1 2nd Steering Committee Meeting in Sofia Silvia Comiati, City of Venice 6 July 2007 Steering Committee Tasks 1. Review of performance against objectives 2. Supervision of project action plan development 3. Supervision of the budget 4. Contribution to the evaluation of the project 1

2 Review of performance against objectives (1) Local Working Group: establishment foreseen by the end of February 2007 Istanbul: LWG established, list of members, and first meeting s minutes sent. El Mina: LWG established, list of members, and first meeting s minutes sent. Oran: LWG established and list of members sent. Beirut: LWG and first meeting in progress. 2

3 Review of performance against objectives (2) Bilateral Meetings: Istanbul- Venice: Technical visit carried out by Venice to Istanbul in May 2007, minutes of the meeting sent. El Mina-Genoa: Visit carried out by EL Mina representatives in Genoa in April Oran-Bordeaux: Technical visit carried out by Bordeaux to Oran in January 2007, minutes of the meeting sent. Beirut- Venice: Technical visit carried out by Venice to Beirut in April 2007, minutes of the meeting sent. Review of performance against objectives (3) SWOT Analysis: Istanbul: SWOT analysis completed. El Mina: SWOT analysis in progress. Oran: SWOT analysis completed. Beirut: SWOT analysis in progress. 3

4 Review of performance against objectives (4) Thematic Working Groups: Istanbul: Responses to the three proposed themes. El Mina: Responses in progress (late transmission of questionnaires by LP). Oran: Responses to the three proposed themes. Beirut: Responses in progress. Supervision of project action plan development (1) 4

5 Supervision of project action plan development (2) Supervision of project action plan development (3) Next steps and deadlines: SWOT Analysis: final document to be prepared by cities Thematic Working Groups discussion: missing contributions to be sent by end of August Pilot Project Start-up: first draft before the next meeting 5

6 Supervision of the budget (1) ARCHIMEDES Project - Programme Budget breakdown per partners Total Budget Venice Istanbul Beirut Genova El Mina Bordeaux Oran UMSM Sofia staff technical staff administrative staff per diem travel experts - Travel equipment local office other costs services other costs TOTAL direct costs indirect costs Total Budget TOTAL GRANT (79%) OWN CONTRIBUTION (21%) Date: February 2007 Supervision of the budget (2) Budget adjustment and changes have to be kept under the 15% of the total budget lines involved and they would need to be discussed with the Lead Partner. It is recommended to avoid shifts between budget lines. 6

7 Supervision of the budget (3) As proposed and agreed at the first steering committee, transfers of funds every six months and only if the partner has spent at least 80% of the previous transfer. Please remember that all sums transferred need to be justified with original invoices and tickets. Generally, other than the flight tickets, cities will have to pay some small travel expenses and snacks in the occasion of the meetings. Those costs will be covered by the transfer of funds foreseen every 6 months. By the end of July, calculations for the second transfer of funds will be done in order to allow the forthcoming payment. Supervision of the budget (4) Next financial accounting to be submitted to the EC by the end of the year; Please send all your documentation to Team srl by 30th November

8 Supervision of the budget (5) In the Financial Form, cities that have travelled to the project meetings or technical visits must fill in the related box just with the exact number of per diem used. Supervision of the budget (6) Per diem covers: - Accomodation - Substances - Small travel expenses (local transportation) Per diem occurs in the case of - transnational project meetings - Technical bilateral visits 8

9 Supervision of the budget (7) 1) Per diem in Transnational project meetings: - Accomodation, Meals and coffee breaks are directly paid by the hosting city. - Snacks and small travel expenses are paid by each city. Supervision of the budget (8) 2) Per diem in Technical/Bilateral visits: - In the Financial Form the city visiting his correlated partner will have to indicate just the number of per diem used 9

10 Contribution to the Evaluation of the Project (1) 1. Quick Reports carried out after each project meeting, analysing the information and remarks coming from participants evaluation forms. 2. The Most Significant Changes Methodology which the Lead Partner, as suggested by the EC Technical Assistance, would like to implement starting from the Sofia meeting. Contribution to the Evaluation of the Project (2) At the end of June the Lead Partner has submitted the Inception Report to the European Commission. This report illustrates what has been achieved in the first six months but also highlights the problems, the difficulties encountered, the adjustments that were made, the updated workplan and the updated logical framework. 10

11 Thank you for your attention! 11

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Version No 13 of 23 November 2018 Table of contents I. GETTING STARTED: THE INITIATION

More information

WHAT S NEW AND WHAT WORKS IN THE EU COHESION POLICY : DISCOVERIES AND LESSONS FOR Call for papers

WHAT S NEW AND WHAT WORKS IN THE EU COHESION POLICY : DISCOVERIES AND LESSONS FOR Call for papers International Evaluation Conference WHAT S NEW AND WHAT WORKS IN THE EU COHESION POLICY 2007 2013: DISCOVERIES AND LESSONS FOR 2014 2020 3-4 March 2011, Vilnius, Lithuania Call for papers CALL FOR PAPERS

More information

Internal Rules of Procedures

Internal Rules of Procedures ECCE financial rules proposal The document presented is a proposal for written financial rules for the operation of the ECCE Executive Board. Internal Rules of Procedures A. Budget The accounting calendar

More information

FINANCIAL GUIDELINES AND STANDARDS FOR EVENT MANAGEMENT

FINANCIAL GUIDELINES AND STANDARDS FOR EVENT MANAGEMENT ANNEX 2 FINANCIAL GUIDELINES AND STANDARDS FOR EVENT MANAGEMENT (to be fine-tuned upon contract signature) 2 INDEX Page 1. FOREWORDS. 5 2. GENERAL PRINCIPLES.. 5 3. BUDGET MANAGEMENT WORKFLOW 5 3.1 PRE-EVENT

More information

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 Acknowledgement Slides, prepared by Gorazd Weiss are used in this presentation Today s topics 1. INTRODUCTION FROM IDEA TO IMPLEMENTATION

More information

INTERREG III B CADSES. Payment Claim Manual

INTERREG III B CADSES. Payment Claim Manual INTERREG III B CADSES Payment Claim Manual 1) Background / Description of involved actors The following chapters give a short overview about the actors involved in the PIC Interreg III B Cadses, their

More information

Guide for Applicants

Guide for Applicants EUROPEAN COMMISSION EUROSTAT Guide for Applicants Eurostat Grants Version 4.0 11 January 2018 1/55 IMPORTANT NOTICE The Guide for Applicants is a user guide that aims to explain to applicants and beneficiaries

More information

Knowledge and Innovation Consultants. Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011

Knowledge and Innovation Consultants. Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011 Knowledge and Innovation Consultants Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011 Financial Management and Reporting 1 The financial management of a project requires the

More information

Policy on Petty Cash Fund

Policy on Petty Cash Fund Policy on Petty Cash Fund Department responsible: Finance and Administrative Services Effective date: December 8, 2005 Amended on: March 1, 2014 and February 17, 2016 Approved by: Resolution #EC 2016-050

More information

Modernization of WBC universities through strengthening of structures and services for knowledge transfer, research and innovation

Modernization of WBC universities through strengthening of structures and services for knowledge transfer, research and innovation Internal Monitoring Report Project Acronym: WBCInno strengthening of Project full title: structures and services for knowledge transfer, research and innovation Project No: 530213-TEMPUS-1-2012-1-RS-TEMPUS-JPHES

More information

STUDY VISITS FINANCIAL CONDITIONS

STUDY VISITS FINANCIAL CONDITIONS European Judicial Training Network Réseau Européen de Formation Judiciaire STUDY VISITS FINANCIAL CONDITIONS 2019 1 January 2019 With financial support from the Justice Programme of the European Union

More information

STUDY VISITS FINANCIAL CONDITIONS

STUDY VISITS FINANCIAL CONDITIONS European Judicial Training Network Réseau Européen de Formation Judiciaire STUDY VISITS FINANCIAL CONDITIONS 2018 1 January 2018 With financial support from the Justice Programme of the European Union

More information

Follow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine

Follow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine Follow up and reporting procedures Lead partners seminar 5th targeted call Lydwine Lafontaine Table of contents Background information Subsidy contract Lead partner principles 1. Progress of the project:

More information

PROCEDURE AND SERVICES UNDER THE UNCITRAL ARBITRATION RULES

PROCEDURE AND SERVICES UNDER THE UNCITRAL ARBITRATION RULES PROCEDURE AND SERVICES UNDER THE UNCITRAL ARBITRATION RULES January 1 st, 2016 PROCEDURE I. General provisions Art. 1 Bodies Art. 2 Scope Art. 3 Confidentiality Art. 4 Entry into force Art. 5 Reference

More information

STUDY VISITS FINANCIAL CONDITIONS

STUDY VISITS FINANCIAL CONDITIONS European Judicial Training Network STUDY VISITS FINANCIAL CONDITIONS 2017 1 November 2017 With the support of the European Union 1 These financial conditions may be subject to changes. Should that be the

More information

START Danube Region Project Fund Workshop for Lead- and Project Partners. May, 6 th 2015 Vienna

START Danube Region Project Fund Workshop for Lead- and Project Partners. May, 6 th 2015 Vienna START Danube Region Project Fund Workshop for Lead- and Project Partners May, 6 th 2015 Vienna PAC 10 & EuroVienna (Implementing Body) EUSDR Priority Area Coordinator 10 / (City of Vienna, Austria): Dr.

More information

Annex 2: Project Financial Reporting & Monitoring Guidelines and Procurement Framework

Annex 2: Project Financial Reporting & Monitoring Guidelines and Procurement Framework Annex 2: Project Financial Reporting & Monitoring Guidelines and Procurement Framework (Sourced from Section 5 & 6 of the SANBio/BioFISA II Project Implementation Guidelines) 1. Costs supported by the

More information

UKF Project Monitoring Guidelines Version 4

UKF Project Monitoring Guidelines Version 4 REPUBLIC OF CROATIA MINISTRY OF SCIENCE, EDUCATION AND SPORTS UKF Project Monitoring Guidelines Version 4 UNITY THROUGH KNOWLEDGE FUND office@ukf.hr, www.ukf.hr, +385 1 2352 685 Planinska 1, HR-10000 Zagreb,

More information

RECOMMENDATIONS FOR PROJECT

RECOMMENDATIONS FOR PROJECT Memo RECOMMENDATIONS FOR PROJECT 0 IMPLEMENTATION ACCORDING TO DEVELOPMENT COOPERATION AND DEMOCRACY PROMOTION PROGRAM BY THE MINISTRY OF FOREIGN AFFAIRS Requirements Mistakes Tips TABLE OF CONTENTS INTRODUCTION...1

More information

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Joint Call on applied geoscience

More information

WP1 Administration, coordination and reporting

WP1 Administration, coordination and reporting ECGFA NET II Work Plan WP1 Administration, coordination and reporting Content 1. Work package objectives... 1 2. Project Management of the ECGFA NET II Project... 1 2.1 Organization and Decision Making

More information

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES Applicants Manual for the period 2014-2020 Version 1.1 PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2015 Applicants Manual

More information

CONCORD, the European NGO Confederation for Relief and Development, is seeking a:

CONCORD, the European NGO Confederation for Relief and Development, is seeking a: CONCORD, the European NGO Confederation for Relief and Development, is seeking a: CONSULTANT TO PRODUCE A PUBLICATION ON THE ENGAGEMENT OF EU DELEGATIONS WITH CSOs CONCORD is the European Confederation

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

FINANCIAL STANDING ORDERS

FINANCIAL STANDING ORDERS FINANCIAL STANDING ORDERS As adopted at 70 th Board Meeting in Bergen, Norway, 12 th to 14 th of May 2016 Table of Content Section 1: Definitions... 4 1.1. Fiscal year... 4 1.2. Budget... 4 1.3. Financial

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

Lead Partner Seminar. JS/MA Riga

Lead Partner Seminar. JS/MA Riga Lead Partner Seminar JS/MA 9.12.2015 Riga Welcome to the Lead Partner Seminar Objective of the day: Give the Lead Partner the needed tools to best implement the project To know where to come with questions

More information

Eligibility of costs in the Horizon 2020 funded EUROfusion project

Eligibility of costs in the Horizon 2020 funded EUROfusion project Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Other Direct Costs: Travel,, Other Goods & Services Presented by: Melanie John, EUROfusion Coordinator Unit,

More information

BIOSURF. (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Loriana PAOLUCCI & Stefano PROIETTI (ISIS)

BIOSURF. (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Loriana PAOLUCCI & Stefano PROIETTI (ISIS) (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Authors: Loriana PAOLUCCI & Stefano PROIETTI (ISIS) Version: Final Quality Review: Stefano PROIETTI Date: 28-02-2015 Grant Agreement

More information

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop Overview of the Northern Ireland Ireland - Scotland VA Programme Electric Vehicles Call Workshop Welcome MARK FEENEY, MA DIRECTOR Introduction and Outline of Workshop Programme Priorities Policy Context

More information

GUIDELINES FOR APPLICANTS FOR EU FUNDING OF PLANT HEALTH EMERGENCY MEASURES

GUIDELINES FOR APPLICANTS FOR EU FUNDING OF PLANT HEALTH EMERGENCY MEASURES EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY Food chain: Stakeholders and International Relations Food Safety Programmes, Emergency Funding SANTE/10527/2016/Rev. 5, GUIDELINES FOR

More information

Decision of the Single Judge of the Players Status Committee

Decision of the Single Judge of the Players Status Committee Decision of the Single Judge of the Players Status Committee passed in Zurich, Switzerland, on 26 March 2012 by Geoff Thompson (England) Single Judge of the Players Status Committee, on the claim presented

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

GUIDE TO BUDGET PREPARATION FOR PROGRAMMES IN THE CIVIL SOCIETY FUND (CSF)

GUIDE TO BUDGET PREPARATION FOR PROGRAMMES IN THE CIVIL SOCIETY FUND (CSF) GUIDE TO BUDGET PREPARATION FOR PROGRAMMES IN THE CIVIL SOCIETY FUND (CSF) JUNE 2018 VERSION 1.2 CONTENT 1. VALIDITY OF THE GUIDE... 2 2. GENERALLY ABOUT BUDGETS FOR A PROGRAMME... 2 3. CONCEPT NOTE BUDGET

More information

Checklist for Assessing Action Budget and Simplified Cost Options for Grant Contracts

Checklist for Assessing Action Budget and Simplified Cost Options for Grant Contracts Checklist for Assessing Action Budget and Simplified Cost Options for Grant Contracts The checklist is composed of procedures and checks that apply to - each cost category / subcategory - specific cost

More information

ANNUAL IMPLEMENTATION REPORT. The URBACT II Programme YEAR Objective concerned: Objective 3: European Territorial Cooperation

ANNUAL IMPLEMENTATION REPORT. The URBACT II Programme YEAR Objective concerned: Objective 3: European Territorial Cooperation The URBACT II Programme 2007-2013 ANNUAL IMPLEMENTATION REPORT YEAR 2007 OPERATIONNAL PROGRAMME: Objective concerned: Objective 3: European Territorial Cooperation Eligible area concerned: UE Member States

More information

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied

More information

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement

More information

FINAL REPORT. "Preparation for the revision of EU-SILC : Testing of rolling modules in EU-SILC 2017"

FINAL REPORT. Preparation for the revision of EU-SILC : Testing of rolling modules in EU-SILC 2017 FINAL REPORT "Preparation for the revision of EU-SILC : Testing of rolling modules in EU-SILC 2017" Contract number 07142.2015.003 2016.131 Statistics Belgium MARCH 2018 slightly adapted for language in

More information

EACEA. Cluster Meeting

EACEA. Cluster Meeting EACEA Cluster Meeting European Policy Experimentations the Way Forward 21 June 2017 Audit Type I & II Certificates Alexandre Virosztek Unit R2 «Legal and Regulatory» 1 Controls & Checks Controls (wide)

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Reference Code: Country: Description of the Assignment: Project: UNDP/SCR/SSS/IC/2017/08 Turkey Capacity development on operational efficiency and strategic planning

More information

Evaluation and Monitoring of EU Structural and Cohesion Funds Programmes, Introduction. What is this course about?

Evaluation and Monitoring of EU Structural and Cohesion Funds Programmes, Introduction. What is this course about? Evaluation and Monitoring of EU Structural and Cohesion Funds Programmes, 2014-2020 Introduction What is this course about? This seminar will deal with the evaluation, monitoring and reporting requirements

More information

ELIGIBILITY OF EXPENSES: APPLICABLE RULES

ELIGIBILITY OF EXPENSES: APPLICABLE RULES INFO DAY ON PROJECT IMPLEMENTATION 1 ST CALL FOR PROJECT PROPOSALS ELIGIBILITY OF EXPENSES: APPLICABLE RULES Hierarchy of rules on eligibility of expenditure Rules defined in EU legal framework ERDF Programme

More information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information 1.1 Background information on the Regional School of

More information

8 th Financial Managers Seminar

8 th Financial Managers Seminar 2002-2012 A Decade of Territorial Evidence 8 th Financial Managers Seminar Athens, 7 March 2013 Reporting expenditure, eligibility, audit trail Reporting documents Activity Report (individual partner Activity

More information

How to plan your budget and project management?

How to plan your budget and project management? European Union European Regional Development Fund Sharing solutions for better regional policies How to plan your budget and project management? Ilaria Piazza Interreg Europe Secretariat i.piazza@interregeurope.eu

More information

FCH 2 JU Financial Workshop. Other Direct Costs. Thanos BATSILAS Financial Officer FCH 2 JU. Brussels, 21 March 2018

FCH 2 JU Financial Workshop. Other Direct Costs. Thanos BATSILAS Financial Officer FCH 2 JU. Brussels, 21 March 2018 FH 2 JU Financial Workshop Other Direct osts Thanos TSILS Financial Officer FH 2 JU russels, 21 March 2018 rticle 6.2.D Financial Statement olumn D 5 cost categories (but 3 reporting sub-columns) 2 forms

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Contents 1. Foreign participants not living in the country where the event takes place... 2 A. General... 2 1. Am I to book my transport and accommodation myself?... 2 B. Travel...

More information

Call for Applications for Financial Assistance for the Organisation of EJN Regional and National meetings

Call for Applications for Financial Assistance for the Organisation of EJN Regional and National meetings Call for Applications for Financial Assistance for the Organisation of EJN Regional and National meetings Member States are encouraged to provide support to their European Judicial Network ( EJN ) contact

More information

IFRS vs. Basel requirements for banks

IFRS vs. Basel requirements for banks The EUROPEAN SUPERVISOR EDUCATION INITIATIVE (ESE) presents the seminar on IFRS vs. Basel requirements for banks hosted by: Czech National Bank Date: 23 25 April 2018 Venue: Prague OBJECTIVES General Background

More information

EBA FINAL draft implementing technical standards

EBA FINAL draft implementing technical standards EBA/ITS/2013/05 13 December 2013 EBA FINAL draft implementing technical standards on passport notifications under Articles 35, 36 and 39 of Directive 2013/36/EU EBA FINAL draft implementing technical standards

More information

AIAKOS PROGRAMME 2018 FINANCIAL CONDITIONS 1

AIAKOS PROGRAMME 2018 FINANCIAL CONDITIONS 1 European Judicial Training Network Réseau Européen de Formation Judiciaire AIAKOS PROGRAMME 2018 FINANCIAL CONDITIONS 1 January 2018 With the support of the European Union 1 These financial conditions

More information

South East Europe (SEE) SEE Control Guidelines

South East Europe (SEE) SEE Control Guidelines South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control

More information

Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation

Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation ARMENIA De-risking and Scaling-up Investment in Energy Efficient Building Retrofits UNDP-GCF Project INCEPTION WORKSHOP Cynthia Page,

More information

FINANCIAL PROVISIONS

FINANCIAL PROVISIONS Justice Programme & Rights, Equality and Citizenship Programme FINANCIAL PROVISIONS Annex to Calls for Proposals Action Grants 2018 Version 1.0 30 January 2018 History of changes Version Date Change Page

More information

PUBLIC COUNCIL OF THE EUROPEAN UNION. Brussels, 26 October /05 LIMITE CIVCOM 303 PESC 907 RELEX 564 JAI 372 COSDP 718 COMEM 58 OC 767

PUBLIC COUNCIL OF THE EUROPEAN UNION. Brussels, 26 October /05 LIMITE CIVCOM 303 PESC 907 RELEX 564 JAI 372 COSDP 718 COMEM 58 OC 767 Conseil UE COUNCIL OF THE EUROPEAN UNION Brussels, 26 October 2005 13757/05 LIMITE PUBLIC CIVCOM 303 PESC 907 RELEX 564 JAI 372 COSDP 718 COMEM 58 OC 767 "I/A" ITEM NOTE From : Secretariat To : Permanent

More information

TERMS OF REFERENCE FOR WORK UNDER THE AUSPICES OF IMPEL

TERMS OF REFERENCE FOR WORK UNDER THE AUSPICES OF IMPEL TOR Reference.: 2017/04 Author(s): Huib van Westen Version: Date: 23 September 2016 TERMS OF REFERENCE FOR WORK UNDER THE AUSPICES OF IMPEL 1. Work type and title 1.1 Identify which Expert Team this needs

More information

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) FWC BENEFICIARIES 2009 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/127054/C/SER/multi 1. BACKGROUND

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

ADRION 2 call for proposals Priority Axis 2 Financial aspects. Tirana, 11 April 2018

ADRION 2 call for proposals Priority Axis 2 Financial aspects. Tirana, 11 April 2018 ADRION 2 call for proposals Priority Axis 2 Financial aspects Tirana, 11 April 2018 Overall budget and project budget Available programme budget: ERDF IPA Total EU contribution Priority Axis 2 29.197.521,05

More information

Project Management and Financial Reporting

Project Management and Financial Reporting Horizon 2020 and ERC Project Management and 11-13 April 2018 Brussels Horizon 2020 Project Management and AGENDA DAY 1 08:30 09:00 Registration 09:00 09:30 Event opening 09:30 10:30 How to Coordinate and

More information

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT ANNEX III SPECIFIC PROVISIONS MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant

More information

Call for proposals. for civil society capacity building and monitoring of the implementation of national Roma integration strategies

Call for proposals. for civil society capacity building and monitoring of the implementation of national Roma integration strategies Call for proposals for civil society capacity building and monitoring of the implementation of national Roma integration strategies For Cyprus, Denmark, Estonia, Finland, Latvia, Lithuania, Luxembourg

More information

III. Meetings and Travel

III. Meetings and Travel 3.1 ASSOCIATION MEETINGS III. Meetings and Travel To conduct business and share information, the Association shall hold regular meetings. 1. There shall be an Annual Meeting in the fall and an Education

More information

Financial Webinar. IMI 2 projects :00 CET

Financial Webinar. IMI 2 projects :00 CET Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration

More information

THE POLAND-RUSSIA CROSS-BORDER COOPERATION PROGRAMME ST CALL FOR PROPOSALS BUDGET

THE POLAND-RUSSIA CROSS-BORDER COOPERATION PROGRAMME ST CALL FOR PROPOSALS BUDGET THE POLAND-RUSSIA CROSS-BORDER COOPERATION PROGRAMME 2014-2020 1 ST CALL FOR PROPOSALS BUDGET PROJECT BUDGET Project budget shall include only: ELIGIBLE COSTS Direct BH 1 Staff costs Indirect BH 7 Administrative

More information

Community Partnerships Program Eligible Costing Rules and Financial Management Guidelines

Community Partnerships Program Eligible Costing Rules and Financial Management Guidelines Community Partnerships Program Eligible Costing Rules and Financial Management Guidelines Top tips when preparing your budget... 2 What are eligible costs?... 3 I. Personnel, Payroll and other Compensation...

More information

Financial Regulation of the European Maritime Safety Agency. Adopted by the Administrative Board on 18 December 2013

Financial Regulation of the European Maritime Safety Agency. Adopted by the Administrative Board on 18 December 2013 of the Adopted by the Administrative Board on 18 December 2013 TABLE OF CONTENT TITLE I GENERAL PROVISIONS... 4 TITLE II BUDGETARY PRINCIPLES... 5 CHAPTER 1 PRINCIPLE OF UNITY AND BUDGET ACCURACY... 5

More information

Project management - WP2

Project management - WP2 ASSEMBLE Plus Kick-Off Meeting Project management - WP2 DGRTT European Affairs Office A. Stécy JOMBERT ASSEMBLE Plus Project Manager Alice.jombert@upmc.fr +33(0)144 27 51 43 19/10/2017 Project Overview

More information

EA-1/20 S1 A-AB: 2016

EA-1/20 S1 A-AB: 2016 Publication Reference EA-1/20 S1 A-AB: 2016 Supplement 1 to EA-1/20 A Procedure for Control of Expenditures and Preparation of Budgets Terms and Conditions for Financial Compensation from the Operating

More information

EX-POST EVALUATION OF THE TWO 2016 EUROPEAN CAPITALS OF CULTURE

EX-POST EVALUATION OF THE TWO 2016 EUROPEAN CAPITALS OF CULTURE EVALUATION AND FITNESS CHECK (FC) ROADMAP TITLE OF THE EVALUATION/FC EX-POST EVALUATION OF THE TWO 2016 EUROPEAN CAPITALS OF CULTURE LEAD DG RESPONSIBLE UNIT TYPE OF EVALUATION DG EAC UNIT D2 Evaluation

More information

Marina ZANCHI DG Research Directorate N International scientific cooperation

Marina ZANCHI DG Research Directorate N International scientific cooperation Marina ZANCHI DG Research Directorate N International scientific cooperation E-mail: marina.zanchi@cec.eu.int 1 Kick-off meeting Sofia 27 May 2005 Contract Reporting and Deliverables Financial Statements

More information

FINANCIAL GUIDELINES. TEAM-SI-JOINT Call Brussels, 19 March 2018

FINANCIAL GUIDELINES. TEAM-SI-JOINT Call Brussels, 19 March 2018 FINANCIAL GUIDELINES TEAM-SI-JOINT Call 2019 Brussels, 19 March 2018 Budget lines A. Investment costs B. Operational costs C. Personnel costs D. Scholarship costs E. Coordination costs See Annex 3 budget

More information

INTERREG IIIC West Zone. Programme Complement

INTERREG IIIC West Zone. Programme Complement INTERREG IIIC West Zone Table of Content 1. Description of Measures... 1 1.1 Operation Type (a) Regional Framework Operations (RFO)... 2 1.2 Operation Type (b) Individual Co-operation Project:... 3 1.3

More information

MAIN LESSONS LEARNED

MAIN LESSONS LEARNED MAIN LESSONS LEARNED from the first reporting round with two pilot projects To ensure your online reporting for the North Sea Region Programme is efficient, please read this short document addressing key

More information

3 rd Call for Project Proposals

3 rd Call for Project Proposals IPA CROSS-BORDER PROGRAMME "GREECE THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA 2007-2013" 3 rd Call for Project Proposals Project Selection Criteria CCI: 2007 CB 16 I PO 009 The following Project Selection

More information

Financial Regulation. Applicable to the budget of the European Medicines Agency. 15 January 2014 EMA/MB/789566/2013 Management Board

Financial Regulation. Applicable to the budget of the European Medicines Agency. 15 January 2014 EMA/MB/789566/2013 Management Board 15 January 2014 EMA/MB/789566/2013 Management Board Applicable to the budget of the European Medicines Agency 7 Westferry Circus Canary Wharf London E14 4HB United Kingdom Telephone +44 (0)20 7418 8400

More information

LIFE Grant Agreement Financial Aspects Highlights

LIFE Grant Agreement Financial Aspects Highlights LIFE Grant Agreement Financial Aspects Highlights Kick-off Meetings Call 2016 Action Grants Strand buddies (EASME) Congratulations for obtaining the Grant! And Welcome to the Finance presentation SUMMARY

More information

FINANCIAL REGULATION

FINANCIAL REGULATION FINANCIAL REGULATION The present Financial Regulation shall enter into force on the 1 st of January 2014 Adopted in Parma on 19 December 2013 For EFSA s Management Board [SIGNED] Sue Davies Chair of the

More information

Financial relations within the 6th Framework Programme

Financial relations within the 6th Framework Programme Financial relations within the 6th Framework Programme Preamble: This is a succinct summary of the relations and financial procedures within the 6th Framework Programmes R&D contracts. These reminders

More information

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006 Rural Development 2007-2013 HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK Guidance document September 2006 Directorate General for Agriculture and Rural Development EN 1 EN CONTENTS 1. A more

More information

ANNEXES. I. PREVIOUS ACTIVITIES (Article 3(4)(b) and (c) of the Code) Posts held over the last 10 years, in foundations or similar bodies

ANNEXES. I. PREVIOUS ACTIVITIES (Article 3(4)(b) and (c) of the Code) Posts held over the last 10 years, in foundations or similar bodies EN ANNEXES CODE OF CONDUCT FOR MEMBERS OF THE EUROPEAN COMMISSION ANNEX 1 DECLARATION OF INTERESTS Full name: I. PREVIOUS ACTIVITIES (Article 3(4)(b) and (c) of the Code) I.1. Posts held over the last

More information

AirPlus Company Account. The central settlement account for your business travel management.

AirPlus Company Account. The central settlement account for your business travel management. AirPlus Company Account. The central settlement account for your business travel management. Would you like to improve your travel expense management? Simplify the booking and settlement processes? Receive

More information

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 Section 1. Introductory Information 1.1 Background information on the Regional

More information

Avoid creating the perception that any OFS funding has been spent inappropriately. Ensure that revenues earn the maximum interest possible

Avoid creating the perception that any OFS funding has been spent inappropriately. Ensure that revenues earn the maximum interest possible 10. Fiscal Controls 10-A. Introduction Section 59-152-150(A) of the First Steps legislation requires OFS to adopt and implement a standard fiscal accountability system for all counties that includes, but

More information

BALANCE. Reporting, auditing and payment. Kick-off meeting, Copenhagen, Denmark. Jesper H. Andersen 31 August + 1 September 2005

BALANCE. Reporting, auditing and payment. Kick-off meeting, Copenhagen, Denmark. Jesper H. Andersen 31 August + 1 September 2005 BALANCE Reporting, auditing and payment Kick-off meeting, Copenhagen, Denmark 31 August + 1 September 2005 Jesper H. Andersen (jha@dhi.dk) Reporting is based on the project description in the approved

More information

Rules for Hosted Buyers

Rules for Hosted Buyers Rules for Hosted Buyers General Provisions 1. Definitions of Terms: a) Tourism and Events Expo (TEE) Hosted Buyers Programme a programme aimed at introducing Hosted Buyers to Exhibitors and vice versa

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

JITS funding guide. JITS Network Secretariat. 08 January Version 3

JITS funding guide. JITS Network Secretariat. 08 January Version 3 JITS funding guide JITS Network Secretariat 08 January 2018 Version 3 Table of Contents I. Background... 2 II. Scope and conditions... 2 II.1. Travel and accommodation... 4 II.2. Interpretation and translation...

More information

GUIDELINES FOR APPLICANTS FOR EU FUNDING OF PLANT HEALTH EMERGENCY MEASURES

GUIDELINES FOR APPLICANTS FOR EU FUNDING OF PLANT HEALTH EMERGENCY MEASURES EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY Food chain: Stakeholders and International Relations Food Safety Programmes, Emergency Funding SANTE/10527/2016/Rev 2, GUIDELINES FOR

More information

Students enrolling after the deadline must send all payments previously due with the applications, plus the $200 late fee.

Students enrolling after the deadline must send all payments previously due with the applications, plus the $200 late fee. APPLICATION REQUIREMENTS Initial applications will only be accepted and considered completed when they are submitted with the following materials: Application form completed with all information requested.

More information

ANNEX III OFFEROR S LETTER TO UNDP CONFIRMING INTEREST AND AVAILABILITY FOR THE INDIVIDUAL CONTRACTOR (IC) ASSIGNMENT

ANNEX III OFFEROR S LETTER TO UNDP CONFIRMING INTEREST AND AVAILABILITY FOR THE INDIVIDUAL CONTRACTOR (IC) ASSIGNMENT ANNEX III OFFEROR S LETTER TO UNDP CONFIRMING INTEREST AND AVAILABILITY FOR THE INDIVIDUAL CONTRACTOR (IC) ASSIGNMENT Date Philippe Lazzarini Resident Representative United Nations Development Programme

More information

KA2 ERASMUS+ STRATEGIC PARTNERSHIPS SCHOOL EDUCATION (KA201) VET (KA202) HIGHER EDUCATION (KA203) ADULT EDUCATION (KA204)

KA2 ERASMUS+ STRATEGIC PARTNERSHIPS SCHOOL EDUCATION (KA201) VET (KA202) HIGHER EDUCATION (KA203) ADULT EDUCATION (KA204) KA2 ERASMUS+ STRATEGIC PARTNERSHIPS SCHOOL EDUCATION (KA201) VET (KA202) HIGHER EDUCATION (KA203) ADULT EDUCATION (KA204) GRANT AGREEMENTS PROJECT MANAGEMENT QUESTIONS GRANT AGREEMENTS ANNEXES I. GENERAL

More information

Committee of Senior Representatives (CSR) Twenty third Meeting Berlin, Germany April 2014

Committee of Senior Representatives (CSR) Twenty third Meeting Berlin, Germany April 2014 Committee of Senior Representatives (CSR) Twenty third Meeting Berlin, Germany 24-25 April 2014 Reference CSR 23/2/2 Title Provisional annotated agenda Submitted by Secretariat Summary / Note This document

More information

The functions of the Professional Development Committee are:

The functions of the Professional Development Committee are: Garden Valley Teachers Association / Garden Valley School Division Joint Professional Development Committee Policy and Procedure Handbook (revised January 2017) I. GOALS / MANDATE The Professional Development

More information

SIU Management and Monitoring System PROGRESS REPORT USER MANUAL PART 2

SIU Management and Monitoring System PROGRESS REPORT USER MANUAL PART 2 SIU Management and Monitoring System PROGRESS REPORT USER MANUAL PART 2 Version 1.0 of 14 August 2018 European Regional Development Fund www.italy-croatia.eu TABLE OF CONTENTS INTRODUCTION... 2 4.4.2 SECTION

More information

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION EXECUTIVE BOARD. Hundred and sixty-seventh Session

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION EXECUTIVE BOARD. Hundred and sixty-seventh Session 167 EX/INF.9 PARIS, 16 September 2003 English & French only UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION EXECUTIVE BOARD Hundred and sixty-seventh Session Item 3.1 of the agenda REPORT

More information

Partnership Agreement between the Lead Partner and the other project partners

Partnership Agreement between the Lead Partner and the other project partners Partnership Agreement between the Lead Partner and the other project partners Foreword This Partnership Agreement is signed on the basis of the following documents that form the legal framework applicable

More information

Good Practice when Preparing a Project Proposal. 15 February 2005

Good Practice when Preparing a Project Proposal. 15 February 2005 Good Practice when Preparing a Project Proposal II 15 February 2005 Before applying Familiarise yourself with the programmes Web site, FAQs, past projects Review open Call for Proposals and associated

More information