Proposal to the External Resources Department, Ministry of Finance, Sri Lanka) December 2008

Size: px
Start display at page:

Download "Proposal to the External Resources Department, Ministry of Finance, Sri Lanka) December 2008"

Transcription

1 Proposal to the External Resources Department, Ministry of Finance, Sri Lanka) December 2008

2 ASIAN DEVELOPMENT BANK TA Loan 2080-SRI: Road Project Preparatory Facility (RPPF) December 2008

3 Recommended Maintenance Cycle

4 Additional Life Span Additional Life Span Additional Life Span Unit Operation & Maintenance Cost (Rs.) Rehabilitation 1 Rehabilitation 2 Rehabilitation 3 Original Life Span Time (Age)

5 Road Condition in Uva Province % of Length by Present Road Condition Type of Road Total Kms Good Fair Poor Metalled and Tarred (single Lane 2 to 4 m) D % 30% 50% Metalled and Tarred (intermediate lane 4 to 6 lanes) C % 30% 60% DBST Surface (Single lane 4 to 6m) % - - Total % 27% 52% Road Condition in North Central Province Total Type of Road Kms Metalled and Tarred (single Lane 2 to 4 m) D 722 Metalled and Tarred (intermediate lane 4 to 6 lanes) C 1,037 % of Length by Present Road Condition Good Fair Poor 60% 25% 15% DBST Surface (Single lane 4 to 6m) % - - Total % 23% 14% Road Condition in Eastern Province Type of Road Total Km % of Length by Present Road Condition Good Fair Poor Gravel/Earth Road (Single Lane 2-4 metres) % 13% 75% Metalled and Tarred (single Lane 2 to 4 m) % 12% 80% Total 1, % 12% 79%

6 The major portion of the provincial road network in most provinces is in poor condition. This should be interpreted as being roads that have long-expired their design life and is overdue on rehabilitation. Since funds for rehabilitation is scare these roads are being kept motorable with expensive maintenance techniques (sand sealing- premix programs etc). As a result, roads that are within the life cycle are denied regular maintenance funds Thus delaying routine expenditure leads to rapid deterioration of the better roads as well, reducing their life expectancy sharply. In a study of the cost between routinely maintained roads and roads under stop-gap maintenance strategy in Uva, the overall life cycle cost was found to be 19 times higher. This is consistent with international studies Politically (and even socially) the rationale is to ensure the non-motorabel roads are made motorable, even if it means that newly rehabilitated roads are denied funding regular maintenance until they too deteriorate to poor condition so that expenditure is justifiable.

7 Domestic Financing Foreign Financing Domestic Financing Sources Domestic Funds Foreign aid related domestic funds Foreign Financing Sources Foreign aid loans Foreign aid grants Reimbursable Foreign aid loans Fund Releasing Criteria Funding recommendations for approved Road Program Finance Commission Ministry of PCs & LG Notification of fund releasing Notification of fund releasing Central Government (Treasury) Fund Requesting Criteria (No specific criterion for foreign funds) Devolved Revenue Ministry of PCs & LG Finalized Next year Road Work Program Provincial Councils Next year Road Work Program Provincial Road Agency Rehabilitation & Improvements Periodic & Routine Maintenance Eg: CAARP STAART Eg: PSDG, Criteria & Block Grant based works Eg: RSDP

8 Domestic Funds: Block Grant: Recurrent expenditures of PCs are covered by these block grants. Other than the Western Province most provinces get the majority of their recurrent budget under block grants from the Central Government. For the road sector this includes salaries, overheads and an allocation for recurrent maintenance which in addition to other assets includes a significant portion for road maintenance. Example Uva Province Rs. 000 Recurrent Expenditure 2006 Actual 2007 Estimate 2008 Estimate Personal Emoluments 22, , ,268.0 Traveling Expenses 1, , ,000.0 Supplies 1, , ,250.0 Maintenance Expenditure 26, , ,725.0 Contractual Services , ,100.0 Transfers ,000.0 Other Recurrent Expenditure Total 53, , ,423.0

9 Provincial Specific Development Grant (PSDG):These are capital grants provided for identified and agreed development priorities in the sectors of infrastructure, health and education etc. The FC has authority to supervise the progress of the performance of the PCs in these projects prior to releasing these grants. PCs do not have provision to deviate from the grant utilization guidelines provided by the Finance Commission. But in provinces where the road network is poor these are used for maintenance work (eg, Uva, EP). Only small length of roads actually receive any capital investment for rehabilitation (eg. Uva-10 kms(0.1%) and NCP -25 kms(2%)). This means that provincial roads can only be rehabilitated once every 50 years of more!)

10 Central Government allocates more than 90% of the budgetary needs of the PCs with provincial revenue accounting for only about 10% of their total financial needs for both recurrent and capital expenditure. In year 2007, the total expenditure of all PCs was Rs. 105, 850 mn and only Rs.13,900 mn was collected by the PCs from devolved revenues. Annual Vehicles Revenue License Fees makes up around 20% of the earned income(2007).

11 Maintenance Allocation & Expenditure Trend (2004( ) Allocation = Height of the bar, Expenditure= Dark Portion of the bar Rs. mn UP NCP EP 2007

12 500.0 Capital Allocation & Expenditure Trend ( ) 07) Allocation = Height of the bar, Expenditure= Dark Portion of the bar Rs. mn UP NCP EP

13 Some Observations Varying Utilization No consistency in Maintenance funds Imprest issues Diminishing Values Total Allocation & Expenditure Trend ( ) 07) Allocation = Height of the bar, Expenditure= Dark Portion of the bar Rs. mn UP NCP EP

14 For an average replacement cost of Rs 18 million in 2008 prices, the maintenance cost at 2% p.a. works out to around Rs 360,000 per km per year. This is a much higher level of maintenance than what is experienced on the present roads. This includes preventative maintenance and maintenance of road signs and markings which are totally missing on the entire provincial road network at present. The approximate breakdown of this amount at present prices would be as follows: Weeding and clearing Sand Sealing (3 yr application) Pothole management Maintenance of signs and markings Emergency repairs/repair of structures Overheads Rs 30,000 per year Rs 200,000 per year Rs 50,000 per year Rs 30,000 per year Rs 20,000 per year Rs 30,000 per year Thus it should be borne in mind that the ongoing re-construction program will increase total maintenance costs in the short term when more and more re-constructed roads will get added to the network for which a proper maintenance regime should be applied. That will then increase routine maintenance expenditure from an average of Rs 100,000 per km to around Rs 360,000 per km as has been suggested herein.

15 350,000.0 Central Govnt. Budgetary & Actual Allocation/km( ) Allocation = Height of the bar, Expenditure= Dark Portion of the bar 300, ,000.0 Rs. 200, , , , Est Est Est UP NCP EP 2008 Estimation is done, assuming same 2007 Fund utilization rate for 2008 allocation

16 Fleet, 2007 Vehicle Type UP Omnibuses NCP EP Private Coaches 1, Dual Purpose Vehicals 4,952 4,780 2,216 Private Cars 3,830 3,241 1,286 Land Vehicles 6,395 7,132 9,800 Goods Transport Vehicles 7,873 6,698 3,867 Motor Cycles 36,304 70,766 64,090 Threewheelers 13,299 10,894 9, , ,810 92,091 Others Total

17 North Central 4.7% Uva 3.3% Central 6.7% Eastern 4.1% Northern 3.2% % of Fleet by Province,2007 Estimated Total Fleet in Sri Lanka = 2,222,803 Western 43.5% North- Western 13.7% Sabaragamuwa 5.9% Southern 14.9% UP, NCP and EP are having the lowest vehicle fleets in the country

18 Growth of Fleet ( ) 07) 120, ,000 80,000 No o. of Vehicles 60,000 40,000 20,000 Annual growth rate = 17% UP 42,513 50,672 64,074 74,376 NCP 69,744 81,898 97, ,810 EP 66,736 73,135 92,131 92,091

19 Earned Vehicle Revenue/km Rs 180, , , , ,000 80,000 60,000 40,000 20, Est Est Est Est. UP NCP EP All Island (Excl. Western) 2008 Estimation is done, considering 15-20% vehicle growth per annum and increasing license fee on January 2008

20 (Earned Vehicle Revenue+Recieved Central Gvnt. Funds)/km Vehivle Revenue/km = Darker Portion Recieved Gvnt. Fund/km=Lighter Portion 250, , , ,000 50, Est Est Est. UP NCP EP

21 Life Cycle Cost Lifecycle cost of a re-constructed road, which would be estimated at Rs 18 million for re-construction and life cycle of 12 years at 2% maintenance cost per year, which works out to a total cost of 1.24 times the cost of reconstruction without escalation. The total life cycle cost without providing for escalation is Rs 22.3 million. On the other hand providing 15% escalation of costs will increase this to Rs 30 million per km in 2008 prices. Year Reconstruct Cost 0 18 Without Escalation Maintenance With Escalation Without Escalation Life Cycle With Escalation Maintenance Cost 2.0% Escalation Cost 15%

22 Road Fund Methods by which this desired maintainable road network could be achieved: 1. Road Maintenance Fund Subscribed to by PCs (with License Revenues) and Donor Agency Year Reconstruct Cost Maintenance Life Cycle Reducing Contribution Without With Without With Donor Provincial Escalation Escalation Escalation Escalation Agency Govt Maintenance Cost 2.0% Escalation Cost 15% Maintenance Increase 1.32

23 It enables the PC to begin maintaining the roads from year of re-construction as opposed to the present system where an improved road would not have the required budget for maintenance. It also enables the road network to be developed according a strategic plan whereby the entire provincial road network. At the end of the period, the PC would be fully able to meet the maintenance cost, where it is expected that the full annual cost of maintenance of the provincial road network could be raised from the vehicle revenue licenses and the grants from the Central Government

24 Uva NCP EP Road kms Roads reported in good condition kms Roads re-constructed after Road kms to be re-constructed Cost of Rs 18 mn/km 24,642 14,040 17,082 Kms re-constructed per year Number of years required (approx) Reconstruction Cost per year (Rs mn) Donor Agency Contribution to Fund Total Life Time Cost by Donor per year Total Cost per province Rs mn 29,078 16,567 20,157 Cost in US $ (mn) Cost per year in US$ (mn)

25 2. Road Maintenance Fund Subscribed by Provincial Council and Central Government 3. Road Maintenance Fund Fully Subscribed to 3. Road Maintenance Fund Fully Subscribed to by Annual Revenue License Fees

26 Uva NCP EP Road kms Roads reported in good condition kms Roads re-constructed after Road kms to be re-constructed Cost of Re-construction (Rs mn) 24,642 14,040 17,082 Kms re-constructed per year Number of years required (approx) Reconstruction Cost per year (Rs mn) Donor Agency Contribution to Fund Total Life Time Cost by Donor per year Total Cost per province Rs mn 29,078 16,567 20,157 Cost in US $ (mn) Cost per year in US$ (mn)

27 Maintenance for Roads should be based on the current state of roads and provided as a km cost. It should not be included in a block grant. Maintenance funds should be Priority 1. There should be no cuts in this. There should be a clear distinction of capital projects. These should be only those that will include rehabilitation. Funds for this should be allocated only after full maintenance funding is provided. There are problems with imprest to be investigated There are problems with utilization to be investigated The desired level of maintenance funding of 2% (around Rs 360,000) per km can be provided from existing allocation and earned provincial revenues.

28 For this purpose for roads that are to be rehabilitated a Road Fund can be created so that those providing funds for rehabilitation (donor or PSDG) contributes life cycle cost to a fund. The province could undertake this on a increasing basis where over 8 t0 10 years it is fully borne by the PC using vehicle revenue license fees. For this purpose it is best to designate all vehicle revenue licensing income into the income of the road agency earmarked for maintenance.

29

AN INTRODUCTION TO ROAD FUNDS - A

AN INTRODUCTION TO ROAD FUNDS - A AN INTRODUCTION TO ROAD FUNDS - A CONCEPTUAL CASE STUDY FOR SRI LANKA Amal S. Kumarage Genevieve Connors October 2000 i AN INTRODUCTION TO ROAD FUNDS A CONCEPTUAL CASE STUDYFOR SRI LANKA Amal S. Kumarage

More information

PUBLIC EXPENDITURE REVIEW PROGRAM

PUBLIC EXPENDITURE REVIEW PROGRAM PUBLIC EXPENDITURE REVIEW PROGRAM ROADS PUBLIC EXPENDITURE REVIEW IN SRI LANKA FINAL REPORT Submitted to the World Bank, Colombo Amal S Kumarage University of Moratuwa Moratuwa, Sri Lanka kumarage@sltnet.lk

More information

Long-Term Monitoring of Low-Volume Road Performance in Ontario

Long-Term Monitoring of Low-Volume Road Performance in Ontario Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario

More information

Latin American Monitoring and Evaluation Conference

Latin American Monitoring and Evaluation Conference Latin American Monitoring and Evaluation Conference Institutional Arrangements for M&E Systems: Sri Lankan Experience. V. Sivagnanasothy Director General, Dept. of Foreign Aid and Budget Monitoring Ministry

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II

Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II Rural road building Province of Bokeo (RRB) 1) BMZ-Nr.: 00 65 05* Programme/Client Rural infrastructure

More information

CIMA Sri Lanka mid size business confidence monitor. Key Facts and Survey Trends Data

CIMA Sri Lanka mid size business confidence monitor. Key Facts and Survey Trends Data 1 CIMA Sri Lanka mid size business confidence monitor Key Facts and Survey Trends Data Economic Prospects Index 2 Economic prospects Index 3% 3 10% 19% 2 27% 2 35% Much less confident Slightly less confident

More information

Governor s Working Group on Highway Funding Tuesday, July 28, 2015

Governor s Working Group on Highway Funding Tuesday, July 28, 2015 Governor s Working Group on Highway Funding Tuesday, July 28, 2015 Sources and Distribution of Highway Revenue Highway User Revenues Receipts & Distribution Fiscal Year 2014 Highway User Revenues Receipts

More information

Notes to the Financial Statements

Notes to the Financial Statements [1] Interest Income Loans and Advances 35,115,310 23,249,174 38,716,585 26,182,244 Treasury Bills and Treasury Bonds 5,463,734 4,896,404 5,463,734 4,896,404 Government of Sri Lanka Restructuring Bonds

More information

A Note on the Regional Dimensions of Population and Unemployment in Sri Lanka

A Note on the Regional Dimensions of Population and Unemployment in Sri Lanka A Note on the Regional Dimensions of Population and Unemployment in Sri Lanka Seneka Abeyratne & Tahani Iqbal Economic Affairs Division Peace Secretariat September 9, 2005 Introduction The objective of

More information

SRI LANKA ROAD SECTOR POLICY REVIEW NOTE

SRI LANKA ROAD SECTOR POLICY REVIEW NOTE SRI LANKA ROAD SECTOR POLICY REVIEW NOTE December 4, 2003 EXECUTIVE SUMMARY 1. Context. This policy note aims to: (i) facilitate the sector reform dialogue with the Government of Sri Lanka (GOSL); and

More information

Residential Street Improvement Plan

Residential Street Improvement Plan Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the

More information

TRAFFIC ACCIDENT COST ANALYSIS

TRAFFIC ACCIDENT COST ANALYSIS TRAFFIC ACCIDENT COST ANALYSIS by L. L. Ratnayake, C. Jayasinghe I.\ I ' ABSTRACT Sri Lanka has approximately 100,000 kilo111eters of road network including 11,147 kilometers of national roads under the

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

BUSINESS MODEL AND STRATEGIC DIRECTION

BUSINESS MODEL AND STRATEGIC DIRECTION BUSINESS MODEL AND STRATEGIC DIRECTION HNB Group HNB Assurance PLC Life Insurance 60% owned listed subsidiary HNB General Insurance Ltd 100% owned General Insurance company HNB PLC Sithma Development Ltd

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

Tajikistan Road Maintenance Development Project. Tajikistan Road Maintenance

Tajikistan Road Maintenance Development Project. Tajikistan Road Maintenance Tajikistan Road Maintenance Development Project OSCE Conference, Dushanbe October 23, 2007 BACKGROUND The length of Tajikistan s public road network is approximately 26.300 km, comprising 4.978 km of republican

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The province of Khyber Pakhtunkhwa in northwest Pakistan covers almost six degrees

More information

Road Assets & Expenditure

Road Assets & Expenditure Report on Local Government Road Assets & Expenditure 2013/14 walga.asn.au REPORT ON LOCAL GOVERNMENT ROAD ASSETS & EXPENDITURE 2013/14 Acknowledgements A special note of appreciation is extended to Clive

More information

Making Growth More Inclusive in Sri Lanka

Making Growth More Inclusive in Sri Lanka Making Growth More Inclusive in Sri Lanka Saman Kelegama Institute of Policy Studies of Sri Lanka 4 th International Conference of SLFUE, Sri Lanka Economic Research Conference 2015 Hotel Janaki, Colombo,

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport. Background Paper Thirteen

Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport. Background Paper Thirteen Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport Background Paper Thirteen Analysis of Steady State Cost of Transport in Ireland Issued by: Economic and Financial

More information

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007 TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4.

More information

MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES

MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES The slowdown in the global economy, coupled with declining export prices and capital outflows, is placing Sri Lanka s recent economic and social progress under

More information

Chapter 15. Agenda. Health Care Problems in the US. Individual Health Insurance Coverages. Problem 1: Rising Health Care Expenditures

Chapter 15. Agenda. Health Care Problems in the US. Individual Health Insurance Coverages. Problem 1: Rising Health Care Expenditures Chapter 15 Individual Health Insurance Coverages Agenda 2 Health Care Problems in the US Individual Health Insurance Coverages Hospital-Surgical Insurance Major Medical Insurance Health Savings Accounts

More information

Tokyo Cement Company Lanka PLC (TKYO) TKYO.N - Rs TKYO.X - Rs 13.50

Tokyo Cement Company Lanka PLC (TKYO) TKYO.N - Rs TKYO.X - Rs 13.50 Sri Lanka Equities CORPORATE UPDATE August 29 John Keells Stock Brokers (Pvt) Ltd. A JKSB Research Publication Dimantha Mathew dimantha@jkstock.keells.com Tokyo Cement Company Lanka PLC (TKYO) TKYO.N -

More information

Summary This paper explores using Key Performance Indicators (KPI s) to measure how effective annual highway maintenance.

Summary This paper explores using Key Performance Indicators (KPI s) to measure how effective annual highway maintenance. Title Measuring Highway Maintenance Performance Author Steve Batchelor, Highway Management Consultant. steve@stevebatchelor.com Paper prepared for presentation at the Maintenance and Construction Changes

More information

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program)

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) A. Road Sector Road Map 1. Strategic Objective 1. The strategic objective of the National Road Development

More information

Roles & Challenges of Development Assistance in LDCs

Roles & Challenges of Development Assistance in LDCs Ministry of Finance International Economic Cooperation Coordination Division Roles & Challenges of Development Assistance in LDCs Ms. Anita Bhattarai Section officer, Ministry of Finance Government of

More information

SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE. SECOND QUARTER 2003 Highlights

SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE. SECOND QUARTER 2003 Highlights Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE SECOND QUARTER 23 Highlights Introduction

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was

More information

Ex post evaluation Laos

Ex post evaluation Laos Ex post evaluation Laos Sector: Road transport (21020) Programme/Project: Rural infrastructure Laos III and IV - Phase III: BMZ No. 2008 65 212*, training component No. 1930 04 595, Phase IV: BMZ No. 2009

More information

Maldives: Letter of Intent, Memorandum of Economic and Financial Policies, and Technical Memorandum of Understanding.

Maldives: Letter of Intent, Memorandum of Economic and Financial Policies, and Technical Memorandum of Understanding. International Monetary Fund Maldives and the IMF Press Release: IMF Executive Board Completes First Review Under Standby and ESF Arrangements with Maldives, and Approves US$7.8 Million Disbursement March

More information

Ex-Post Evaluation of Japanese ODA Loan Pro-Poor Rural Development Project

Ex-Post Evaluation of Japanese ODA Loan Pro-Poor Rural Development Project Sri Lanka Ex-Post Evaluation of Japanese ODA Loan Pro-Poor Rural Development Project External Evaluator: Hisae Takahashi Ernst &Young Sustainability Co., Ltd. 0. Summary This project aims at reducing rural

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Asset Management Plan

Asset Management Plan 2016 Asset Management Plan United Counties of Prescott and Russell 6/1/2016 Preface This Asset Management Plan is intended to describe the infrastructure owned, operated, and maintained by the United Counties

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010 Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri

More information

New transit plan for Toronto

New transit plan for Toronto March 31, 2011 Backgrounder New transit plan for Toronto Summary of Pembina Institute analysis and recommendations By Cherise Burda Mayor Ford and the province have agreed on a new transit plan for Toronto,

More information

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA Roy Harry MUMU, John Belly Kelly KAIO PNG National Roads Authority Boroko, National Capital District, Papua New Guinea roymumu@daltron.com.pg, johnkaio@datec.net.pg

More information

DEVELOPMENT CHARGES BACKGROUND STUDY STAFF CONSOLIDATION REPORT. HEMSON C o n s u l t i n g L t d. Grey County

DEVELOPMENT CHARGES BACKGROUND STUDY STAFF CONSOLIDATION REPORT. HEMSON C o n s u l t i n g L t d. Grey County DEVELOPMENT CHARGES BACKGROUND STUDY Grey County STAFF CONSOLIDATION REPORT C o n s u l t i n g L t d. November 17, 2016 C o n s u l t i n g L t d. COUNTY OF GREY 2016 DEVELOPMENT CHARGES BACKGROUND STUDY

More information

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

ECONOMIC ANALYSIS (SUMMARY) 1

ECONOMIC ANALYSIS (SUMMARY) 1 Country Partnership Strategy: SRI, 2012 2016 A. Economic Performance and Outlook ECONOMIC ANALYSIS (SUMMARY) 1 1. Sri Lanka maintained an average rate of growth of 6.4% over the 5 years from 2006 to 2010.

More information

UNIVERSITY OF OTTAWA HEART INSTITUTE FINANCIAL STATEMENTS MARCH 31, 2018

UNIVERSITY OF OTTAWA HEART INSTITUTE FINANCIAL STATEMENTS MARCH 31, 2018 FINANCIAL STATEMENTS TABLE OF CONTENTS PAGE Independent Auditor s Report 1 Financial Statements Statement of Financial Position 3 Statement of Changes in Net Assets 5 Statement of Operations 6 Statement

More information

Cambodia: Telecommunication I

Cambodia: Telecommunication I Cambodia: Telecommunication I Ex-post evaluation OECD sector 22020 / Telekommunication BMZ project ID 1995 65 805 Project-executing agency Consultant Ministry of Post and Telecommunication (MPTC) Weidleplan

More information

Salary Survey. The Association of South African Quantity Surveyors (ASAQS) March 2017 (Published in October 2017) South African Construction Industry

Salary Survey. The Association of South African Quantity Surveyors (ASAQS) March 2017 (Published in October 2017) South African Construction Industry The Association of South African Quantity Surveyors (ASAQS) Salary Survey March 2017 (Published in October 2017) South African Construction Industry Business Information Services www.industryinsight.co.za

More information

SRI LANKA SECTOR QUARTERLY UPDATE. Highlights

SRI LANKA SECTOR QUARTERLY UPDATE. Highlights Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SRI LANKA SECTOR QUARTERLY UPDATE FORTH QUARTER 29 Highlights Financial Sector Quarterly

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

D. Major Programme IV: Secretariat of the Assembly of States Parties

D. Major Programme IV: Secretariat of the Assembly of States Parties D. Major Programme IV: Secretariat of the Assembly of States Parties Introduction 423. The Secretariat provides the Assembly of States Parties and its Bureau and subsidiary bodies with administrative and

More information

Enhanced NPV Analysis

Enhanced NPV Analysis Case Study Enhanced NPV Analysis Initiative Number 2013_05 Version No Date Item Affected Description of Change 1 24 Feb 14 Draft Document Created 2 25 Feb 14 Clarity edits after internal review by HNO

More information

Peacebuilding Fund Board

Peacebuilding Fund Board Peacebuilding Fund Board Inaugural Meeting SRI LANKA 29 January 2016 Outline 1) Peacebuilding fund 2) Peacebuilding facilities Immediate response facility Peacebuilding and recovery facility 3) Initiatives

More information

FESBC CONTRACT TENDERING AND COST GUIDELINES

FESBC CONTRACT TENDERING AND COST GUIDELINES Contract Tendering Guidelines: 1) Where Forest Enhancement Society of BC (FESBC) funding has been allocated to a Recipient for a Project or in an Investment Schedule in any given Fiscal Year, the Recipient

More information

1 Income Tax (Amendments to the Inland Revenue Act No.10 of 2006) Specific concessions will be announced for: Any investment not less than USD 500mn.

1 Income Tax (Amendments to the Inland Revenue Act No.10 of 2006) Specific concessions will be announced for: Any investment not less than USD 500mn. Circular to Clients Budget Proposals 2017 Taxation 1 Income Tax (Amendments to the Inland Revenue Act No.10 of 2006) 1.1 Investment Incentives 1.1.1 100% capital allowances will be granted on investment

More information

The Tsunami: Impact, Responses, and Issues 14

The Tsunami: Impact, Responses, and Issues 14 The Tsunami: Impact, Responses, and Issues 14 Introduction 25. The tsunami that hit Sri Lanka on December 26, 2004 caused the worst devastation from a natural disaster in the country's history. While the

More information

Canadian Automobile Association Edition. Driving Costs

Canadian Automobile Association Edition. Driving Costs Canadian Automobile Association 2005 Edition Driving Costs DRIVING COSTS 2005 The Canadian Automobile Association s Driving Costs brochure can help you calculate how much it costs to own and operate your

More information

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015 Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors

More information

Section 4c. Our services: Land transport

Section 4c. Our services: Land transport Section 4c Our services: Land transport Land transport LAND TRANSPORT Local roads and footpaths Bridges Road safety Amenities Contribution to public transport Cycle ways Our land transport activity is

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States

Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States Dr Adnan Rahman Director General, IRF www.irfnet.ch THE INTERNATIONAL ROAD FEDERATION Promoting the development

More information

Mines Act Permit Fees. Discussion Paper

Mines Act Permit Fees. Discussion Paper Mines Act Permit Fees Discussion Paper February 2014 A. Introduction: British Columbia s mineral exploration and mining industry is considered to be a global leader that provides well-paying jobs that

More information

Poverty Profile Executive Summary. Azerbaijan Republic

Poverty Profile Executive Summary. Azerbaijan Republic Poverty Profile Executive Summary Azerbaijan Republic December 2001 Japan Bank for International Cooperation 1. POVERTY AND INEQUALITY IN AZERBAIJAN 1.1. Poverty and Inequality Measurement Poverty Line

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide. Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University

More information

SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide)

SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide) TO: Mayor and Members General Issues Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: October 16, 2013 SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077)

More information

SRI LANKA Quarterly Economic Update

SRI LANKA Quarterly Economic Update SRI LANKA Quarterly Economic Update April 212 SRI LANKA Quarterly Economic Update April 212 212 Asian Development Bank All rights reserved. Published in 212. Printed in the Philippines. ISBN 978-92-992-764-8

More information

PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT

PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT ENG. M.O. KIDENDA, MBS DIRECTOR GENERAL KENYA NATIONAL HIGHWAYS AUTHORITY Wednesday 30 th July, 2014 1 PRESENTATION OUTLINE

More information

REPORT OF THE COUNCIL OF THE FEDERATION WORKING GROUP ON FISCAL ARRANGEMENTS ASSESSMENT OF THE FISCAL IMPACT OF THE CURRENT FEDERAL FISCAL PROPOSALS

REPORT OF THE COUNCIL OF THE FEDERATION WORKING GROUP ON FISCAL ARRANGEMENTS ASSESSMENT OF THE FISCAL IMPACT OF THE CURRENT FEDERAL FISCAL PROPOSALS REPORT OF THE COUNCIL OF THE FEDERATION WORKING GROUP ON FISCAL ARRANGEMENTS ASSESSMENT OF THE FISCAL IMPACT OF THE CURRENT FEDERAL FISCAL PROPOSALS MAIN REPORT JULY, 2012 Table of Contents: Summary of

More information

APPENDIX TO THE ANNUAL REPORT AUDITED FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 JUNE 2005

APPENDIX TO THE ANNUAL REPORT AUDITED FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 JUNE 2005 APPENDIX TO THE ANNUAL REPORT 2004-2005 AUDITED FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 JUNE 2005 INCOME STATEMENT Note 2005 2004 $ $ INCOME Government Grants 2d, 11 9,272,062 8,451,844 Investment

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Unit Sri Lanka Country Management Unit South Asia Region Document

More information

KAWARTHA HALIBURTON CHILDREN'S AID SOCIETY FINANCIAL STATEMENTS MARCH 31, 2017

KAWARTHA HALIBURTON CHILDREN'S AID SOCIETY FINANCIAL STATEMENTS MARCH 31, 2017 KAWARTHA HALIBURTON CHILDREN'S AID SOCIETY FINANCIAL STATEMENTS MARCH 31, 2017 KAWARTHA HALIBURTON CHILDREN'S AID SOCIETY FINANCIAL STATEMENTS MARCH 31, 2017 TABLE OF CONTENTS Page Number INDEPENDENT AUDITORS'

More information

Case Study RESOURCE ALLOCATION TO REGIONS AND DISTRICTS IN THE EASTERN CAPE PROVINCE OF SOUTH AFRICA. Di McIntyre

Case Study RESOURCE ALLOCATION TO REGIONS AND DISTRICTS IN THE EASTERN CAPE PROVINCE OF SOUTH AFRICA. Di McIntyre Case Study RESOURCE ALLOCATION TO REGIONS AND DISTRICTS IN THE EASTERN CAPE PROVINCE OF SOUTH AFRICA Di McIntyre The Health Economic Unit, University of Cape Town, Cape Town, South Africa Acknowledgement:

More information

DECISION nr.180/

DECISION nr.180/ DECISION nr.180/10.06.2004 regarding the notification of the Ministry of Public Finance on the guarantees granted for external loan contracted by National Railway Passenger Transport Society CFR - Calatori

More information

ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY

ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY To ensure our municipal assets are maintained and renewed INDEX in a responsible and financially sustainable manner. 2016 INTRODUCTION Our first Asset Management

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

General Information on the Russian Banking Sector. Banking sector in the economy of Russia

General Information on the Russian Banking Sector. Banking sector in the economy of Russia Summary Methodology to "Review of the Banking Sector of the Russian Federation" * (18 th Issue ) (Internet - version) Comments refer to the data of Review of the Banking Sector of the Russian Federation

More information

SUSTAINABILITY AND FUTURE OF SWAZILAND S ROAD INFRASTRUCTURE

SUSTAINABILITY AND FUTURE OF SWAZILAND S ROAD INFRASTRUCTURE SUSTAINABILITY AND FUTURE OF SWAZILAND S ROAD INFRASTRUCTURE BAWINILE BRENDA DLAMINI, EMILE HORAK * and GERT BASSON ** Ministry of Public Works and Transport: Roads Department, P. O. Box 58, Mbabane, Swaziland

More information

India: Public Private Partnerships in Highways Sector

India: Public Private Partnerships in Highways Sector India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most

More information

Asset Management Plan 2016 Township of King

Asset Management Plan 2016 Township of King Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State

More information

SRI LANKA. Highlights

SRI LANKA. Highlights Financial Sector Quarterly Update- 3nd t Quarter 26 SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE THIRD QUARTER 26 Highlights Introduction : This note is prepared by the World Bank Colombo Office to review

More information

IAS Impairment of Assets. By:

IAS Impairment of Assets. By: IAS - 36 Impairment of Assets International Accounting Standard No. 36 (IAS 36) Impairment of Assets Objective 1. The objective of this Standard is to establish procedures that an entity applies to ensure

More information

Ping An Bank Q Report Release. Apr 2013

Ping An Bank Q Report Release. Apr 2013 Ping An Bank 2013 1Q Report Release Apr 2013 Contents I. Highlights II. Business Operation (I) Business Development (II) Efficiency Analysis (III) Asset Quality III. Our Vision 1 I. Highlights I. Highlights:

More information

SR&ED and the Plastics Sector Issues and Recommendations

SR&ED and the Plastics Sector Issues and Recommendations Scientific Research and Experimental Development SR&ED and the Plastics Sector Issues and Recommendations Western Plastics Association Member Meeting September 12, 2017 Wayne Pattern PEng, PMP Senior Manager,

More information

The Bridges of Wellington County

The Bridges of Wellington County feature The Bridges of The Ontario Good Roads Association (OGRA) partnered with the Residential & Civil Construction Alliance of Ontario (RCCAO) and the Ministry of Transportation to undertake the Bridges

More information

SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE. FIRST QUARTER 2004 Highlights

SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE. FIRST QUARTER 2004 Highlights SRI LANKA FINANCIAL SECTOR QUARTERLY UPDATE FIRST QUARTER 24 Highlights Introduction : This note is prepared by the World Bank Colombo Office to review the trends of some of the key indicators which have

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

Town Council s Strategic Priorities

Town Council s Strategic Priorities Town Council s Strategic Priorities Mid 2013 to End of 2014 (Updated August 12 th, 2014) In September 2013 Town Council and senior staff developed a list of projects and initiatives that represented Council

More information

The financing dimension in SHA 2011

The financing dimension in SHA 2011 The financing dimension in SHA 2011 A focus on the Revenue of Schemes Patricia Hernandez WHO HA Geneva The approach to revenues Pooling Financing agent (FA) Financing scheme (HF) Functions (HC) Institutional

More information

External Evaluator: Yasuhisa Kuroda (OPMAC Co., Ltd.)

External Evaluator: Yasuhisa Kuroda (OPMAC Co., Ltd.) External Evaluator: Yasuhisa Kuroda (OPMAC Co., Ltd.) JBIC ODA Loan Projects: Mid-Term Review Time of Mid-Term Review Field Survey: May 2006 Project Title: Sri Lanka Small and Micro Industries Leader and

More information

ADMIE HOLDING REPORTS 9 MONTH 2018 RESULTS FOR PERIOD January 1 st, 2018 to September 30 th, 2018

ADMIE HOLDING REPORTS 9 MONTH 2018 RESULTS FOR PERIOD January 1 st, 2018 to September 30 th, 2018 ADMIE HOLDING REPORTS 9 MONTH 2018 RESULTS FOR PERIOD January 1 st, 2018 to September 30 th, 2018 ADMIE Holding: Net Profit 29.2 million, in line with forecast targets Interim dividend 0,0316 per share,

More information

REQUEST FOR PROPOSALS FOR PROJECT MANAGEMENT CONSULTANCY FOR SMART CITY, AMRUT & OTHER INFRASTRUCTURE PROJECTS IN GUJARAT SEPTEMBER-2015

REQUEST FOR PROPOSALS FOR PROJECT MANAGEMENT CONSULTANCY FOR SMART CITY, AMRUT & OTHER INFRASTRUCTURE PROJECTS IN GUJARAT SEPTEMBER-2015 GOVERNMENT OF GUJARAT: WATER SUPPLY DEPARTMENT GUJARAT URBAN DEVELOPMENT MISSION VOLUME 2 FINANCIAL PROPOSAL REQUEST FOR PROPOSALS FOR PROJECT MANAGEMENT CONSULTANCY FOR SMART CITY, AMRUT & OTHER INFRASTRUCTURE

More information

Town of Huntsville Municipal Asset Management Plan

Town of Huntsville Municipal Asset Management Plan Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P a g e Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...

More information

Contents. 2 Nikro Management Services

Contents. 2 Nikro Management Services Budget 2017 Contents 1 Income Tax (Amendments to the Inland Revenue Act No.10 of 2006) 1.1 Investment Incentives.. 3 1.2 Revision of capital allowances... 3 1.3 Revision of time bar provisions.. 4 1.4

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

THE SOUTHERN GATEWAY PROJECT DRAFT CAPITAL MAINTENANCE AGREEMENT TERM SHEET

THE SOUTHERN GATEWAY PROJECT DRAFT CAPITAL MAINTENANCE AGREEMENT TERM SHEET THE SOUTHERN GATEWAY PROJECT DRAFT CAPITAL MAINTENANCE AGREEMENT TERM SHEET This document provides background information and summarizes certain major terms of the Capital Maintenance Agreement ( CMA )

More information

Reimbursement for Business Use of Personal Vehicles Model Year 2005 Update

Reimbursement for Business Use of Personal Vehicles Model Year 2005 Update PROTECTED Reimbursement for Business Use of Personal Vehicles Model Year 2005 Update A Study prepared exclusively for The of the Public Service of Canada by PHH Strategic Business Services February 2005

More information