1 760 Brant St., Suite 405C, Burlington ON, L7R 4B8, Canada Tel Fax INN14-CS-001 Sept 30, 2014 Document: Project: TECHNICAL MEMORANDUM INNOVAT Case Study 10,000 t/d Heap Leach Panama This memorandum presents an economic comparison based on a 10,000 t/d heap leach operation located in Latin America. All assumptions, equipment layouts, mining, and costing, for the purposes of this comparison, have been accepted from the pre-feasibility base case and have not been adjusted except as required to implement a Continuous Vat Leaching (CVL) based process. INNOVAT was directly engaged in engineering activities related to the project from 2007 through 2013, including bulk pilot plant testing, and believes that the cost estimates associated with the implementation of Continuous Vat Leaching have been conservatively estimated, and that potentially significant savings in both processing, and material handling can be realized with modification to the base case. 1.0 INTRODUCTION Three economic analyses are presented in this memo, two of which have been prepared by INNOVAT, and one of which was presented as a heap leach, prefeasibility study by the owner. All costing where possible has been carried forward, or based on the base case. The models are as follows: Base case: 10,000t/d Heap Leach Facility (unadjusted) Direct Comparison: 10,000t/d Continuous Vat Leaching Alternate: 5,000t/d Continuous Vat Leaching The following considerations were used when evaluating the alternate methods: Maintain design criteria of the original project plan Use direct cost from original project plan where feasible

2 CASE STUDY 10,000t/d HEAP LEACH COMPARISON INN14CS 2 Use unit cost from original project plan where direct cost is not feasible 2.0 BASIS OF COMPARISON INNOVAT has not modified the flow sheets in any way beyond addition of components which are required for Continuous Vat Leaching, and removal of components related specifically to Heap Leaching. The mining and material handling process has been unmodified for the 10,000t/d Continuous Vat Leach case, and modified only as a result of the reduction in processing rate for the 5,000t/d CVL case. The crushing circuit has been modified as a result of the Continuous Vat Leaching process feed size requirement of -6mm. In order to use the primary and secondary crusher from the base case, an additional tertiary, and quaternary crushing stage have been added to both of the CVL scenarios. The cost of this inclusion has been captured in both the CAPEX and OPEX within the comparison. It is expected that a crushing circuit designed specifically to reduce the particle size from ROM to -6mm would require three stages and have a small cost savings over the crushing circuit utilized in this comparison. The CVL facility has been placed near the base of the proposed heap leach facility, and receives ore from the crushed ore stockpile. No modification has been made to the material handling / conveyor system as presented in the base case. The CVL is expected to discharge the material to a tailings pile which has been modelled to occupy the space currently designed for the heap leach facility. The costing associated with this tailings pile has been developed based on a combination of the costs reported for the heap leach facility, and the costs reported for the waste rock dump. 3.0 COMPARISON OF COSTS 3.1 PRE-PRODUCTION CAPITAL EXPENDITURE - PROCESS In the case of the 10,000t/d CVL system, cost reductions associated with the centralization of the process were included and amounted primarily to a minor reduction in the cost of the reagent

3 CASE STUDY 10,000t/d HEAP LEACH COMPARISON INN14CS 3 system. The pre-production direct cost comparison between the base case and 10,000t/d CVL case excluding Area 30 Heap Leach & Solution Handling, and Area 60 Detoxification, produces a difference of 0.33% capital expense. If we look at only Area 30 and 60, the preproduction cost of the CVL scenario represents a 50% cost premium over the base case. It is important to note however, that this cost premium is almost completely offset in year one during the heap leach expansion. The difference between the total process & infrastructure capital cost (pre-production) between the base case and 10,000t/d CVL case is a 12.4% increase in capital cost. In the case of the 5,000t/d CVL system, direct cost of associated equipment was reduced as a result of the 50% reduction in processing rate. The aggregate reduction in direct cost associated with this throughput reduction is 20.8%, excluding Area 30 Heap Leach & Solution Handling, and Area 60 Detoxification. The capital cost difference associated with Area 30 & 60 is 9.2% in favour of the 5,000t/d CVL case. Further savings occur following year one, where leach pad expansion must occur with the base case. The difference between the total process & infrastructure capital cost (pre-production) between the base case and 5,000t/d CVL case is a 19.4% decrease in capital cost. 3.2 PRE-PRODUCTION CAPITAL EXPENDITURE MINING As the mining schedule and mining method were not modified, the mining costs have been carried directly for the 10,000t/d case, and reduced only by decreasing the number of required haul trucks in the 5,000t/d case. The 10,000t/d CVL case shares a common mining capital expenditure throughout life of mine in comparison to the base case, whereas the 5,000t/d case includes a capital savings of 19.6% as the equipment requirement for 5,000t/d has decreased with respect to the base case. 3.3 OPERATING EXPENSE - MINING Mining costs have not been modified for the 10,000t/d comparison as the mining and material handling process has not been altered. Additional mining cost was included in the 5,000t/d case owing to the reduced equipment efficiency. This increase over the mine life amounts to a mining operating cost increase of 6.9%.

4 CASE STUDY 10,000t/d HEAP LEACH COMPARISON INN14CS OPERATING EXPENSE PROCESS LABOUR Process labour has been adjusted based on the removal of all of the tasks specifically associated with the heap leach, offset by the workers required for continuous vat leaching. The main difference is the removal of the piping crew which accounts for 10% of the process staff. In comparison to the base case, the 10,000t/d CVL case total life of mine (LOM) process labour expenditure is reduced by 12%. In comparison to the 5,000t/d CVL case, the total LOM process labour expenditure increases by 62% exclusively as a result of an additional 6 years of operation. It is expected that optimization of the project for a 5,000t/d operation would reduce this process labour expense to a more comparable level. 3.5 OPERATING EXPENSE - PROCESSING Processing cost was modified primarily to account for the switch from heap leaching to CVL. A minor cost savings in the case of 10,000t/d of 3.8% over LOM is expected. This savings is attributed to a reduction in power consumption, use of hydrated lime, and removal of heap specific expenses. A similar savings is expected in the 5,000t/d case, with a 1.6% reduction in total processing cost. 3.6 OPERATING EXPENSE - LABORATORY Laboratory costs were reduced in both cases primarily by a reduction in the number of samples taken. Given the rapid leach characteristics of the ore within the vat, and the ability of the system to tolerate feed variation, the number of samples has been reduced. In the case of 10,000 t/d, this equates to 75 solids assays, and 125 solution assays per day. This results in a savings over the base case of 19.4% and 33.9% for the 10,000t/d and 5,000t/d comparison respectively. 3.7 OPERATING EXPENSE SERVICES & SUPPORT Services and Support costs have not been affected by the change in processing method and therefore the 10,000t/d CVL case cost remains identical to the base case. In comparison to the 5,000t/d CVL case, the LOM cost has increased 15.7% as a result of yearly expenditures occurring for an additional 6 years.

5 CASE STUDY 10,000t/d HEAP LEACH COMPARISON INN14CS OPERATING EXPENSE G & A G&A costs have not been modified in the case of the 10,000t/d comparison. The G&A costs have been carried directly. For the 5,000t/d case, the yearly expenditure has been reduced to accommodate the changes required for a 50% reduction in processing, with the total G&A expenditure increasing by 74%. This is one area where significant additional savings can be realized in the 5,000t/d case, as yearly costs from the base case have been extended over 12 years, resulting in much higher total expense per category. It is expected that these costs can be reduced by virtue of the smaller plant, or distributed over the project life resulting in a more accurate G&A cost comparison. 3.9 MONITORING/RECLAMATION & CLOSURE The total cost of monitoring/reclamation & closure has not been adjusted in any way. This activity is expected to take place following leaching and as such has been moved where required to begin at the end of leaching activity. It should be noted that reclamation on an ongoing basis can take place with either CVL scenario OTHER TAXES The calculation of other taxes is done using the same formula as applied to the base case. The total tax expenditure does not vary significantly between cases TRANSPORT, INSURANCE, REFINING The same formula for determining the total cost of this category has been used across all cases. Since the CVL installation has a higher total recovery, the total cost over the life of the project has increased, but remains the same on a per ounce basis ONGOING CAPITAL EXPENDITURE Mining capital expenditure on an ongoing basis remains unchanged in the 10,000t/d CVL case in comparison to the base case. Closure cost is expected to reduce significantly, as the tailings pile does not require the same treatment as the heap leach facility at project completion. In addition,

6 CASE STUDY 10,000t/d HEAP LEACH COMPARISON INN14CS 6 costs related to heap leach pad expansions have been modified to reflect tailings dump expansion. The tailings area as designed for the CVL will undergo identical pad expansions, but these expansions will consist only of appropriate clearing, and placement of a geotextile, more closely resembling the preparation of the existing WRD site. The combined savings from adjustment of the leach pad expansions, and reduction in closure requirements results in a savings of approximately $12,950,644 LOM. A similar savings is realized in the 5,000t/d CVL comparison. At this scale, $12,669,875 is saved LOM on ongoing expenditures as a result of the transition from heap leach to tailings pile. 4.0 SUMMARY OF COMPARISON A summary of the key financial parameters is shown in Table 1. Here you can see that the 10,000t/d CVL case offers superior economics in comparison to the base case, and that while the average cost per ounce of gold is 7% higher in the 5,000t/d case, the overall economics are better thanks to the reduced capital expenditure both initially and ongoing. In all cases the NPV of the CVL installation betters the base case, which is aided by the short leach duration, which leads to a rapid realization of gold production. A complete cash flow analysis for each case is attached in the Appendix. Table 1 - Key Financial Parameters Base Case Heap Leach (10,000t/d) CVL Case (10,000t/d) CVL Case (5,000t/d) Mine Life 5.3 year 5.3 year 11.1 year CAPEX (Pre-Production) $ $ $ After-tax IRR 33.7% 47.1% 36.5% Operating Years to Payback (5%) After Tax NPV of Project Cash Flow At 0% Discount Rate $ $ $ At 5% Discount Rate $ $ $ At 10% Discount Rate $ $ $

7 CASE STUDY 10,000t/d HEAP LEACH COMPARISON INN14CS 7 Base Case Heap Leach (10,000t/d) CVL Case (10,000t/d) CVL Case (5,000t/d) At 15% Discount Rate $ $ $ Average cash cost per oz $ 402 $ 359 $ 430 Cost per oz (including Capital) $ 981 $ 905 $ APPENDIX

8 APPENDIX 10,000t/d HEAP LEACH COMPARISON INN14CS A 10,000 t/d Heap Leach (Base Case)

9 APPENDIX 10,000t/d HEAP LEACH COMPARISON INN14CS B 10,000t/d Continuous Vat Leaching

10 APPENDIX 10,000t/d HEAP LEACH COMPARISON INN14CS C 5,000t/d Continuous Vat Leaching

KINROSS GOLD CORPORATION

KINROSS GOLD CORPORATION April 1 2014 KINROSS GOLD CORPORATION Results of the Tasiast feasibility study 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained

More information

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 89521 USA NEWS RELEASE Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns October

More information

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo PRESS RELEASE Banro Files NI 43-101 Technical Report on Namoya Project, Democratic Republic of the Congo Toronto, Canada May 13, 2014 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX

More information

Kişladağ Expansion Project

Kişladağ Expansion Project Kişladağ Expansion Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private

More information

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project NEWS RELEASE Centerra Gold Announces Positive Feasibility Study on the Öksüt Project All figures are in United States dollars. This news release contains forward-looking information that is subject to

More information

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866) FOR IMMEDIATE RELEASE ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) 368-9932 or 1 (866) 788-8801 (All amounts are expressed in United States dollars, unless

More information

Liberty Gold Announces Positive Preliminary Economic Assessment for the Goldstrike Oxide Gold Deposit, Great Basin, USA

Liberty Gold Announces Positive Preliminary Economic Assessment for the Goldstrike Oxide Gold Deposit, Great Basin, USA NEWS RELEASE 18-12 July 10, 2018 Liberty Gold Announces Positive Preliminary Economic Assessment for the Goldstrike Oxide Gold Deposit, Great Basin, USA Post-tax NPV5% of US$129.5 million, IRR of 29.4%,

More information

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland TORONTO, ON October 30, 2018 - Marathon Gold Corporation

More information

Jinshan Gold Mines Inc. April 24, 2006

Jinshan Gold Mines Inc. April 24, 2006 Jinshan Gold Mines Inc. April 24, 2006 FINAL FEASIBILITY STUDY EXTENDS MINE LIFE AND DEMONSTRATES ROBUST ECONOMICS FOR JINSHAN S CSH (217) GOLD PROJECT, CHINA INFILL DRILLING INCREASES MEASURED AND INDICATED

More information

Aldridge Announces Results for Yenipazar Optimization Study

Aldridge Announces Results for Yenipazar Optimization Study ALDRIDGE MINERALS INC. 10 King Street East, Suite 300 Toronto, Ontario Canada M5C 1C3 www.aldridgeminerals.ca Aldridge Announces Results for Yenipazar Optimization Study - Pre- Production Capital Costs

More information

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project DENVER, COLORADO. SEPTEMBER 24, 2018: ROYAL GOLD, INC. (NASDAQ:RGLD) (together with its subsidiaries, Royal Gold or the Company

More information

TSX: LYD ANNUAL GENERAL MEETING

TSX: LYD ANNUAL GENERAL MEETING TSX: LYD ANNUAL GENERAL MEETING JUNE 28, 2018 AMULSAR GOLD PROJECT Cautionary Statement Certain information contained in this presentation, including any information relating to Amulsar's expected future

More information

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces Strong Quarterly Production Shows Increase of 40% year over year, on Track for Full Year Guidance Toronto, Ontario

More information

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario September 9, 2009 NEWS RELEASE Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased

More information

ITY CIL Project. September 20, 2017

ITY CIL Project. September 20, 2017 ITY CIL Project September 20, 2017 SPEAKERS SÉBASTIEN DE MONTESSUS Chief Executive Officer, President & Director TABLE OF CONTENT 1 ITY CIL PROJECT OVERVIEW JEREMY LANGFORD Chief Operating Officer 2 ITY

More information

Eldorado Gold Reports Results of Technical Studies

Eldorado Gold Reports Results of Technical Studies NEWS RELEASE TSX: ELD NYSE: EGO March 21, 2018 Eldorado Gold Reports Results of Technical Studies VANCOUVER, BC Eldorado Gold Corporation, ( Eldorado or the Company ) today announces the release of three

More information

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained

More information

All amounts are in US dollars, unless otherwise indicated.

All amounts are in US dollars, unless otherwise indicated. TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD S FEASIBILITY STUDY FOR BOTO GOLD DELIVERS SIGNIFICANTLY IMPROVED PROJECT ECONOMICS 23% After-tax Internal Rate of Return Payback 3.4 years Net Present Value $261

More information

Aries Project Prefeasibility Study Optimization Report

Aries Project Prefeasibility Study Optimization Report Aries Project Prefeasibility Study Optimization Report Submitted to: RAM River Coal Corporation Project Number: 624-12 Date: August 8, 2017 Norwest Corporation Suite 1830, 1066 W. Hastings Street Vancouver,

More information

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION News Release TSX: LMC March 14, 2019 LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION (All amounts in US dollars, unless otherwise indicated) 2018 Highlights

More information

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland TORONTO, ON May 17, 2018 - Marathon Gold Corporation ( Marathon or the Company ) (TSX: MOZ) is pleased to announce the

More information

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery Argonaut Gold Announces Updates on the Magino and San Agustin Projects Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery The San Agustin Preliminary Economic Assessment Results

More information

Argonaut Gold Announces Positive Feasibility Study for its Magino Project

Argonaut Gold Announces Positive Feasibility Study for its Magino Project Argonaut Gold Announces Positive Feasibility Study for its Magino Project 17 Year Mine Life to Average 150,000 Gold Ounces of Production During Initial Five Years and Produce Nearly Two Million Ounces

More information

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE May 31, 2018 For Immediate Release NEWS RELEASE TSX: GPR NYSE AMERICAN: GPL GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE Potential for Average Annual Production

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com April 11, 2017 NYSE - MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project

Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project Halifax, Nova Scotia December 18, 2018 - Erdene Resource Development Corp. (TSX:ERD; MSE:ERDN) ("Erdene" or "Company"),

More information

NEWS RELEASE Centerra Gold 2015 Second Quarter Results

NEWS RELEASE Centerra Gold 2015 Second Quarter Results NEWS RELEASE Centerra Gold 2015 Second Quarter Results This news release contains forward-looking information that is subject to the risk factors and assumptions set out on page 26 and in the Cautionary

More information

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT NEWS RELEASE 17-18 September 14, 2017 PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT Pre-Tax NPV 5% of $365 million, IRR of 54%, and Pre-Production Capex of $51

More information

Rainy River Second Quarter 2017 Highlights. Financial Update

Rainy River Second Quarter 2017 Highlights. Financial Update New Gold Provides Rainy River Development Update; Project Schedule and Cost Remain in Line with January 2017 Plan (All dollar figures are in US dollars unless otherwise indicated) June 27, 2017 New Gold

More information

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES $2.2 Billion After-Tax NPV@8 and IRR of 20. 3.6 Year Payback at $3.00/lb. Copper and 36 Year Mine Life 45 Million lbs. Average

More information

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Spanish Mountain Gold Announces Results of New PEA for the First Zone 1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain

More information

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO TORONTO, ONTARIO - (September 10, 2012) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce results of the

More information

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 NEWS RELEASE Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 April 26, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold

More information

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter.

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter. Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces Cash Balance Increases to $54.1 Million Toronto, Ontario (July 14, 2016) Argonaut Gold Inc. (TSX: AR) ( Argonaut, Argonaut Gold or

More information

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Detour Gold Announces 2016 Operating Results and 2017 Guidance January 30, 2017 NEWS RELEASE Detour Gold Announces 2016 Operating Results and 2017 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth quarter and full year

More information

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars)

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars) Suite 900-999 West Hastings Street Vancouver, BC, V6C 2W2, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com March 26, 2014 Capstone Extends Pinto Valley Mine Life to 2026 (all amounts

More information

NEWS RELEASE JANUARY 29, 2015

NEWS RELEASE JANUARY 29, 2015 NEWS RELEASE 15-02 JANUARY 29, 2015 PILOT GOLD ANNOUNCES REVISED PRELIMINARY ECONOMIC ASSESSMENT FOR HALILAGA COPPER-GOLD PORPHYRY PROJECT Project Generates After-tax 43.1% IRR and US$474 Million NPV 7%

More information

International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results

International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results 1177 West Hastings Street Suite 2300 Vancouver, BC Canada V6E 2K3 www.ithmines.com NR13-07 July 23, 2013 International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results Vancouver,

More information

NEWS RELEASE NR: October 11, 2017

NEWS RELEASE NR: October 11, 2017 NEWS RELEASE NR: 17-11 October 11, 2017 Eros Announces Results of Preliminary Economic Assessment for the Bell Mountain Gold Project Vancouver, BC (October 11, 2017) Eros Resources Corp. (TSX.V: ERC) (

More information

CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016

CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016 CANADA S INTERMEDIATE GOLD PRODUCER 1 2016 LOM Presentation / Workshop 25 January 2016 Forward Looking Information This presentation contains certain forward-looking information and statements as defined

More information

TSX: LYD SPROTT NATURAL RESOURCE SYMPOSIUM

TSX: LYD SPROTT NATURAL RESOURCE SYMPOSIUM TSX: LYD SPROTT NATURAL RESOURCE SYMPOSIUM JULY 17-20 2018 AMULSAR GOLD PROJECT Cautionary Statement Certain information contained in this presentation, including any information relating to Amulsar's

More information

TSX:AR. Corporate Presentation. June 1, 2017

TSX:AR. Corporate Presentation. June 1, 2017 TSX:AR Corporate Presentation June 1, 2017 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information under applicable Canadian securities

More information

Orezone Announces Positive Preliminary Economic Assessment

Orezone Announces Positive Preliminary Economic Assessment Orezone Announces Positive Preliminary Economic Assessment January 22, 2014 - Orezone Gold Corporation (ORE:TSX) is pleased to announce the results of an independent Preliminary Economic Assessment (the

More information

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

More information

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia News Release B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia Vancouver, March 12, 2014 B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX:

More information

Corporate Presentation

Corporate Presentation Corporate Presentation April 2018 Exploration Development Production Forward Looking Information This investor presentation contains certain statements, which may constitute forward-looking information

More information

Investing in African Mining Indaba. Cape Town, South Africa February 5, 2018

Investing in African Mining Indaba. Cape Town, South Africa February 5, 2018 Investing in African Mining Indaba Cape Town, South Africa February 5, 2018 All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation

More information

CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604)

CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604) CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) 336-8612 Fax: (604) 718-2808 www.canamex.us NEWS RELEASE Canamex Resources Announces Positive Preliminary Economic

More information

Marigold Life of Mine Plan

Marigold Life of Mine Plan Marigold Life of Mine Plan October 7, 2014 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking statements within the meaning

More information

NEWS VISTA GOLD CORP. ANNOUNCES MT. TODD GOLD PROJECT PRELIMINARY FEASIBILITY STUDY AND INCREASE IN RESERVES OF 44% TO 5.9 MILLION OUNCES OF GOLD

NEWS VISTA GOLD CORP. ANNOUNCES MT. TODD GOLD PROJECT PRELIMINARY FEASIBILITY STUDY AND INCREASE IN RESERVES OF 44% TO 5.9 MILLION OUNCES OF GOLD 7961 Shaffer Parkway Suite 5 Littleton, CO 80127 Phone: 720-981-1185 Fax: 720-981-1186 Trading Symbol: VGZ Toronto and NYSE MKT Stock Exchanges NEWS VISTA GOLD CORP. ANNOUNCES MT. TODD GOLD PROJECT PRELIMINARY

More information

Côté Gold Project Feasibility Study Conference Call

Côté Gold Project Feasibility Study Conference Call Côté Gold Project Feasibility Study Conference Call November 2, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

Q Financial Results

Q Financial Results LEAGOLD MINING IS BUILDING A NEW MID-TIER GOLD PRODUCER FOCUSED ON LATIN AMERICA Q3 2017 Financial Results November 14 2017 TSX: LMC OTCQX: LMCNF www.leagold.com Disclaimer This presentation contains "forward-looking

More information

LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION

LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION News Release TSX: LMC January 16, 2019 LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION (All amounts in US dollars, unless otherwise indicated) Vancouver, January 16, 2019 Leagold Mining

More information

SECOND QUARTER 2018 RESULTS. August 10, 2018

SECOND QUARTER 2018 RESULTS. August 10, 2018 SECOND QUARTER 2018 RESULTS August 10, 2018 FORWARD LOOKING STATEMENTS Certain statements and information contained in this presentation constitute forward-looking statements within the meaning of applicable

More information

Kişladağ Update March 2018

Kişladağ Update March 2018 Kişladağ Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

Q Results. Conference Call. October 26, Kışladağ, Turkey

Q Results. Conference Call. October 26, Kışladağ, Turkey Q3 2018 Results Conference Call October 26, 2018 Kışladağ, Turkey Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation

More information

Golden Star Announces Wassa Mine Feasibility Study Results

Golden Star Announces Wassa Mine Feasibility Study Results Golden Star Announces Wassa Mine Feasibility Study Results TORONTO March 26, 2014 - Golden Star is pleased to announce the results of its Feasibility Study on the development of an underground mining operation

More information

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast August 01 2013 KINROSS GOLD CORPORATION Q2 2013 Results Conference Call & Webcast 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained

More information

MELIADINE. Unearth the Potential at the Meliadine Project. April 14, 2015 Alexandre Proulx AGNICO EAGLE MELIADINE 1

MELIADINE. Unearth the Potential at the Meliadine Project. April 14, 2015 Alexandre Proulx AGNICO EAGLE MELIADINE 1 MELIADINE Unearth the Potential at the Meliadine Project April 14, 2015 Alexandre Proulx AGNICO EAGLE MELIADINE 1 Forward Looking Statement The information in this presentation has been prepared as of

More information

Centerra Gold Inc. Management s Discussion and Analysis ( MD&A ) For the Period Ended June 30, 2015

Centerra Gold Inc. Management s Discussion and Analysis ( MD&A ) For the Period Ended June 30, 2015 Centerra Gold Inc. Management s Discussion and Analysis ( MD&A ) For the Period Ended June 30, 2015 The following discussion has been prepared as of July 28, 2015, and is intended to provide a review of

More information

MANAGEMENT S DISCUSSION AND ANALYSIS For the years ended December 31, 2016 and 2015

MANAGEMENT S DISCUSSION AND ANALYSIS For the years ended December 31, 2016 and 2015 MANAGEMENT S DISCUSSION AND ANALYSIS The following ( MD&A ) for Timmins Gold Corp. together with its wholly owned subsidiaries ( Timmins or the Company ) is prepared as of March 8, 2017 and relates to

More information

Orezone Announces Positive Feasibility Study for Bomboré

Orezone Announces Positive Feasibility Study for Bomboré Orezone Announces Positive Feasibility Study for Bomboré Mine Life increased to 11 years, 24.4% after tax IRR and AISC of US$678/oz April 28, 2015, Orezone Gold Corporation (ORE-TSX) is pleased to announce

More information

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs EDV EVR Toronto Stock Exchange For additional information, contact: Doug Reddy SVP Business Development +1 604 609 6114 dreddy@endeavourmining.com Endeavour Mining Corporation Corporate Office Suite 3123,

More information

Q P R E S T E A P E A R E S U L T S

Q P R E S T E A P E A R E S U L T S Q 4 2 0 1 4 P R E S T E A P E A R E S U L T S 1 1. 1 4 DISCLAIMER AND OTHER MATTERS SAFE HARBOR: Some statements contained in this presentation are forwardlooking statements within the meaning of the Private

More information

FINANCIAL EVALUATION OF LAIVA GOLD MINE - FINLAND

FINANCIAL EVALUATION OF LAIVA GOLD MINE - FINLAND Hafan Dawel Highlight Farm Highlight Lane Barry CF62 8AA UK Phone +44 (0) 7525 123434 kjoslin@kjmc.co.uk KJ Mining Consulting FINANCIAL EVALUATION OF LAIVA GOLD MINE - FINLAND May 2016 Financial Evaluation

More information

Alio Gold Reports Second Quarter 2018 Results

Alio Gold Reports Second Quarter 2018 Results Alio Gold Reports Second Quarter 2018 Results VANCOUVER, British Columbia, g. 10, 2018 -- Alio Gold Inc. (TSX, NYSE AMERICAN: ALO) ( Alio Gold or the Company ) today reported its second quarter 2018 financial

More information

Detour Gold Updates Life of Mine Plan for Detour Lake

Detour Gold Updates Life of Mine Plan for Detour Lake February 4, 2012 NEWS RELEASE Detour Gold Updates Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce an updated life of mine plan

More information

NEWS RELEASE Centerra Gold Reports Fourth Quarter and 2014 Year-end Results

NEWS RELEASE Centerra Gold Reports Fourth Quarter and 2014 Year-end Results NEWS RELEASE Centerra Gold Reports Fourth Quarter and 2014 Year-end Results This news release contains forward-looking information that is subject to the risk factors and assumptions set out on page 30

More information

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012 THE ELEMENTS OF VALUE CREATION Revised Prefeasibility Study Results Dumont Nickel Project May 14, 2012 Disclaimer Cautionary Statements Concerning Forward Looking Statements This presentation contains

More information

Q MANAGEMENT S DISCUSSION AND ANALYSIS

Q MANAGEMENT S DISCUSSION AND ANALYSIS Q1 2018 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE QUARTER ENDED MARCH 31, 2018 MANAGEMENT S DISCUSSION AND ANALYSIS This ( MD&A ) of Detour Gold Corporation ( Detour Gold, we, our or the Company ) provides

More information

January 11, 2017 News Release SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE

January 11, 2017 News Release SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE January 11, 2017 News Release 17 01 SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE VANCOUVER, B.C. -- Silver Standard Resources Inc. (NASDAQ: SSRI) (TSX: SSO) ( Silver

More information

New PEA for Paramount Gold s San Miguel Project Confirms Robust Combination of Heap Leaching and Milling

New PEA for Paramount Gold s San Miguel Project Confirms Robust Combination of Heap Leaching and Milling New PEA for Paramount Gold s San Miguel Project Confirms Robust Combination of Heap Leaching and Milling Low Initial Capital of $69 Million and Low Operating Costs Generate Exceptional Economics Quick

More information

2017 Second Quarter Highlights

2017 Second Quarter Highlights New Gold Announces 2017 Second Quarter Results; Rainy River Project Schedule and Cost Remain in Line with January 2017 Plan (All dollar figures are in US dollars unless otherwise indicated) July 26, 2017

More information

DEVELOPMENT UPDATE - ATO

DEVELOPMENT UPDATE - ATO CAPITALIZATION TSX Symbol: STGO Total Basic Shares O/S (M): 42.9 BOARD OF DIRECTORS MATTHEW WOOD Chairman, President and CEO BATAA TUMUR-OCHIR and Vice President Mongolia ANEEL WARAICH and Executive Vice

More information

THE UPDATE ON THE ABCOURT-BARVUE FEASIBILITY STUDY IS POSITIVE A MAJOR REDUCTION IN THE INITIAL CAPITAL COST IS EXPECTED

THE UPDATE ON THE ABCOURT-BARVUE FEASIBILITY STUDY IS POSITIVE A MAJOR REDUCTION IN THE INITIAL CAPITAL COST IS EXPECTED FOR IMMEDIATE RELEASE TSX Venture ABI.V February 8, 2019 THE UPDATE ON THE ABCOURT-BARVUE FEASIBILITY STUDY IS POSITIVE A MAJOR REDUCTION IN THE INITIAL CAPITAL COST IS EXPECTED Rouyn-Noranda, Québec,

More information

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia PEA Study Highlights La Mina as One of the Lowest Cost Gold Development

More information

NEWS RELEASE. Centerra Gold Revises 2016 Guidance Favourably and Reports Third Quarter Results

NEWS RELEASE. Centerra Gold Revises 2016 Guidance Favourably and Reports Third Quarter Results NEWS RELEASE Centerra Gold Revises 2016 Guidance Favourably and Reports Third Quarter Results This news release contains forward-looking information that is subject to the risk factors and assumptions

More information

WODGINA ORE RESERVE COMMENTARY

WODGINA ORE RESERVE COMMENTARY ASX ANNOUNCEMENT 4 May 2018 WODGINA ORE RESERVE COMMENTARY Mineral Resources Limited (ASX:MIN; MRL) refers to its announcement on 1 May 2018 titled Wodgina Mineral Resource and Ore Reserve Update and its

More information

Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce

Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce NEWS RELEASE TSX.V PDG Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce Vancouver, British Columbia, December 22, 2011 Prodigy Gold Incorporated (PDG:

More information

Forward Looking Statement

Forward Looking Statement Certej Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities

More information

TSX:AR CORPORATE PRESENTATION

TSX:AR CORPORATE PRESENTATION TSX:AR CORPORATE PRESENTATION Second Quarter 2018 Conference Call August 10, 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information

More information

MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL

MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL Symbol: MBC:TSX Shares Outstanding: 72,689,336 Fully Diluted: 79,812,886 FOR IMMEDIATE RELEASE: SEPTEMBER 7, 2010 MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL

More information

CORPORATE PRESENTATION AUGUST 2012

CORPORATE PRESENTATION AUGUST 2012 CORPORATE PRESENTATION AUGUST 2012 LEGAL DISCLAIMER SAFE HARBOR: Some statements in this presentation are forward looking in nature. The United States Private Securities Litigation Reform Act of 1995 provides

More information

YEAR END 2015 CONFERENCE CALL

YEAR END 2015 CONFERENCE CALL YEAR END 2015 CONFERENCE CALL February 26, 2015 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking information within

More information

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results Production of 34,165 Gold Equivalent Ounces and On Track to Meet Lower End of Annual Production Guidance Toronto, Ontario - (November

More information

Current Business Activities

Current Business Activities ITEM 2. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS The following Management s Discussion and Analysis of Financial Condition and Results of Operations ( MD&A

More information

ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK

ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK No. 2014-03 ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK Vancouver, British Columbia, March 3, 2014 Elgin Mining Inc. ( Elgin Mining or the Company ) (TSX:ELG and ELG.WT)

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Updated LOM Plan Detour Lake June 28, 2018 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information and forward-looking

More information

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Q4 and Year End 2012 Conference Call. ArgonautGold.com Q4 and Year End 2012 Conference Call Forward Looking Statement FORWARD LOOKING INFORMATION ALL MONETARY AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED This document contains certain forward-looking statements

More information

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars) Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts

More information

2014 FINANCIAL REVIEW

2014 FINANCIAL REVIEW 2014 FINANCIAL REVIEW Management s Discussion and Analysis 1 Management s Responsibility for Financial Reporting 38 Report of Independent Registered Public Accounting Firm 40 Consolidated Financial Statements

More information

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso Mining High Grade Gold in Burkina Faso 2018 Second Quarter Financial Results August 14, 2018 1 Cautionary Statement This presentation contains forward-looking information. Forward looking information contained

More information

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results PRESS RELEASE Banro Announces Record Q1 2015 Production and Revenue Results Toronto, Canada May 13, 2015 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX - "BAA") today announced its

More information

ANACONDA MINING ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE GOLDBORO GOLD PROJECT

ANACONDA MINING ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE GOLDBORO GOLD PROJECT ANACONDA MINING ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE GOLDBORO GOLD PROJECT January 17, 2018 Toronto, ON Anaconda Mining Inc. ( Anaconda or the Company ) (ANX: TSX) is pleased to announce

More information

BELO SUN MINING COMPLETES PRE-FEASIBILITY STUDY

BELO SUN MINING COMPLETES PRE-FEASIBILITY STUDY BELO SUN MINING COMPLETES PRE-FEASIBILITY STUDY Toronto, ON, May 6, 2013 Belo Sun Mining Corp. (BSX: TSX) has completed a positive Pre-feasibility Study ( PFS ) for its 100% owned Volta Grande Project

More information

Q MANAGEMENT S DISCUSSION AND ANALYSIS

Q MANAGEMENT S DISCUSSION AND ANALYSIS Q3 2018 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2018 MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis ( MD&A ) of Detour Gold Corporation

More information

SEPTEMBER QUARTERLY REPORT TUCANO TURNAROUND CONTINUES TO DELIVER

SEPTEMBER QUARTERLY REPORT TUCANO TURNAROUND CONTINUES TO DELIVER Quarterly Report As at 30 September 2018 SEPTEMBER QUARTERLY REPORT TUCANO TURNAROUND CONTINUES TO DELIVER Beadell Resources Limited (Beadell or Company) is pleased to advise that the foundation for the

More information

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009 SUITE 900-999 WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: 604.684.8894 FAX: 604.688.2180 FOR IMMEDIATE RELEASE November 12, 2009 #09-36 Capstone Reports Strong Third Quarter and Year-to-Date

More information

Minera IRL Reports Positive Ollachea Project Optimization Results

Minera IRL Reports Positive Ollachea Project Optimization Results Minera IRL Reports Positive Ollachea Project Optimization Results Lima, 4 June 2014: Minera IRL Limited ( Minera IRL or the Company ), (TSX:IRL) (AIM:MIRL) (BVL:MIRL), the Latin America gold mining company,

More information

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014 ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company or Argonaut

More information