer Contract Clauses Presented by Ben Westcott Shareholder Andrews Myers, PC bwestcott@andrewsmyers.com Liability Considerations Design Defects Concealed Conditions Schedule Insurance Payment Terms
More informationGLWA PURCHASE ORDER TERMS AND CONDITIONS
1. Definitions Throughout this document the term Seller means the entity furnishing goods, services, and goods and services, and shall be synonymous with the term Supplier. The term Buyer means the Great
More informationSTANDARD PURCHASE AGREEMENT Use for materials only. If there is on-site work use Standard Subcontract Agreement.
STANDARD PURCHASE AGREEMENT Use for materials only. If there is on-site work use Standard Subcontract Agreement. P.O. # CONTRACTOR VENDOR SHIP TO Attention: Name: Knutson Construction Services Midwest,
More informationBETWEEN name. address. AND name (hereinafter called the Subcontractor ) address
AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR CONTRACTOR S COPY SUBCONTRACT NO. Alberta Standard Construction Subcontract THIS AGREEMENT made this day of, A.D. 20 BETWEEN name (hereinafter called the
More informationAIA Document B141 TM 1997 Part
1 AIA Document B141 TM 1997 Part Standard Form of Agreement Between Owner and Architect with Standard Form of Architect's Services TABLE OF ARTICLES 1.1 INITIAL INFORMATION 1.2 RESPONSIBILITIES OF THE
More informationRFQ Attachment 6 STANDARD FORM OF GENERAL CONDITIONS BETWEEN OWNER AND DESIGN-BUILDER
RFQ Attachment 6 STANDARD FORM OF GENERAL CONDITIONS BETWEEN OWNER AND DESIGN-BUILDER TABLE OF CONTENTS Article Name Page Article 1 General... 1 Article 2 Design-Builder s Services and Responsibilities...
More informationOWNER: ARCHITECT: ARTICLE 1 AGREEMENT
Subcontract CONTRACT DETAILS: Cost Code: {ContractSchedOfValues.BdgtCode} Date: {Contracts.ContractDate} Project #: {Projects.Number} Project Name: Project Address: {Projects.Address} Subcontract #: {Contracts.ContractNumber}
More information2013 Construction Series. Highlights
2013 Construction Series Highlights 2013 C-Series Highlights Revisions, enhancements, and coordination of all 20+ C- series documents Added three new documents: C-111, Advertisement for Bids C-451, Qualifications
More informationEXHIBIT G. Insurance Requirements. [with CCIP]
SECTION 1 GENERAL INSURANCE REQUIREMENTS EXHIBIT G Insurance Requirements [with CCIP] A. CCIP. Contractor has implemented a Contractor Controlled Insurance Program ( CCIP ) to furnish certain insurance
More informationConstruction Law Update Comparing Contracts-A Review Of The AIA 201 and ConsensusDocs
Construction Law Update Comparing Contracts-A Review Of The 201 and ConsensusDocs Michael P. Sams, Esq. Kenney & Sams, P.C. Old City Hall 45 School Street Boston, MA 02108 (617)-722-6045 mpsams@kandslegal.com
More informationSUBCONTRACT. by and between. to perform the Work identified in Article 2 in accordance with the Projects Contract documents.
Phone 800 555-5555 Fax 999 555-5551 TO: 4320 Eucalyptus Way Santa Rosa CA 95401 SUBCONTRACT PROJECT: 186 Williams Post Office 19420 Williams Rd. Monte Rio CA 95462 This agreement entered into this day
More informationClaim Avoidance on Highway Projects
Claim Avoidance on Highway Projects Joseph R. Hellenbrand, P. E., PSP Capital Project Management, Inc. ASHE National Conference Bismarck, North Dakota June 13, 014 1 Joe Hellenbrand P.E.; PSP 0 years of
More information