1 Applies to WSI RFS (Over and Under 50K) Data Field Completion Requirements Page 1 of 7

2 RFS Data Fields Original RFS 1 RFS CPJ# To be completed by SSBC when approving. These types of projects include the over $50K, Out of Scope, MAM and MOE. Supplemental RFS 2 WSI Project 3 Agreement BCGV# will be recorded in this field when the client is approving an out source project. These types of projects are the under $50K with no space change. BCGV# To be completed by WSI when requesting approval. Must match the building, lease and client in the building where the work is being completed or where the client is moving to. This is the client that is responsible for any costs or that the costs have been appropriated from. 4 Building The Agreement will be completed by WSI when the RFS is being sent to the client for approval (under $50K), when the RFS is being sent to SSBC for approval the agreement number will be provided with the CPJ by SSBC when the signed RFS is returned to WSI to proceed. Where the work is being completed or where the client is moving to. 5 Lease Where the work is being completed or where the client is moving to. 6 Type of MAM, MOE, RCMP 310, Tenant Services Service 7 Project Project Name with brief description of Description 8 Location of Service Should match the agreement lookup table, if not WSI should communicate with SSBC to ensure the proper civic address is being used. SSBC will make corrections as required, which will be reflected in the next version of the agreement lookup table. 9 Client * Ministry (Forests, Lands and Natural Resource Operations) or Parent Organization (Provincial Health Services Authority) that is responsible for any costs or that the costs have been appropriated from. 10 Branch ** Branch (Ministry Operations) or Organization (Emergency and Health Services Commission) that is responsible for any costs or that the costs have been appropriated from. 11 Client Contact The individual that WSI sends the RFS to for obtaining approval. 12 Implementer The individual from WSI that is implementing the work. 13 Customer Not Applicable Not Applicable Page 2 of 7

3 14 Scope of Work Required 15 Approved by Customer Signing Authority 16 Work will be Substantially Completed by: Should: - provide enough information to substantiate the dollar value 1 - document what services or tasks will be provided - document how a problem will be rectified - be written with an understanding that the audience may not be familiar with the project - summarize a conversation - include types of materials to be used and quantities - include details such as whole or partial / what is in what is out of scope - document any special circumstances - detail the reason for a decrease in the RFS value - detail (P27) P02 *** Disbursements Generally travel costs for projects over $50K and more than 100km each way. - detail P24 **** Hands on Design Consulting Work Work undertaken by a DPS PM at an hourly rate instead of through the MSA percentage fee rates. - detail (P30) ***** P33 Hands on Labour Work that could be undertaken by a technician/contractor but will be delivered by WSI instead. The individual(s) that has the spending authority for the work being completed, not necessarily the same person as the client contact. Actual Substantial Completion Date as defined by the 1997 BC Builder s Lien Act: For the purposes of the Act, a head contract, contract or subcontract is substantially performed if the work to be done under that contract is capable of completion or correction at a cost of not more than: 3% of the first $500,000 of the contract price 2% of the next $500,000 of the contract price, and 1% of the balance of the contract price. For the purpose of this Act, an improvement is completed if the improvement or a substantial part of it is ready for use or is being used for the purpose intended. Substantial completion means that the work is complete to the extent it can be occupied or used for its intended purpose in accordance with contract and/or regulatory requirements. That cannot be accomplished without a certificate of occupancy. Warranty period in respect to the Project will commence upon the date of Substantial Completion. Should document the changes made to the details on the previous RFS and: - include the value of the previous RFS s - detail the specific reason(s) why the substantial completion date has been changed 1 For Example: A RFS to improve the front entry concrete for $10,000 begs a number of questions. Will the concrete be replaced or repaired, does the work include stairs or planters, what is the approximate area that needs improvement. The inclusion of the additional information will substantiate the dollar value. Changes to Interface Data Some of the information recorded on the RFS is pertinent to the data transfers between WSI and SSBC. Any changes to these fields in a project that has been implemented must first be brought to the attention of the Interface Team within Facilities Contract Management Branch, prior to requesting a change from WSI. This team will be able to determine the best course of action for each situation and ensure the solution is implemented in a timely manner. The pertinent fields are: Field 1 RFS (CPJ) Field 3 Agreement Field 4 Building Page 3 of 7

4 @RealBC Space Use Agreement *- Client **- Branch WSI Agreement Look Up Table Page 4 of 7

5 WSI PM Labour and Fee should always be reviewed prior to approving a RFS Page 5 of 7

6 Project Proposal Challenging P Codes **** P01 (P24) Hands on Design/Consulting Work This is for work undertaken by a DPS PM and at an hourly rate instead of through the MSA percentage fee rates. This would be for preparing a furniture plan in-house instead of using an outside consultant. *** P02 (P27) Disbursements Projects Greater than $50K o Includes travel costs (meals, accommodation and vehicles) when: an overnight stay is required due to extenuating circumstances. actual vehicle expenses are incurred because a project site is more than 200km return trip from a WSI Office. the WSI PM is asked to ensure they allow for travel expenses in their budgets on any project they are delivering that is more than 100km each way. Projects Less than $50K o Excludes travel costs (meals, accommodation and vehicles) as they are incorporated under the O&M management fee. o WSI may make a request for SSBC to consider reimbursement on a project by project basis. P26 Contingency Fees To allow for uncertainties or specific alternative scenarios in the project budget estimate. Typically applied as an overall % portion of the budget and is set according to project risk. Includes: planning and estimating errors and omissions, unforeseen increases in costs, design developments and variations in market and environmental conditions. Excludes: scope creep or major scope changes, extraordinary events such as natural disasters and strikes. ***** P33 (P30) Hands on Labour This is work that could be undertaken by a technician/contractor but will be delivered by WSI instead. It is sometimes more efficient for WSI to undertake some small works directly instead of hiring an outside contractor and WSI charges this time back hourly. Excessive time requirements are also be captured under this code. P99 Project Management Fee Under $50k not fee eligible (unless a phased portion of a project or a single project requires multiple RFS and the work is being delivered by a DPS PM) Over $50K - 7.5% on the first $500K and 3.5% for the remaining project costs above $500K. Other Terms and Conditions Out of Scope Projects The building or lease where the work is being completed or where the client is moving to is not active in system. WSI should use the dummy building (the correct building number must be used if it is the lease that is not active) and agreement numbers in RealProject2. SSBC should with the pertinent information (building, lease or land numbers) as they become available. Each time the CPJ is updated with Building and Lease information the Interface Team within FCMB must be notified so that data coming from WSI can be mapped to A project where there is no agreement number because the proposed use agreement has not been pushed through to a space use agreement is not an out of scope project. In these cases a draft use agreement should be created to allow WSI access to the agreement number. Non Contract Specific Projects There is no intention for the building where the work is being completed to become a part of SSBC s inventory, as in the case with MLA Offices. The Interface Team within FCMB will review other proposed Non Contract Specific Projects on a case by case basis. WSI should use the dummy building and agreement numbers in RealProject2. Page 6 of 7

7 Dummy Building and Agreement s Region Building Agreement BC 01 and FMZ 511 and BC 02 and FMZ 521 and BC 03 and FMZ 530 and Requirement for Multiple RFS s There is a requirement for more than one RFS in a single project when: there are multiple funding sources capital, expense, multiple clients there are multiple buildings, leases or lands (or any combination) including work being completed in a complex WSI will establish parent/child RFS s when multiple RFS s are required. The CSAT, Inspection and Acceptance and reporting information will be attached to the Parent RFS, the Child(ren) RFS will have individual budgeting information. Each RFS must document the parent/child relationship. In cases where multiple RFS for a single project total an estimate of more than $500K, acknowledgement of the fee schedule breakdown (7.5% on first $500K, 3.5% on remainder) must be identified on each of the RFS. Page 7 of 7

Interior Health Authority Board Manual 3.6 DIRECTOR RETAINERS, FEES AND EXPENSES

Interior Health Authority Board Manual 3.6 DIRECTOR RETAINERS, FEES AND EXPENSES 1. INTRODUCTION (1) The Board of Directors (the Board ) is committed to the responsible use of public funds to support Board operations. This Policy reflects requirements of the Provincial Government,

More information

Construction Project Manager TERMS OF REFERENCE

Construction Project Manager TERMS OF REFERENCE Construction Project Manager TERMS OF REFERENCE PURPOSE SSAA Mackay Branch Inc. Requires offers from suitably qualified Consultants to undertake the role of Project Manager for the development of George

More information

Income Tax. Statement of Practice SP - IT/2 /07

Income Tax. Statement of Practice SP - IT/2 /07 Income Tax Statement of Practice SP - IT/2 /07 Tax treatment of the reimbursement of Expenses of Travel and Subsistence to Office Holders and Employees Enquiries in relation to the reimbursement of travel

More information

Board Policies & Procedures Section: Board Remuneration Number: Sub-Section: Per Diem Policy Approved:

Board Policies & Procedures Section: Board Remuneration Number: Sub-Section: Per Diem Policy Approved: 1.0 PURPOSE: To provide criteria for the equitable and consistent treatment and remuneration of all Board of Directors of the Central East LHIN and whose appointments have been processed through the Public

More information

FESBC CONTRACT TENDERING AND COST GUIDELINES

FESBC CONTRACT TENDERING AND COST GUIDELINES Contract Tendering Guidelines: 1) Where Forest Enhancement Society of BC (FESBC) funding has been allocated to a Recipient for a Project or in an Investment Schedule in any given Fiscal Year, the Recipient

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS for the City of Fort Morgan, Colorado March 19, 2014 Brent Nation Director of Utilities CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN, COLORADO 80701 (970) 370-6558 REQUEST FOR PROPOSALS

More information

CAPITAL PROJECT PROCESS

CAPITAL PROJECT PROCESS CAPITAL PROJECT PROCESS May 2009 GETTING STARTED What is a project? A project is defined as all work (maintenance & repair or renovation) that requires 5,000 or more in time and materials and/or is sufficiently

More information

Request for Proposals COMPOSTING TECHNICAL ASSISTANCE

Request for Proposals COMPOSTING TECHNICAL ASSISTANCE Request for Proposals COMPOSTING TECHNICAL ASSISTANCE Release Date: September 19, 2014 Contact for Proposals: Ben Gauthier, ANR, DEC Waste Management and Prevention Division (802) 522-5080 benjamin.gauthier@state.vt.us

More information

Consolidated Revenue Fund Extracts (Unaudited)

Consolidated Revenue Fund Extracts (Unaudited) Extracts PROVINCE OF BRITISH COLUMBIA 91 Operating Result for the Fiscal Year Ended March 31, 2005 In Millions 2005 2004 Estimated 1 Actual Actual Revenue $ $ $ Taxation... 13,539 14,284 13,241 Contributions

More information

1. Work with the Stormwater Program to ensure robust participation in the process by an inclusive range of stakeholders.

1. Work with the Stormwater Program to ensure robust participation in the process by an inclusive range of stakeholders. Vermont Department of Environmental Conservation Watershed Management Division 1 National Life Drive [phone] 802-490-6169 Main 2 Montpelier, VT 05620-3522 www.watershedmanagement.vt.gov Agency of Natural

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS The Lorain County Board of Commissioners is seeking proposals from qualified interested parties to serve as CONSTRUCTION MANAGER for the review of bidding documents, contract

More information

OTHER APPROPRIATIONS

OTHER APPROPRIATIONS OTHER APPROPRIATIONS SUMMARY () VOTED APPROPRIATIONS Vote 40 Contingencies (All Ministries) and New Programs... 6,000 240,000 Vote 4 BC Family Bonus... 85,000 59,000 Vote 42 Citizens' Assembly... 3,400

More information

SUBJECT: Reimbursement of Expenses When on Society Business (Governing Policy)

SUBJECT: Reimbursement of Expenses When on Society Business (Governing Policy) SECTION: BY: Board of Directors (Governing Policy) DATE: March 30, 2007 1. Policy Purpose This policy sets the requirements and practices for the reimbursement of amounts incurred by employees, contractors,

More information

A REAL DEAL MEETUP EXCLUSIVE REPORT:

A REAL DEAL MEETUP EXCLUSIVE REPORT: A REAL DEAL MEETUP EXCLUSIVE REPORT: Here are some questions to consider asking potential power team members when you are putting your own REI Power Team! Property Managers Do you have the time to manage

More information

Public Private Ventures Process Guide

Public Private Ventures Process Guide Public Private Ventures Process Guide This guideline is applicable for proposed privatized transactions that utilize private bond proceeds or other private financing to fund a portion or all cost for development

More information

REQUEST FOR PROPOSALS (RFP) Marina Management Services. Docktown Marina

REQUEST FOR PROPOSALS (RFP) Marina Management Services. Docktown Marina REQUEST FOR PROPOSALS (RFP) Marina Management Services Docktown Marina Date of Issue: Friday, October 2, 2015 Proposal Due Date: Wednesday, October 28, 2015 by 2:00 p.m. PST PROJECT OVERVIEW The City of

More information

APPENDIX C: LPA INVOICE-VOUCHER State Form (5-06)

APPENDIX C: LPA INVOICE-VOUCHER State Form (5-06) APPENDIX C: LPA INVOICE-VOUCHER State Form 52663 (5-06) An LPA Invoice Voucher must be included with each claim submitted. The LPA Invoice Voucher and claims can be submitted as copies. The LPA should

More information

AGREEMENT FOR ENGINEERING SERVICES. J.R.MacKenzie, P.Eng Goodlad Street Burnaby, BC, V5E 2H9 (herinafter called ENGINEER)

AGREEMENT FOR ENGINEERING SERVICES. J.R.MacKenzie, P.Eng Goodlad Street Burnaby, BC, V5E 2H9 (herinafter called ENGINEER) AGREEMENT FOR ENGINEERING SERVICES This Agreement made this 16 day of January, 2016 between: (herinafter called CLIENT) J.R.MacKenzie, P.Eng. 7916 Goodlad Street Burnaby, BC, V5E 2H9 Canada (herinafter

More information

SECTION: Accounts Payable and Disbursements. SUBJECT: Reimbursement of Expenses When on Society Business (Managing Policy)

SECTION: Accounts Payable and Disbursements. SUBJECT: Reimbursement of Expenses When on Society Business (Managing Policy) 1. Policy Purpose: The Board has approved a Governing Policy for Reimbursement of. The purpose of this managing policy is to provide further direction for staff in order to comply with the Governing Policy.

More information

Application and Project Deadline Applications must be received by 5:00 pm on the deadlines provided.

Application and Project Deadline Applications must be received by 5:00 pm on the deadlines provided. Pike County Accommodations Tax Project Funding Program The County of Pike is offering project funds for tourism through projects presented to them by individuals, businesses, agencies or corporations with

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR THE OREM CITY PARKING STUDY Issued February 26 th, 2018 City of Orem 56 North State Street Orem Utah 84057 TABLE OF CONTENTS 1.0 Introduction... 2 1.1 The Successful Applicant...

More information

Vermont Agency of Natural Resources Department of Environmental Conservation Laboratory. Request for Proposal

Vermont Agency of Natural Resources Department of Environmental Conservation Laboratory. Request for Proposal Laboratory Services LIMS IT Support IT Page 1 of 8 Introduction Vermont Agency of Natural Resources Department of Environmental Conservation Laboratory Request for Proposal Technical Support Services for

More information

APPLICATION FOR FARM LABOUR CONTRACTOR LICENCE

APPLICATION FOR FARM LABOUR CONTRACTOR LICENCE OFFICE USE ONLY ER No. Assign. No. Officer Employment Standards Act APPLICATION FOR FARM LABOUR CONTRACTOR LICENCE NOTE: Once licensed, your name, address, phone number and number of bonded employees will

More information

Vermont Agency of Natural Resources Department of Environmental Conservation Laboratory Services Division. Request for Proposal

Vermont Agency of Natural Resources Department of Environmental Conservation Laboratory Services Division. Request for Proposal Vermont Agency of Natural Resources Department of Environmental Conservation Laboratory Services Division Request for Proposal Technical Support Services for Laboratory Information Management System March

More information

Construction of the Leased Premises

Construction of the Leased Premises Construction of the Leased Premises Pre-Construction Requirements Construction Start The Tenant is required to commence construction no later than fourteen days after receipt by the Tenant of approved

More information

Grain Operations Webinar Series

Grain Operations Webinar Series Grain Operations Webinar Series Webinar 2 Budgeting and Capital Project Management for Grain Operations Supervisors Presenter: Jim Voigt President JFV Solutions, Inc. Mt Zion, IL Objectives Define budgeting

More information

Business Transformation Project/Common Purpose 3.01 Procurement

Business Transformation Project/Common Purpose 3.01 Procurement MINISTRY OF COMMUNITY AND SOCIAL SERVICES Business Transformation Project/Common Purpose 3.01 Procurement Historically, the Ministry of Community and Social Services has provided social assistance to needy

More information

International Trip - A University traveler in travel status to any destination that is not considered in- state or out-of-state.

International Trip - A University traveler in travel status to any destination that is not considered in- state or out-of-state. PROCEDURAL STATEMENT This policy sets forth requirements authorizing individual travel, determining allowable travel expenses, and completing the reimbursement process. The following policy applies to

More information

LIVINGSTON COUNTY COUNTY BUSINESS EXPENSE REIMBURSEMENT POLICY

LIVINGSTON COUNTY COUNTY BUSINESS EXPENSE REIMBURSEMENT POLICY LIVINGSTON COUNTY COUNTY REIMBURSEMENT POLICY RESOLUTION # 2016-08-131 LIVINGSTON COUNTY, MICHIGAN APPROVED: 8/8/16 RESOLUTION # 2015-04-100 APPROVED: 4/27/15 RESOLUTION # 2011-12-344 APPROVED: 12/19/11

More information

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE SPRINKLER SYSTEM INSPECTIONS ITB NO.: DMS-14/15-004

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE SPRINKLER SYSTEM INSPECTIONS ITB NO.: DMS-14/15-004 4050 Esplanade Way Tallahassee, Florida 32399-0950 Tel: 850.488.2786 Fax: 850. 922.6149 Rick Scott, Governor Craig J. Nichols, Agency Secretary ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE

More information

SSAP 23 STATEMENT OF STANDARD ACCOUNTING PRACTICE 23 CONSTRUCTION CONTRACTS

SSAP 23 STATEMENT OF STANDARD ACCOUNTING PRACTICE 23 CONSTRUCTION CONTRACTS SSAP 23 STATEMENT OF STANDARD ACCOUNTING PRACTICE 23 CONSTRUCTION CONTRACTS (Issued May 1998; Revised January 2001) The standards, which have been set in bold italic type, should be read in the context

More information

A Guide to Canadian Standard Form of Agreement Between Client and Architect Abbreviated Version Document Seven

A Guide to Canadian Standard Form of Agreement Between Client and Architect Abbreviated Version Document Seven A Guide to Canadian Standard Form of Agreement Between Client and Architect Abbreviated Version Document Seven Background This guide is written to assist both the Client and Architect in completing the

More information

The Development Agreement. Long-Term Care Home Renewal Branch October 2016

The Development Agreement. Long-Term Care Home Renewal Branch October 2016 The Development Agreement Long-Term Care Home Renewal Branch October 2016 Learning Objectives By the end of this session, you will have a solid understanding of: The description and purpose of a Development

More information

Repair Authority - Terms of Authority

Repair Authority - Terms of Authority Repair Authority - Terms of Authority This document sets out the terms applicable to repair work that Insurance Australia Limited and its related bodies corporate (we, us, our) authorise under a Repair

More information

Services de santé de Chapleau Health Services 1.0 PRINCIPLES. Expense Reimbursement Application: All Employees. None. Exceptions: Resources:

Services de santé de Chapleau Health Services 1.0 PRINCIPLES. Expense Reimbursement Application: All Employees. None. Exceptions: Resources: Manual: Administration Page: 1 of 14 Policy: Application: Exceptions: All Employees None Resources: References: Broader Public Sector Expense Directive issued by Management Board of Cabinet Effective April

More information

Booking Conditions. b) "Booking" means the contract, arranged through the Travel Agent, for Accommodation between you and us;

Booking Conditions. b) Booking means the contract, arranged through the Travel Agent, for Accommodation between you and us; Booking Conditions 1. Introduction 1.1 Booking of Accommodation with Italcamel Travel Agency s.r.l is subject to these terms and conditions (the "Terms and Conditions"). 1.2 In these conditions a reference

More information

Contracts and Independent Logging Contractors

Contracts and Independent Logging Contractors Contracts and Independent Logging Contractors Contracts WV Timber Sale Contract Employee vs. Contractor Status Contractor 1 Contracts Are legal instruments Should be drafted and negotiated only with the

More information

IMPACT FEE CREDIT APPLICATION & GUIDELINES

IMPACT FEE CREDIT APPLICATION & GUIDELINES IMPACT FEE CREDIT APPLICATION & GUIDELINES Land Development Division City of Kansas City, Missouri Updated on January 2009 TABLE OF CONTENTS I. Introduction II. III. IV. Defined terms Formulas Items Not

More information

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL GENERAL 1. Stipulated Price Contract CCDC2-2008 2. CCDC2-2008 Supplemental Conditions The Construction Contract for this project is the standard Construction Document- CCDC2 2008, Stipulated Price Contract.

More information

Scottish Conditions of Appointment of an Architect SCA/2014 (Apr 2015)

Scottish Conditions of Appointment of an Architect SCA/2014 (Apr 2015) SCA/201 (Apr 2015) Definitions Where the defined terms are used in the SCA/201 (Apr 2015) they are distinguished by an initial capital letter. Appointment The agreement between the Client and the Architect

More information

1 Authority, Responsibility, and Policy

1 Authority, Responsibility, and Policy 1 Authority, Responsibility, and Policy 1 Authority, Responsibility, and Policy...1-3 1.1 Authority and Responsibility...1-3 1.1.1 Handbook P-2, Design and Construction Purchasing Practices Handbook 1...1-3

More information

External Consultants & General Contractors Contracts

External Consultants & General Contractors Contracts The University of British Columbia Land and Building Services Prepared by: Frank Geyer Work Procedure Approved by: David Barnes External Consultants & General Contractors Contracts Issue Date: 21 November

More information

FINANCIAL IMPLICATIONS OF THE POLITICAL PARTY FUNDING BILL. Presenter : Gillian Wilson / GH Manack 7 June 2018

FINANCIAL IMPLICATIONS OF THE POLITICAL PARTY FUNDING BILL. Presenter : Gillian Wilson / GH Manack 7 June 2018 FINANCIAL IMPLICATIONS OF THE POLITICAL PARTY FUNDING BILL Presenter : Gillian Wilson / GH Manack 7 June 2018 Content of Presentation Introduction Structure of the unit administering the funds Principles

More information

2019 BUDGET GUIDELINES FOR SPECIAL NEEDS RESOURCING PROGRAMS

2019 BUDGET GUIDELINES FOR SPECIAL NEEDS RESOURCING PROGRAMS CHILDREN S SERVICES 2019 BUDGET GUIDELINES FOR SPECIAL NEEDS RESOURCING PROGRAMS This version replaces the guidelines previously dated September 2017 For help accessing this document, please contact Toronto

More information

REQUEST FOR PROPOSAL For PROFESSIONAL SERVICES. Water & Stormwater Utility Rate Analyses

REQUEST FOR PROPOSAL For PROFESSIONAL SERVICES. Water & Stormwater Utility Rate Analyses REQUEST FOR PROPOSAL For PROFESSIONAL SERVICES Water & Stormwater Utility Rate Analyses 1. INTRODUCTION The intent of this REQUEST FOR PROPOSAL is to obtain a qualified person, firm, or corporation, hereafter

More information

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY PROJECT OVERVIEW The City of Guelph (City) wishes to retain a consulting engineering firm to complete a Stormwater Funding Study.

More information

Management s Response to the Auditor General s Review of Management of Construction Contracts Toronto Water and Sewer Emergency Repair Contracts

Management s Response to the Auditor General s Review of Management of Construction Contracts Toronto Water and Sewer Emergency Repair Contracts 1. The General Manager, Toronto Water, in consultation with the Deputy City Manager and Chief Financial Officer and the City Solicitor: Initially, these contracts were structured in two parts (Part A for

More information

Emergency Measures Organization Disaster Financial Assistance Program

Emergency Measures Organization Disaster Financial Assistance Program Emergency Measures Organization Disaster Financial Assistance Program Preparation of Claim Forms The claims format is designed to help guide the user through the claims process to prepare a straightforward

More information

203(k) Program Full and Streamline

203(k) Program Full and Streamline General Description Renovation Lending is simply adding the cost of repairs and improvements into the mortgage used to purchase or refinance a home The new first mortgage includes the purchase price or

More information

REQUEST FOR PROPOSALS FOR PROFESSIONAL EXTERNAL AUDITING SERVICES RFP No

REQUEST FOR PROPOSALS FOR PROFESSIONAL EXTERNAL AUDITING SERVICES RFP No Putnam Valley Central School District 146 Peekskill Hollow Road Putnam Valley, New York 10579 REQUEST FOR PROPOSALS FOR PROFESSIONAL EXTERNAL AUDITING SERVICES RFP No. 2017-18-01 Jill Figarella, District

More information

Consumer building guide

Consumer building guide Consumer building guide FT246 February 2004 www.fairtrading.nsw.gov.au Additional copies This publication can be viewed or printed from the Publications page of our Web site at: www.fairtrading.nsw.gov.au

More information

Posted: Nevada Tahoe Conservation District Administrative Office, Douglas County Clerk, Washoe County Clerk, NV Division of Conservation Districts.

Posted: Nevada Tahoe Conservation District Administrative Office, Douglas County Clerk, Washoe County Clerk, NV Division of Conservation Districts. PO Box 915 Zephyr Cove, NV 89448 775-586-1610 x 21 Board Meeting Agenda November 15, 2018 4:00 PM (estimated 1 hour duration) Location: NTCD office or phone in Call in Information: (515) 739-1034, code

More information

REQUEST FOR PROPOSAL ORGANIZATIONAL REVIEW OF THE VILLAGE OF BURNS LAKE. November 2013

REQUEST FOR PROPOSAL ORGANIZATIONAL REVIEW OF THE VILLAGE OF BURNS LAKE. November 2013 REQUEST FOR PROPOSAL ORGANIZATIONAL REVIEW OF THE VILLAGE OF BURNS LAKE November 2013 Page 2 of 14 SUMMARY OF KEY INFORMATION Request for Proposals to Deliver a Organizational Review for the Village of

More information

PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning

PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning REGION OF WATERLOO PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: February 1, 2005 FILE CODE: D10-20/CTC SUBJECT:

More information

Managing Construction Risks

Managing Construction Risks Managing Construction Risks RISK #1 The project s budget is understated, and money runs out before the project is completed. (1) Develop a detailed budget with a contingency. The contingency for new construction

More information

CHILD CARE SERVICES CONTRACT

CHILD CARE SERVICES CONTRACT Agreement Number 1006.03-SCD- Charged to 11.71.520300200-8604000 CHILD CARE SERVICES CONTRACT (the Agreement ) Vancouver Island Health Authority (South Island) Child & Family Rehabilitation Services (the

More information

Small Year End Compliance Template

Small Year End Compliance Template Small Year End Compliance Template PRE-JOB Client Information Request Engagement Letter and/or Contract Attach Group Structure Diagram Attach and Review Last Year's Points Forward Complete budget and/or

More information

Chapter 7 Department of Transportation and Infrastructure. Pre-mixed Asphalt Procurement

Chapter 7 Department of Transportation and Infrastructure. Pre-mixed Asphalt Procurement Pre-mixed Asphalt Procurement Chapter 7 Department of Transportation and Infrastructure Pre-mixed Asphalt Procurement Contents Why We Chose this Project.. 259 Background...... 260 Objective and Methodology......

More information

Canadian Standard Form of Agreement between Client and Architect Abbreviated Version

Canadian Standard Form of Agreement between Client and Architect Abbreviated Version The Royal Architectural Institute of Canada Canadian Standard Form of Agreement between Client and Architect Abbreviated Version DOCUMENT SEVEN 2005 Edition ADAPTED FOR: Affix RAIC Authorization Seal Here

More information

2015 SIDEWALK REPAIR REQUEST FOR TENDER

2015 SIDEWALK REPAIR REQUEST FOR TENDER The Corporation of the Town of Tecumseh 2015 SIDEWALK REPAIR REQUEST FOR TENDER September, 2015 * * * The Corporation of the Town of Tecumseh 917 Lesperance Road Tecumseh, ON N8N 1W9 Phone (519) 735-2184

More information

Smart Metering Infrastructure Program

Smart Metering Infrastructure Program Smart Metering Infrastructure Program MASTER SERVICES AGREEMENT SUMMARY December, 2010 The following is a general summary of the Master Agreement for the provision by Capgemini Canada Inc. of project management,

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Needs Assessment and Feasibility Study For New El Centro Public Library Facility Release Date: January 22, 2015 Contact Information: City of El Centro Community Services Department

More information

GLOBAL FOOTPRINT NETWORK, INC. A CALIFORNIA NONPROFIT ORGANIZATION

GLOBAL FOOTPRINT NETWORK, INC. A CALIFORNIA NONPROFIT ORGANIZATION REPORT ON AUDIT OF FINANCIAL STATEMENTS (WITH SUMMARIZED FINANCIAL INFORMATION FOR THE YEAR ENDED DECEMBER 31, 2012) TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR'S REPORT........................... 1-2 FINANCIAL

More information

INTERVIEW AND RELOCATION EXPENSE DIRECTIVE

INTERVIEW AND RELOCATION EXPENSE DIRECTIVE INTERVIEW AND RELOCATION EXPENSE DIRECTIVE Management Board Directive#15/84 Date of Issue: July, 1988; Effective Date: June 26, 1984; Amended: April 1, 2009 1) This Directive, issued pursuant to sections

More information

FHA 203(K) PROGRAM. General Description. Overlays. Available Options

FHA 203(K) PROGRAM. General Description. Overlays. Available Options General Description Renovation Lending is simply adding the cost of repairs and improvements into the mortgage used to purchase or refinance a home. The new first mortgage includes the purchase price or

More information

This Webcast Will Begin Shortly

This Webcast Will Begin Shortly This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: webcast@acc.com Thank You! You have Employees Conducting Business

More information

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 3, Lesson 2 Contract Financing

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 3, Lesson 2 Contract Financing STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 3, Lesson 2 Contract Financing October 2017 CON170, Unit 3 Lesson 2 Contract Financing - Page 1 STUDENT PREPARATION Required Student Preparation

More information

THE ULTIMATE PEACE OF MIND.

THE ULTIMATE PEACE OF MIND. BMW Roadside Assistance & Accident Management 133 BMW bmw.com.au THE ULTIMATE PEACE OF MIND. BMW Roadside Assistance & Accident Management. Peace of mind begins right now. All new BMW Vehicle owners automatically

More information

CN I&T Vendors Travel and Expense Policy and Guidelines for Consultants

CN I&T Vendors Travel and Expense Policy and Guidelines for Consultants CN I&T Vendors Travel and Expense Policy and Guidelines for Consultants Version AUGUST 2018 Table of Contents Expenses (Travel and other)..... 2-5 Invoicing........6 AUGUST 2018 P a g e 1 The following

More information

INSURANCE CONSUMER ADVISEMENT

INSURANCE CONSUMER ADVISEMENT INSURANCE CONSUMER ADVISEMENT Assignment of Benefits: Homeowners Know Your Legal Rights I. What is an Assignment of Benefits? An Assignment of Benefits is a transfer of an insured s (you the policy holder)

More information

Withholding and Reporting Requirements

Withholding and Reporting Requirements Withholding and Reporting Requirements Relationships between workers and payers can vary. Your status may have tax and benefit implications. EMPLOYEES If you are an employee, your employer will deduct

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent CMAA Document A-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent 2013 EDITION This document is to be used in connection with the Standard Form of

More information

Defense Health Agency Future Capital Funding

Defense Health Agency Future Capital Funding Defense Health Agency Future Capital Funding March 27, 2017 1 Future Capital Funding Programming/Funding Models Support enterprise decision making for facilities investments Logical approach/common strategy

More information

Home Warranty Insurance in British Columbia

Home Warranty Insurance in British Columbia Home Warranty Insurance in British Columbia WHAT YOU NEED TO KNOW TO PROTECT YOUR INVESTMENT Understanding Home Warranty... 1 Coverage Expiry Dates... 2 Know What s Covered... 4 Buying a Resale Home...

More information

By Signing this agreement, I acknowledge and agree to below terms and condition:

By Signing this agreement, I acknowledge and agree to below terms and condition: Solar PV Sale and Installation Agreement Terms and Conditions By Signing this agreement, I acknowledge and agree to below terms and condition: You consent to us collecting, holding, using and disclosing

More information

Hazard Loss Claims - Current Loan (Due for this month or Prepaid) Total Loss Claim Greater Than $40,000

Hazard Loss Claims - Current Loan (Due for this month or Prepaid) Total Loss Claim Greater Than $40,000 We recognize that dealing with property damage is never easy. Enclosed are instructions and a checklist to guide you through the loss claims process. wants to make this process as easy on you as possible.

More information

CITY OF EL CENTRO POLICY STATEMENT

CITY OF EL CENTRO POLICY STATEMENT CITY OF EL CENTRO POLICY STATEMENT Policy Statement No: 105 Adopted: 10/17/01 Category: General Revised: 04/02/03 Subject: Travel Distribution: All Departments I. Purpose The City of El Centro acknowledges

More information

The Society of Garden Designers

The Society of Garden Designers The Society of Garden Designers Engaging a Garden Designer Guidance for Clients on Professional Fees Society of Garden Designers Katepwa House Ashfield Park Avenue Ross-on-W ye Herefordshire HR9 5AX tel

More information

City of Terrace. Request for Proposals Pedestrian Overpass Concept Design & Feasibility Study. Issue Date: January 31, 2018

City of Terrace. Request for Proposals Pedestrian Overpass Concept Design & Feasibility Study. Issue Date: January 31, 2018 City of Terrace Request for Proposals Issue Date: January 31, 2018 Closing Date: March 2, 2018 City of Terrace 5003 Graham Avenue Terrace, BC V8G 1B3 Contact: David Block Director of Development Services

More information

Mitigation, Prevention, Occupational Health and Safety

Mitigation, Prevention, Occupational Health and Safety Section 1: Program Information Program Purpose: Support the New Brunswick agriculture industry to prevent accidents and promote occupational safety on farms as well as to identify, manage, protect and

More information

The New NZS 3910:2013

The New NZS 3910:2013 The New NZS 3910:2013 Introduction On the 1 st of October 2013, NZS 3910:2013 Conditions of Contract for Building and Civil Engineering Construction was released by New Zealand Standards. This is the first

More information

Loan Servicing Procedures Guide

Loan Servicing Procedures Guide Loan Servicing Procedures Guide Multifamily Capital Markets Newmark Knight Frank provides post-closing services to you for your loan. Your entire relationship is overseen by your Portfolio Manager. As

More information

APPENDIX - A TECHNICAL SPECIFICATIONS. JEA Fleet Services Heavy Duty Maintenance and Repair

APPENDIX - A TECHNICAL SPECIFICATIONS. JEA Fleet Services Heavy Duty Maintenance and Repair APPENDIX - A TECHNICAL SPECIFICATIONS JEA Fleet Services Heavy Duty Maintenance and Repair 1. GENERAL SCOPE OF WORK The purpose of this Invitation to Negotiate (the "ITN") is to evaluate and select a Respondent

More information

Purchasing Manual. Resolution Exhibit A. AWWD Purchasing Manual Date: Last Revised 6/29/10

Purchasing Manual. Resolution Exhibit A. AWWD Purchasing Manual Date: Last Revised 6/29/10 Purchasing Manual Resolution 2527-2009 Exhibit A Date: Last Revised 6/29/10 Date: Last Revised 6/29/10 Table of Contents Purchasing Decision Trees Item to Be Purchased Cross Reference Guide Section 1.

More information

revised April 19th Request for Proposals Post FCC Spectrum Auction Planning Proposals are Due May 2, 2016 by 5 pm Eastern Standard Time

revised April 19th Request for Proposals Post FCC Spectrum Auction Planning Proposals are Due May 2, 2016 by 5 pm Eastern Standard Time revised April 19th Request for Proposals Post FCC Spectrum Auction Planning Proposals are Due May 2, 2016 by 5 pm Eastern Standard Time I. OVERVIEW The Federal Communications Commission will hold a voluntary

More information

This Webcast Will Begin Shortly

This Webcast Will Begin Shortly This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: splemoderator@smartpros.com Thank You! 1 KEY ISSUES IN NEGOTIATING

More information

Contact Rockgas Auto LPG loan and Fuel Card application

Contact Rockgas Auto LPG loan and Fuel Card application Contact Rockgas Auto LPG loan and Fuel Card application Part 1 details of applicant and guarantor All applicants must complete sections 1 4 and 6 8. Should you require any assistance completing this form,

More information

Warranty Service Authorization Policy

Warranty Service Authorization Policy Warranty Service Authorization Policy As part of continuous improvement program for Albany High Performance Door Solutions, and to facilitate the payment process of warranty claims, we have developed this

More information

BC GOVERNMENT AND SERVICE EMPLOYEES' UNION

BC GOVERNMENT AND SERVICE EMPLOYEES' UNION BC GOVERNMENT AND SERVICE EMPLOYEES' UNION Financial Manual Revised November 24, 2016 SCHEDULE "A" Current Maximum Rates/Allowances, etc. Article 2.1 - Union dues 1.85% of gross pay. Gross pay includes

More information

Request for Proposals Drainage Master Plan

Request for Proposals Drainage Master Plan Request for Proposals 201-15 Drainage Master Plan The City of Dawson Creek invites proposals from qualified professionals or firms to undertake a drainage master plan. This master plan will include an

More information

HEQCO REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS PROPOSAL SUBMISSION INSTRUCTIONS

HEQCO REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS PROPOSAL SUBMISSION INSTRUCTIONS HEQCO REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS PROPOSAL SUBMISSION INSTRUCTIONS Proposals are to be submitted according to the following method: 1. Proposal submission must contain one (1) electronic copy

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL PURCHASING DEPARTMENT P.O. BOX 1349 300 N. PATTERSON ST. VALDOSTA, GEORGIA 31601 #LC- 460-015 FOR: HVAC Service for County Buildings OPENING DATE: Friday, March 6, 2015 TIME: 10:00

More information

Downtown Core Sidewalk Repair Loan Program

Downtown Core Sidewalk Repair Loan Program Downtown Core Sidewalk Repair Loan Program Program Administered by: Center City Development Corporation 114 North Main Street Memphis, TN 38103 (901) 575-0540 www.downtownmemphiscommission.com Packet information

More information

This document provides information about the provincial government s response to the 2009 coroner s recommendations.

This document provides information about the provincial government s response to the 2009 coroner s recommendations. On March 7, 2007, a van carrying 17 people (16 farmworkers and a driver) was involved in a motor vehicle accident near Abbotsford, B.C. that resulted in the deaths of three workers and injuries to the

More information

Indirect costs, on the other hand, are expenses that cannot be specifically identified with a particular project or activity.

Indirect costs, on the other hand, are expenses that cannot be specifically identified with a particular project or activity. II. Other Direct Costs A. Overview A project budget is comprised of direct costs, i.e. salaries and other direct costs, and indirect costs. Other direct costs refer to expenditures that are allowed as

More information

RENTAL TERMS AND CONDITIONS

RENTAL TERMS AND CONDITIONS RENTAL TERMS AND CONDITIONS The Luxe Nomad ( TLN ) acts as an agent for Property owners ( Owner ) and their representatives ( Owner Representative ) in promoting Properties for rent and arranging bookings.

More information

RULES ON ELIGIBILITY OF COSTS

RULES ON ELIGIBILITY OF COSTS Annex 1 of the Call for proposals RULES ON ELIGIBILITY OF COSTS These rules present various possible categories of eligible costs. The call for proposal may then stipulate that only some of the below categories

More information

ACTION FOR BRIDGEPORT COMMUNITY DEVELOPMENT, INC.

ACTION FOR BRIDGEPORT COMMUNITY DEVELOPMENT, INC. FINANCIAL STATEMENTS SEPTEMBER 30, 2015 AND 2014 CONTENTS Independent Auditors Report 1-2 Statements of Financial Position - September 30, 2015 and 2014 3 Statements of Activities for the Years Ended September

More information

Preparing your CanExport claim. The Canadian Trade Commissioner Service Le Service des délégués commerciaux du Canada

Preparing your CanExport claim. The Canadian Trade Commissioner Service Le Service des délégués commerciaux du Canada Preparing your CanExport claim The Canadian Trade Commissioner Service Le Service des délégués commerciaux du Canada Before You Begin Refer to the Applicant Guide for information on eligible and ineligible

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information