1 The Quantity Surveyor s Role in the Budgeting Process in Nigeria- Best Practice By: Barth T. Feese, B.Sc.(QS), MBA, FNIQS, RQS Director, Budget Monitoring & Evaluation, Budget Office of the Federation, Ministry of Budget and National Planning, Abuja. Presentation at: NIQS Workshop, Theme: Budgeting and Capital Project Monitoring and Evaluation, Held in Makurdi, 27 th 28 th July, 2016

2 Outline Introduction: Concepts of Planning and Budgeting Public Financial Management Reforms and Evolution of Budgeting Processes Challenges of Budget Implementation Methodology Summary of Key Findings The Quantity Surveyor s Role in Planning and Budgeting Conclusions and Policy Implications.

3 Introduction/Background Concepts of Development Planning: Capitalist (markets), Socialist (Planned), Mixed Econ. Budgets are an aggregation of a nation s or community s strategic priorities and the government s articulation of policy initiatives towards meeting such needs (or development objectives). Budgets provide financial and service information to decision makers Thus the annual budget is an instrument for achieving the medium term plan And the medium term plan a tool for realising the developmental aspirations in long term development plan.

4 Introduction/Background (Cont d) If budgets are so important for improving lives Why has capital budget implementation remained unimpressive (at 50% on average) in Nigeria since 1999, with poor outcomes? Thus the paper traces: i) The evolution of budgeting systems in Nigeria, Within the context of the numerous Public Financial Management Reforms (FRA 2007, PPA 2007, etc.)

5 Introduction/Background (Cont d) ii) Highlighting major challenges: e.g., None inclusion, bureaucracy, political interference, institutional capacity constraints, poor collaboration, weak plan-budget link, iii) With analysis and summary of findings from a survey based on some best practices iv) An examination of the question: What role can the QS play in helping to overcome the challenges of capital budgeting implementation in Nigeria?.

6 Public Financial Management Reforms and the Evolution of Budgeting Processes Traditional Line Item Budgeting Approach Incremental, Budget Ceilings (Expenditure Limits or Envelops ). MDGs Needs Assessment/Costing Approach Goal/Outcome-based, Links Plans & Budgets Performance Based Budgeting (PBB) Outcome-based, Incentives-Rewards/Sanctions. Zero Based Budgeting (ZBB) Cost Justifications, Prioritised expenditures.

7 Comparative Analysis of Budget Systems The Table 1 below shows that: The line item method, while focusing on cost control as an objective (Sectoral Envelops, Budget Ceilings, or Expenditure Limits), It is wasteful, accounts for inputs only And resource allocation is not contingent upon any rigorous analysis (Based on needs, expected outcomes, or impacts and costs)

8 Comparative Analysis of Budget Systems (Cont d) As it is in the case of all the other budgeting approaches, which are all improvements on the line item budget, including NA, PBB and ZBB Thus NA, PBB and ZBB have features of justification of expenditures by costs compared to needs/benefits/impact A good budgeting system must have performance indicators for tracking implementation progress and benchmarking against milestones Only the line item method lacks this feature.

9 Table 1: Evolution of Budgeting Systems & ZBB: Line Item Budgeting MDG Needs Assessment/ Costing Techniques Performance Based Budgeting (PBB) Zero Base Budgeting (ZBB) Difference Accounting/ Number oriented Outcome Based Function oriented (Objectives) Function and priority based Features Input Budgeting Input/outputs Budgeting Input/ Output budgeting Dynamic Input/ Output budgeting Dealing with Ongoing Schemes Ongoing schemes taken for granted On going schemes taken for granted Ongoing schemes taken for Granted Every year old and new schemes evaluated together Objective Control cost Resource Allocation based on Needs and outcomes Resource allocation, with reference to results Resource allocation, in context of Prioritization Justification of Expenses Budget ceiling, approval, Appropriation Cost-benefit, Impacts, performance indicators Cost-benefit, performance Indicators Achievements in prioritized activity Areas

10 Budget Cycle Monitoring / Evaluation MTFF: MTEF/FSP Implementation Budget Budget Préparation Presidential Assent NASS Appropriation 10

11 Budget Implementation Challenges and Lessons Learnt Poor project preparation by MDAs Reflecting Executive Capacity gaps in the MDAs Bureaucratic bottlenecks:- imposed by procurement guidelines (e.g. advert timelines) None alignment of national plans and budgets Institutional weaknesses:- poor policy coordination, poor collaboration between tiers of Government Lack of Incentive based M&E Governance Framework:- Reward Vs. Sanctions for performance or non-performance by MDAs

12 Methodology Survey Instruments Focus group discussions, personal interviews, online questionnaires. Target Population Budget implementers, development practitioners, independent experts, civil society organisations, chosen among 130 participants. Data Collection and Analysis Qualitative (interviews, focus group discussions) and quantitative (online questionnaires) analysis, Collaborative (CGS) and stand alone projects.

13 Summary of Key Findings Collaboration & Coordination: Between Federal & State Governments (CGS) Bottom-up planning and budgeting - Achieved 98%, while stand alone ones performed at 50% Conditions imposed: For leveraging public financial management reforms (e.g. Local Development Plan anchored on Needs Assessment/Costing, FRA, PPA)-(98%vs50%) Monitoring and Evaluation System: Feedback Governance framework Incentive based, reward and sanctions Capacity Building: Professionals/CSOs in trainings & independent M&E 98% vs. 50%

14 Role of the QS: Tackling Budget Implementation Challenges QS Experience and tackling Budget Implementation: Traditional QS role: Construction Economist, Project Cost Planning and Control, Project Manager On Social and Infrastructure Projects How can the QS assist Government in relaxing some of the budget implementation challenges? i.e., average 50% (funds released, funds utilised and actual project execution on site). How can we help resolve the institutional, systemic and capacity issues underlying the poor budget performance? Can the QS bring his construction industry experience, his strong technical, financial and managerial skills to bear on solving problems in the wider economy?.

15 Role of the QS: Background Training QS Basic Training (Technical, financial and managerial): Technology, Measurement, Economics, Law, Management Versatility and Adaptability: QSs are well equipped to play a leading role in economic planning and development management Like the Accountants did: Breaking into Management Consulting and IT.

16 Role of the QS: Expand Practice Areas Capacity Building/Training and Consultancy Opportunities in: Development of policy planning and budgeting reforms, Public financial management reforms Public Procurement, Fiscal Responsibility Needs Assessment/Costing Sustainable Development Goals (Target year 2030) Costing Nigeria s New Vision/LTDP (Target Year 2030) Zero Based Budgeting Performance based management Public Private Partnerships Project management Monitoring and Evaluation Public Sector Reforms

17 Role of the QS: Expand Practice Areas (Cont d) Present Economic Decline Vs. Need for Huge Investments in Social and Economic Development Social: Human Capacity-Health, Education Economic-Infrastructure (Roads, Power, Transport, Water etc.), Agriculture, Housing, Environment, ICT, etc. Massive Resource Mobilisation, Allocation and Utilisation: Requires public financial management reforms Planning and Budgeting Techniques: NA, ZBB, PBB, CBA,Project feasibility studies, Others Public Sector Management (Service Delivery):. QS can key into the process-federal, State & LG.

18 Role of the QS: Skills Update Learning by Doing-Get Involved Organise a series of compulsory seminars/training workshops on public financial management reforms for practicing QSs. Cascade training workshops to state and local chapters Modify and Enrich the curriculums of QS University Departments: To include development policy planning and budgeting techniques and new financial modeling tools Domestic resource mobilisation and financing strategies Fiscal Policy, Revenue Forecasting

19 Role of the QS: Marketing New Skills and Services Local Private Network: Involve wider group of economic and financial management stakeholders in QS activities and programmes (e.g., NESG, NES) International Networks: Engage more with International Development Partners (IDPs) involved in supporting Nigeria s development efforts (UNDP, DFID, USAID, EU, etc.). Government Networks: Organise planning and budgeting training programmes for Government Departments at Federal, State and Local Government levels, in collaboration with the IDPs and the organised private sector Legislative Networks: Get involved in the formation and registration of a legal M&E professional organisation at the NASS

20 Summary, Conclusion and Implications for Public Policy Reviewed history, evolution of budget processes in Nigeria Highlighted Challenges of policy planning and budget implementation Examined Role of the QS in emerging government reforms and financial architecture in Nigeria Concludes QS can play a prominent role in economic planning and budget reforms in Nigeria Recommends skill and knowledge update with new market positioning among stakeholders Take advantage of Government s call for QS collaboration in helping obtain value for money through M&E

21 21

THE QUANTITY SURVEYOR S ROLE IN THE BUDGETING PROCESS IN NIGERIA-BEST PRACTICE

THE QUANTITY SURVEYOR S ROLE IN THE BUDGETING PROCESS IN NIGERIA-BEST PRACTICE THE QUANTITY SURVEYOR S ROLE IN THE BUDGETING PROCESS IN NIGERIA-BEST PRACTICE By: Bartholomew Tarlumun Feese, B.S.C (QS), MBA, F.N.I.Q.S, Director, Budget Monitoring and Evaluation, Federal Ministry Of

More information

Study of relationship between Ministry of Health and Ministry of Finance in Ghana

Study of relationship between Ministry of Health and Ministry of Finance in Ghana Study of relationship between Ministry of Health and Ministry of Finance in Ghana Presentation at the Global Health Initiative, Woodrow Wilson International Center for Scholars June 24, 2009 Content of

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

Source. Impact Indicator 2 B (04/14) M1 (04/15) T (04/16) Source. Source

Source. Impact Indicator 2 B (04/14) M1 (04/15) T (04/16) Source. Source PROJECT NAME IMPACT Impact Indicator 1 B (04/14) M1 (04/15) T (04/16) Sustainable improvement in the lives of poor and vulnerable groups by achieving progress in 2 Millennium Development Goals: 1. Reduced

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

URBACT IMPLEMENTATION NETWORKS

URBACT IMPLEMENTATION NETWORKS URBACT IMPLEMENTATION NETWORKS URBACT in a nutshell European Territorial Cooperation programme (ETC) cofinanced by ERDF All 28 Member States as well as 2 Partner States (Switzerland and Norway) are eligible

More information

T H E NA I RO B I C A L L TO A C T I O N F O R C L O S I N G T H E I M P L E M E N TA T I O N G A P I N H E A LT H P RO M O T I O N

T H E NA I RO B I C A L L TO A C T I O N F O R C L O S I N G T H E I M P L E M E N TA T I O N G A P I N H E A LT H P RO M O T I O N T H E NA I RO B I C A L L TO A C T I O N F O R C L O S I N G T H E I M P L E M E N TA T I O N G A P I N H E A LT H P RO M O T I O N 1. INTRODUCTION PURPOSE The Nairobi Call to Action identifies key strategies

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

UNDP Anti-corruption initiatives in Eastern Europe. Francesco Checchi, Anti-Corruption Programme Coordinator UNDP Bratislava Regional Centre

UNDP Anti-corruption initiatives in Eastern Europe. Francesco Checchi, Anti-Corruption Programme Coordinator UNDP Bratislava Regional Centre UNDP Anti-corruption initiatives in Eastern Europe Francesco Checchi, Anti-Corruption Programme Coordinator UNDP Bratislava Regional Centre UNDP AC activities Corruption as a governance deficit Programming

More information

ECHO Drought Risk Reduction Action Plan for the Horn of Africa Region ( ) (Kenya, Uganda, Ethiopia, Djibouti)

ECHO Drought Risk Reduction Action Plan for the Horn of Africa Region ( ) (Kenya, Uganda, Ethiopia, Djibouti) ECHO Drought Risk Reduction Action Plan for the Horn of Africa Region (2012-2013) (Kenya, Uganda, Ethiopia, Djibouti) DRRAP Partners planning meeting Naivasha, 24-25 July 2012 DG Humanitarian Aid and Civil

More information

B.29[17d] Medium-term planning in government departments: Four-year plans

B.29[17d] Medium-term planning in government departments: Four-year plans B.29[17d] Medium-term planning in government departments: Four-year plans Photo acknowledgement: mychillybin.co.nz Phil Armitage B.29[17d] Medium-term planning in government departments: Four-year plans

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011

PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011 PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011 OBJECTIVES OF THE PRESENTATION By the end of the presentation,

More information

MEPB MANDATE OR MINISTERIAL RESPONSIBILITY

MEPB MANDATE OR MINISTERIAL RESPONSIBILITY MEPB MANDATE OR MINISTERIAL RESPONSIBILITY The mandate of Ministry of Economic Planning and Budget (MEPB) as charged in the Assignment of Ministerial Responsibility Lagos State Government Gazette, No18,

More information

REPIM Curriculum Vitae Sharon Hanson-Cooper

REPIM Curriculum Vitae Sharon Hanson-Cooper RESEARCH ON ECONOMIC POLICY IMPLEMENTATION & MANAGEMENT FERNWOOD HOUSE, WEST WOODFOOT, SLALEY, HEXHAM, NE47 0DF, NORTHUMBERLAND, ENGLAND. TEL: 00 44 1434 673385 e mail: enquiries@repim.eu Name: SHARON

More information

Terms of Reference. External monitoring mission for the Project Mid-Term Review

Terms of Reference. External monitoring mission for the Project Mid-Term Review I- BACKGROUND Project: Supporting Citizens Access to Justice Terms of Reference External monitoring mission for the Project Mid-Term Review a) Standard UNDP M&E requirements The UNDP M&E (monitoring and

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

The Multilateral Development Finance Non-System

The Multilateral Development Finance Non-System The Multilateral Development Finance Non-System A Mapping of the Multilateral Development Finance System George Mavrotas, UNU-WIDER Helmut Reisen, OECD Development Centre Performance and Coherence in Multilateral

More information

Design & Planning of EPWP Phase II

Design & Planning of EPWP Phase II Design & Planning of EPWP Phase II Briefing and Key Decisions 10 November 2008 EPWP 2 GOAL To create 4,5 million (short and ongoing) work opportunities for poor and unemployed people in South Africa so

More information

TRAINING CATALOGUE ON IMPACT INSURANCE Building practitioner skills in providing valuable and viable insurance products

TRAINING CATALOGUE ON IMPACT INSURANCE Building practitioner skills in providing valuable and viable insurance products TRAINING CATALOGUE ON IMPACT INSURANCE Building practitioner skills in providing valuable and viable insurance products 2017 Contents of the training catalogue The ILO s Impact Insurance Facility... 3

More information

Comprehensive Agricultural Development Master Plan. Final Report. Annex II. CAMP Implementation. May 2015

Comprehensive Agricultural Development Master Plan. Final Report. Annex II. CAMP Implementation. May 2015 The Republic of South Sudan Ministry of Agriculture, Forestry, Cooperatives and Rural Development Ministry of Livestock and Fisheries Industries Comprehensive Agricultural Development Master Plan Final

More information

MTEF s: Concept and Lessons

MTEF s: Concept and Lessons MTEF s: Concept and Lessons Bill Dorotinsky International Monetary Fund September 10, 2007 Outline Budget Formulation in context MTEF Concept Technical objectives Process View Sequenced decision-making

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acronyms List AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acquired immunodeficiency syndrome Country Coordinating Mechanism,

More information

TEAM GAMBIA Ismaila Bah Fatou Kinney Jobe Lamin Manneh Maria Azzi Abdou Salam Jatta Awa Touray

TEAM GAMBIA Ismaila Bah Fatou Kinney Jobe Lamin Manneh Maria Azzi Abdou Salam Jatta Awa Touray TEAM GAMBIA Ismaila Bah Fatou Kinney Jobe Lamin Manneh Maria Azzi Abdou Salam Jatta Awa Touray Initial Problem Misallocation of resources leading to weak implementation as a result of high debt burden,

More information

Evaluation of the Operationalisation of the ECPF at the level of ECOWAS Directorates from June 2016

Evaluation of the Operationalisation of the ECPF at the level of ECOWAS Directorates from June 2016 Evaluation of the Operationalisation of the ECPF at the level of ECOWAS Directorates from 2013- June 2016 Presented by: Daniel K.B. Inkoom Presentation Outline Background of Assignment Process and Levels

More information

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness SURVEY GUIDANCE 2011 Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness This document explains the objectives, process and methodology agreed for the 2011 Survey on

More information

Domestic Revenue Mobilization for Health ICGFM Conference

Domestic Revenue Mobilization for Health ICGFM Conference Domestic Revenue Mobilization for Health ICGFM Conference May 17, 2018 Annie Baldridge Darrell Freund John Yates What is DRM for Health? 2 What is DRM for Health? USAID defines DRM as the process through

More information

Enabling Activities for the Preparation of Sierra Leone s Second National. Communications to the United Nations Framework Convention on Climate

Enabling Activities for the Preparation of Sierra Leone s Second National. Communications to the United Nations Framework Convention on Climate Terminal evaluation of the Enabling Activities for the Preparation of Sierra Leone s Second National Communications to the United Nations Framework Convention on Climate Change (UNFCCC) Project Sierra

More information

ZIMBABWE_Reporting format for final scoring (Ref. 4)

ZIMBABWE_Reporting format for final scoring (Ref. 4) Process 1: Bringing people in the same space Score each step: 0 (not applicable); 1 (started); 2 (on-going); 3 (nearly completed); 4 (completed) STEP 1. Select/develop coordinating mechanisms at country

More information

Public Financial Management and Pro-Poor Service Delivery

Public Financial Management and Pro-Poor Service Delivery Public Financial Management and Pro-Poor Service Delivery National Budget and Poverty Reduction Workshop December 8, 2005 Rob Taliercio, Senior Country Economist World Bank Cambodia Country Office Policy

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

SUGGESTED SOLUTION FINAL MAY 2019 EXAM. Test Code - FNJ 7081

SUGGESTED SOLUTION FINAL MAY 2019 EXAM. Test Code - FNJ 7081 SUGGESTED SOLUTION FINAL MAY 2019 EXAM SUBJECT- SCM & PE Test Code - FNJ 7081 BRANCH - () (Date :) Head Office : Shraddha, 3 rd Floor, Near Chinai College, Andheri (E), Mumbai 69. Tel : (022) 26836666

More information

Summary of Findings, Recommendations and Lessons Learnt. 1st Meeting of the Programme Steering Committee. Chisinau, Moldova September 28 29, 2012

Summary of Findings, Recommendations and Lessons Learnt. 1st Meeting of the Programme Steering Committee. Chisinau, Moldova September 28 29, 2012 Improving capacities to eliminate and prevent recurrence of obsolete pesticides as a model for tackling unused hazardous chemicals in the former Soviet Union Summary of Findings, Recommendations and Lessons

More information

Evaluation Study of SPARC support and the resultant progress made in implementing the MDGs Conditional Grants Scheme

Evaluation Study of SPARC support and the resultant progress made in implementing the MDGs Conditional Grants Scheme Evaluation Study of SPARC support and the resultant progress made in implementing the MDGs Conditional Grants Scheme December 2010 The opinions expressed in this report are those of the authors and do

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

Private Sector and development: a global responsibility?

Private Sector and development: a global responsibility? Private Sector and development: a global responsibility? - the EU Communication on the role of Private sector and Development - The conclusions of the Foreign Affairs Council - Points of Departure of Concord

More information

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level TERMS OF REFERENCE POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: National Consultant Chief Technical Advisor for BIOFIN UNDP/ The Biodiversity Finance Initiative (BIOFIN) Home-based in Thailand,

More information

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1 of16 November 2009 Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1. INTRODUCTION The Swedish International Development Cooperation Agency (Sida) will support

More information

Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana

Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana Strengthening the Development Results and Impacts of the Paris Declaration through

More information

Executive Summary(in one page)

Executive Summary(in one page) Senegal 2015.10.08 PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Senegal Submission Date 08/10/2015 NDA or Focal Point Contact Point

More information

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H 1. Basic information 1.1. CRIS Number: 43040 Rural Development 1.2. Title:

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Session 4 Mainstreaming Anti-Corruption into Climate Finance

Session 4 Mainstreaming Anti-Corruption into Climate Finance Session 4 Mainstreaming Anti-Corruption into Climate Finance Workshop on Corruption Risks and Anti- Corruption Strategies in Climate Finance Manila, Philippines 25 to 27 May 2015 Session objectives and

More information

The PRINCE2 Practitioner Examination. Sample Paper TR. Answers and rationales

The PRINCE2 Practitioner Examination. Sample Paper TR. Answers and rationales The PRINCE2 Practitioner Examination Sample Paper TR Answers and rationales For exam paper: EN_P2_PRAC_2017_SampleTR_QuestionBk_v1.0 Qu Correct Syll Rationale answer topic 1 A 1.1a a) Correct. PRINCE2

More information

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework BERGRIVIER MUNICIPALITY Risk Management Risk Appetite Framework APRIL 2018 1 Document review and approval Revision history Version Author Date reviewed 1 2 3 4 5 This document has been reviewed by Version

More information

OECD Workshop on Evaluation and Priority Setting September 2008, 2

OECD Workshop on Evaluation and Priority Setting September 2008, 2 National Research Priorities in Luxembourg: from Foresight to Programmes OECD TIP-RIHR Workshop on evaluation and priority setting Paris, 15-1616 September 2008 Dr. Robert KERGER Overview Rationale The

More information

Report of the Auditor General of Alberta

Report of the Auditor General of Alberta Report of the Auditor General of Alberta JULY 2014 Mr. Matt Jeneroux, MLA Chair Standing Committee on Legislative Offices I am honoured to send my Report of the Auditor General of Alberta July 2014 to

More information

Tajikistan Country Report. Mid Term Review of the UNDP-UNEP Poverty- Environment Initiative (PEI) Scale-Up. Kris B. Prasada Rao

Tajikistan Country Report. Mid Term Review of the UNDP-UNEP Poverty- Environment Initiative (PEI) Scale-Up. Kris B. Prasada Rao Tajikistan Country Report Mid Term Review of the UNDP-UNEP Poverty- Environment Initiative (PEI) Scale-Up Kris B. Prasada Rao 27 October 2011 1 LIST OF ACRONYMS CC CCA CP CIS CBO CSO CPAP DDP DFID EC ECIS

More information

Statement of Intent healthalliance (FPSC) Ltd. Incorporating the Statement of Performance Expectations

Statement of Intent healthalliance (FPSC) Ltd. Incorporating the Statement of Performance Expectations Statement of Intent healthalliance (FPSC) Ltd Incorporating the Statement of Performance Expectations 2016-2020 Contents About healthalliance (FPSC) Limited... 2 Our Environment & Focus... 3 Role... 4

More information

A Roadmap for SDG Implementation in Mauritius Indicative. UNDP Mission Team 17 November 2016

A Roadmap for SDG Implementation in Mauritius Indicative. UNDP Mission Team 17 November 2016 A Roadmap for SDG Implementation in Mauritius Indicative UNDP Mission Team 17 November 2016 WHAT IS MAPS? MAINSTREAMING Landing the SDG agenda at the national and local levels: integration into national

More information

Fundamentals of Project Risk Management

Fundamentals of Project Risk Management Fundamentals of Project Risk Management Introduction Change is a reality of projects and their environment. Uncertainty and Risk are two elements of the changing environment and due to their impact on

More information

Evaluation Activities Evaluation Perspectives

Evaluation Activities Evaluation Perspectives Evaluation Activities 2007-13 Evaluation Perspectives 2014-2020 Mid Term Evaluation of the Cyprus R.D.P. 2007-2013 Conclusions, Problems and Lessons learned for measures 121,123 D. Lianos Savvas Maliotis,

More information

Public Financial Management (PFMx)

Public Financial Management (PFMx) Public Financial Management (PFMx) Module 14 PFM Reform Planning This training material is the property of the International Monetary Fund (IMF) and is intended for use in IMF Fiscal Affairs Department

More information

Development Planning in Uganda Patrick Birungi, PhD

Development Planning in Uganda Patrick Birungi, PhD Development Planning in Uganda Patrick Birungi, PhD Director Development Planning National Planning Authority Delivered to Rotary Club, Kampala 25 th July, 2016 Outline Introduction Functions of the National

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

CITYkeys: Key Performance Indicators. Peter Bosch Vera Rovers

CITYkeys: Key Performance Indicators. Peter Bosch Vera Rovers CITYkeys: Key Performance Indicators Peter Bosch Vera Rovers Indicator based results How successful are smart city projects? Indicator based results Do smart city projects make a difference? The goal of

More information

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 800,000 SEARCH FOR COMMON GROUND (SFCG) GUINEA FOR A

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 800,000 SEARCH FOR COMMON GROUND (SFCG) GUINEA FOR A THIRD GLOBAL CALL FOR PROPOSALS PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 800,000 TO SEARCH FOR COMMON GROUND (SFCG) GUINEA FOR A Building Civil Society Capacity to Engage in State Reform Programs June

More information

New Technical Initiative on Innovative Health Financing

New Technical Initiative on Innovative Health Financing New Technical Initiative on Innovative Health Financing Washington DC, 14 th April 2016 jointlearningnetwork.org 1 Why do we need this new track? - Senior policymakers are very conscious of resource constraints

More information

Annual Review - Summary Sheet

Annual Review - Summary Sheet Annual Review - Summary Sheet Title: International 2050 Pathways Partnerships and Global Calculator Programme Value: 2,409,585 ( 2,107,000 original + 302,585 extension) Start Date: 04/2015 End Date: 03/2016

More information

Note on the Development of the Global Fund s Strategy

Note on the Development of the Global Fund s Strategy Note on the Development of the Global Fund s Strategy The Global Fund Voluntary Replenishment 2005 Note on the Development of the Global Fund s Strategy The Global Fund to Fight AIDS, Tuberculosis and

More information

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN Approved Version April 2014 Contents Contents... 2 1. Key Elements of Results Based Management in

More information

Development Account Project on Strengthening Capacity for Post 2015 Monitoring Third Workshop ADDIS ABABA, ETHOPIA, 14 th 18 th May, 2018

Development Account Project on Strengthening Capacity for Post 2015 Monitoring Third Workshop ADDIS ABABA, ETHOPIA, 14 th 18 th May, 2018 Development Account Project on Strengthening Capacity for Post 2015 Monitoring Third Workshop ADDIS ABABA, ETHOPIA, 14 th 18 th May, 2018 Incorporation of the SDG into national development plans National

More information

Terms of Reference. Contract #: (to be provided by PSU)

Terms of Reference. Contract #: (to be provided by PSU) Independent Evaluation of the Accelerating the Implementation of the Investment Case for Maternal, Newborn and Child Health in Asia and the Pacific Programme Terms of Reference Contract #: (to be provided

More information

Assets, Regeneration and Growth Committee 1 st June 2015

Assets, Regeneration and Growth Committee 1 st June 2015 Assets, Regeneration and Growth Committee 1 st June 2015 Title Community Asset Strategy Report of Chief Operating Officer Wards All Status Public Enclosures Appendix 1: Draft Community Asset Strategy Officer

More information

Biological data collection for fisheries on highly migratory species

Biological data collection for fisheries on highly migratory species Ref. Ares(2017)2295335-04/05/2017 Annex 3 Biological data collection for fisheries on highly migratory species The project(s) dealing with biological data for fisheries on highly migratory species should

More information

SETTING-UP THE CONDITIONS TO ESTABLISH A CREDIT GUARANTEE SCHEME FOR AGRIBUSINESS SMEs IN UKRAINE

SETTING-UP THE CONDITIONS TO ESTABLISH A CREDIT GUARANTEE SCHEME FOR AGRIBUSINESS SMEs IN UKRAINE EASTERN EUROPE AND SOUTH CAUCASUS INITIATIVE SETTING-UP THE CONDITIONS TO ESTABLISH A CREDIT GUARANTEE SCHEME FOR AGRIBUSINESS SMEs IN UKRAINE Phase I Third Task Force meeting Task Force on a Credit Guarantee

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 07 July 2017 Country: Bangkok, Thailand Description of the assignment: National Consultant Chief Technical Advisor for BIOFIN Duty Station: Home-based in

More information

SDG NATIONAL MONITORING, REPORTING AND NATIONAL STRATEGIC IMPLEMENTATION PLANS UGANDA

SDG NATIONAL MONITORING, REPORTING AND NATIONAL STRATEGIC IMPLEMENTATION PLANS UGANDA SDG NATIONAL MONITORING, REPORTING AND NATIONAL STRATEGIC IMPLEMENTATION PLANS UGANDA Development Account Project on Strengthening Capacity for Post- 2015 Monitoring Third Workshop, Addis Ababa, Ethiopia,

More information

Strategic Framework of ReSPA

Strategic Framework of ReSPA I. ReSPA Objectives Strategic Framework of ReSPA 2016-2020 The Agreement Establishing ReSPA sets out the organisational objectives as follows: Improve co-operation in the field of public administration

More information

LCRP Steering Committee Meeting 3 JULY 2018

LCRP Steering Committee Meeting 3 JULY 2018 LCRP Steering Committee Meeting 3 JULY 2018 Agenda Opening speech by H.E. Minister of Social Affairs, Pierre Bou Assi Welcome note by the UN RC/HC, Philippe Lazzarini Overview of the LCRP 2017: funding,

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Terms of Reference (ToR) Mid -Term Evaluations of the Two Programmes: UNDP Support to Deepening Democracy and Accountable Governance in Rwanda (DDAG) and Promoting Access to Justice, Human Rights and Peace

More information

GHANA AID HARMONISATION AND EFFECTIVENESS MATRIX

GHANA AID HARMONISATION AND EFFECTIVENESS MATRIX Ownership Ghana Action Plan (1) Countries have operational development strategies Coherent long-term vision CDF methodology: Medium term strategy derived from vision Country specific development targets

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015

Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015 Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015 A. Introduction and background In preparation of the new (2017 2021) UN-Viet Nam Strategic Cooperation Framework (One UN Strategic

More information

PUBLIC FINANCE MANAGEMENT SEMINAR

PUBLIC FINANCE MANAGEMENT SEMINAR PUBLIC FINANCE MANAGEMENT SEMINAR Linking Public Sector Planning to Budgeting Mountain Breeze Hotel Embu, 28 th - 29 th September 2017 Uphold. Public. Interest Session Content Linking Public Sector Planning

More information

CAP, including rural development, and IPARD post-2013

CAP, including rural development, and IPARD post-2013 CAP, including rural development, and IPARD post-2013 Loretta Dormal-Marino, Deputy Director-General, DG AGRI Fifth Annual Working Meeting of the Ministers of Agriculture from SEE 11-12 November 2011 C

More information

Annex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme

Annex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme non-official publication Modified Version of 14 June 2012 Annex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme The Conceptual Framework is an integral part of the Framework Agreement

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. CORRIGENDUM : Ce document annule et remplace le COM(2008)334 final du Concerne la version EN.

COMMISSION OF THE EUROPEAN COMMUNITIES. CORRIGENDUM : Ce document annule et remplace le COM(2008)334 final du Concerne la version EN. EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 22.01.2009 COM(2008)334 final/2 CORRIGENDUM : Ce document annule et remplace le COM(2008)334 final du 3.6.2008. Concerne la version EN. COMMUNICATION

More information

Achievement: The government sponsored an emergency aid conference with donors which brought the nation USD 1.1 billion in relief funding.

Achievement: The government sponsored an emergency aid conference with donors which brought the nation USD 1.1 billion in relief funding. 00 Kyrgyz Republic INTRODUCTION The Kyrgyz Republic is a low-income country with a gross national income (GNI) of USD 870 per capita (2009), which has grown at an average rate of 3.4% per annum since 2005

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS ASSIGNMENT TITLE: International Planning/Budgeting Expert Discussion Paper - Integration of the SDGs into Myanmar s Planning and Budgeting Frameworks DURATION:

More information

Programming Period. European Social Fund

Programming Period. European Social Fund 2014 2020 Programming Period European Social Fund f Legislative package 2014-2020 European Regional Development Fund (EC) 1301/2013 Cohesion Fund (EC) 1300/2013 European Social Fund (EC) 1304/2013 European

More information

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

EVALUATION AND FITNESS CHECK (FC) ROADMAP

EVALUATION AND FITNESS CHECK (FC) ROADMAP TITLE OF THE EVALUATION/FC LEAD DG RESPONSIBLE UNIT TYPE OF EVALUATION EVALUATION AND FITNESS CHECK (FC) ROADMAP Evaluation of the impact of the CAP measures towards the general objective "viable food

More information

Construction projects: manage risk to achieve success

Construction projects: manage risk to achieve success Construction projects: manage risk to achieve success By: Gareth Byatt, Principal Consultant Risk Insight Consulting Date: 12 th August 2017 Summary: This Paper discusses risk management on construction

More information

Immunization Planning and the Budget Cycle

Immunization Planning and the Budget Cycle Key Points Immunization Planning and the Budget Cycle * Domestic public funding is the most important source of immunization financing, and immunization planning and financing must be considered as a part

More information

Budget Execution Rate in last three years- Baseline

Budget Execution Rate in last three years- Baseline Budget Execution Rate in last three years- Baseline 45 Average of Budget Execution % in last three Years 40 35 35.8 33 37 41 30 25 43 40 Ministry ofinterior Affairs 20 15 27 Ministry of Justice Ministry

More information

REPUBLIC OF KENYA Ministry Of Finance

REPUBLIC OF KENYA Ministry Of Finance REPUBLIC OF KENYA Ministry Of Finance DONOR HARMONIZATION AND ALIGNMENT IN KENYA Paper presented at the Kenya/Donor Consultative Group Meeting held on 11 th to 12 th April, 2005 in Nairobi By D. K. Kibera

More information

Risk Management Plan PURPOSE: SCOPE:

Risk Management Plan PURPOSE: SCOPE: Management Plan Authority Source: Vice-Chancellor Approval Date: 16/05/2018 Publication Date: 17/05/2018 Review Date: 17/05/2021 Effective Date: 16/05/2018 Custodian: General Counsel and University Secretary

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

ANNUAL MEETING OF SENIOR BUDGET OFFICIALS OF CENTRAL, EASTERN AND SOUTHEASTERN EUROPEAN (CESEE) COUNTRIES

ANNUAL MEETING OF SENIOR BUDGET OFFICIALS OF CENTRAL, EASTERN AND SOUTHEASTERN EUROPEAN (CESEE) COUNTRIES Investment Budgeting 5th ANNUAL MEETING OF SENIOR BUDGET OFFICIALS OF CENTRAL, EASTERN AND SOUTHEASTERN EUROPEAN (CESEE) COUNTRIES St. Petersburg, Russian Federation,25-26 June 2009 Joop Vrolijk, OECD/SIGMA

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy,

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, Terms of Reference International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, 2011-2020 1. Summary Title Terms of Reference for an international consultant in Nutrition

More information

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Support to participation in Union Programmes Action summary This Action will facilitate Serbian participation in EU programmes by cofinancing

More information