1 PPL Electric Utilities Act 129 Phase 3 Business Rebate Program April 27, 2016

2 Background ACT 129 was signed into law in November 2008 Energy efficiency programs help customers manage their electric consumption and reduce their electricity costs Programs are available to default supply and shopping customers on a voluntary basis Program costs are recovered from customers Budget is ~$62 million per year Pass through (rider); PPL makes no profit No cross subsidization 2

3 Phases of Energy Efficiency Programs Phase 1: November May 2013 Phase 2: June 1, 2013 May 31, 2016 Phase 3: June 1, 2016 May 31, 2021 Energy Efficiency Plan filed on November 30, 2015 PaPUC approval on March 17, 2016 Programs launch June 1,

4 Status of Phase 2 Business Rebates Waitlist implemented on May 20, 2015 for all sectors and programs Program closed to new pre-applications on April 22, 2016 Customers and contractors with waitlisted projects will be contacted over the next several weeks to advise status of funding Final applications for all completed Phase 2 projects are due by June 15,

5 Phase 3 Overall Energy Reduction Target 1,443,035 MWh/yr Equivalent to a 3.8% reduction in overall consumption Phase 1 (~3.5 years) was 1,146,431 MWh/yr; 3% reduction Phase 2 (3 years) was 821,072 MWh/yr; 2.1% reduction Compliance targets for Phase 1 were set in the legislation Compliance targets for Phase 2 and Phase 3 were set by the PaPUC 5

6 Compliance Targets Low-Income 5.5% of the total energy savings target 79,367 MWh/yr Entirely from income-qualified programs Government, non-profit, education (GNE) 3.5% of the total energy savings target 50,507 MWh/yr Peak Load Reduction 92 MW 6

7 Other Requirements Portfolio of energy efficiency programs must be cost-effective Demand reduction must be cost-effective Cost-effectiveness is determined by the Total Resource Cost test Equitable distribution of programs across customer sectors EDCs must hire Conservation Service Providers (CSPs) to deliver programs EDCs must competitively bid all CSP contracts Cannot reuse Phase 2 CSPs without competitive bids PaPUC must approve all CSP contracts 7

8 Process for Designing Programs Market potential study and other research Results from previous phases A lot of input from stakeholders June - October 2015: OCA, OSBA, SEF, CAUSE/PULP, PPLICA, KEEA, CEO, and others Establish savings and cost budgets for each customer sector (residential, low-income, small C&I, large C&I, GNE) Many iterations File EE&C Plan November 30, 2015 Comments, testimony, reply testimony, reply comments, and a hearing before an Administrative Law Judge PaPUC approval on 3/17/16 8

9 Phase 3 Business Rebate Program Efficient Equipment Program Lighting, lighting controls, refrigeration, HVAC, motors, variable frequency drives and more Rebates based on $/annual kwh saved Custom Program Complex energy efficiency measures requiring measurement and verification Compressed air, motors/vsds, industrial process improvements, building management systems, combined heat and power (CHP), other technologies Rebates based on $/annual kwh saved 9

10 Other Program Highlights Mid-Stream lighting rebates for distributors Program rebates given at Point-of-Sale Encourages trade allies to purchase moreefficient lighting products Easier program participation Direct Discount rebates for qualified trade allies (Fall 2016) Rebates for Behavioral measures (targeting GNE sector) 10

11 Efficient Equipment Rebates Performance-based rebates at: $0.05/annual kwh Up to 50% of project cost or $500,000 Comprehensive list of measures Savings determined by 2016 PA TRM 11

12 Custom Rebates Performance-based rebates at: $0.06/annual kwh Up to 50% of project cost or $500,000 Complex measures requiring measurement and verification Projects must pass TRC to be eligible 12

13 Combined Heat and Power (CHP) Performance-based rebates at: $0.03/annual kwh Up to 50% of project cost or $500,000 Projects must pass TRC to be eligible 13

14 Midstream Lighting Rebates Prescriptive-based rebates vary by product. Rebates provided at the Point-of-Sale (POS) through participating distributors. Customer information must be given by contractor at POS to verify eligibility. 14

15 Direct Discount Rebates Starts Fall 2016 Rebates paid directly to participating trade allies. Requires reenrollment Details and eligibility requirements to follow. 15

16 Online Application Portal Phase 3 project applications can be completed and submitted online starting June 1. Project documents can be also be submitted through the portal. Project status updates will be displayed in the portal. 16

17 RECAP: Phase 3 Business Rebate Program PY8 PPL Business Rebates Efficient Equipment Custom $0.05/kWh $0.06/kWh Additional program services provide based on your individual needs: Technical Assistance Help identify efficiency opportunities that are specific to your business Review efficiency design specs and provide recommendations CHP $0.03/kWh Energy Benchmarking and Master Planning: Learn where and how your facilities are wasting energy Educate on best practices that finance, facilities and administrative staff can employ to maximize longterm savings 17

18 Phase 3 Trade Ally Kickoff Events Dates Venue Times Thurs., 6/2 Tues., 6/7 Wed., 6/8 Thurs., 6/9 Fri., 6/10 Red Lion East Harrisburg 4251 Lindle Road, Harrisburg, PA Hilton Conf. Ctr. 100 Adams Ave. Scranton, PA Genetti/Best Western 1345 North Church Street, Hazleton, PA Lehigh University, Iacocca Hall Hampton Inn 140 Via Bella St, Williamsport, PA 7:30 Breakfast 8-9:30 am 7:30 Breakfast 8-9:30 am 7:30 Breakfast 8-9:30 am 7:30 Breakfast 8-9:30 am 7:30 Breakfast 8-9:30 am *Webinar of the Trade Ally Kickoff presentation will be available for those that cannot attend in person, details will be provided. 18

19 CONTACT INFORMATION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY : COMPANY FOR APPROVAL OF ITS : ACT 129 PHASE III ENERGY : DOCKET NO. M-2015 EFFICIENCY AND CONSERVATION : PLAN : PETITION OF PECO

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2015 through November 30, 2015 Program Year 7, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2012 through November 30, 2012 Program Year 4, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 1, 2015 through August 31, 2015 Program Year 7, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2015 through November 30, 2015 Program Year 7, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF UGI UTILITIES, INC. ELECTRIC DIVISION FOR APPROVAL OF ITS ENERGY EFFICIENCY AND CONSERVATION PLAN DOCKET NO. M-0- TESTIMONY OF BRIAN J. FITZPATRICK

More information

STATEWIDE EVALUATION TEAM SEMI-ANNUAL REPORT

STATEWIDE EVALUATION TEAM SEMI-ANNUAL REPORT STATEWIDE EVALUATION TEAM SEMI-ANNUAL REPORT Year 6, Quarters 1 & 2 June 1, 2014 through November 30, 2014 Prepared For: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency

More information

DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT

DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT DUQUESNE LIGHT COMPANY PROGRAM YEAR 7 ANNUAL REPORT Program Year 7: June 1, 2015 May 31, 2016 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

STATEWIDE EVALUATION TEAM PRELIMINARY ANNUAL REPORT TO THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

STATEWIDE EVALUATION TEAM PRELIMINARY ANNUAL REPORT TO THE PENNSYLVANIA PUBLIC UTILITY COMMISSION STATEWIDE EVALUATION TEAM PRELIMINARY ANNUAL REPORT TO THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Year 5 June 1, 2013 through May 31, 2014 Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Semi-Annual Report to the Pennsylvania Public Utility Commission

Semi-Annual Report to the Pennsylvania Public Utility Commission A.1.1 Semi-Annual Report to the Pennsylvania Public Utility Commission Phase III of Act 129 Program Year 10 (June 1, 2018 November 30, 2018) For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period November 05 through February 06 Program Year 7, Quarter For Pennsylvania Act 9 of 008 Energy Efficiency and Conservation Plan

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 2014 through August 2014 Program Year 6, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009

Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009 Annual Report to the Pennsylvania Public Utility Commission For the period December 2009 to May 2010 Program Year 2009 For Act 129 of 2008 Energy Efficiency and Conservation Program Prepared by Duquesne

More information

Template for Pennsylvania EDC Energy Efficiency and Conservation Plans. 1. Overview of Plan... 5

Template for Pennsylvania EDC Energy Efficiency and Conservation Plans. 1. Overview of Plan... 5 Energy Efficiency and Conservation Plan Page 1 of 162 Template for Pennsylvania EDC Energy Efficiency and Conservation Plans To be submitted by EDCs by November 30, 2015 Contents Transmittal Letter Table

More information

Ameren Missouri MEEIA Energy Efficiency Plan

Ameren Missouri MEEIA Energy Efficiency Plan 2019-24 MEEIA Energy Efficiency Plan PUBLIC Table of Contents 1.0 Key Aspects of the Plan... 5 2.0 Portfolio Summary... 6 3.0 Sector Programs... 14 3.1 Low-Income Sector Programs... 15 3.1.1 Low-Income

More information

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado March 31, 2018 / Proceeding No. 16A-0512EG 2017 xcelenergy.com 2018 Xcel Energy Inc. Xcel Energy

More information

11 McNees. Iz 11_1 z z~~/ Wallace & Nurick LLC. January 4, 2015

11 McNees. Iz 11_1 z z~~/ Wallace & Nurick LLC.   January 4, 2015 11 McNees Wallace & Nurick LLC 00 Pine Street PO Box 1166 Harrist Thi: 7172328000 fthx: 71 7.237.5300 1",q, PA 17108i 168 Adeolu A. Bakare Direct Dial: 717.237.5290 Direct Fax: 717.260.1712 abakare@mwn.com

More information

FIVE YEAR PLAN FOR ENERGY EFFICIENCY

FIVE YEAR PLAN FOR ENERGY EFFICIENCY FIVE YEAR PLAN FOR ENERGY EFFICIENCY Executive Summary Prepared for: Holy Cross Energy Navigant Consulting, Inc. 1375 Walnut Street Suite 200 Boulder, CO 80302 303.728.2500 www.navigant.com July 15, 2011

More information

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan Exhibit DAS-1 Tucson Electric Power Company Demand-Side Management Program Portfolio Plan 2008-2012 TABLE OF CONTENTS 1. Introduction...3 2. DSM Portfolio Performance Costs, Savings and Net Benefits...3

More information

Energy Association of Pennsylvania Response to PA PUC Staff Questions Re: On Bill (Financing) Repayment

Energy Association of Pennsylvania Response to PA PUC Staff Questions Re: On Bill (Financing) Repayment Energy Association of Pennsylvania Response to PA PUC Staff Questions Re: On Bill (Financing) Repayment 1. In order to determine the success of a pilot program, performance metrics will need to be established.

More information

Trade Allies Poised for ComEd

Trade Allies Poised for ComEd Trade Allies Poised for ComEd Beyond Lighting Erinn Monroe ACEEE Energy Efficiency as a Resource Chicago, IL Trade Allies Poised for ComEd: Beyond Lighting Quick Launch Recruiting and training trade allies

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PECO ENERGY COMPANY STATEMENT NO. 2-R BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY COMPANY FOR APPROVAL OF ITS ACT 129 PHASE III ENERGY EFFICIENCY AND CONSERVATION PLAN DOCKET

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust July 20, 2016 1. Communications A.) Awareness and Press Outreach Events o Save the date for the Trust s Combined

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION DIRECT TESTIMONY LOVITA GRIFFIN, EEP RATE ANALYST

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION DIRECT TESTIMONY LOVITA GRIFFIN, EEP RATE ANALYST BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF CENTERPOINT ENERGY ARKANSAS GAS FOR APPROVAL OF ITS QUICK START ENERGY EFFICIENCY PROGRAM, PORTFOLIO AND PLAN INCLUDING

More information

APSC FILED Time: 4/1/2014 1:00:19 PM: Recvd 4/1/ :52:33 PM: Docket tf-Doc. 196

APSC FILED Time: 4/1/2014 1:00:19 PM: Recvd 4/1/ :52:33 PM: Docket tf-Doc. 196 April 1,2014 Arkansas Public Service Commission 1000 Center Street POBox 400 Little Rock, AR 72203-0400 Re: Docket No. 07-076-TF Empire District Electric Company Annual Report on Conservation and Energy

More information

SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO

SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO First Revision Sheet 90 I.P.U.C. No.28 Substitute Original Sheet 90 90 SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO 1. Availability The services described herein are available to specified residential,

More information

DOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER

DOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS ELECTRIC AND NATURAL GAS DEMAND-SIDE MANAGEMENT (DSM PLAN FOR THE CALENDAR YEAR 0 AND TO CHANGE ITS ELECTRIC AND

More information

ENERGY EFFICIENCY AND

ENERGY EFFICIENCY AND 2018 ENERGY EFFICIENCY AND LOAD MANAGEMENT PROGRAM PLAN NMPRC CASE NO. 17-00 -UT APRIL 14, 2017 Table of Contents 1 EXECUTIVE SUMMARY... 3 1.1 SUMMARY OF CHANGES FROM PREVIOUS PLAN... 5 2 PROGRAM GOALS...

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO Proceeding No. A- E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP FOR APPROVAL OF ITS ELECTRIC DEMAND

More information

EEAC EM&V Briefing. Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013

EEAC EM&V Briefing. Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013 EEAC EM&V Briefing Ralph Prahl EEAC Consultant EM&V Team Leader July 9th, 2013 Organization of Presentation EM&V in Massachusetts: Past, Present and Future Past Background Review of MA EM&V Framework Current

More information

RE: Reply Comments of the Keystone Energy Efficiency Alliance on Alternative Ratemaking Methodologies Docket No. M

RE: Reply Comments of the Keystone Energy Efficiency Alliance on Alternative Ratemaking Methodologies Docket No. M 1501 Cherry Street Philadelphia, PA 19102 267-519-5316 keealliance.org Via Electronic Filing Rosemary Chiavetta, Secretary PA Public Utility Commission Commonwealth Keystone Bldg. 400 North Street Harrisburg

More information

PA ACT 129 UPDATE THE NEXT GENERATION OF UTILITY ENERGY EFFICIENCY PROGRAMS IN PA

PA ACT 129 UPDATE THE NEXT GENERATION OF UTILITY ENERGY EFFICIENCY PROGRAMS IN PA PA ACT 129 UPDATE 1 THE NEXT GENERATION OF UTILITY ENERGY EFFICIENCY PROGRAMS IN PA Schaedler Yesco Act 129 Update Seminar June 19 th, 2013 Wilkes Barre, PA Stephen Moritz: President AllFacilities Energy

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust August 22, 2018 1. Communications A) Awareness and Press Press o The Residential Manager was interviewed for a

More information

Energy Efficiency and Finance: Opportunities and Issues

Energy Efficiency and Finance: Opportunities and Issues Energy Efficiency and Finance: Opportunities and Issues Steven Nadel, Executive Director American Council for an Energy-Efficient Economy July 31, 2012 Quads of Total Primary Energy U.S. Energy Use in

More information

Connection. Keystone. Utility News in Pennsylvania. Act 129 s Energy Efficiency and Conservation Plans. Connecting in Pennsylvania ON THE INSIDE

Connection. Keystone. Utility News in Pennsylvania. Act 129 s Energy Efficiency and Conservation Plans. Connecting in Pennsylvania ON THE INSIDE Keystone Connection Utility News in Pennsylvania A newsletter published by the Pennsylvania Public Utility Commission regarding utility news in the telecommunications, energy, transportation and water

More information

Matthew F. Hilzinger Chief Financial Officer

Matthew F. Hilzinger Chief Financial Officer Matthew F. Hilzinger Chief Financial Officer Morgan Stanley Global Electricity & Energy Conference April 3, 2008 Forward-Looking Statements This presentation includes forward-looking statements within

More information

August EEAC Small Business Offerings & Services. August 16, 2017

August EEAC Small Business Offerings & Services. August 16, 2017 August EEAC Small Business Offerings & Services August 16, 2017 Topics 1. Small Businesses in Massachusetts 2. Dive into Turnkey Small Business Services 3. Small Business Case Study 2 Stage Setting: Small

More information

Pennsylvania s Energy Efficiency Uncapped

Pennsylvania s Energy Efficiency Uncapped Pennsylvania s Energy Efficiency Uncapped Assessing the Potential Impact of Expanding the State s Energy Efficiency Program Beyond the Current Budget Cap Prepared for Keystone Energy Efficiency Alliance

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust July 26, 2017 1. Communications A) Awareness and Press Outreach Events: o Staff presented at the Education Facility

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO Proceeding No. 15A 0424E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP FOR APPROVAL OF ITS ELECTRIC

More information

Community Solar Rate Rider: Schedule No February 13, 2018

Community Solar Rate Rider: Schedule No February 13, 2018 Community Solar Rate Rider: Schedule No. 500 February 13, 2018 1 Community Solar Agenda Design Principles Program Highlights Pricing Methodology Example Customer Impact Conclusion Next Steps 2 Design Principles

More information

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C.

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C. DEFAULT SERVICE IN PENNSYLVANIA David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C. Synopsis: This presentation provides an overview of default electric service in Pennsylvania beginning

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust March 22, 2017 1. Communications A) Awareness and Press Outreach Events: i. Business Manager Rick Meinking exhibited

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust March 28, 2018 1. Communications A) Awareness and Press Press o o Efficiency Maine was mentioned in coverage of

More information

Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan

Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan 2016-2018 Natural Gas Demand Side Management Evaluation, Measurement, and Verification (EM&V) Plan submitted to the Ontario Energy Board Date: November 10, 2016 DNV GL - Energy www.dnvgl.com/energy Table

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. METROPOLITAN EDISON COMPANY Docket No. PENNSYLVANIA ELECTRIC COMPANY Docket No.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. METROPOLITAN EDISON COMPANY Docket No. PENNSYLVANIA ELECTRIC COMPANY Docket No. Met-Ed/Penelec/Penn Power/West Penn Statement No. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION METROPOLITAN EDISON COMPANY Docket No. PENNSYLVANIA ELECTRIC COMPANY Docket No. PENNSYLVANIA POWER COMPANY

More information

May 3, Dear Ms. Bordelon:

May 3, Dear Ms. Bordelon: Entergy Services, Inc. 639 Loyola Avenue (70113) P.O. Box 61000 New Orleans, LA 70161-1000 Tel 504 576 4122 Fax 504 576 5579 Michael J. Plaisance Senior Counsel Legal Services - Regulatory May 3, 2018

More information

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES CASE SUMMARY, PETITION AND TESTIMONY

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES CASE SUMMARY, PETITION AND TESTIMONY STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF : SOUTH JERSEY GAS COMPANY TO : CONTINUE ITS ENERGY EFFICIENCY : BPU DOCKET NO. PROGRAMS ( EEP IV ) AND ENERGY : EFFICIENCY

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust November 14, 2018 1. Communications A) Awareness and Press Press o Ductless heat pumps were the topic of an article

More information

COMMONWEALTH OF PENNSYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P.O. BOX 3265, HARRISBURG, PA March 1, 2012

COMMONWEALTH OF PENNSYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P.O. BOX 3265, HARRISBURG, PA March 1, 2012 COMMONWEALTH OF PENNSYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P.O. BOX 3265, HARRISBURG, PA 17105-3265 March 1, 2012 IN REPLY PLEASE REFER TO OUR FILE M-2012-2289411 TO ALL INTERESTED PARTIES: Re:

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust September 26, 2013 I. Communications a. Awareness and Press Efficiency Maine s training team (Dale Carnegie and

More information

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts.

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts. Program Administrator: The Brooklyn Union Gas Company d/b/a National Grid NY Program/Project: Residential High-Efficiency Heating and Water Heating and Controls Program Reporting period: Quarter 4 (October

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust July 25, 2012 I. Communications a. Government Affairs The Trust has launched a Stakeholder Process for the development

More information

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES ATTACHMENT 1 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF PUBLIC SERVICE ELECTRIC AND GAS COMPANY FOR APPROVAL OF ITS ENERGY EFFICIENCY 2017 PROGRAM AND RECOVERY OF ASSOCIATED

More information

MASSACHUSETTS CROSS-CUTTING BEHAVIORAL PROGRAM EVALUATION

MASSACHUSETTS CROSS-CUTTING BEHAVIORAL PROGRAM EVALUATION MASSACHUSETTS CROSS-CUTTING BEHAVIORAL PROGRAM EVALUATION Volume I Final Prepared for: MASSACHUSETTS ENERGY EFFICIENCY ADVISORY COUNCIL Prepared by: OPINION DYNAMICS CORPORATION 230 Third Avenue Third

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION ENERGY EFFICIENCY AND CONSERVATION PROGRAM DOCKET NO. M

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION ENERGY EFFICIENCY AND CONSERVATION PROGRAM DOCKET NO. M PECO ENERGY COMPANY STATEMENT NO. 3 BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION ENERGY EFFICIENCY AND CONSERVATION PROGRAM DOCKET NO. M-2009-2093215 DIRECT TESTIMONY SUPPORTING PECO'S PETITION FOR

More information

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts.

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts. Program Administrator: Niagara Mohawk Power Corporation d/b/a National Grid Program/Project: Residential High Efficiency Central Air Conditioning Program Reporting period: Quarter 2 (April June) 2010 Report

More information

2018 Non-Residential Rebates

2018 Non-Residential Rebates How to Apply Important Information 2018 Non-Residential Rebates 1. Read the Terms and Conditions and product eligibility requirements (pages 3 and 4). Complete program guidelines are available online at

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION SWEPCO BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF CERTAIN REPORTS ) REQUIRED TO BE FILED BY SOUTHWESTERN ) ELECTRIC POWER COMPANY ) DOCKET NO: 08-039-RP ANNUAL REPORT OF CONSERVATION

More information

Incentives and Behaviour Change: Demystifying Market Transformation. October 20, 2015 Christopher Russell Visiting Fellow, ACEEE

Incentives and Behaviour Change: Demystifying Market Transformation. October 20, 2015 Christopher Russell Visiting Fellow, ACEEE Incentives and Behaviour Change: Demystifying Market Transformation October 20, 2015 Christopher Russell Visiting Fellow, ACEEE crussell@aceee.org 1 American Council for an Energy- Efficient Economy (ACEEE)

More information

APSC FILED Time: 3/31/ :15:35 AM: Recvd 3/31/ :13:45 AM: Docket tf-Doc. 231

APSC FILED Time: 3/31/ :15:35 AM: Recvd 3/31/ :13:45 AM: Docket tf-Doc. 231 SERVICES YOU COUNT ON March 31,2015 Arkansas Public Service Comm ission 1000 Center Street POBox 400 Little Rock, AR 72203-0400 Re: Docket No. 07-076-TF Empire District Electric Company An nual Report

More information

Commercial Refrigeration Incentive Application for Business Customers

Commercial Refrigeration Incentive Application for Business Customers 2019 Commercial Refrigeration Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval

More information

TEXAS PROPERTY ASSESSED CLEAN ENERGY (TX-PACE) FINANCING: 101

TEXAS PROPERTY ASSESSED CLEAN ENERGY (TX-PACE) FINANCING: 101 TEXAS PROPERTY ASSESSED CLEAN ENERGY (TX-PACE) FINANCING: 101 NTAEE January 18, 2018 TX-PACE WILL L O W E R Utility Costs I N C R E A S E Net Operating Income Bottom Line: Increased Building Value WHAT

More information

Small Business Energy Advantage (SBEA) Recapitalization. Q&A Webinar May 9, 2018

Small Business Energy Advantage (SBEA) Recapitalization. Q&A Webinar May 9, 2018 Small Business Energy Advantage (SBEA) Recapitalization Q&A Webinar May 9, 2018 Outline Overview SBEA Program CT Energy Efficiency Fund Loan Portfolio Statistics Underwriting Criteria Program Structure

More information

Memorandum. Highlights from. To From Date Subject EEAC. Eric Belliveau and the. Report July. EEAC Consultant Team. Plan.

Memorandum. Highlights from. To From Date Subject EEAC. Eric Belliveau and the. Report July. EEAC Consultant Team. Plan. Memorandum To From Date Subject Eric Belliveau and the 6 August 2012 Monthly Report July 2012 The is pleased to provide this monthly update to the Council on our recentt activities. Highlights from the

More information

Pre-Project Submission Form

Pre-Project Submission Form Pre-Project Submission Form INSTRUCTIONS: Please complete ALL required fields below. For Head Office Applications, complete a Pre Project Submission Form for each facility. Check each box below to confirm

More information

2014 Annual Update of the Electric and Natural Gas Conservation and Load Management Plan

2014 Annual Update of the Electric and Natural Gas Conservation and Load Management Plan Docket No. 13-03-02 Compliance Filing 2014 Annual Update of the 2013-2015 Electric and Natural Gas Conservation and Load Management Plan Submitted by: The Connecticut Light and Power Company The United

More information

ORDER NO * * * * * * * In this Order, we approve for implementation a series of energy efficiency and

ORDER NO * * * * * * * In this Order, we approve for implementation a series of energy efficiency and ORDER NO. 82384 IN THE MATTER OF BALTIMORE GAS AND ELECTRIC COMPANY S ENERGY EFFICIENCY, CONSERVATION AND DEMAND RESPONSE PROGRAMS PURSUANT TO THE EMPOWER MARYLAND ENERGY EFFICIENCY ACT OF 2008 * * * *

More information

2014 through This goal would also be a guide in establishing the annual budget and compliance filing process for 2014 through 2017.

2014 through This goal would also be a guide in establishing the annual budget and compliance filing process for 2014 through 2017. Staff Draft Straw Proposal NJCEP 2013 through 2016 Funding Level Now the NJCEP 2014 through 2017 Funding Level Comprehensive Energy Efficiency and Renewable Energy Resource Analysis August 21, 2012 Summary

More information

Custom Incentive Application for Business Customers

Custom Incentive Application for Business Customers 2019 Custom Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and Conditions

More information

SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES. 25.181. Energy Efficiency Goal. (a) (b) (c) Purpose. The purposes of this section are to ensure that: (1) electric utilities administer energy savings incentive programs in a market-neutral, nondiscriminatory

More information

Pay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings

Pay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings Pay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings Fiscal Year 20182019 (7/1/20172018 through 6/30/20182019) Table of Contents 1. Purpose... 5 2. General

More information

16 th Revision of Sheet No. 83 Canceling 15 th Revision of Sheet No. 83, 7 th Revision WN U-60 of Sheet No. 255 and 2 nd Revision of Sheet No.

16 th Revision of Sheet No. 83 Canceling 15 th Revision of Sheet No. 83, 7 th Revision WN U-60 of Sheet No. 255 and 2 nd Revision of Sheet No. 16 th Revision of Sheet No. 83 Canceling 15 th Revision of Sheet No. 83, 7 th Revision WN U-60 of Sheet No. 255 and 2 nd Revision of Sheet No. 255-a, INC. ELECTRICITY CONSERVATION SERVICE 1. PURPOSE: To

More information

REQUEST FOR QUALIFICATIONS GUARANTEED ENERGY SAVINGS CONTRACT RFQ #

REQUEST FOR QUALIFICATIONS GUARANTEED ENERGY SAVINGS CONTRACT RFQ # Name: Lackawanna County Address: 200 Adams Ave Address: Scranton PA 18503 Introduction REQUEST FOR QUALIFICATIONS GUARANTEED ENERGY SAVINGS CONTRACT RFQ # 345-12-1 Lackawanna County is requesting Qualifications

More information

Application Terms & Conditions and Final Payment Agreement

Application Terms & Conditions and Final Payment Agreement Prescriptive, Self-Direct Custom Program & Self-Direct Application Terms & Conditions and Final Payment Agreement Version: January 1, 2015 January 2017 TERMS AND CONDITIONS AEP Ohio offers Efficient Products

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust September 27, 2017 1. Communications A) Awareness and Press Outreach Events: o Staff participated in an energy

More information

IID APPLICATION INSTRUCTIONS ENERGY REWARDS PROGRAM FOR NON-RESIDENTIAL CUSTOMERS

IID APPLICATION INSTRUCTIONS ENERGY REWARDS PROGRAM FOR NON-RESIDENTIAL CUSTOMERS ENERGY REWARDS PROGRAM FOR NON-RESIDENTIAL CUSTOMERS APPLICATION INSTRUCTIONS How to Apply 1. Before applying for a rebate through IID s Energy Rewards Program, please be sure to read the Energy Rewards

More information

Comprehensive Energy Conservation & Solar Performance Contracts. City Hall, Public Safety and Solar Projects

Comprehensive Energy Conservation & Solar Performance Contracts. City Hall, Public Safety and Solar Projects Comprehensive Energy Conservation & Solar Performance Contracts City Hall, Public Safety and Solar Projects Budget, Finance and Audit Committee January 6, 2014 Agenda Project Projects background Current

More information

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts.

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts. : The Brooklyn Union Gas Company d/b/a National Grid NY Program/Project: Residential High-Efficiency Heating and Water Heating and Controls Program Reporting period: Quarter 1 (January - March) 2011 Report

More information

BEFORE THE MARYLAND PUBLIC SERVICE COMMISSION CASE NO IN THE MATTER OF BALTIMORE GAS AND ELECTRIC COMPANY

BEFORE THE MARYLAND PUBLIC SERVICE COMMISSION CASE NO IN THE MATTER OF BALTIMORE GAS AND ELECTRIC COMPANY BEFORE THE MARYLAND PUBLIC SERVICE COMMISSION CASE NO. 0 IN THE MATTER OF BALTIMORE GAS AND ELECTRIC COMPANY FOR AUTHORIZATION TO DEPLOY A SMART GRID INITIATIVE AND TO ESTABLISH A SURCHARGE MECHANISM FOR

More information

Planned Actual Planned Adjusted

Planned Actual Planned Adjusted Section I: Program Overview A. Program Summary Program Description The Commercial Prescriptive Lighting Program is a contractor-driven program that provides financial incentives to commercial and industrial

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR APPROVAL TO RECOVER ITS REGULATORY DISINCENTIVES AND INCENTIVES ASSOCIATED WITH

More information

Commercial and Industrial Energy Efficiency Program Manual

Commercial and Industrial Energy Efficiency Program Manual Commercial and Industrial Energy Efficiency Program Manual - 2018 Table of Contents Commercial & Industrial Energy Efficiency Program Manual Section 1: Introduction... 3 1.1 Program Overview... 3 Section

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. Re: Act 129 Energy Efficiency and Conservation Program Phase III Docket No.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. Re: Act 129 Energy Efficiency and Conservation Program Phase III Docket No. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Re: Act 129 Energy Efficiency and Conservation Program Phase III Docket No. M-2014-2424864 COMMENTS OF THE KEYSTONE ENERGY EFFICIENCY ALLIANCE TO THE TENTATIVE

More information

Innovative Tools for Estimating Robust Non-Energy Impacts that Enhance Cost-Effectiveness Testing and Marketing of Energy Efficiency Programs

Innovative Tools for Estimating Robust Non-Energy Impacts that Enhance Cost-Effectiveness Testing and Marketing of Energy Efficiency Programs Innovative Tools for Estimating Robust Non-Energy Impacts that Enhance Cost-Effectiveness Testing and Marketing of Energy Efficiency Programs Abstract Noel Stevens and Nathan Caron, DNV GL Christopher

More information

Quarterly Performance Report» Q3 2016

Quarterly Performance Report» Q3 2016 Quarterly Performance Report» Q3 2016 Cumulative Total Regional amw Savings All Electric Investments Cycle 5 (2015-2019) Cycle 4 (2010-2014) Cycle 3 (2005-2009) Cycle 1 & 2 (1997-2004) 1200 900 600 300

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR APPROVAL OF ITS 2009 ENERGY EFFICIENCY AND LOAD MANAGEMENT PLAN AND ASSOCIATED

More information

ORDER NO * * * * * * * On October 25 and 26, 2018, the Commission held a legislative-style hearing in

ORDER NO * * * * * * * On October 25 and 26, 2018, the Commission held a legislative-style hearing in ORDER NO. 88964 IN THE MATTER OF THE EMPOWER MARYLAND 2018-2020 ENERGY EFFICIENCY, CONSERVATION AND DEMAND RESPONSE PROGRAM PLANS PURSUANT TO THE EMPOWER MARYLAND ENERGY ACT OF 2008 * * * * * * * BEFORE

More information

Energy Efficiency Portfolio Implementation Plan

Energy Efficiency Portfolio Implementation Plan Energy Efficiency Portfolio Implementation Plan January 2012 CASE 07-M-0548 Proceeding on Motion of the Commission Regarding an Energy Efficiency Portfolio Standard Issued and effective October 25, 2011

More information

NEW CONSTRUCTION PARTICIPATION CHECKLIST

NEW CONSTRUCTION PARTICIPATION CHECKLIST NEW CONSTRUCTION PARTICIPATION CHECKLIST June 1, 2017 through December 31, 2017 DIRECTIONS: Please save a copy of this form to your computer by selecting FILE/SAVE AS before entering text and numbers.

More information

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process MILWAUKIE CITY COUNCIL STAFF REPORT Agenda Item: WS 4. Meeting Date: 9-16-14 To: Mayor and City Council Through: Bill Monahan, City Manager Subject: Proceeding with the ESCO Process From: Gary Parkin,

More information

Commonwealth Edison Company Energy Efficiency and Demand Response Plan Settlement Stipulation

Commonwealth Edison Company Energy Efficiency and Demand Response Plan Settlement Stipulation I. INTRODUCTION Commonwealth Edison Company 2018-2021 Energy Efficiency and Demand Response Plan Settlement Stipulation This Settlement Stipulation ( Stipulation ), when fully executed and accepted, will

More information

Request for Proposal (RFP) for. Implementation Contractor. for. Ameren Missouri Demand Side Management Program Implementation Cycle III

Request for Proposal (RFP) for. Implementation Contractor. for. Ameren Missouri Demand Side Management Program Implementation Cycle III Request for Proposal (RFP) for Implementation Contractor for Ameren Missouri Demand Side Management Program Implementation Cycle III Issued: July 31, 2017 This document and its supporting materials is

More information

How Ontario is Putting Conservation First

How Ontario is Putting Conservation First How Ontario is Putting Conservation First Nik Schruder Conservation & Corporate Relations, IESO September 2015 Presented at the 2015 ACEEE National Conference on Energy Efficiency as a Resource Overview

More information

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts.

(b) There are no additional key aspects of program performance goals. (c) There are no updates to the forecast of net energy and demand impacts. : The Brooklyn Union Gas Company d/b/a National Grid NY Program/Project: Residential High-Efficiency Heating and Water Heating and Controls Program Reporting period: Quarter 3 (July - September) 2011 Report

More information

Final Version October 19, ENERGY EFFICIENCY PLAN TERM SHEET

Final Version October 19, ENERGY EFFICIENCY PLAN TERM SHEET CORE PRINCIPLES ENERGY EFFICIENCY PLAN TERM SHEET Energy efficiency is a cornerstone of the Commonwealth s long term energy policy. The Plan ( Plan ) reflects this key role and builds upon the high level

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NOTICE TO SPS CUSTOMERS

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NOTICE TO SPS CUSTOMERS BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S ENERGY EFFICIENCY COMPLIANCE APPLICATION THAT REQUESTS AUTHORIZATION TO: (1 PER APPROVED VARIANCE,

More information

Energy Efficiency Obligations for Russian industry

Energy Efficiency Obligations for Russian industry Energy Efficiency Obligations for Russian industry An ex ante evaluation of options 10/09/2014 Heleen Groenenberg Russian industry can save 43% on primary energy > Total final energy consumption in Russia

More information

Executive Director s Summary Report

Executive Director s Summary Report Executive Director s Summary Report to the Board of Trustees of the Efficiency Maine Trust January 23, 2019 1. Communications A) Awareness and Press Press o Efficiency Maine s electric vehicle charging

More information

2015 Connecticut Legislative Session and June Special Session NICHOLAS CICALE LEGISLATIVE COMMISSIONERS OFFICE

2015 Connecticut Legislative Session and June Special Session NICHOLAS CICALE LEGISLATIVE COMMISSIONERS OFFICE 2015 Connecticut Legislative Session and June Special Session NICHOLAS CICALE LEGISLATIVE COMMISSIONERS OFFICE 2015 was an education year THE ENERGY & TECHNOLOGY COMMITTEE TOOK SMALL PRAGMATIC STEPS IN