1 Argonaut Gold Announces Positive Feasibility Study for its Magino Project 17 Year Mine Life to Average 150,000 Gold Ounces of Production During Initial Five Years and Produce Nearly Two Million Ounces of Gold Toronto, Ontario (November 8, 2017) Argonaut Gold Inc. (TSX: AR) (the "Company", "Argonaut Gold" or "Argonaut") is pleased to announce the results of a feasibility study ( FS ) for its 100% owned Magino gold project ( Magino or the Project ) located 40 kilometres northeast of Wawa, Ontario, Canada. A 10,000 tonne per day processing facility was selected for the FS in order to significantly reduce the initial capital requirement. This differs from the 30,000 tonne per day project presented in the January 2016 pre-feasibility study ( PFS ) and provides the Company with a scalable project, which it can fund on a stand-alone basis, if a decision is made to proceed with the Project. The Project is designed to allow future expansion should economics warrant such a decision. A 30,000 tonne per day scenario was also evaluated, is summarized in this press release and will be described in summary in the Other Relevant Data section of the National Instrument ( NI ) Technical Report scheduled for filing within 45 days. All dollar amounts are expressed in United States dollars, unless otherwise specified (C$ refers to Canadian dollars). Pete Dougherty, President & CEO stated: We believe this FS demonstrates that Magino is a strategic, long-life asset in an attractive mining jurisdiction, Ontario. We have been able to appropriately scale the Project to a manageable capital number while providing the optionality of expanding the scale of the project in the future either through operational cash flow during Magino s life or through a potential joint-venture partnership. The 10,000 tonne per day project reports an average grade of 1.4 g/t Au during the first five years and 1.2 g/t Au during the 14 years of active mining. With a strong cash position, zero debt and the expectation of solid cash flow from our Mexican operations as we execute on our 60% production growth plan between 2017 and 2019, we feel that the $321 million initial capital estimate is a manageable investment for the Company, at the right time, given our ability to add debt capacity at either the corporate or project level and the cash flow anticipated from our Mexican operations. We have also been mindful when developing mine plans and designing the process facility not to sterilize the ore body and ensure proper space is available should economics warrant an investment to expand the Project to 30,000 tonnes per day in the future. Given our internal growth profile, we are focused in the near term on that growth. Decisions on Magino will be made when and if it is appropriate. The size, location, economics and expandability of Magino give Argonaut significant flexibility to explore options around the Project on its own or with partners. The FS assumed $1,250 gold and a 0.78:1 United States dollar to Canadian dollar exchange rate. The FS yields average annual production of approximately 116,000 gold ounces over a 17 year mine life (including three years of ore processed from a low grade stockpile), an average of 1

2 150,000 gold ounces during the first five years and an average of 123,000 gold ounces during the 14 years of active mining. Estimated cash costs and all-in sustaining costs ( AISC ) are $669/oz and $711/oz respectively (see Non-IFRS Measures section). The economic results of the FS are presented in Table 1 below: Table 1: Magino Feasibility Study Economic Results Parameter Unit Au Price US $/oz 1,250 Exchange Rate US:CDN 0.78 Production Mine Life (from start of commercial production) Yrs 17 Au Payable LOM k oz 1,964 Avg k oz/yr Life-of-mine ( LOM ) Net Sales Revenue (after royalties) US$M 2,443 Operating Costs LOM US$M 1,313 US$/t milled Capital Costs Pre-Production US$M 293 Sustaining & Closure US$M 84 Subtotal US$M 377 Contingency US$M 28 Total Capital Costs US$M 405 Operating Cash Flow US$M 1,142 Cash Cost US$/oz 669 All-in Sustaining Cost US$/oz 711 Economic Results After-Tax Free Cash Flow US$M 540 Avg US$M/yr 32 Discount Rate % 5 Pre-Tax NPV 5% US$M 408 Pre-Tax Internal Rate of Return (IRR) % 22.6 Pre-Tax Payback Yrs 3.8 After-Tax NPV 5% US$M 288 After-Tax IRR % 19.5 After-Tax Payback Yrs 3.9 The Company has evaluated the net present value at a 5% discount rate (NPV 5% ) of the Project at various sensitivities, including gold price and foreign exchange rate. Table 2 below illustrates the FS after-tax NPV 5% sensitivity to various gold price and foreign exchange rate assumptions: Table 2: Magino Base Case After-Tax NPV at 5% Discount Sensitivity to Gold Price & Exchange Rate ($M) 2

3 Exchange Rate (US$/C$) Gold Price ($/oz) $1,100 $1,150 $1,200 $1,250 $1,300 $1,350 $1, $183 $228 $273 $317 $362 $406 $ $173 $218 $263 $307 $352 $397 $ $163 $208 $253 $298 $342 $387 $ $153 $198 $244 $288 $333 $378 $ $143 $188 $234 $279 $323 $368 $ $132 $178 $224 $269 $313 $358 $ $122 $169 $214 $259 $304 $348 $393 Mineral Resource Estimate A conceptual pit was generated in order to constrain the tabulation of Mineral Resources. A gold price of $1,300 was used along with other cost, recovery and slope parameters. Mineral Resources were estimated in the conceptual pit using a 0.25 g/t gold cut-off grade. Table 3 tabulates undiluted Measured and Indicated Mineral Resources and Inferred Mineral Resources at a 0.25 g/t gold cut-off grade. Table 3: Mineral Resource Estimate Resource Category Tonnes (Mt) Au (g/t) Contained Au Ounces (koz) Measured ,010 Indicated ,187 Measured & Indicated ,197 Inferred Note: Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. It is reasonably expected that the majority of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. The Mineral Resources tabulated in Table 3 are inclusive of Mineral Reserves. Numbers may not total due to rounding. Mineral Reserve Estimate The Mineral Reserve estimate for the Magino open pit was constrained with estimates of gold price, mining dilution, process recovery, operating costs, pit slope angles, and refining/transport costs. The Mineral Resource block model for the Magino deposit was then used to determine optimal mining shells and pit phasing. Measured and Indicated Mineral Resources were included in the pit optimization process. Inferred Mineral Resources within the designed open pit are treated as waste. Detailed pit and phase designs were created based on the pit optimization results. These designs incorporated geotechnical parameters as well as ramp accesses and formed the basis of the Mineral Reserve estimate. 3

4 A gold cut-off grade of 0.41 g/t was used to calculate the Mineral Reserve estimate for Magino. The FS Mineral Reserve estimate is summarized in the Table 4: Table 4: Mineral Reserve Estimate Reserve Class Diluted Tonnage (Mt) Diluted Grade g/t Au Contained Gold Au (koz) Proven Probable ,332 Total Proven & Probable ,137 Notes: Mineral Reserves are based on the mine production schedule. Mineral Reserves include 3% ore loss and 20% dilution. Cut-off grade varies by year as per the production schedule (marginal cut-off is 0.41 g/t Au). A gold price of US$1,200/ounce and an exchange rate of US$0.78 to C$1.00 have been assumed. Numbers may not total due to rounding. Mineral Processing, Metallurgical Testing and Recovery Methods The metallurgical testing was completed at McClelland Laboratories Inc. Recent work focused on optimizing processing conditions and a further evaluation of ore variability within the Magino deposit. The testing program included gravity concentration and leach optimization testing. Results from the program suggest an optimum grind size of P microns, demonstrated gold recoveries ranging from 90 to 94% from an average head grade sample of 1.31 g/t Au. The work confirmed the basic flowsheet previously adopted in the January 2016 PFS but resulted in some optimization design criteria detail such as leach retention time and reagent consumption data. Flowsheet development and design criteria were based on metallurgical test work results. The process plant was designed on a throughput of 10,000 tonnes of ore per day with an average gold head grade of 1.25 g/t and to achieve an overall 92.0% gold recovery. The adopted flowsheet includes primary crushing, single stage semi-autogenous grinding, a gravity recovery circuit, cyanide leach and carbon-in-pulp gold adsorption circuit with cyanide recovery and detoxification and thickening prior to tailings discharge to a tailings facility. Table 5 summarizes the process criteria selected for process design and Project economics: Table 5: Process Design Criteria Summary 4

5 Criteria Unit Value Overall Plant Feed t/d 10,000 Crushing Circuit Throughput Rate t/h 556 Grinding and Leach Process Rate t/h 453 Grinding Circuit Product Size, 80% Passing µm 75 Leach Circuit Retention Time h 36 Cyanide Concentration, Leach Feed ppm 750 Cyanide Consumption 1 Lime Requirement, CaO Detoxification Method kg NaCN/t kg/t 0.2 for shallow, mid & deep ores 0.4 for deep-deep ores 0.8 for shallow, mid & deep ores 0.7 for deep-deep ores SO 2/Air Detoxification Limit (Discharge to TMF) ppm CN WAD < 1.0 CIP Circuit Retention Time-Design h 1.9 Elution/stripping Circuit Capacity t 4 Gold Head Grade, LOM Average Au, g/t 1.25 Anticipated Gold Recovery, Design Au, % 92.0 Note 1: Values include recirculation of cyanide from tailings wash thickener. Mine Plan and Production Schedule Open pit mining of the Magino deposit is intended to produce a total of 59.0 million tonnes (Mt) of ore and Mt of waste for a 3.9:1 overall strip ratio, over a 15-year mine production life (including one year of pre-production). The current life of mine plan focuses on achieving consistent ore production rates, and mining of higher value material, as well as balancing grade and strip ratios. Lower grade material that is above the marginal cut-off but below the operational cut-off will be stockpiled and processed at the end of mine life (years 14 through 17). Table 6 summarizes the pit design ore tonnages and grades for the open pit deposit: Table 6: Proposed Mining Plan Description Unit Value Mine Production Life (incl. pre-prod) yr 15 Process Diluted Ore Feed Mt 59.0 Diluted Gold Grade (head grade) g/t 1.13 Contained Gold koz 2,137 Waste Mt Total material Mt Strip Ratio t:t 3.9 Open pit mining operations will use a fleet comprised of 16 m 3 front shovels, a 13 m 3 front-end loader and 140 t haul trucks. This fleet will be supplemented by drills, graders, and track and rubber-tire dozers. A 5 metre working bench height was selected for mining in ore and waste with overall 10 metre effective bench height based on a double bench configuration. Mining will begin at the Project in the year preceding full operations to provide waste rock for general construction, as well as construction of the first lift of the containment structure at the tailings facility. This will also enable the stockpiling of higher grade ore prior to the start of mill 5

6 processing. Mill processing will commence in year 1. Open pit mining will be completed in the first half of year 14. Mill processing of lower grade material will continue until the first quarter of year 17. Table 7 summarizes the life of mine material movement by year for both the mine and the processing facility: Ore Tonnes Mined (M tonnes) Table 7: Mine Production Schedule Waste Tonnes Mined (M tonnes) Tonnes Processed (M tonnes) Strip Ratio Gold Grade Processed (g/t) Gold Recovered (000s oz) Year Pre- Production N/A 20.6 N/A N/A N/A N/A 3.65 N/A N/A N/A 3.65 N/A N/A N/A 0.81 N/A Total ,966 Capital Costs The capital cost estimate includes the costs required to develop, sustain, and close the operation for a planned 17-year mine life, which includes three years of processing low grade, stockpiled material. Major construction at site is expected to take place over a 24-month period. The sustaining capital is carried over operating years one through 16 and closure costs are projected over years 17 to 22. Table 8 details the high-level capital cost estimate: Table 8: Summary of Life of Mine Capital Costs Description Estimate (US$M) 6

7 Mining 42.2 On-Site Development 39.8 Mineral Processing Infrastructure 36.0 Project Indirects 24.1 EPCM 30.5 Owner's Cost 12.1 Contingency 28.4 Total Initial Capital Sustaining Capital 67.3 Closure Cost 16.9 Total Sustaining/Closure Capital 84.2 Total Capital Costs Operating Costs The FS operating cost estimate includes the costs required to mine, handle and transport ore to the mill, mill and process the ore to doré, general and administrative expenses, as well as water treatment plant operating costs. The life of mine operating costs and unit costs are summarized in Table 9: Table 9: Life of Mine Total Operating Cost and Unit Cost Estimate Description Estimate (US$M) Unit Cost (US$/tonne) Unit Cost (US$/payable oz) Mining Re-handle Equipment Lease Processing G&A Refining Royalties Total Operating Costs Environmental Assessment and Permitting The Company submitted its Environmental Impact Statement in January 2017 and the environmental permitting process is well underway. Federal and provincial regulators have completed their conformity review and held Indigenous and public sessions. Currently, the Company is responding to technical comments and continues its substantive engagement activities with the federal and provincial governments, as well as Indigenous communities, local municipalities and other community stakeholders. The Company anticipates providing responses to technical comments during the fourth quarter of 2017, which would target final environmental assessment and closure plan approvals during This, in turn, will allow the Company to apply for and receive necessary permits to begin construction of all major infrastructure. 7

8 Formal agreements have been signed with the Missanabie Cree First Nation and the Red Sky Métis Independent Nation. The Company continues to consult with and work towards agreements with other Indigenous communities. 30,000 Tonne Per Day Opportunity While the FS offers a strong economic result, represents the preferred option and is expected to be the best use of the available Mineral Resources considering the current market conditions and Company profile, an increased throughput option at a processing rate of 30,000 tonnes per day was also evaluated ( 30ktpd Case ). The Company believes that 30,000 tonnes per day throughput provides interesting project optionality for the future on a stand-alone basis should economics support such a decision. The Company also sees a path whereby the 30ktpd Case could be fully evaluated and pursued as a preferred development scenario for the Project should Magino become part of a joint-venture agreement with a third party that provides greater value for Argonaut shareholders than the FS. The 30ktpd Case is preliminary in nature and is based on the same Measured and Indicated Mineral Resources as stated in the FS, does not support Mineral Reserve estimation and should not be considered an update or replacement for the FS. The 30ktpd Case is only intended to show the potential of an increased throughput should market conditions change or an alternative commercial structure that potentially provides greater value to Argonaut shareholders than the FS is successfully negotiated. Mine Plan Comparison The 30ktpd Case used a lower cut-off grade than the FS to account for the decreased unit operating costs associated with higher production rates. In general, the marginal cut-off grade used was 0.34 g/t Au. Only Measured and Indicated Mineral Resources from the FS were used in the 30ktpd Case conceptual mine plan. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The total mineralized material that is above the marginal cut-off grade in the 30ktpd Case is approximately double that in the FS. However, due to higher plant throughput, the grade is approximately 0.2 g/t lower and the mine life is approximately six years shorter. Contained gold is increased by approximately 1.1 million ounces. The conceptual tonnes, grade and ounces of the 30ktpd Case compared to the FS is summarized in Table 10: Table 10: Mine Plan Comparison Description Unit 30ktpd Case* FS Total Mineralized Material Mined Mt

9 Total Waste Mined Mt 423** 232 Total Mined Mt Average Gold Grade g/t Processing Rate t/d 30,000 10,000 Production life years 11 17*** Total Contained Gold Moz Notes: *Conceptual estimates ONLY **Waste material for increased throughput case includes lower grade material ***Production life for FS includes 2.25 years of processing lower grade material at end of mine life Economic Analysis The economic results for the 30ktpd Case utilized the same assumptions as the FS ($1,250 gold and 0.78:1 USD:CAD exchange rate). The 30ktpd Case yields average annual production of approximately 269,000 gold ounces over an 11 year mine life (including one and a half years of ore processed from a low grade stockpile) and an average of 319,000 gold ounces during the first five years. Estimated cash costs and AISC are $664/oz and $721/oz respectively (see Non- IFRS Measures section). Table 11 summarizes the economic results of the 30ktpd case: Table 11: Summary of Economic Results from 30ktpd Case Parameter Unit 30ktpd Case Au Price US $/oz 1,250 Exchange Rate US:CDN 0.78 Production Mine Life (from start of commercial gold production) Yrs 11 Au Payable LOM k oz 2,960 Avg k oz/yr LOM Net Sales Revenue (after royalties) US$M 3,686 Operating Costs LOM US$M 1,967 US$/t milled Capital Costs Pre-Production US$M 561 Sustaining & Closure US$M 167 Subtotal US$M 727 Contingency US$M 49 Total Capital Costs US$M 776 Operating Cash Flow US$M 1,733 Cash Cost US$/oz 664 All-in Sustaining Cost US$/oz 721 Economic Results After-Tax Free Cash Flow US$M 701 Avg US$M/yr 64 Discount Rate % 5 Pre-Tax NPV 5% US$M 588 9

10 Pre-Tax Internal Rate of Return (IRR) % 23.2 Pre-Tax Payback Yrs 4.3 After-Tax NPV 5% US$M 399 After-Tax IRR % 18.9 After-Tax Payback Yrs 4.4 Capital and Operating Costs Capital and operating costs for the 30ktpd Case are shown in Tables 12 and 13: Table 12: Summary of Capital Costs 30ktpd Case Description Estimate (US$M) Mining On-Site Development 61.4 Mineral Processing Infrastructure 56.9 Project Indirects 39.1 EPCM 31.3 Owner's Cost 11.0 Contingency 48.8 Total Initial Capital Sustaining Capital Closure Cost 17.6 Total Sustaining/Closure Capital Total Capital Costs Table 13: Summary of Operating Costs 30ktpd Case Description Estimate (US$M) Unit Cost (US$/tonne) Unit Cost (US$/pay oz) Mining Re-handle Equipment Lease Processing G&A Refining Royalties Total Operating Costs 1, Bill Zisch, Chief Operating Officer, commented: We are fortunate that the Magino deposit is an ore body that lends itself to scalability. Having the ability to right size the Project, in terms of initial capital, for our size of company and current market conditions while maintaining optionality for the future is a significant benefit to the organization. We will continue through the Environmental Assessment process and permitting and then gauge market conditions and all available options for Magino to best unlock value for our shareholders. Contribution, Work and Qualified Persons 10

11 Table 14 details the Qualified Persons ( QP ) and their respective area of responsibility in the FS. Table 14: Qualified Persons QP Company Report Section(s) of Responsibility Mr. Michael Makarenko, P. Eng. Mr. Dino Pilotto, P. Eng. Mr. Michael Lechner, P. Geo. Mr. Luiz Castro, P. Eng. Ms. Sindy Cheng, P. Eng. Dr. Ian Hutchison, PhD., PE JDS Energy & Mining JDS Energy & Mining Resource Modeling Inc. Golder Associates Lycopodium Minerals Canada Limited SLR Consulting Introduction, Reliance on others, Description/Location, Accessibility/climate, History, Infrastructure: (road access, foundations, power, plant site, ancillary, sewage treatment), Market studies, Cap-ex cost estimates, Op-ex estimates, Project execution, Economic analyses, Adjacent properties, Other relevant data, Interpretations / Conclusions, References, Units, Abbreviations etc. Mining reserve estimate, Mining methods, Mining Cap-ex and Op-ex estimate Geological setting, Mineralization, Deposit types, Exploration, Drilling, Sample preparation, Data verification, Mineral resource estimate Geotechnical criteria (open pit) Mineral processing, Metallurgical test work interpretation and Process Capex and Op-ex estimates Other significant factors and risks, Infrastructure: Public by-pass road, Site geotechnical conditions, Water management, Mine waste and tailings management, Environmental considerations Technical information included in this release was supervised and approved by Michael Makarenko, an independent QP under NI For further information on the Magino project, please see the reports as listed below on the Company s website or on Magino Gold Project Preliminary Feasibility Study Technical Report on the Magino Project, Wawa, Ontario, Canada dated February 22, 2016 (effective date January 18, 2016) Non-IFRS Measures The Company has included certain non-ifrs measures including Cash cost per gold ounce sold and All-in sustaining cost per gold ounce sold in this press release, which are presented in accordance with International Financial Reporting Standards ( IFRS ). Cash cost per gold ounce sold is equal to production costs divided by gold ounces sold. All-in sustaining cost per gold ounce sold is equal to production costs plus general and administrative expenses, exploration expenses, accretion of reclamation provision and sustaining capital expenditures divided by gold ounces sold. The Company believes that these measures provide investors with an improved ability to evaluate the performance of the Company. Non-IFRS measures do not have any standardized meaning prescribed under IFRS. Therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of 11

12 performance prepared in accordance with IFRS. Please see the most recent management's discussion and analysis for full disclosure on non-ifrs measures. Cautionary Note Regarding Forward-looking Statements This press release contains certain forward-looking statements and forward-looking information under applicable Canadian securities laws concerning the business, operations and financial performance and condition of Argonaut Gold Inc. ( Argonaut or Argonaut Gold ). Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to estimated production and mine life of the mineral projects of Argonaut; the ability to obtain permits for operations; synergies; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; the benefits of the development potential of the properties of Argonaut; the future price of gold, copper, and silver; the estimation of mineral reserves and resources; success of exploration activities; currency exchange rate fluctuations; and financial impact of completed acquisitions. Except for statements of historical fact relating to Argonaut, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as plan, expect, project, intend, believe, anticipate, estimate and other similar words, or statements that certain events or conditions may, should or will occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Argonaut and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include variations in ore grade or recovery rates, changes in market conditions, risks relating to the availability and timeliness of permitting and governmental approvals; risks relating to international operations, fluctuating metal prices and currency exchange rates, changes in project parametres, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated. These factors are discussed in greater detail in Argonaut's most recent Annual Information Form and in the most recent MD&A filed on SEDAR, which also provide additional general assumptions in connection with these statements. Argonaut cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forwardlooking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Argonaut believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release. Although Argonaut has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there 12

13 may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Argonaut undertakes no obligation to update forward-looking statements if circumstances or management s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forwardlooking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered if the property is developed. Comparative market information is as of a date prior to the date of this document. About Argonaut Gold Argonaut Gold is a Canadian gold company engaged in exploration, mine development and production activities. Its primary assets are the production stage El Castillo mine and San Agustin mine, which together form the El Castillo Complex in Durango, Mexico and the production stage La Colorada mine in Sonora, Mexico. Advanced exploration stage projects include the San Antonio project in Baja California Sur, Mexico, and the Magino project in Ontario, Canada. The Company also has several exploration stage projects, all of which are located in North America. For more information, contact: Argonaut Gold Inc. Dan Symons Vice President, Investor Relations Phone: dan.symons@argonautgold.com 13

Argonaut Gold Announces Third Quarter 2017 Operating and Financial Results

Argonaut Gold Announces Third Quarter 2017 Operating and Financial Results Argonaut Gold Announces Third Quarter 2017 Operating and Financial Results Third Quarter Production of 24,280 Gold Equivalent Ounces Including San Agustin Precommercial Production Toronto, Ontario - (November

More information

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery Argonaut Gold Announces Updates on the Magino and San Agustin Projects Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery The San Agustin Preliminary Economic Assessment Results

More information

TSX:AR CORPORATE PRESENTATION

TSX:AR CORPORATE PRESENTATION TSX:AR CORPORATE PRESENTATION Second Quarter 2018 Conference Call August 10, 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information

More information

Argonaut Gold Announces First Quarter 2018 Operating and Financial Results

Argonaut Gold Announces First Quarter 2018 Operating and Financial Results Argonaut Gold Announces First Quarter 2018 Operating and Financial Results Production of 40,853 Gold Equivalent Ounces, Net Cash 1 Increases $7.2 million and Earnings per Share of $0.07 Toronto, Ontario

More information

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results Production of 34,165 Gold Equivalent Ounces and On Track to Meet Lower End of Annual Production Guidance Toronto, Ontario - (November

More information

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter.

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter. Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces Cash Balance Increases to $54.1 Million Toronto, Ontario (July 14, 2016) Argonaut Gold Inc. (TSX: AR) ( Argonaut, Argonaut Gold or

More information

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces Strong Quarterly Production Shows Increase of 40% year over year, on Track for Full Year Guidance Toronto, Ontario

More information

Argonaut Gold Announces Fourth Quarter and Full Year Financial and Operating Results

Argonaut Gold Announces Fourth Quarter and Full Year Financial and Operating Results Argonaut Gold Announces Fourth Quarter and Full Year Financial and Operating Results Fourth Quarter Net Income of $5.2 Million and Cash Flow from Operations of $11.7 Million Toronto, Ontario (February

More information

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Q4 and Year End 2012 Conference Call. ArgonautGold.com Q4 and Year End 2012 Conference Call Forward Looking Statement FORWARD LOOKING INFORMATION ALL MONETARY AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED This document contains certain forward-looking statements

More information

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Spanish Mountain Gold Announces Results of New PEA for the First Zone 1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain

More information

GEOs are based on conversion ratio of 70:1 for silver to gold ounces ratio which is the referenced ratio throughout this press release.

GEOs are based on conversion ratio of 70:1 for silver to gold ounces ratio which is the referenced ratio throughout this press release. Argonaut Gold Announces 2017 Production, Provides 2018 Guidance and Three-Year Production Outlook, Strengthens Management Team and Provides Release Date For Fourth Quarter and Year End Operational and

More information

TSX:AR. Corporate Presentation. June 1, 2017

TSX:AR. Corporate Presentation. June 1, 2017 TSX:AR Corporate Presentation June 1, 2017 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information under applicable Canadian securities

More information

Detour Gold Updates Life of Mine Plan for Detour Lake

Detour Gold Updates Life of Mine Plan for Detour Lake February 4, 2012 NEWS RELEASE Detour Gold Updates Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce an updated life of mine plan

More information

Orezone Announces Positive Preliminary Economic Assessment

Orezone Announces Positive Preliminary Economic Assessment Orezone Announces Positive Preliminary Economic Assessment January 22, 2014 - Orezone Gold Corporation (ORE:TSX) is pleased to announce the results of an independent Preliminary Economic Assessment (the

More information

All amounts are in US dollars, unless otherwise indicated.

All amounts are in US dollars, unless otherwise indicated. TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD S FEASIBILITY STUDY FOR BOTO GOLD DELIVERS SIGNIFICANTLY IMPROVED PROJECT ECONOMICS 23% After-tax Internal Rate of Return Payback 3.4 years Net Present Value $261

More information

PURE GOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR THE MADSEN-RED LAKE GOLD DEPOSIT

PURE GOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR THE MADSEN-RED LAKE GOLD DEPOSIT NEWS RELEASE 19-03 February 11, 2019 PURE GOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR THE MADSEN-RED LAKE GOLD DEPOSIT Study supports robust high grade underground mine with strong NPV, IRR and low initial

More information

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866) FOR IMMEDIATE RELEASE ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) 368-9932 or 1 (866) 788-8801 (All amounts are expressed in United States dollars, unless

More information

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN OSISKO UPDATES CANADIAN MALARTIC MINE PLAN Average Annual Gold Production of 610,000 ounces at US$516 per ounce (2014 2018) Average Annual Gold Production of 597,000 ounces at US$525 per ounce Life of

More information

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014 ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company or Argonaut

More information

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia News Release B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia Vancouver, March 12, 2014 B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX:

More information

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project DENVER, COLORADO. SEPTEMBER 24, 2018: ROYAL GOLD, INC. (NASDAQ:RGLD) (together with its subsidiaries, Royal Gold or the Company

More information

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO TORONTO, ONTARIO - (September 10, 2012) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce results of the

More information

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2014

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2014 ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2014 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company

More information

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained

More information

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project NEWS RELEASE Centerra Gold Announces Positive Feasibility Study on the Öksüt Project All figures are in United States dollars. This news release contains forward-looking information that is subject to

More information

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance January 16, 2018 NEWS RELEASE Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth

More information

Boto Gold Project Feasibility Study Conference Call

Boto Gold Project Feasibility Study Conference Call Boto Gold Project Feasibility Study Conference Call October 23, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2018 Results Conference Call & Webcast October 25, 2018 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking

More information

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario September 9, 2009 NEWS RELEASE Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased

More information

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES $2.2 Billion After-Tax NPV@8 and IRR of 20. 3.6 Year Payback at $3.00/lb. Copper and 36 Year Mine Life 45 Million lbs. Average

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Second Quarter 2018 Results Conference Call & Webcast July 26, 2018 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking

More information

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Detour Gold Announces 2016 Operating Results and 2017 Guidance January 30, 2017 NEWS RELEASE Detour Gold Announces 2016 Operating Results and 2017 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth quarter and full year

More information

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs EDV EVR Toronto Stock Exchange For additional information, contact: Doug Reddy SVP Business Development +1 604 609 6114 dreddy@endeavourmining.com Endeavour Mining Corporation Corporate Office Suite 3123,

More information

Côté Gold Project Feasibility Study Conference Call

Côté Gold Project Feasibility Study Conference Call Côté Gold Project Feasibility Study Conference Call November 2, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT NEWS RELEASE 17-18 September 14, 2017 PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT Pre-Tax NPV 5% of $365 million, IRR of 54%, and Pre-Production Capex of $51

More information

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland TORONTO, ON October 30, 2018 - Marathon Gold Corporation

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Fourth Quarter and Year-End 2017 Results Conference Call & Webcast March 9, 2018 1 Forward Looking Information This presentation contains certain forward-looking information

More information

Continental Gold Announces a Positive Feasibility Study for the Buriticá Project

Continental Gold Announces a Positive Feasibility Study for the Buriticá Project Continental Announces a Positive Feasibility Study for the Buriticá Project Toronto, Ontario, February 24, 2016 - Continental Inc. (TSX:CNL; OTCQX:CGOOF) ("Continental" or the "Company") is pleased to

More information

Saramacca Reserve Declaration

Saramacca Reserve Declaration Saramacca Reserve Declaration September 24, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information

More information

Skouries Update March 2018

Skouries Update March 2018 Skouries Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016

CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016 CANADA S INTERMEDIATE GOLD PRODUCER 1 2016 LOM Presentation / Workshop 25 January 2016 Forward Looking Information This presentation contains certain forward-looking information and statements as defined

More information

PRESS RELEASE TSX NYSE: RIC

PRESS RELEASE TSX NYSE: RIC PRESS RELEASE TSX NYSE: RIC Richmont Mines Reports Strong Results from the Island Gold Mine Expansion Case Preliminary Economic Assessment Positive First Step in a Multi-Phased Transformation of the Island

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER 2019 Guidance Conference Call & Webcast January 23, 2019 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information

More information

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland 2012 No. 12 TSX: DNA Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland TORONTO, ONTARIO - (Marketwire - July 25, 2012) - Dalradian

More information

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation

More information

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo PRESS RELEASE Banro Files NI 43-101 Technical Report on Namoya Project, Democratic Republic of the Congo Toronto, Canada May 13, 2014 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER European Gold Forum Zurich April 4-6, 2017 1 Forward Looking Information This presentation contains certain forward-looking information and forward-looking statements,

More information

Detour Gold Reports Third Quarter 2018 Results

Detour Gold Reports Third Quarter 2018 Results NEWS RELEASE Detour Gold Reports Third Quarter 2018 Results October 24, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports its operational and financial results for the third

More information

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

More information

Lamaque Update March 2018

Lamaque Update March 2018 Lamaque Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 10, 2018 Capstone Mining 2017 Production Results and 2018 Operating

More information

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland TORONTO, ON May 17, 2018 - Marathon Gold Corporation ( Marathon or the Company ) (TSX: MOZ) is pleased to announce the

More information

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE May 31, 2018 For Immediate Release NEWS RELEASE TSX: GPR NYSE AMERICAN: GPL GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE Potential for Average Annual Production

More information

Eldorado Gold Reports Results of Technical Studies

Eldorado Gold Reports Results of Technical Studies NEWS RELEASE TSX: ELD NYSE: EGO March 21, 2018 Eldorado Gold Reports Results of Technical Studies VANCOUVER, BC Eldorado Gold Corporation, ( Eldorado or the Company ) today announces the release of three

More information

KINROSS GOLD CORPORATION

KINROSS GOLD CORPORATION April 1 2014 KINROSS GOLD CORPORATION Results of the Tasiast feasibility study 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained

More information

TSX:AR. Proven Management, Unparalleled Growth, Focus on Per Share Value Creation

TSX:AR. Proven Management, Unparalleled Growth, Focus on Per Share Value Creation TSX:AR Proven Management, Unparalleled Growth, Focus on Per Share Value Creation November 2017 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking

More information

NEWS RELEASE. Mountain Province Diamonds Announces September 30, 2017 Quarter End Results

NEWS RELEASE. Mountain Province Diamonds Announces September 30, 2017 Quarter End Results NEWS RELEASE November 13, 2017 Shares Issued and Outstanding: 160,245,166 TSX and NASDAQ: MPVD Mountain Province Diamonds Announces September 30, 2017 Quarter End Results Toronto and New York, November

More information

Orezone Announces Positive Feasibility Study for Bomboré

Orezone Announces Positive Feasibility Study for Bomboré Orezone Announces Positive Feasibility Study for Bomboré Mine Life increased to 11 years, 24.4% after tax IRR and AISC of US$678/oz April 28, 2015, Orezone Gold Corporation (ORE-TSX) is pleased to announce

More information

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 NEWS RELEASE Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 April 26, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold

More information

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012 THE ELEMENTS OF VALUE CREATION Revised Prefeasibility Study Results Dumont Nickel Project May 14, 2012 Disclaimer Cautionary Statements Concerning Forward Looking Statements This presentation contains

More information

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 89521 USA NEWS RELEASE Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns October

More information

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates March 6, 2015 NEWS RELEASE Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates Detour Gold Corporation (TSX: DGC) ( Detour Gold or the

More information

Marigold Life of Mine Plan

Marigold Life of Mine Plan Marigold Life of Mine Plan October 7, 2014 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking statements within the meaning

More information

POSITIONING FOR SUSTAINABLE GROWTH

POSITIONING FOR SUSTAINABLE GROWTH POSITIONING FOR SUSTAINABLE GROWTH Island Gold Mine Expansion Case PEA May 29, 2017 TSX NYSE : RIC RICHMONT MINES FORWARD-LOOKING STATEMENTS Safe Harbor Statement & Cautionary Note to U.S. Investors Concerning

More information

Kişladağ Update March 2018

Kişladağ Update March 2018 Kişladağ Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO-EAGLE FILES NEW TECHNICAL REPORT ON GOLDEX

More information

SECOND QUARTER 2018 RESULTS. August 10, 2018

SECOND QUARTER 2018 RESULTS. August 10, 2018 SECOND QUARTER 2018 RESULTS August 10, 2018 FORWARD LOOKING STATEMENTS Certain statements and information contained in this presentation constitute forward-looking statements within the meaning of applicable

More information

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS FOR IMMEDIATE RELEASE December 8th, 2009 TSX: SUE SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS Toronto, Ontario, Canada, December 8 th, 2009 Sulliden Gold Corporation ( Sulliden or the Company )

More information

Alio Gold Reports Second Quarter 2018 Results

Alio Gold Reports Second Quarter 2018 Results Alio Gold Reports Second Quarter 2018 Results VANCOUVER, British Columbia, g. 10, 2018 -- Alio Gold Inc. (TSX, NYSE AMERICAN: ALO) ( Alio Gold or the Company ) today reported its second quarter 2018 financial

More information

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars) Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts

More information

New Gold Announces Preliminary Economic Assessment at Blackwater Annual Gold Production Over 500,000 Ounces at Well Below Industry Average Cash Costs

New Gold Announces Preliminary Economic Assessment at Blackwater Annual Gold Production Over 500,000 Ounces at Well Below Industry Average Cash Costs New Gold Announces Preliminary Economic Assessment at Blackwater Annual Gold Production Over 500,000 Ounces at Well Below Industry Average Cash Costs (All figures are in US dollars unless otherwise indicated)

More information

A Canadian Focused Gold Producer

A Canadian Focused Gold Producer A Canadian Focused Gold Producer CORPORATE PRESENTATION Denver Gold Forum September 2018 1 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED CAUTIONARY NOTE REGARDING FORWARD-LOOKING

More information

Aldridge Announces Results for Yenipazar Optimization Study

Aldridge Announces Results for Yenipazar Optimization Study ALDRIDGE MINERALS INC. 10 King Street East, Suite 300 Toronto, Ontario Canada M5C 1C3 www.aldridgeminerals.ca Aldridge Announces Results for Yenipazar Optimization Study - Pre- Production Capital Costs

More information

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars)

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars) Suite 900-999 West Hastings Street Vancouver, BC, V6C 2W2, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com March 26, 2014 Capstone Extends Pinto Valley Mine Life to 2026 (all amounts

More information

For further information: Investor Relations (416)

For further information: Investor Relations (416) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO EAGLE COMPLETES UPDATED NI 43-101 TECHNICAL REPORT ON THE MELIADINE GOLD

More information

LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION

LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION News Release TSX: LMC January 16, 2019 LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION (All amounts in US dollars, unless otherwise indicated) Vancouver, January 16, 2019 Leagold Mining

More information

AuRico Metals Announces Positive Preliminary Economic Assessment for Kemess East Gold Copper Project

AuRico Metals Announces Positive Preliminary Economic Assessment for Kemess East Gold Copper Project 110 Yonge Street Suite 601, Toronto, ON, M5C 1T4 T: +1.416.216.2780 www.auricometals.ca AuRico Metals Announces Positive Preliminary Economic Assessment for Kemess East Gold Copper Project Annual Production

More information

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Turquoise Hill files 2016 Oyu Tolgoi Technical Report October 21, 2016 Press release Turquoise Hill files 2016 Oyu Tolgoi Technical Report VANCOUVER, CANADA Turquoise Hill Resources today filed an updated compliant independently-prepared technical report

More information

ANACONDA MINING ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE GOLDBORO GOLD PROJECT

ANACONDA MINING ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE GOLDBORO GOLD PROJECT ANACONDA MINING ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE GOLDBORO GOLD PROJECT January 17, 2018 Toronto, ON Anaconda Mining Inc. ( Anaconda or the Company ) (ANX: TSX) is pleased to announce

More information

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results PRESS RELEASE Banro Announces Record Q1 2015 Production and Revenue Results Toronto, Canada May 13, 2015 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX - "BAA") today announced its

More information

First Quarter 2018 Results April 26, 2018

First Quarter 2018 Results April 26, 2018 TSX: LUN Nasdaq Stockholm: LUMI First Quarter 2018 Results April 26, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance

More information

Kişladağ Expansion Project

Kişladağ Expansion Project Kişladağ Expansion Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private

More information

May 31, 2017 News Release SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT

May 31, 2017 News Release SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT May 31, 2017 News Release 17 18 SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT VANCOUVER, B.C. -- Silver Standard Resources Inc. (NASDAQ: SSRI)

More information

Scotiabank Mining Conference. December 3, 2014

Scotiabank Mining Conference. December 3, 2014 Scotiabank Mining Conference December 3, 2014 Cautionary Notes NON-GAAP MEASURE CASH COSTS PER OUNCE, NET OF BY-PRODUCT CREDITS THIS PRESENTATION PRESENTS INFORMATION ABOUT OUR CASH COSTS OF PRODUCTION

More information

TSX:AR CORPORATE PRESENTATION

TSX:AR CORPORATE PRESENTATION TSX:AR CORPORATE PRESENTATION September 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information under applicable Canadian securities

More information

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2017

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2017 ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2017 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company or Argonaut ) and

More information

Côté Gold Analyst Site Visit

Côté Gold Analyst Site Visit Côté Gold Analyst Site Visit September 15, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information

More information

LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN SUSTAINING COST ESTIMATE TO US$583 PER OUNCE FOR ITS FRUTA DEL NORTE GOLD PROJECT

LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN SUSTAINING COST ESTIMATE TO US$583 PER OUNCE FOR ITS FRUTA DEL NORTE GOLD PROJECT 885 West Georgia Street T +1 604 689 7842 Suite 2000 F +1 604 689 4250 Vancouver, BC info@lundingold.com Canada V6C 3E8 lundingold.com NEWS RELEASE LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN

More information

Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce

Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce NEWS RELEASE TSX.V PDG Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce Vancouver, British Columbia, December 22, 2011 Prodigy Gold Incorporated (PDG:

More information

FOURTH QUARTER 2017 RESULTS. February 21, 2018

FOURTH QUARTER 2017 RESULTS. February 21, 2018 FOURTH QUARTER 2017 RESULTS February 21, 2018 FORWARD LOOKING STATEMENTS Certain statements contained herein may constitute forward-looking statements (or forward looking information ) and are made pursuant

More information

BELO SUN MINING COMPLETES PRE-FEASIBILITY STUDY

BELO SUN MINING COMPLETES PRE-FEASIBILITY STUDY BELO SUN MINING COMPLETES PRE-FEASIBILITY STUDY Toronto, ON, May 6, 2013 Belo Sun Mining Corp. (BSX: TSX) has completed a positive Pre-feasibility Study ( PFS ) for its 100% owned Volta Grande Project

More information

Jinshan Gold Mines Inc. April 24, 2006

Jinshan Gold Mines Inc. April 24, 2006 Jinshan Gold Mines Inc. April 24, 2006 FINAL FEASIBILITY STUDY EXTENDS MINE LIFE AND DEMONSTRATES ROBUST ECONOMICS FOR JINSHAN S CSH (217) GOLD PROJECT, CHINA INFILL DRILLING INCREASES MEASURED AND INDICATED

More information

Orvana reports results for the first quarter of fiscal 2014 with adjusted net income of $1.2 million or $0.01 per share

Orvana reports results for the first quarter of fiscal 2014 with adjusted net income of $1.2 million or $0.01 per share Orvana reports results for the first quarter of fiscal 2014 with adjusted net income of $1.2 million or $0.01 per share Toronto, Ontario, February 7, 2014 - Orvana Minerals Corp. (TSX:ORV) (the Company

More information

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2016

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2016 ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2016 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company or Argonaut ) and

More information

TSX:AR CORPORATE PRESENTATION

TSX:AR CORPORATE PRESENTATION TSX:AR CORPORATE PRESENTATION November 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information under applicable Canadian securities

More information

International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results

International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results 1177 West Hastings Street Suite 2300 Vancouver, BC Canada V6E 2K3 www.ithmines.com NR13-07 July 23, 2013 International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results Vancouver,

More information

ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010

ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010 ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com April 11, 2017 NYSE - MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference TSX: YRI NYSE: AUY Cautionary Note Regarding Forwardlooking Statements CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

More information

/ TSX: AR

/ TSX: AR 4.1 M gold ozs in M&I Reno Office 1.1 M gold ozs and 14 M silver ozs in M&I 1.7 M gold ozs oxide/trans. 1.5 M gold ozs sulphide in M&I 1.7 M gold ozs in M&I Argonaut Gold; TSX: AR Share Capital (02-26-2014)

More information