1 REGION OF WATERLOO PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: February 1, 2005 FILE CODE: D10-20/CTC SUBJECT: UPDATE ON THE REGION OF WATERLOO RAPID TRANSIT TECHNICAL STUDIES AND ENVIRONMENTAL ASSESSMENT RECOMMENDATION: For information SUMMARY: The Region of Waterloo and Government of Canada are jointly funding various technical studies to determine the best approach for implementation of rapid transit service in Waterloo Region. The Province of Ontario is also jointly funding the Environmental Assessment study for Rapid Transit with the Region. This report provides an update on the status of each of these studies. This initiative is a key component of the Region s Growth Management Strategy that will address future growth challenges and help shape urban form. It is also consistent with Provincial and Federal growth objectives. It is anticipated that the Technical studies will be completed in April of The Terms of Reference for the Environmental Assessment should be ready for submission to the Ministry of Environment by March of The Environmental Assessment can proceed once the Terms of Reference has received approval from the Minister of the Environment. REPORT: Region of Waterloo Council unanimously adopted the Regional Growth Management Strategy (RGMS) on June 25, 2003 to address the future growth challenges facing the Region. This Strategy is anchored on the implementation of Rapid Transit in a visionary approach to community building. It is a holistic approach that intrinsically links the development of transportation infrastructure with the achievement of land use objectives. The RGMS provides a higher level of protection for environmentally sensitive areas and agricultural lands and as well supports development of a compact transit efficient urban form along a planned 30 kilometre Central Transit Corridor linking the three cities of Cambridge, Kitchener and Waterloo. As a result, key Municipal objectives relating to environmental protection, agricultural land preservation, economic competitiveness, reurbanization, social inclusiveness and public health will be achieved. On May 15, 2004, the Government of Canada, the Government of Ontario and the Region of Waterloo jointly announced funding of up to $2.5 million for technical studies and an Environmental Assessment for the Region of Waterloo Rapid Transit project as summarized in the following sections. Page 1 of 5

2 Technical Study Requirements The Federal government is providing 50% funding up to $250,000 for technical studies including: Demonstration of how best to support the relationship between the anticipated urban growth and the transit investment through land use planning and policy instruments; Assessment of various transit options, including Bus Rapid Transit and Light Rail Transit, and how each can be integrated with other transportation services; Additional ridership projections for the proposed new transit line including surveys of public views of new transit initiatives and future ridership forecasts. Detailed cost-benefit analysis of the project incorporating scenarios around ridership objectives and land use, and an analysis of alternative transportation investments. Regional Council, on September 29, 2004, approved the hiring of Cansult Limited to undertake the Technical Studies. There was a significant data collection component for this assignment which has now been completed. Specific data included population and employment forecasts, transit and automobile origin destination information and a stated preference survey. The consultant has completed the following components of the work plan and will be reporting to the Project Team on February 3 rd : Stated preference survey and development of a travel forecasting model; Re-urbanization opportunities within the Central Transit Corridor for the Business as Usual, Bus Rapid Transit and Light Rail Transit alternatives; Findings and lessons learned from the case studies of seven cities; and Review of the Bus Rapid Transit and Light Rail Transit operating concepts. Tasks that still need to be completed include: Forecasting ridership for each transit alternative; Evaluation of transportation alternatives; Identifying potential land use policy, financial incentives and Transportation Demand Management initiatives; and Update capital and operating cost estimates; Cost-Benefit Analysis. It is expected that these tasks will be completed by the middle of March with a draft report ready by the end of March. Transport Canada has requested that a peer reviewer be retained as part of this process. The peer review team has been retained and consists of the following personnel: 1. Ridership Projections Dr. Eric Miller, University of Toronto 2. Transportation Alternatives Thom Budd, Hatch, Mott, McDonald 3. Land Use Policy, Financial Incentives and Transportation Demand Management Initiatives Bob Lehman, MKI 4. Cost-Benefit Analysis Bob Lehman, MKI Deloitte & Touche will be coordinating the peer review component of the study. After allocating time for the peer reviewer and regional staff to review the draft report, it is anticipated a report will be brought to Planning and Works Committee in April of This revised schedule will not have an impact on the overall timing of the Rapid Transit project Page 2 of 5

3 Individual Environmental Assessment The Provincial government is providing 50% funding up to $1,000,000 for the undertaking of an Environmental Assessment. The purpose of the Ontario Environmental Assessment Act (EA Act) is the betterment of the people of the whole or any part of Ontario by providing for the protection, conservation and wise management in Ontario of the environment. Environment is applied broadly and includes the natural, social, cultural, built and economic components. The majority of road infrastructure projects undertaken by the Region are subject to compliance with an approved Class EA process. Transit projects of this nature are subject to an Individual EA process that requires a report be submitted to the Ministry of Environment for approval by the Province. Compliance with the Federal Environmental Assessment Act must also be considered for projects requiring Federal Government approval. The first step in satisfying the requirements of the EA Act is to produce a Terms of Reference for the Individual EA. Once completed, the Terms of Reference would be submitted to the Minister of Environment for approval. The Individual EA would then follow the approved Terms of Reference. Regional Council, on June 9, 2004, approved the hiring of IBI Group to develop the Terms of Reference for the Environmental Assessment Study. IBI Group is currently drafting the Terms of Reference in preparation for a five week pre-submission review that will provide agency stakeholders and the public an opportunity to provide comment. A Public Consultation meeting was held on December 8, This introductory Public Consultation Session explained the EA process and the Terms of Reference purpose, and scope the issues and opportunities that will be incorporated into the Terms of Reference, such as the various Alternatives Undertakings and Alternative Methods to be included in the Terms of Reference planning process. The 35 attendees were also asked to provide input on transportation and related issues that should be considered in the EA and addressed through the Terms of Reference. A second Public Consultation Meeting will be held in February/March as part of the pre-submission review. This timing would permit submission of the Terms of Reference to the Ministry of Environment in late March. The Minister of Environment then has a twelve-week period to review and approve the document following which the Individual Environmental Assessment could start. A potential schedule illustrating timing for the subsequent Individual Environmental Assessment is shown in Appendix A. This schedule indicates completion by October of 2006 and is considered to be aggressive. Regional staff are investigating ways to streamline the process, but with regulatory public review periods, it is anticipated completion in the fall of 2006 is the most likely scenario. CORPORATE STRATEGIC PLAN: The implementation of Rapid Transit in the Central Transit Corridor is consistent with the Region s Growth Management Strategy and addresses the Region s goal to provide effective policies that ensure responsible and sustainable growth. FINANCIAL IMPLICATIONS: Page 3 of 5

4 The Region s approved 2005 Planning Housing and Community Services 10 Year Capital Forecast includes a total of $1,600,000 in 2005 and $500,000 in 2006 for the technical studies and Environmental Assessment process. The Federal Government will be funding 50% of the cost of the Technical Studies up to a maximum of $250,000, and the Province of Ontario will be funding 50% of the cost of the Environmental Assessment up to a maximum of $1,000,000. OTHER DEPARTMENT CONSULTATIONS/CONCURRENCE: The Transportation and Environmental Services Department and the Legal Services Division will be consulted throughout these studies and are represented on the Project Team. ATTACHMENTS: Appendix A Potential Schedule Individual EA Preparation for Waterloo Region CTC Rapid Transit Initiative PREPARED BY: Graham Vincent, Director, Transportation Planning APPROVED BY: Larry E. Kotseff, Commissioner of Planning, Housing and Community Services Page 4 of 5

5 Appendix A Potential Schedule - Individual EA Preparation for Waterloo Region CTC Rapid Transit Initiative May June July August Sept Oct Nov Dec Jan Feb March April May June July August Sept Oct PHASE 1: PROJECT INITIATION Project Team Mtg #1 - Project Initiation Notice of Study Commencement Data Gathering Detailed Work Plan Detailed Communication Plan Project Team Mtg #2 - Project Scoping Base Mapping Preparation - Route Planning Public Outreach Events PHASE 2: PROJECT RATIONALE Public Event #1 - Technical Study Results/Rationale Project Team Mtg #3 - Evaluation Method/Criteria PHASE 3: ENVIRONMENTAL INVENTORIES Initial Scoping Summer Fall Winter Spring Field Investigations Opportunities & Constraints Analysis PHASE 4: EVALUATION OF ALTERNATIVES Evaluate Alternatives to the Undertaking Project Team Mtg #4 - Confirm Preferred Undertaking Public Event #2 - Preferred Undertaking Screen/Confirm Alternative Methods Project Team Mtg #5 - Confirm Shortlist Methods Evaluate Short-Listed Methods Project Team Mtg #6 - Confirm Preferred Methods Base Map Preparation - Design Municipal Council Presentations - Project Public Event #3 - Preferred Methods PHASE 5: PRELIMINARY DESIGN Alignment Plan & Profile Detailing Station Concept Plans Impact & Mitigation Assessment Regional Design Review Project Team Mtg #7 - Preliminary Design Approval Municipal Council Presentations - Design Public Event #4 - Design PHASE 6: EA REPORT Draft EA Report Preparation Project Team Mtg #8 - Draft EA Report Approval Regional Council Presentation Mediation Period MOE Submission Project Team Meeting Reports Consultation Events 30-Day Public Review 24-Jan-05 Page 5 of 5

Region of Waterloo Transportation and Environmental Services Rapid Transit

Region of Waterloo Transportation and Environmental Services Rapid Transit Region of Waterloo Transportation and Environmental Services Rapid Transit To: Chair Tom Galloway and Members of the Planning and Works Committee Date: November 17, 2015 File Code: D09-00(A) Subject: Stage

More information

SOCIAL SERVICES Social Policy, Planning and Program Administration

SOCIAL SERVICES Social Policy, Planning and Program Administration REGION OF WATERLOO SOCIAL SERVICES Social Policy, Planning and Program Administration TO: Chair Sean Strickland and Members of the Community Services Committee DATE: September 10, 2013 FILE CODE: S13-30

More information

Region of Waterloo Transportation and Environmental Services Rapid Transit Corporate Services Financial Services and Development Financing

Region of Waterloo Transportation and Environmental Services Rapid Transit Corporate Services Financial Services and Development Financing Report: TES-RTS-17-07 COR-FSD-17-30 Region of Waterloo Transportation and Environmental Services Rapid Transit Corporate Services Financial Services and Development Financing To: Chair Sean Strickland

More information

Public Transit Infrastructure Fund (PTIF) Phase I Progress Update and Next Steps

Public Transit Infrastructure Fund (PTIF) Phase I Progress Update and Next Steps Clause 6 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 29, 2017. 6 Public Transit Infrastructure

More information

6 TRANSFER OF PROVINCIAL GAS TAX TO MUNICIPALITIES FOR PUBLIC TRANSPORTATION

6 TRANSFER OF PROVINCIAL GAS TAX TO MUNICIPALITIES FOR PUBLIC TRANSPORTATION 6 TRANSFER OF PROVINCIAL GAS TAX TO MUNICIPALITIES FOR PUBLIC TRANSPORTATION The Finance and Administration Committee recommends the adoption of the recommendations contained in the following report, October

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT SEPTEMBER 2017 FOREWORD TO MONTHLY STATUS REPORT On September 6, 2017, the Minister

More information

SHIFT RAPID TRANSIT MASTER PLAN AND BUSINESS CASE RECOMMENDATION

SHIFT RAPID TRANSIT MASTER PLAN AND BUSINESS CASE RECOMMENDATION TO: FROM: SUBJECT: CHAIR AND MEMBERS STRATEGIC PRIORITIES AND POLICIES COMMITTEE MEETING ON JULY 24, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND CITY

More information

Public-Private Partnerships in Maryland. Canada-US Forum on Public-Private Partnerships October 3, 2013

Public-Private Partnerships in Maryland. Canada-US Forum on Public-Private Partnerships October 3, 2013 Public-Private Partnerships in Maryland Canada-US Forum on Public-Private Partnerships October 3, 2013 Towards a More Comprehensive P3 Approach 2010 P3 Law (Chapters 640 and 641 of 2010) Joint Legislative

More information

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee Mark G. Meneray, Commissioner, Legislative & Planning Services and Corporate Counsel Date:

More information

Public Meeting of the Mayors Council (Items 2, 3 and 4)

Public Meeting of the Mayors Council (Items 2, 3 and 4) TransLink Room 427/428 Public Meeting of the Mayors Council (Items 2, 3 and 4) February 15, 2018 2 Item 2: Report of the Finance Committee Next Steps on the Phase Two Plan Item 2 3 3 Investment Plan Item

More information

Region of Waterloo Planning, Development and Legislative Services Community Planning

Region of Waterloo Planning, Development and Legislative Services Community Planning Region of Waterloo Planning, Development and Legislative Services Community Planning To: Chair Tom Galloway and Members of the Planning and Works Committee Date: April 4, 217 File Code: D7-4(A) Subject:

More information

City of Kingston Information Report to Environment, Infrastructure & Transportation Policies Committee Report Number EITP

City of Kingston Information Report to Environment, Infrastructure & Transportation Policies Committee Report Number EITP City of Kingston Information Report to Environment, Infrastructure & Transportation Policies Committee Report Number EITP-16-003 To: From: Resource Staff: Date of Meeting: Subject: Chair and Members of

More information

Building a Better Tomorrow

Building a Better Tomorrow Building a Better Tomorrow Investing in Ontario s Infrastructure to Deliver Real, Positive Change A Discussion Paper on Infrastructure Financing and Procurement February 2004 2 BUILDING A BETTER TOMORROW

More information

National Energy Board Decision on Enbridge Line 9B Application Follow Up Actions

National Energy Board Decision on Enbridge Line 9B Application Follow Up Actions STAFF REPORT ACTION REQUIRED National Energy Board Decision on Enbridge Line 9B Application Follow Up Actions Date: August 12, 2014 To: From: Wards: City Council City Manager and City Solicitor All Reference

More information

DEVELOPMENT CHARGES & ASSET MANAGEMENT: FULFILLING THE NEW REQUIREMENTS OF THE DCA. Monday, June 12, 2017

DEVELOPMENT CHARGES & ASSET MANAGEMENT: FULFILLING THE NEW REQUIREMENTS OF THE DCA. Monday, June 12, 2017 DEVELOPMENT CHARGES & ASSET MANAGEMENT: FULFILLING THE NEW REQUIREMENTS OF THE DCA Monday, June 12, 2017 Today we will discuss Overview of Development Charges and Asset Management Regulatory Context Asset

More information

Regional Municipality of Waterloo. Library Committee. Agenda. Media Release: Friday, June 10, 2016, 4:30 p.m. Tuesday, June 14, 2016

Regional Municipality of Waterloo. Library Committee. Agenda. Media Release: Friday, June 10, 2016, 4:30 p.m. Tuesday, June 14, 2016 Regional Municipality of Waterloo Library Committee Agenda Tuesday, Immediately following Community Services Committee Room 217 150 Frederick Street, Kitchener Media Release: Friday, June 10, 2016, 4:30

More information

Provincial Election 2018

Provincial Election 2018 Provincial Election 2018 Party Platforms: What We Know So Far Last Updated January 31, 2017 Ontario Liberal Party Held open consultation process Nov Dec 2017 Results of public consultation survey to be

More information

BOARD OF EDUCATION 2017 / Governance Framework and Annual Work Plan

BOARD OF EDUCATION 2017 / Governance Framework and Annual Work Plan BOARD OF EDUCATION 2017 / 2018 Governance Framework and Annual Work Plan 2 Annual Work Plan and Governance Framework 2017-2018 The Importance of a Governance Framework Effective Boards of Education have

More information

Report to: Development Services Committee Date: June 26, 2017

Report to: Development Services Committee Date: June 26, 2017 SUBJECT: New Provincial Plans Release of the 2017 Growth Plan, Greenbelt Plan and Oak Ridges Moraine Conservation Plan PREPARED BY: Policy and Research, Planning and Urban Design REVIEWED BY: Marg Wouters,

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks)

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks) ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study MONTHLY PROGRESS REPORT #19 Period Ending September 30, 2003 1. Work Accomplished This Period (4 Weeks) Strategic

More information

Local Development Scheme October 2018

Local Development Scheme October 2018 Local Development Scheme October 2018 TIMETABLE (LOCAL DEVELOPMENT SCHEME) SETTING OUT WHAT LOCAL PLANS ARE BEING PRODUCED BY THE AUTHORITY 2018 to 2021 CONTENTS SUMMARY 1.0 INTRODUCTION 2 What is a Local

More information

Report on Council and Senior Staff Planning Retreat December 17 and 18, Presentation to Council January 27, 2015

Report on Council and Senior Staff Planning Retreat December 17 and 18, Presentation to Council January 27, 2015 Report on Council and Senior Staff Planning Retreat December 17 and 18, 2014 Presentation to Council January 27, 2015 Outline of retreat Update about state of the community Review of foundational work

More information

CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP. Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa

CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP. Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa OVERVIEW Project Overview Business Case & Benefits Procurement

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

AUDIT OF THE INFRASTRUCTURE PROGRAM CANADA-ONTARIO INFRASTRUCTURE PROGRAM (COIP) AND CANADA-ONTARIO MUNICIPAL RURAL INFRASTRUCTURE FUND (COMRIF)

AUDIT OF THE INFRASTRUCTURE PROGRAM CANADA-ONTARIO INFRASTRUCTURE PROGRAM (COIP) AND CANADA-ONTARIO MUNICIPAL RURAL INFRASTRUCTURE FUND (COMRIF) Final Audit Report AUDIT OF THE INFRASTRUCTURE PROGRAM CANADA-ONTARIO INFRASTRUCTURE PROGRAM (COIP) AND CANADA-ONTARIO MUNICIPAL RURAL INFRASTRUCTURE FUND (COMRIF) January 2008 Recommended for Approval

More information

BUDGET 2014 Building Modern Infrastructure

BUDGET 2014 Building Modern Infrastructure BUDGET 2014 Building Modern Infrastructure May 1, 2014 Ontario s projected population growth will result in significant demand for all types of infrastructure, including transportation, health care and

More information

DEFERRED MATTERS. CIVIC WORKS COMMITTEE (AS OF April 18, 2017)

DEFERRED MATTERS. CIVIC WORKS COMMITTEE (AS OF April 18, 2017) DEFERRED MATTERS CIVIC WORKS COMMITTEE (AS OF April 18, ) Item File Subject Request Date Requested/ Expected Reply Date 1. 13 On-street Municipal Parking Spaces for Boulevard Cafes in the Downtown Finalize

More information

Letter of Direction Final Report

Letter of Direction Final Report 2016-17 Letter of Direction Final Report September 30, 2016 Table of Contents Executive Summary... 3 1 Introduction... 5 1.1 Letter of Direction (LOD)... 5 1.2 Beyond the Final Report... 5 2 Communications

More information

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process CHAPTER 2 BACKGROUND What Is the 2030 TSP? Update of Previous Planning Work Plan Development Process Public Involvement and Review Process Hennepin County Transportation Systems Plan (HC-TSP) Chapter 2

More information

3 YORK REGION 2031 POPULATION AND EMPLOYMENT FORECASTS

3 YORK REGION 2031 POPULATION AND EMPLOYMENT FORECASTS 3 YORK REGION 2031 POPULATION AND EMPLOYMENT FORECASTS The Planning and Economic Development Committee recommends: 1. Receipt of the presentation by Paul Bottomley, Manager, Growth Management Economy and

More information

PRELIMINARY 2017 Unified Budget & Levies

PRELIMINARY 2017 Unified Budget & Levies Metropolitan Council PRELIMINARY 2017 Unified Budget & Levies August 10, 2016 Council Meeting Council Budget Development Operating Budget Operations Pass-through Debt Service Capital Program Authorized

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

INTERGOVERNMENTAL AGREEMENT BETWEEN METRO AND WASHINGTON COUNTY FOR THE SOUTHWEST CORRIDOR PLAN

INTERGOVERNMENTAL AGREEMENT BETWEEN METRO AND WASHINGTON COUNTY FOR THE SOUTHWEST CORRIDOR PLAN INTERGOVERNMENTAL AGREEMENT BETWEEN METRO AND WASHINGTON COUNTY FOR THE SOUTHWEST CORRIDOR PLAN This Intergovernmental Agreement ( Agreement ) is made and entered into by and between Washington County

More information

Item #6B. September 17, 2014

Item #6B. September 17, 2014 Regional Planning Partnership September 17, 2014 Item #6B 2016 MTP/SCS Update: Land Use Forecast Methodology Issue: How is the land use forecast methodology applied in the Metropolitan Transportation Plan/Sustainable

More information

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Transportation Division

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Transportation Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transportation Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: February 4, 2013 SUBJECT/REPORT NO: Transit Bus

More information

Springs Coast Steering Committee Proposed FY2020 Springs Funding Application Timeline and Process. July 11, 2018

Springs Coast Steering Committee Proposed FY2020 Springs Funding Application Timeline and Process. July 11, 2018 Springs Coast Steering Committee Proposed FY2020 Springs Funding Application Timeline and Process July 11, 2018 Applications Submitted via Spreadsheet FY2019 Process SCMC Reviewed Spreadsheet Submissions

More information

10 Property Tax Treatment for Regional Transit Facilities

10 Property Tax Treatment for Regional Transit Facilities Clause 10 in Report No. 16 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 16, 2017. 10 Property Tax Treatment

More information

Pilot Watersheds Plan Development: Work Plan

Pilot Watersheds Plan Development: Work Plan Pilot Watersheds Plan Development: Work Plan This Work Plan outlines tasks for the development of watershed-based plans consistent with the One Watershed, One Plan vision and program grant requirements.

More information

Electricity Power System Planning

Electricity Power System Planning Chapter 3 Section 3.02 Ministry of Energy Electricity Power System Planning Standing Committee on Public Accounts Follow-Up on Section 3.05, 2015 Annual Report The Committee held a public hearing in November

More information

Item No Audit and Finance Standing Committee July 18, 2018

Item No Audit and Finance Standing Committee July 18, 2018 PO Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 12.2.1 Audit and Finance Standing Committee July 18, 2018 TO: Chair and Members of Audit and Finance Standing Committee Original Signed SUBMITTED

More information

1. I N T R O D U C T I O N

1. I N T R O D U C T I O N INTRODUCTION The Chico 2030 General Plan is a statement of community priorities to guide public decisionmaking. It provides a comprehensive, long-range, and internally consistent policy framework for the

More information

Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Audit of the Income Assistance Program. Prepared by:

Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Audit of the Income Assistance Program. Prepared by: Aboriginal Affairs and Northern Development Canada Internal Audit Report Audit of the Income Assistance Program Prepared by: Audit and Assurance Services Branch Project # 12-07 February 2013 TABLE OF CONTENTS

More information

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process City of Saint John Common Council Meeting Wednesday, July 18, 2012 Special Meeting of Council 1. Call to Order Prayer 9:30 a.m. Council Chamber 1.1 Strategic Decision Making; Council Priorities, Core Service

More information

Ministry of Environment. Plan for saskatchewan.ca

Ministry of Environment. Plan for saskatchewan.ca Ministry of Environment Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 9 Financial Summary...10

More information

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit Edmonton Metropolitan Region Planning Toolkit Re-imagine. Plan. Build. Edmonton Metropolitan Region Growth Plan 1.0 INTRODUCTION On October 26, 2017, the Government of Alberta approved the Edmonton Metropolitan

More information

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

A loyal three made stronger in one. Loyalist Township Strategic Plan ( ) A loyal three made stronger in one Loyalist Township Strategic Plan (2012-2015) Adopted by Council on August 13, 2012 Loyalist Township Strategic Plan I. Community Profile As prescribed by the Ministry

More information

REFURBISHMENT AND NEW GENERATION NUCLEAR

REFURBISHMENT AND NEW GENERATION NUCLEAR Filed: 00--0 EB-00-00 Exhibit D Tab Page of 0 0 0 REFURBISHMENT AND NEW GENERATION NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear plant refurbishment

More information

Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects

Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects STAFF REPORT ACTION REQUIRED Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects Date: October 23, 2012 To: From: Wards: City Council City Manager All

More information

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING RE: An Environmental Assessment for the Easterly Extension of the 407 Transportation Corridor Proponent: EA File

More information

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond

More information

VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT

VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT 1 2 3 4 Highway 407 East Phase 1 Project Artist s rendering Highlights of Highway 407 East Phase 1 Highway 407 East will help to relieve congestion

More information

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transit Division

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transit Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transit Division TO: Mayor and Members General Issues Committee COMMITTEE DATE: March 23, 2017 SUBJECT/REPORT NO: WARD(S) AFFECTED: PREPARED BY: Ten Year Local

More information

REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010

REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010 REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010 SUBJECT City of Victoria Request for General Strategic Priorities Funding Application Support Johnson Street Bridge

More information

CENTRAL CITY LINE PROJECT UPDATE AND SMALL STARTS EVALUATION & RATINGS APPLICATION UPDATED & REVISED 4/20/17

CENTRAL CITY LINE PROJECT UPDATE AND SMALL STARTS EVALUATION & RATINGS APPLICATION UPDATED & REVISED 4/20/17 CENTRAL CITY LINE PROJECT UPDATE AND SMALL STARTS EVALUATION & RATINGS APPLICATION UPDATED & REVISED 4/20/17 EXECUTIVE SUMMARY The Central City Line (CCL) is a proposed 6-mile long high performance Bus

More information

COMMITTEE OF THE WHOLE MEETING JANUARY 15, 2018

COMMITTEE OF THE WHOLE MEETING JANUARY 15, 2018 REPORT #PD-2018-01 COMMITTEE OF THE WHOLE MEETING JANUARY 15, 2018 COUNTY OF SIMCOE MUNICIPAL COMPREHENSIVE REVIEW RECOMMENDATION That Report #PD-2018-01 be received. OBJECTIVE The purpose of this report

More information

STAFF REPORT Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) Scenario Performance Update for Board Direction

STAFF REPORT Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) Scenario Performance Update for Board Direction November 2017 Board of Directors STAFF REPORT SUBJECT: RECOMMENDED ACTION: 2018 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) Scenario Performance Update for Board Direction Support

More information

THE ESTIMATES, MINISTRY OF ENERGY SUMMARY $ $ $ $ OPERATING

THE ESTIMATES, MINISTRY OF ENERGY SUMMARY $ $ $ $ OPERATING THE ESTIMATES, 2004-05 1 SUMMARY The Ministry of Energy's mandate includes the creation of an energy conservation culture while ensuring a reliable, sustainable, and diverse supply of power at stable and

More information

THE CITY OF RED DEER HERITAGE MANAGEMENT PLAN

THE CITY OF RED DEER HERITAGE MANAGEMENT PLAN THE CITY OF RED DEER HERITAGE MANAGEMENT PLAN EXECUTIVE SUMMARY Red Deer City Council adopted the Management Plan as a planning tool on September 11, 2006 Prepared by: BACKGROUND The heritage resources

More information

FY2014 Capital and Operating Budget Discussion

FY2014 Capital and Operating Budget Discussion Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission January 2015 Document Control Contract Name Contract Number C066

More information

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description.

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description. Filed: 2018-07-04, EB-2018-0108, Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 1 of 9 From: To: Cc: Subject: Date: Attachments: Stephanie Allman "emma.sharkey@ontario.ca" "zora.crnojacki@oeb.ca" Enbridge

More information

Update on Municipal Asset Management Planning

Update on Municipal Asset Management Planning Update on Municipal Asset Management Planning Municipal Finance Officers Association Conference Ontario Ministry of Infrastructure September 20, 2017 Overview Municipal asset management planning in Ontario

More information

Letter of Direction Interim Report

Letter of Direction Interim Report 2016-17 Letter of Direction Interim Report June 30, 2016 Table of Contents 1 Introduction... 3 1.1 Letter of Direction (LOD)... 3 1.2 Letter of Direction (LOD) Report Back... 4 2 Communications Protocols...

More information

Update: City of Toronto Review of Mayor s Task Force Report Item 8 May 5, 2016 Building Investment, Finance and Audit Committee

Update: City of Toronto Review of Mayor s Task Force Report Item 8 May 5, 2016 Building Investment, Finance and Audit Committee Page 1 of 8 Update: City of Toronto Review of Mayor s Task Force Report Item 8 May 5, 2016 Building Investment, Finance and Audit Committee Report: To: BIFAC:2016-75 Building Investment, Finance and Audit

More information

Housing Operations. Housing Division Re-Organization. Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps

Housing Operations. Housing Division Re-Organization. Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps Housing Operations Housing Operations Housing Division Re-Organization Robert Lee s retirement Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps Housing Division Re-Org Principles

More information

to the Growth Plan for the Greater Golden Horseshoe, 2006

to the Growth Plan for the Greater Golden Horseshoe, 2006 Proposed Amendment 2 to the Growth Plan for the Greater Golden Horseshoe, 2006 November 2012 Population and Employment Forecasts Policies and Implementation Proposed Amendment 2 to the Growth Plan for

More information

Regional Municipality of Waterloo. Budget Committee. Agenda. Media Release: Friday, October 20, 2017, 4:30 p.m. Tuesday, October 24, 2017

Regional Municipality of Waterloo. Budget Committee. Agenda. Media Release: Friday, October 20, 2017, 4:30 p.m. Tuesday, October 24, 2017 Media Release: Friday, October 20, 2017, 4:30 p.m. Regional Municipality of Waterloo Budget Committee Agenda Tuesday, Approximately 1:30 p.m. (following Special Council) Council Chambers, 2 nd Floor 150

More information

August 31, 2016 Financial Report

August 31, 2016 Financial Report August 31, 2016 Financial Report Capital Metropolitan Transportation Authority 10/14/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses

More information

Edward R. Sajecki Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building Corporate Report Clerk s Files Originator s Files CD.03.MIS DATE: TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: January 12, 2009 Edward R. Sajecki Commissioner

More information

MINISTRY OF NORTHERN DEVELOPMENT AND MINES

MINISTRY OF NORTHERN DEVELOPMENT AND MINES THE ESTIMATES, 1 As the regional ministry for Northern Ontario and the ministry responsible for the provincial minerals sector, the Ministry of Northern Development and Mines strives to make Northern Ontario

More information

5 Prudent Investor Status for York Region through Pending Amendments to the Municipal Act (Bill 68)

5 Prudent Investor Status for York Region through Pending Amendments to the Municipal Act (Bill 68) Clause 5 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 5 Prudent Investor Status for

More information

MINISTRY OF NORTHERN DEVELOPMENT AND MINES

MINISTRY OF NORTHERN DEVELOPMENT AND MINES THE ESTIMATES, 1 As the regional ministry for Northern Ontario and the ministry responsible for the provincial minerals sector, the Ministry of Northern Development and Mines strives to make Northern Ontario

More information

Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project

Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project REPORT FOR ACTION Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project Date: February 14, 2017 To: City Council From: Deputy City Manager & Chief Financial

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 26, 2017

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 26, 2017 Item 6, Report No. 8, of the Finance, Administration and Audit Committee, which was adopted without amendment by the Council of the City of Vaughan on September 26, 2017. 6 DEVELOPMENT SERVICES FEE STRUCTURE

More information

MINISTRY OF NATURAL RESOURCES

MINISTRY OF NATURAL RESOURCES THE ESTIMATES, 2005-06 1 SUMMARY The Ministry envisions a healthy environment that is naturally diverse and supports a high quality of life for the people of Ontario through sustainable development. The

More information

Treasury Board Secretariat. Follow-Up on VFM Section 3.07, 2015 Annual Report RECOMMENDATION STATUS OVERVIEW

Treasury Board Secretariat. Follow-Up on VFM Section 3.07, 2015 Annual Report RECOMMENDATION STATUS OVERVIEW Chapter 1 Section 1.07 Treasury Board Secretariat Infrastructure Planning Follow-Up on VFM Section 3.07, 2015 Annual Report Chapter 1 Follow-Up Section 1.07 RECOMMENDATION STATUS OVERVIEW # of Status of

More information

BUSINESS PLAN: Land Use Planning

BUSINESS PLAN: Land Use Planning BUSINESS PLAN: Land Use Planning How does this service contribute to the results identified in the City of London Strategic Plan? A strong economy A vibrant and diverse community A green and growing City

More information

Comprehensive Plan Rewrite JULY 2018

Comprehensive Plan Rewrite JULY 2018 Comprehensive Plan Rewrite JULY 2018 COMPREHENSIVE PLAN BACKGROUND Role of the Comprehensive Plan Long-range plan (10-20 years) Guides where and how Thornton will grow Serves as an umbrella document for

More information

Governor Harry W. Nice Memorial Bridge Improvement Project. Charles County Commissioners Presentation September 1, 2009

Governor Harry W. Nice Memorial Bridge Improvement Project. Charles County Commissioners Presentation September 1, 2009 Governor Harry W. Nice Memorial Bridge Improvement Project Charles County Commissioners Presentation September 1, 2009 Purpose of Presentation Provide a project update since the last Charles County Commissioners

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

STAFF REPORT Financial Planning & Purchasing. Finance & Strategic Planning Committee Meeting Council/Committee Date: September 18, 2017

STAFF REPORT Financial Planning & Purchasing. Finance & Strategic Planning Committee Meeting Council/Committee Date: September 18, 2017 1 Corporate Services STAFF REPORT Financial Planning & Purchasing Title: Development Charge Update Progress Report Number: CORP2017-069 Author: Michael Pugliese Meeting Type: Finance & Strategic Planning

More information

ACTION ITEM: Roadmap and Timeline for Proposed Gorge 2020 Management Plan Review and Update

ACTION ITEM: Roadmap and Timeline for Proposed Gorge 2020 Management Plan Review and Update TO: FROM: Columbia River Gorge Commissioners Krystyna U. Wolniakowski, Executive Director Jeff Litwak, Counsel DATE: October 11, 2016 SUBJECT: ACTION ITEM: Roadmap and Timeline for Proposed Gorge 2020

More information

2019 Budget Overview. Presentation to Budget Committee December 11, 2018

2019 Budget Overview. Presentation to Budget Committee December 11, 2018 2019 Budget Overview Presentation to Budget Committee December 11, 2018 Introductory Comments Mike Murray Chief Administrative Officer 2019 Budget Challenges Base Budget pressures Infrastructure funding

More information

KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW/BUDGET 2017/18

KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW/BUDGET 2017/18 KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW/BUDGET 2017/18 Mangaung Metropolitan Municipality wishes to inform all its stakeholders and communities of the key opportunity to make inputs

More information

Moretele Local Municipality. IDP/Budget Process Plan 2018/ ( IDP: Process Plan)

Moretele Local Municipality. IDP/Budget Process Plan 2018/ ( IDP: Process Plan) Moretele Local Municipality IDP/Budget Process Plan /2019 1 Revision Control Final - August 2017 Strategic Services IDP/PMS Unit Enquiries: 012 716 1321 / 1324 (tel) thabo.makwela@moretele.org.za nyakale.lale@moretele.org.za

More information

How Ontario is Putting Conservation First

How Ontario is Putting Conservation First How Ontario is Putting Conservation First Nik Schruder Conservation & Corporate Relations, IESO September 2015 Presented at the 2015 ACEEE National Conference on Energy Efficiency as a Resource Overview

More information

Budget Setting Methodology 2017/18

Budget Setting Methodology 2017/18 Budget Setting Methodology 2017/18 1. Purpose As part of the Trust s annual planning cycle the Trust needs to set its budgets for the year. The purpose of this paper is to propose the methodology and timetable

More information

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland MANAGING FOR RESULTS: An Implementation Plan for the City of Portland Office of Management and Finance City Auditor s Office Bureau of Planning City of Portland, Oregon June, 2003 Managing for Results

More information

Kelly Howsley Glover, Long Range Planner Wasco County Planning Commission. Wasco County Planning Department

Kelly Howsley Glover, Long Range Planner Wasco County Planning Commission. Wasco County Planning Department STAFF REPORT PLALEG-16-08-001 Amendments to the Wasco County Comprehensive Plan Request: Prepared by: Prepared for: Applicant: Staff Recommendation: Amend the Wasco County Comprehensive Plan 1. Change

More information

Financial Management Report... 3

Financial Management Report... 3 November 13, 2013 Table of Contents Financial Management Report... 3 OPERATING FUNDS STATEMENT OF REVENUES & EXPENSES... 3 METROPOLITAN COUNCIL INVESTMENT PERFORMANCE SHORT-TERM PORTFOLIO... 4 METROPOLITAN

More information

SUPPORTING EVIDENCE FOR ENTRIES INTO NUCLEAR ACCOUNTS

SUPPORTING EVIDENCE FOR ENTRIES INTO NUCLEAR ACCOUNTS Exhibit H Tab Page of 0 0 SUPPORTING EVIDENCE FOR ENTRIES INTO NUCLEAR ACCOUNTS.0 PURPOSE This evidence describes actual (0) and projected (0) expenditures used for the calculation of entries into the

More information

Moving Forward: Improving Metro Vancouver s Transportation Network

Moving Forward: Improving Metro Vancouver s Transportation Network Moving Forward: Improving Metro Vancouver s Transportation Network 2011 Supplemental Plan and Outlook Transportation and Financial Supplemental Plan for 2011 to 2013 and Outlook for 2014 to 2020 For the

More information

Scarborough Subway Extension Project Delivery Options. City Manager Deputy City Manager & Chief Financial Officer

Scarborough Subway Extension Project Delivery Options. City Manager Deputy City Manager & Chief Financial Officer STAFF REPORT ACTION REQUIRED Scarborough Subway Extension Project Delivery Options Date: April 8, 2015 EX5.6 To: From: Wards: Reference Number: Executive Committee City Manager Deputy City Manager & Chief

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

To report back on the results of the external review of compensation for elected officials.

To report back on the results of the external review of compensation for elected officials. STAFF REPORT April 24, 2006 To: From: Subject: Employee and Labour Relations Committee City Manager Compensation Review: Elected Officials Purpose: To report back on the results of the external review

More information

Branch: Urban Planning and Environment

Branch: Urban Planning and Environment Branch: Urban Planning and Environment Introduction The Urban Planning and Environment Branch participates in the continuum of land use and environmental planning that starts with pursuing long range city

More information

POLICY PLAYBOOK TRANSIT 2018 PROVINCIAL ELECTION

POLICY PLAYBOOK TRANSIT 2018 PROVINCIAL ELECTION POLICY PLAYBOOK TRANSIT 2018 PROVINCIAL ELECTION THE CURRENT STATE OF TRANSPORTATION IN THE REGION One of the fastest growing metros in North America, Toronto is a vibrant, global city, consistently ranking

More information

Capital Funding Program Notes ATTACHMENT B. 1. Ontario Bus Replacement Program (OBRP)

Capital Funding Program Notes ATTACHMENT B. 1. Ontario Bus Replacement Program (OBRP) Capital Funding Program Notes ATTACHMENT B 1. Ontario Bus Replacement Program (OBRP) This bus replacement program is capped at $50 million province wide and is allocated on the basis of fleet plans and