1 Summary of Expenditure for CMS Maintenance & Operations for the Year 2015 INTRODUCTION This document summarizes the expenditure that the CMS Collaboration has made in 2015 in order to maintain and operate the detectors and Collaboration-wide facilities (M&O Cat. A), as well as the expenses made directly by the Sub-detector communities to maintain their respective systems (M&O Cat. B). This is the fourteenth report that the CMS Collaboration presents on M&O Expenditures and the thirteenth year we report the M&O Cat. B. The budget request for M&O in 2015 was made in October 2014 (cf. CERN-RRB ). The income received and the reports of the payments made are classified according to the guidelines of the Scrutiny Group. Commitments are not detailed in this report owing to the very nature of M&O: long-term commitments should be rare and when they occur they are commented upon in the text. 1. INCOME The M&O 2015 approved budget totalled kchf plus kchf for Energy consumption. The actual total invoiced amount was kchf. We note that for the years 2013 to 2015 the amount of kchf is still outstanding to date. 2.1 M&O-A 2. PAYMENTS An overview of expenditure versus budget is shown in the Annex 1. Expenses In the course of 2015, CMS has continued to proactively take measures to balance as best as possible the expenditures with the budgetary allocation for M&O-A. Efforts to this effect, which were successful in past years could not be sustained in view of the need to cover Page 1/8 M&O Summary of Expenditure 2015

2 expenditures related to a number of unforeseen incidents for which no budgetary provision existed. This was already signalled to the RRB during the meetings of April and October Furthermore, the reasons for the expected overspend were discussed and analysed in detail with the RRB Scrutiny Group in the course of the spring and summer in the framework of the scrutiny exercise. There are two principal reasons for the overspend of the budget and the RRB has already been alerted to both of them. The first one is related to an incident with the Pixel Tracker Subsystem, which occurred at the end of 2014 where a quarter of modules in one sector developed electro-chemically induced short-circuits and therefore ceased functioning. In order to implement the necessary repairs before installation, the Technical Shutdown programme had to be extended, leading to consequently higher expenditures (related to the cost of maintaining Shutdown mode). The budget categories concerned are mainly: A.1.10 Moving/hydraulic systems, A.1.12 Shutdown activities, A.1.13 General Technical support, A.6.01 Assembly areas, clean rooms, A.6.02 Workshops, A.7.04 Heavy Transport, A.7.05 Cranes and A.7.08 Survey. The second factor is the problem related to the Magnet Cryogenic system and the extensive corrective measures required to ensure the correct functioning of the Coldbox. The budget categories concerned are mainly: A.1.06 Cooling systems, A.1.08 External Cryogenics, A.1.13 General Technical support. The total cost related to the above was estimated at approximately 350 kchf, as reported to the October 2015 RRB. The actual spending on each of the related categories is reported in Annex 1. Furthermore, spending in the area of Detector Safety Systems (A.1.11) has been higher than budgeted which is due to a conscious choice to invest more substantially than foreseen in the Sniffer fire detection system in order to improve the efficiency of detector protection and produce cost savings in the future. In addition to the above, CMS encountered another unexpected problem with leaks on Yoke EndCap Disk YE1+, experienced in the final part of Collateral water damage occurred in several areas of the detector and the repair and mitigation programme un-planned full opening of the detector during the 13 week year-end technical stop (YETS). Most of the costs of this will affect spending on the 2016 budget when the actual related payments are made. A number of measures were taken to reduce spending in other categories in order not to exceed the overall budget, as mentioned above. However, in view of the fact that such efforts already took place in the past, it was not possible to sustain this approach. However, CMS was highly successful in one specific area, which was a major source of cost over-runs in the past. This concerns the category A.1.05 Gas Consumption for which the measures taken were reported to the RRB in October These measures were largely a result of recommendations of a special Task Force created at the beginning of 2015 on the recommendation of the RRB Scrutiny Group. Principally, as a result of an intensive campaign to identify and remove sources of leaks in the Muon System and due to finding alternative, cheaper, supply sources for certain gasses it was possible to reduce expenditure to 511 kchf on an allocation of 600 kchf. It should be noted that in the past three years overspending ranged between 10%-80% of the allocation. The combined effect of over-spending on some budget lines related to the above-mentioned problems offset by savings in other categories (most notably gas consumption) is an overall over-spend of 233 kchf which corresponds to 2% of the M&O-A budget. Page 2/8 M&O Summary of Expenditure 2015

3 The actual amount of expenditures for budget category A.4.4 Online Computing (material costs), was kchf with a total budget of kchf. However, as agreed with the RRB Scrutiny Group, the expenditure reported in this document is considered as corresponding to the allocation. The balance of kchf has been covered by funds from the special DAQ account approved at the October 2011 RRB. Major On-line hardware replacement purchases have taken place in the course of 2014 and 2015 with most payments actually being made in This resulted in a very substantial outstanding commitment of kchf related to DAQ as reported to the April 2015 RRB. This commitment is now almost fully absorbed and reported as 2015 expenditure in this document. Despite the overspend of the 2015 allocation, the overall M&O-A budget over the past six years has been practically fully balanced with expenditures over the corresponding period. CMS continues to make every effort to maintain its expenditures within the overall M&O-A budget envelope. Outstanding commitments The total amount of open commitments at the end of 2015 was 854 kchf. The amount of commitments, related to DAQ equipment ordered in the course of 2015 is 192 kchf. Of the remaining amount of 662 kchf, some 56% is related to industrial support contracts and 44% for consumables and goods to be delivered in 2016 (including 82 kchf for safetyrelated items). 2.2 M&O-B by Sub-system Tracker Contributions from Funding Agencies covered 98% of the Tracker budget request. Overall, there was no serious funding problem in The arrangements with individual Funding Agencies and Institutes worked as expected in most cases. During 2015, in addition to the standard M&O expenses, a tail of expenses related to refurbishments and upgrades performed during LS1 continued and is not over yet. The major categories of expenses were: Hired Manpower, Cooling System, Areas, Standard Electronics-PS, Gas System, and Controls. With the approval of the Tracker Finance Board, 140 kchf were spent for two un-budgeted small CO2 cooling plants in the Pixel Lab on the surface at P5, meant to cool the Phase I upgraded Pixel detector when it will need to be extracted and brought up on the surface for servicing. This addition led to a significant overspending in the Cooling category. Overspending occurred also in the Standard Electronics-PS category. On the other hand, there was under-spending for the regular M&O in all other categories, with the notable case of hired manpower where the under-spending was 34 kchf. Also the anticipated tail of LS1 spending was not completely exhausted in 2015, and it still continues in Page 3/8 M&O Summary of Expenditure 2015

4 The overall result of the above factors is that there appears to be significant savings from regular M&O and LS1 leftovers combined, amounting to 540 kchf. However, 284 kchf are traceable to activities still on going, as the payments are simply delayed. Some 70 kchf more are going to be spent in 2016 for unanticipated jobs not included in the 2016 request but that are now needed. An amount of 100 kchf will be advanced to 2016 from the 2017 needs in order to reduce the 2017 budget request by 100 kchf. In conclusion, 86 kchf will remain available as cash savings from the 2015 regular M&O budget as well as all the previously budgeted LS1 jobs, and this amount will be taken into account when formulating future budget requests. ECAL The total 2015 M&O-B requests for the Material Resources for the Electromagnetic Calorimeter of CMS amounted to 820 kchf, representing a decrease of 100 kchf in comparison to Contributions to these expenses were made either by placing orders directly or by cash contributions to the ECAL M&O-B account. The full requested amounts were obtained from all participating Funding Agencies. This year, the dominant expense comes from Standard Electronics (B1.06) where the HV barrel calibration system has been improved. The Barrel HV system requires frequent calibration due to the sensitivity of the APD gains to changes in their bias voltages. HV splitter boxes have been purchased to remove manual intervention at the power supplies. They allow the calibration to proceed without the need for physically unplugging and plugging (and potentially damaging) the delicate HV connectors. This new system improves the speed of calibration operation, and allows a check of the calibration to be performed throughout the year during LHC technical stops. The second dominant expense was in the category of hired manpower at CERN (B.1.14), principally for engineers working (as in the previous years) on the data acquisition system hardware, firmware and software. Problems were recently found in the internal water-cooling circuits of several MARATON power supplies belonging to different LHC experiments. As a result of this, CMS has recommended that all MARATON units undergo a programme of preventative maintenance. For ECAL, all of the units have been refurbished at the beginning of This will result in some expenditure, of the order of 150 kchf, which will be covered by reserves that have accumulated in anticipation of this activity. Regarding the projection of the ECAL M&O-B budget up to 2018, the preliminarily estimate shows the same total amount as for HCAL HCAL continues to operate in the way similar to the previous years. The participating institutions fund various tasks on an in-kind basis and there is no cash fund. The HCAL M&O-B budget is completely determined by the budget items contributed by the corresponding Funding Agencies of the institutions, carrying out the operational procedures of the detector. Page 4/8 M&O Summary of Expenditure 2015

5 In calendar year 2015, all the expenditures were made according to the 2015 Draft Budget approved by the October 2014 RRB. The largest item this year was again the hired manpower at CERN. There were no surprises in the expenditures and all the Funding Agencies contributed their share without any problem. Run II data taking started in March. Problems in the firmware for the HCAL back-end caused some data loss. However, this problem was diagnosed early and a solution was found, ensuring that the data loss was not too extensive. HF-FE Cards were produced with the new QIE10 that will utilize the multi-anode feature of the new PMTs installed on the HF detectors and also provide timing information. Testing these cards started in the Building 904 facility but due to late delivery of some of the parts by CERN (VTTX), they could not be installed on the detectors during the Year-end Technical Stop (YETS) 2015/16. Installation of these cards will be done in parallel to the HE work during the EYETS 2016/17. The HF detector calibration and development of monitoring work done with the additional funds provided by the RDMS should also be noted here. Muon Systems CSC System The 2015 budget was 880 kchf and the amount spent was 740 kchf. The bulk of the difference came from the manpower expenditures, which were only 703 kchf while 800 kchf was budgeted. Additional savings came from Stores expenditures, which amounted to 4 kchf, from a budgeted 40 kchf. The major activities in 2015 were the preparation for Run II and the actual running. Because of the preparatory work in 2014, the CSC system was in excellent shape, and actually fewer experts were needed at CERN during the year. This is reflected in lower manpower expenditures. This is expected to continue, and thus the CSC Subsystem expects a lower overall manpower budget in the future. While the 2016 budget is fixed, the requested manpower budget for has been decreased. This period will be primarily datataking years. Before data taking started, CSCs continued to work on debugging the newly installed electronics for the ME1/1 system. During the course of the year, calibration runs with the new electronics were debugged and the first calibration runs were taken in June. We also took special runs with the HV increased and decreased by 50 V to investigate tuning the HV to provide a more uniform gas gain for all wire segments. This is a prelude to possibly lowering the average gain to improve the longevity of the chambers. DT System During 2015 the Muon Barrel Drift-Tubes detector ran smoothly with about 99% of channels active. The new copper-to-optical transducers that fulfil the relocation of Sector Collector electronics were proven to be very reliable. The installation and commissioning of a slice of the TwinMux (TM7) electronics for new Level-1 Muon trigger was a major effort during The comparison with the legacy DT trigger shows good agreement. Production of the Page 5/8 M&O Summary of Expenditure 2015

6 boards was completed and the switch over of the whole Muon barrel from old to new LV1 trigger system was initiated during the YETS Longevity studies were organized at the GIF++ area using one MB1 chamber and will continue in In order to perform the tasks described above, 122% of the 2015 M&O-B budget was spent. The over-spending was foreseen and expected by the plan communicated to the RRB in 2014 with the intention to use the carry-over accumulated in the past years. The largest fraction (51% of the total budget) was spent on Hired Manpower at CERN for operational activities. Higher expenditures with respect to budget were incurred for readout electronics and controls to cover TwinMux spares and slice test activities that are not included in the Phase I Upgrade budget. The order of 8xSY4527F system crates and 3 boosters PS (total of 63 kchf), which was foreseen on 2014, was submitted on the 2015 budget. No other major unforeseen expenditures were made on other items. Almost all the Funding Agencies contributed to the M&O-B budget as foreseen; one FA will complete its payment in the current year. RPC System The 2015 M&O-B budget was 254 kchf, shared between 19 Institutions on the basis of the respective number of authors, including the PhD students. About 65% of the M&O-B contributions were paid in 2015 and the remaining part was received in early 2016, of which some 12% were provided as in-kind contributions. The total expenditure made in 2015 was approximately 383 kchf, divided into hired manpower (300 kchf) and material/spares (83 kchf). Most of the hired manpower budget has been used to keep at CERN hardware and software experts and some key-persons in the technical and run coordination area. The RPC Project was able to fulfill all the expected expenditures and smoothly operate 1026 chambers, using a large fraction of the 2014 carry-over. A carry-over of at least half of the M&O-B budget is needed to run the project in view of the fact that not all the contributions were paid during the year. A major power system intervention has been scheduled in 2016, during which the HV mainframes and the fan unit in USC will be replaced after about eight years of running. The estimated budget for the has been reviewed in order to take into account the new LHC schedule and some small change in the spare procurement. Trigger In 2015, the Trigger Group supported the Legacy trigger during the first few months of the LHC run, commissioned the Stage-1 of the Phase I Upgrade of the calorimeter trigger that was operational during the second part of the year and was working in parallel on the Stage-2 of the Phase I Upgrade and the upgrade of the Muon trigger. This required larger than usual team of trigger specialists present at CERN. The total spending from the cash account was 276 kchf. The primary expense (248 kchf) was to support specialists Page 6/8 M&O Summary of Expenditure 2015

7 stationed at CERN. In addition, 24 kchf was spent on fiber optics cables and related items needed for the Muon upgrade. The remaining 4 kchf were spent on materials and services required by the online experts. There were no major unforeseen expenses in the course of Most of the agreed contributions were received. Austria, CERN, Poland, UK and US, paid their contributions on time. Payments from Portugal and Spain included their contribution from previous years. In addition, the Trigger account received contributions from DESY (4 kchf) and from the RPC project (10 kchf) as a share of the electronics purchases. In summary, the total amount of 2015 cash contributions was 271 kchf. At the end of 2014, there was an effective carry-over amount of 176 kchf. The carry-over at the end of 2015 was reduced to 95 kchf. In 2016, it is planned to continue working aggressively on the Upgrades of the Trigger and its maintenance with most of the budgeted funds going towards the hired manpower at CERN. BRIL The year 2015 was the first fully operational year of the new BRIL Project with its responsibilities for Background and Luminosity Measurement and Safety and the Radiation Simulation activities required for Operational and Upgrade planning. Contributions from Funding Agencies covered 94.5% of the BRIL budget request. Overall there was no serious funding problem in The arrangements with individual Funding Agencies and Institutes worked as expected. The budget for 2015 was based on 2012 Beam Radiation Monitoring (BRM) experience with extrapolation to the new responsibilities. Spending in 2015 was slightly below this prediction with a 26% budget surplus. The actual cash carry-over, taking into account all contributions received is 52 kchf or 20% of the proposed budget. The building of a modest cash reserve is also important for a new project, and in addition the spending on manpower did not proceed quite as planned. BRIL expects to use this developed manpower surplus effectively in This will be the first real year of Maintenance and the Extended Year-end Technical Stop (EYETS) will entail major effort from BRIL as it will be necessary to withdraw and reinsert the BCM/PLT Carriages to permit access to the CMS Pixel detector. All the activities planned in LS1 were completed and all detector commissioning went as planned. The BRIL Project, in collaboration with the LumiPOG, was able to prepare the best preliminary Luminosity precision to date for the results currently in preparation for publication. ANNEXES Annex 1: M&O Cat. A Expenditure vs. Budget in 2015 Page 7/8 M&O Summary of Expenditure 2015

8 ANNEX 1 M&O Cat. A Expenditure vs. Budget in 2015 Type Subsystem Item Budget Payments Expense M&O-A w/o PowA.1. Detector related costs A.1.01 Magnet A.1.02 Magnet controls A.1.03 Magnet power supply A.1.04 Gas systems A.1.05 Gas consumption A.1.06 Cooling systems A.1.07 Cooling fluids(above 50 C) A.1.08 External cryogenics A.1.09 Cryogenic fluids (below 50 C) A.1.10 Moving/hydraulic systems A.1.11 Detector safety systems A.1.12 Shutdown activities A.1.13 General Technical support A.1.14 UPS maintenance A.1.15 Power supply maintenance A.1.16 Beam pipe & vacuum A.1.17 Counting & control rooms A.1.18 Safety A.1. Detector related costs Total 4,086 4,220 A.2. Secretariat A.2.01 Secretarial assistance A.2.02 Economat A.2.04 Printing and publication A.2. Secretariat Total A.3. Communications A.3.01 GSM phones; on-call service A.3.02 Collaborative tools A.3. Communications Total A.4. On-line computing A.4.01 System management A.4.02 Data storage, (temporary on disk) 0 0 A.4.03 Detector controls 0 0 A.4.04 Computers/processors/LANs 2,618 2,618 A.4.05 Software licenses 0 0 A.4. On-line computing Total 3,568 3,549 A.5. Test beams, calibration facilities A.5.01 General operation A.5.02 Common electronics A.5.03 Electronics pool rentals A.5.04 Gas systems 10 9 A.5.05 Gas consumption A.5. Test beams, calibration facilities Total A.6. Laboratory operations A.6.01 Assembly areas, clean rooms A.6.02 Workshops A.6. Laboratory operations Total A.7. General services A.7.01 Cooling & ventilation A.7.03 Power distribution system A.7.04 Heavy transport A.7.05 Cranes A.7.06 Cars A.7.08 Survey A.7.09 Storage space A.7.10 Common desktop infrastructure A.7.11 Reviewing & Engineering A.7.12 Outreach A.7. General services Total 1,835 1,937 A.9. Core Computing Infrastructure & Services A.9.01 Central computing environment A.9.02 Software process service A.9.03 User support A.9.04 Central production operations A.9.05 Hardware A.9. Core Computing Infrastructure & Services Total 1,964 1,949 M&O-A w/o Power Total 12,460 12,693 Power 1,700 1,700 Expense Total 14,160 14,393 kchf Page 8/8 M&O Summary of Expenditure 2015

Draft Budget for M&O 2011

Draft Budget for M&O 2011 Draft Budget for M&O 2011 CERN-RRB-2010-109 Cf. CERN-RRB-2010-108 A. Charkiewicz, RRB-31, October 12, 2010 Status of M&O MoU Signatures Funding Agency Austria Belgium-FNRS Belgium-FWO Brazil Bulgaria Colombia

More information

MINERνA Project Management Plan

MINERνA Project Management Plan MINERνA Document #59 Version 33 February 1, 2010 (This page intentionally left blank) ii Submitted, Approved, and Accepted By: MINERνA Fermilab D. Harris date MINERνA Project Manager and MINERνA Co-Spokesperson

More information

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise Procedure No.: BC032.019 Page: 1 of 12 Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise Manager, North America Process Safety Center of Expertise Sr. Vice President,

More information

Draft Programming Document th meeting of the Management Board December 2016

Draft Programming Document th meeting of the Management Board December 2016 1 (5) MB/45/2016 final Helsinki, 14.12.2016 PUBLIC Draft Programming Document 2018-2020 44 th meeting of the Management Board 13-14 December 2016 Proposal The Management Board is invited to adopt ECHA

More information

ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. FINANCE COMMITTEE 338 th Meeting 14 December 2011

ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. FINANCE COMMITTEE 338 th Meeting 14 December 2011 CERN/FC/5578 CERN/2995 Original: English 30 November 2011 ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH For information FINANCE COMMITTEE 338 th Meeting

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 20.12.2011 COM(2011) 907 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL PROGRESS REPORT ON THE DEVELOPMENT OF THE SECOND GENERATION SCHENGEN INFORMATION

More information

CAPITAL BUDGET NUCLEAR

CAPITAL BUDGET NUCLEAR Updated: 00-0- EB-00-00 Tab Page of 0 0 CAPITAL BUDGET NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear capital project budget for the historical year,

More information

ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. FINANCE COMMITTEE 354 th Meeting 16 December 2015

ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. FINANCE COMMITTEE 354 th Meeting 16 December 2015 CERN/FC/5955 CERN/3212 Original: English 02 December 2015 ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Action to be taken For information FINANCE

More information

RULES ON ELIGIBILITY OF COSTS

RULES ON ELIGIBILITY OF COSTS Annex 1 of the Call for proposals RULES ON ELIGIBILITY OF COSTS These rules present various possible categories of eligible costs. The call for proposal may then stipulate that only some of the below categories

More information

Disclaimer. The present document is made available only for advance information.

Disclaimer. The present document is made available only for advance information. Disclaimer The present document is made available only for advance information. It will be incorporated into the Horizon 2020 Annotated Grant Agreement and afterwards not anymore be presented as a separate

More information

CHAMONIX 2014 CONCLUSIONS: MAIN POINTS AND ACTIONS

CHAMONIX 2014 CONCLUSIONS: MAIN POINTS AND ACTIONS CHAMONIX 2014 CONCLUSIONS: MAIN POINTS AND ACTIONS F. Bordry (Chair), F. Zimmermann (Scientific secretary) CERN, Geneva, Switzerland Abstract The summary session of the LHC Performance Workshop in Chamonix,

More information

EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS

EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS CO-FINANCED BY THE EXTERNAL BORDERS FUND Ref. No. A-089-711/10 Prepared by the responsible authority of the EBF in Sweden The National Criminal Police 1 EVALUATION

More information

UNDERWRITING GUIDELINES FOR TECHNOLOGY MANUFACTURERS SEGMENT

UNDERWRITING GUIDELINES FOR TECHNOLOGY MANUFACTURERS SEGMENT UNDERWRITING GUIDELINES FOR TECHNOLOGY MANUFACTURERS SEGMENT Local exceptions to these underwriting guidelines may apply. Please consult with your underwriter or sales executive for details and to discuss

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 1 December 2015 Original: English For decision United Nations Children s Fund Executive Board First regular session 2016 2-4 February 2016 Item

More information

Office of Science. Experiences from the Large Hadron Collider. U.S. Department of Energy s. Burning Plasma Physics Advisory Committee (BPPAC) Meeting

Office of Science. Experiences from the Large Hadron Collider. U.S. Department of Energy s. Burning Plasma Physics Advisory Committee (BPPAC) Meeting s Experiences from the Large Hadron Collider Burning Plasma Physics Advisory Committee (BPPAC) Meeting Jim Yeck April 29, 2003 OUTLINE Overview of the LHC CERN Experience U.S. LHC Construction Project

More information

SONOMA MARIN AREA RAIL TRANSIT DISTRICT PROPOSED BUDGET: FISCAL YEAR and Fiscal Year Year End Report

SONOMA MARIN AREA RAIL TRANSIT DISTRICT PROPOSED BUDGET: FISCAL YEAR and Fiscal Year Year End Report SONOMA MARIN AREA RAIL TRANSIT DISTRICT PROPOSED BUDGET: FISCAL YEAR 2017 18 and Fiscal Year 2016 17 Year End Report JUNE 21, 2017 PROPOSED BUDGET: FISCAL YEAR 2017 18 and Fiscal Year 2016 17 Year End

More information

Quarterly report Financial resources

Quarterly report Financial resources CLEAN DEVELOPMENT MECHANISM Quarterly report Financial resources 1. Status of income and expenditure to support CDM activities during the period from 1 January to 30 September 2013 1.1. Income 1. Table

More information

ALICE EMCal Project Execution Plan

ALICE EMCal Project Execution Plan ALICE EMCal Project Execution Plan at Lawrence Berkeley National Laboratory Berkeley, CA For the U.S. Department of Energy Office of Science Office of Nuclear Physics MIE-71-RC Document EMCal.4.v4 January

More information

Electron Lenses. for the LHC

Electron Lenses. for the LHC Electron Lenses for the LHC Vladimir Shiltsev With contributions from Yu.Alexahin, J.Johnstone, V.Kamerdzhiev, U.Dorda LARP B-B-Compensation Workshop, SLAC, July 2-4, 2007 Content On possible uses of ELs

More information

SLAC PPA Budget Discussion: FY09 Allocations Among BNR Codes

SLAC PPA Budget Discussion: FY09 Allocations Among BNR Codes SLAC PPA Budget Discussion: FY09 Allocations Among BNR Codes S. Kahn, D. MacFarlane, R. Blandford, T. Raubenheimer, C. Chang Particle Physics and Astrophysics Directorate Page 1 Purpose of This Meeting

More information

BUDGET FOR 2019 AND ASSESSMENT OF CONTRIBUTIONS TO THE GENERAL FUND

BUDGET FOR 2019 AND ASSESSMENT OF CONTRIBUTIONS TO THE GENERAL FUND Agenda Item 9 IOPC/OCT18/9/1/1 Date 14 September 2018 Original English 1992 Fund Assembly 92A23 1992 Fund Executive Committee 92EC71 Supplementary Fund Assembly SA15 BUDGET FOR 2019 AND ASSESSMENT OF CONTRIBUTIONS

More information

PENSION ADMINISTRATION SYSTEM 5 (PENFAX)

PENSION ADMINISTRATION SYSTEM 5 (PENFAX) PENSION ADMINISTRATION SYSTEM 5 (PENFAX) FINANCE BACKGROUND 5.1 The Minister of Finance is assigned responsibility for the administration of the Public Service Superannuation Fund (PSSF) by the Public

More information

Assessment Questions

Assessment Questions AN INTRODUCTION TO THE PRINCIPLES OF MANAGERIAL ACCOUNTING Assessment Questions AS-1 ( 1 ) What is managerial accounting? Managerial accounting relies on financial information to help managers and employees

More information

The latest CALICE activities

The latest CALICE activities The latest CALICE activities Fabrizio Salvatore Royal Holloway University of London HEP seminar, RHUL, 22 nd January 2008 Rationale for a Linear Collider The LHC start up next year is expected to mark

More information

EBA MB EUROPEAN BANKING AUTHORITY 2011 ANNUAL ACCOUNTS

EBA MB EUROPEAN BANKING AUTHORITY 2011 ANNUAL ACCOUNTS EBA MB 2012 054 EUROPEAN BANKING AUTHORITY 2011 ANNUAL ACCOUNTS CERTIFICATION LETTER FROM THE EBA ACCOUNTING OFFICER The Annual accounts of the European Banking Authority for the year 2011 have been prepared

More information

Reliability Too Important to Leave to the Experts?

Reliability Too Important to Leave to the Experts? Reliability Too Important to Leave to the Experts? Tony Frisch Edward West Xtera Communications Vodafone Presenter Profile Edward West works for Vodafone in the Submarine Systems Engineering department.

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 6 June 2017 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Seventy-ninth

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/64/41 9 June 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL

More information

Annex III. Zero nominal growth scenario

Annex III. Zero nominal growth scenario This is an extract from the UNFCCC official document FCCC/SBI/2017/4 to highlight its Annex III. Annex III Zero nominal growth scenario 1. As requested by the Conference of the Parties, 1 this annex presents

More information

22. I.T. SECTIONS (HARDWARE AND SOFTWARE)

22. I.T. SECTIONS (HARDWARE AND SOFTWARE) 22. I.T. SECTIONS (HARDWARE AND SOFTWARE) 22.1 Main functions: The I.T. Sections look after the work relating to: (vi) (vii) (viii) Providing secretarial assistance and support to the following Committees:

More information

Town of Holly Springs

Town of Holly Springs Meeting Date: March 20, 2018 Town of Holly Springs Town Council Meeting Agenda Form Town Clerk s Office Use: Agenda Item #: 8h Attachment #: 3h Agenda Placement: Consent Agenda (Special Recognitions (awards,

More information

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Financial Guidelines for Beneficiaries EDCTP Association October 2016 Financial Guidelines for Beneficiaries EDCTP Association October 2016 This document is prepared as a supplement to the Grant Agreement (GA), where majority of the information is extracted from. In the

More information

UNEP/OzL.Pro.30/4/Add.1/Rev.1. United Nations Environment Programme

UNEP/OzL.Pro.30/4/Add.1/Rev.1. United Nations Environment Programme UNITED NATIONS EP UNEP/OzL.Pro.30/4/Add.1/Rev.1 Distr.: General 15 October 2018 Original: English United Nations Environment Programme Thirtieth Meeting of the Parties to the Montreal Protocol on Substances

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/81/28 23 May 2018 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL

More information

October Hundred and Fortieth Session. Rome, October Measures to improve Implementation of the Organization's Support Cost Policy

October Hundred and Fortieth Session. Rome, October Measures to improve Implementation of the Organization's Support Cost Policy October 2011 FC 140/8 E FINANCE COMMITTEE Hundred and Fortieth Session Rome, 10-14 October 2011 Measures to improve Implementation of the Organization's Support Cost Policy Queries on the substantive content

More information

First amending Budget Brussels, 28 September 2018

First amending Budget Brussels, 28 September 2018 First amending Brussels, 28 September PART I 1 Contribution from the credit institutions 10 Contribution from the credit institutions 100 Contribution from the credit institutions Budget 2017 (2nd Amendemnt)

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 11 March 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Sixty-third

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 11 March 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Sixty-third

More information

BUDGET Brussels, 16 October 2018

BUDGET Brussels, 16 October 2018 BUDGET 2019 Brussels, 16 October 2018 Heading Budget 2018 Budget 2019 Remarks PART I 1 Contribution from the credit institutions 10 Contribution from the credit institutions 100 Contribution from the credit

More information

A proposal for a CERN-Japan collaboration programme as a reform of the Asia-CERN Fellowship Programme. July 13, 2004 (Version-3 July 30, 2004)

A proposal for a CERN-Japan collaboration programme as a reform of the Asia-CERN Fellowship Programme. July 13, 2004 (Version-3 July 30, 2004) A proposal for a CERN-Japan collaboration programme as a reform of the Asia-CERN Fellowship Programme July 13, 2004 (Version-3 July 30, 2004) Takahiko Kondo (KEK and Japanese ATLAS group member) Summary

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/66/46 15 March 2012 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Bilateral Guideline. EEA and Norwegian Financial Mechanisms Bilateral Guideline EEA and Norwegian Financial Mechanisms 2014 2021 Adopted by the Financial Mechanism Committee on 9 February 2017 09 February 2017 Contents 1 Introduction... 4 1.1 Definition of strengthened

More information

REQUEST FOR PROPOSAL. Sheriff's Office Detention Facility Uninterruptible Power System Maintenance Services LIEBERT UPS

REQUEST FOR PROPOSAL. Sheriff's Office Detention Facility Uninterruptible Power System Maintenance Services LIEBERT UPS REQUEST FOR PROPOSAL Sheriff's Office Detention Facility Uninterruptible Power System Maintenance Services LIEBERT UPS EL Paso County Detention Facility 601 East Overland El Paso, Texas 79901 The contractor

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/76/32 17 April 2016 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

REPORT 2014/015 INTERNAL AUDIT DIVISION. Audit of selected guaranteed maximum price contracts in the Office of Capital Master Plan

REPORT 2014/015 INTERNAL AUDIT DIVISION. Audit of selected guaranteed maximum price contracts in the Office of Capital Master Plan INTERNAL AUDIT DIVISION REPORT 2014/015 Audit of selected guaranteed maximum price contracts in the Office of Capital Master Plan Overall results relating to the audit of selected guaranteed maximum price

More information

72 Corporate Data / Stock Information

72 Corporate Data / Stock Information 50 About Us Hitachi, Ltd. Integrated Report 2016 52 Segment Information 54 Financial & Non-Financial Highlights 56 10-Year Financial Data 58 Operating and Financial Review 64 Consolidated Statements of

More information

MAINTENANCE SERVICE ANNEX CONTRACT

MAINTENANCE SERVICE ANNEX CONTRACT MAINTENANCE SERVICE ANNEX CONTRACT between Customer_name Address_1 Address_2 Address_3 Address_4 Address_5 and SB Electronic Systems Limited Arden Grove Harpenden Herts AL5 4SL ActDate This Maintenance

More information

BUDGET 2012 BUDGET 2013

BUDGET 2012 BUDGET 2013 REVENUE 2013 1 Contribution from national supervisory authorities 10 Contribution from national supervisory authorities 1000 Contribution from national supervisory authorities 12,122,768 Art. 62 of Regulation

More information

Metro. Board Report. Fare revenue projections, based on preliminary assumptions for ridership

Metro. Board Report. Fare revenue projections, based on preliminary assumptions for ridership Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA SUBJECT: FY18 BUDGET DEVELOPMENT UPDATE ACTION: RECEIVE AND FILE RECOMMENDATION

More information

Deans, Directors, Department Heads, Business Administrators, Faculty, Finance Personnel, and Sponsored Project Personnel

Deans, Directors, Department Heads, Business Administrators, Faculty, Finance Personnel, and Sponsored Project Personnel Title: Applicable to: Recharge Center and Pass-Through Activity Guidelines Deans, Directors, Department Heads, Business Administrators, Faculty, Finance Personnel, and Sponsored Project Personnel Effective

More information

CBD. Distr. GENERAL. UNEP/CBD/ICNP/3/2 12 February 2014 ORIGINAL: ENGLISH

CBD. Distr. GENERAL. UNEP/CBD/ICNP/3/2 12 February 2014 ORIGINAL: ENGLISH CBD Distr. GENERAL UNEP/CBD/ICNP/3/2 12 February 2014 OPEN-ENDED AD HOC INTERGOVERNMENTAL COMMITTEE FOR THE NAGOYA PROTOCOL ON ACCESS TO GENETIC RESOURCES AND THE FAIR AND EQUITABLE SHARING OF BENEFITS

More information

The annual budget, as it appears today, has been prepared by the budget committee and was approved by the student council on October 11, 2013.

The annual budget, as it appears today, has been prepared by the budget committee and was approved by the student council on October 11, 2013. Annual Budget Notes 2013-2014 This budget covers the period June 1, 2013 to May 31, 2014 our fiscal year. All expenditures from June 1, 2013 to date have been reflected and considered in the preparation

More information

BEST PRACTICE 3: System Water Loss Control Overview Why a Best Practice? State Planning Requirements

BEST PRACTICE 3: System Water Loss Control Overview Why a Best Practice? State Planning Requirements BEST PRACTICE 3: System Loss Control Foundational best practice Utility operations - implemented by water utilities on their own system Customer participation not applicable Overview loss control is the

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 26.6.2013 COM(2013) 472 final 2013/0222 (COD) C7-0196/13 Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on fees payable to the European Medicines

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 14 October 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Sixty-fifth

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Aalberts Industries posts 17% rise in net profit, revenue more than EUR 1 billion

Aalberts Industries posts 17% rise in net profit, revenue more than EUR 1 billion date 28 February 2006 more information J. Aalberts phone +31 (0)343 565 080 e-mail info@aalberts.nl Aalberts Industries posts 17% rise in net profit, revenue more than EUR 1 billion 2005 good year with

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

1. Framework for considering the possible need to create a new case for merger control

1. Framework for considering the possible need to create a new case for merger control Public consultation 20 October 2017 Merger control The Autorité de la concurrence has launched an initiative to modernise and simplify merger law. Several topics will be proposed for consideration: the

More information

Thesis Proposal. Bret King Memorial Hospital Miramar Miramar, Fl 12/10/04

Thesis Proposal. Bret King Memorial Hospital Miramar Miramar, Fl 12/10/04 Thesis Proposal Bret King Miramar, Fl 12/10/04 Table of Contents Executive Summary 3 Building Background...4 A. Insurance Policy.5 B. Fire Supression System.8 C. Structural System...11 i. Weight Matrix

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

PRELIMINARY CONCLUSIONS

PRELIMINARY CONCLUSIONS Helsinki, 27 December 2013 PUBLIC PRELIMINARY CONCLUSIONS 32 ND MANAGEMENT BOARD MEETING 17-18 DECEMBER 2013, HELSINKI 1. Report from the Executive Director The Management Board welcomed the quarterly

More information

Warranty and Important Information

Warranty and Important Information Warranty and Important Information Safety precautions This symbol indicates the presence of components that may cause electric shock. This symbol indicates the presence of moving parts inside the machine.

More information

CHAPTER 2 MONEY MANAGEMENT SKILLS

CHAPTER 2 MONEY MANAGEMENT SKILLS CHAPTER 2 MONEY MANAGEMENT SKILLS CHAPTER OVERVIEW Successful money management is based on organized financial records, accurate personal financial statements, and effective budgeting. This chapter offers

More information

Financial Webinar. IMI 2 projects :00 CET

Financial Webinar. IMI 2 projects :00 CET Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 14 November 2016 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Seventy-seventh

More information

Towards the LHC Start

Towards the LHC Start Science @ KIP Heidelberg, June 5, 2008 Towards the LHC Start What, why, how and a bit of daily life. Martin Wessels KIP, University of Heidelberg LH C est pas sorcier The Guardian "Particle physics is

More information

Faxed & ed responses are not acceptable - Return bid form in a sealed envelope with the bid number noted on the outside.

Faxed &  ed responses are not acceptable - Return bid form in a sealed envelope with the bid number noted on the outside. 4905 East Broadway, D-232 Bid No. B15/9903 Tucson, AZ 85709-1420 Requisition No. R0054391 Telephone (520) 206-4759 Buyer Philip Quintanilla Date 4/22/15 Page 1 Of 4 Bid must be in this office on or before:

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 15 October 2015 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Seventy-fifth

More information

FINANCIAL GUIDELINES. TEAM-SI-JOINT Call Brussels, 19 March 2018

FINANCIAL GUIDELINES. TEAM-SI-JOINT Call Brussels, 19 March 2018 FINANCIAL GUIDELINES TEAM-SI-JOINT Call 2019 Brussels, 19 March 2018 Budget lines A. Investment costs B. Operational costs C. Personnel costs D. Scholarship costs E. Coordination costs See Annex 3 budget

More information

maxon motor maxon motor control EPOS Positioning Controller Getting Started Edition July 2007 Positioning Controller Documentation Getting Started

maxon motor maxon motor control EPOS Positioning Controller Getting Started Edition July 2007 Positioning Controller Documentation Getting Started control EPOS Positioning Controller Getting Started Edition July 2007 24/1 Positioning Controller Documentation Getting Started maxon document number 573049-08 EPOS Positioning Controller EPOS 24/1 Getting

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/81/21 24 May 2018 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL

More information

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN ACCELERATORS AND TECHNOLOGY SECTOR

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN ACCELERATORS AND TECHNOLOGY SECTOR EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN ACCELERATORS AND TECHNOLOGY SECTOR CERN-ATS-2009-003 EDMS # 1004835 Report of the External Advisory Committee with respect to the report of the Task Force

More information

Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk

Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk Management Preconstruction & Construction Managing Construction

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/80/51 17 October 2017 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 3 November 2016 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Seventy-seventh

More information

Fiscal Year Budget Proposal

Fiscal Year Budget Proposal Fiscal Year 20182019 Budget Proposal Board of Directors March 27, 2018 RIVANNA WATER & SEWER AUTHORITY FY 2019 Proposed Budget Table of Contents Budget Highlights Prepared: March 6, 2018 Adopted: Draft

More information

A Refresher Course on Current Financial Reporting Standards 2013 (Day 2)

A Refresher Course on Current Financial Reporting Standards 2013 (Day 2) A Refresher Course on Current Financial Reporting Standards 2013 (Day 2) HKAS 37 Provisions, Contingent Liabilities and Contingent Assets COOPERATION REQUESTED Please make sure that your mobile phones

More information

BIFM Flood Risk Management Guidance

BIFM Flood Risk Management Guidance BIFM Flood Risk Management Guidance BEST PRACTICE CHECKLIST IN ASSOCIATION WITH RISKCENTRIC Publisher Published by the British Institute of Facilities Management BIFM February 2014 Flood risk is increasing:

More information

Case Handout 2. Antelope Run Inc. Suggested Solution Controls With a Review Element

Case Handout 2. Antelope Run Inc. Suggested Solution Controls With a Review Element Case 18-10 Handout 2 Antelope Run Inc. Suggested Solution Controls With a Review Element Note: This document represents the suggested solution for documenting the procedures performed to test a control

More information

FINANCIAL PLAN for CONSTRUCTION and EXPLOITATION PHASE

FINANCIAL PLAN for CONSTRUCTION and EXPLOITATION PHASE FINANCIAL PLAN for CONSTRUCTION and EXPLOITATION PHASE Deliverable 8S-2.2 June 2011 Editors: Bente Maegaard, Steven Krauwer Contributor: Peter Wittenburg All rights reserved by UCPH on behalf of CLARIN

More information

Advice Gap Analysis: Report to FCA

Advice Gap Analysis: Report to FCA Advice Gap Analysis: Report to FCA 5 December 2014 Contents Page Executive summary 3 Approach 10 Results, sensitivities and discussion - demand 33 Results, sensitivities and discussion - supply 38 Reliances

More information

Three waters A GIS-BASED METHOD FOR SUPPORTING OPERATIONAL EVENTS MANAGEMENT IN WATER SUPPLY SYSTEM

Three waters A GIS-BASED METHOD FOR SUPPORTING OPERATIONAL EVENTS MANAGEMENT IN WATER SUPPLY SYSTEM Three waters Marcin Dąbrowski, PhD Eng. Silesian University of Technology Gliwice, Poland A GIS-BASED METHOD FOR SUPPORTING OPERATIONAL EVENTS MANAGEMENT IN WATER SUPPLY SYSTEM Operational events commonly

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/63/37 5 March 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

ACCOUNTS FOR THE YEAR 2013 -------------------------------------------------- TABLE OF CONTENTS GENERAL INFORMATION ON EUROFOUND... 3 CERTIFICATE OF THE ACCOUNTING OFFICER... 4 LEGAL BASIS FOR THE FINANCIAL

More information

COMMISSION DECISION. of ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA. (only the English text is authentic)

COMMISSION DECISION. of ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA. (only the English text is authentic) EUROPEAN COMMISSION Brussels, 22.4.2013 C(2013) 2159 final COMMISSION DECISION of 22.4.2013 ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA (only the English text is authentic) EN EN

More information

CITY OF SIGNAL HILL SUBJECT: AUTHORIZE RELEASE OF REQUEST FOR PROPOSALS FOR ON- CALL ENGINEERING DESIGN SERVICES

CITY OF SIGNAL HILL SUBJECT: AUTHORIZE RELEASE OF REQUEST FOR PROPOSALS FOR ON- CALL ENGINEERING DESIGN SERVICES CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL GRISSEL CHAVEZ DEPUTY DIRECTOR OF PUBLIC WORKS SUBJECT: AUTHORIZE

More information

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations INTERNAL AUDIT DIVISION REPORT 2015/041 Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations Overall results relating to the effective management of mine action

More information

SP Energy Networks Business Plan

SP Energy Networks Business Plan Environmental Discretionary Reward Scheme 16 SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex Regulatory Reporting Pack Wooden Poles Guidance Document SP Energy Networks June 2013 Regulatory

More information

COLE COUNTY MISSOURI

COLE COUNTY MISSOURI COLE COUNTY MISSOURI Budget Officer Recommended Budget For Fiscal Year 2019 Prepared by: Auditor s Office Kristen Berhorst County Auditor Cole County, Missouri 2019 Budget Table of Contents Budget Message

More information

Implementation of the Tunnel Directive in EU Member States (MS)

Implementation of the Tunnel Directive in EU Member States (MS) Implementation of the Tunnel Directive in EU Member States (MS) by Dr.-Ing. Bernd Thamm BRT-Consult, Lindlar, Germany at the 4th Portuguese Road Congress- Estrada 2006 April 5-7, 2006 Estoril, Portugal

More information

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process City of Saint John Common Council Meeting Wednesday, July 18, 2012 Special Meeting of Council 1. Call to Order Prayer 9:30 a.m. Council Chamber 1.1 Strategic Decision Making; Council Priorities, Core Service

More information

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual SOUTH DAKOTA BOARD OF REGENTS Policy Manual SUBJECT: NUMBER: A. PURPOSE To provide guidance on what constitutes maintenance and repair and the process used to document and approve projects. B. DEFINITIONS

More information

Note: Comprehensive Income: Fiscal year ended December 31, 2017; 13,473 million yen -% Fiscal year ended March 31, 2017; 17,429 million yen 78.

Note: Comprehensive Income: Fiscal year ended December 31, 2017; 13,473 million yen -% Fiscal year ended March 31, 2017; 17,429 million yen 78. CONSOLIDATED FINANCIAL RESULTS FOR THE FISCAL YEAR ENDED DECEMBER 31, 2017 Japanese GAAP February 14, 2018 Company name: EBARA CORPORATION Stock exchange listings: Tokyo Code number: 6361 URL: http://www.ebara.com/en/

More information

Budget Management. Income Budget. Personnel Management

Budget Management. Income Budget. Personnel Management Personnel Management Income Budget Definitive income forecasts called for 1,046.873 million euros, and net recognised economic rights came to 1,044.912 million euros, to which must be added 6.01 million

More information

Safety and Operations Committee. Information Item III-B. January 24, 2019

Safety and Operations Committee. Information Item III-B. January 24, 2019 Safety and Operations Committee Information Item III-B January 24, 2019 Overnight Maintenance Window and Work Hours Page 54 of 75 Washington Metropolitan Area Transit Authority Board Action/Information

More information

830 CMR 64H.1.3 Computer Industry Services and Products

830 CMR 64H.1.3 Computer Industry Services and Products 830 CMR 64H.1.3 Computer Industry Services and Products 830 CMR: DEPARTMENT OF REVENUE 830 CMR 64H:00: SALES AND USE TAX 830 CMR 64H.1.3 is repealed and replaced with the following (1) Statement of Purpose;

More information

CERN/2841/Corr. CERN/FC/5338/Corr. Original: English 11 June 2009

CERN/2841/Corr. CERN/FC/5338/Corr. Original: English 11 June 2009 CERN/2841/Corr. Original: English 11 June 2009 ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Action to be taken TAKE NOTE FINANCE COMMITTEE 325 th

More information

Memorandum. Date: February 21, 2018 To: From: Subject:

Memorandum. Date: February 21, 2018 To: From: Subject: Agenda Item 6 Memorandum Date: February 21, 2018 To: From: Subject: Transportation Authority Board Anna LaForte Deputy Director for Policy and Programming 3/13/2018 Board Meeting: Allocation of $8,795,721

More information

Preliminary Findings From CEER Report On Network Losses. Ognjen Radovic

Preliminary Findings From CEER Report On Network Losses. Ognjen Radovic 1 Preliminary Findings From CEER Report On Network Losses Ognjen Radovic The Council of European Energy Regulators (CEER) CEER is the voice of Europe's national regulators of electricity and gas at EU