CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016

Size: px
Start display at page:

Download "CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016"

Transcription

1 CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016

2 Forward Looking Information This presentation contains certain forward-looking information and statements as defined in applicable securities law (referred to herein as forward-looking statements ). Forward-looking statements include, but are not limited to, statements with respect to the 2016 guidance (gold production, total cash costs, all-in sustaining costs, and capital expenditures), updated mine plan and economic analysis of the Detour Lake mine including, but not limited to, the life of mine plan, the waste to ore ratio, processing and production rates, grades, metallurgical recovery rates, operating and capital costs, the projected life of mine, the net present value, opportunities to optimize the mine operation, the success and continuation of exploration activities, the future price of gold, reclamation obligations, government regulations and environmental risks. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forwardlooking statements. These risks, uncertainties and other factors include, but are not limited to, assumptions and parameters underlying the life of mine plan not being realized, a decrease in the future gold price, discrepancies between actual and estimated production, changes in costs (including labour, supplies, fuel and equipment), changes to tax rates; environmental compliance and changes in environmental legislation and regulation, exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the related Technical Report and section entitled Description of Business - Risk Factors in Detour Gold s 2014 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and sustaining capital costs; the Company s ability to attract and retain skilled staff; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. All forward-looking statements in this presentation are necessarily based on opinions and estimates made as of the date such statements are made and are subject to important risk factors and uncertainties, many of which cannot be controlled or predicted. Detour Gold and the Qualified Persons who authored the associated Technical Report undertake no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. 2

3 3 Notes to Investors Non-IFRS Financial Performance Measures Detour Gold has included non-ifrs measures in this presentation. The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved ability to evaluate the underlying performance of the Company. The non-ifrs measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers. Other companies may calculate these measures differently as a result of differences in underlying principles and policies applied. Total site costs and total site costs per ounce Detour Gold reports total site costs and total site costs per ounce on a produced basis in this presentation. Total site costs include production and operating costs such as mining, processing, site general and administration, bullion shipment, refining, agreements with Aboriginal communities, capital costs (excluding closure costs) and net of silver sales. These are exclusive of depreciation and depletion. The Company calculates total site costs per ounce as the sum of total site costs (as described above) divided by the total gold ounces produced. Gold ounces produced is noted before delivering the royalty in kind ounces. Unit costs Detour Gold reports the following unit costs: Mining unit costs: calculated as mining costs divided by total tonnes mined (ore + waste). Processing unit costs: calculated as process costs (excluding bullion delivery and refining) divided by the total tonnes milled. G&A unit costs: calculated as site G&A costs (excluding costs related to agreements with Aboriginal communities) divided by total tonnes milled. All-in sustaining costs The Company believes this measure more fully defines the total costs associated with producing gold. The Company calculates all-in sustaining costs as the sum of total cash costs (as described below), share-based compensation, corporate general and administrative expense, exploration and evaluation expenses that are sustaining in nature, reclamation cost accretion (also known as unwinding of the discount on decommissioning and restoration provisions), sustaining capital including deferred stripping, and realized gains and losses on hedges due to operating and capital costs, all divided by the total gold ounces sold to arrive at a per ounce figure. Total cash costs Total cash costs are reported on a sales basis. Total cash costs include production costs such as mining, processing, refining and site administration, agreements with Aboriginal communities, less non-cash share-based compensation and net of silver sales divided by gold ounces sold to arrive at total cash costs per gold ounce sold. The measure also includes other mine related costs incurred such as mine standby costs and current inventory write downs. Production costs are exclusive of depreciation and depletion. Production costs include the costs associated with providing the royalty in kind ounces.

4 Notes to Investors Information Containing Estimates of Mineral Reserves and Resources The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument Standards of Disclosure for Mineral Projects ( NI ), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission ( SEC ) applies different standards in order to classify mineralization as a reserve. In particular, while the terms measured, indicated and inferred mineral resources are required pursuant to NI , the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, inferred mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases. Technical Report On January 25, 2016, Detour Gold announced an updated life of mine plan for the Detour Lake operation and filed a NI compliant Technical Report on SEDAR. The Technical report was prepared by the following Qualified Persons from Detour Gold: Drew Anwyll, P.Eng., Senior VP Technical Services (lead author); Andrew Croal, P.Eng., Director Technical Services; Ruben Wallin, P.Eng., Vice President Environment and Sustainability; David Ritchie, M.Eng., P.Eng., Principal Geotechnical Engineer for AMEC Foster Wheeler acting as TMA Engineer of Record; and Jacques McMullen, P.Eng. Corporate Technical Advisor. Qualified Persons The scientific and technical content of this presentation was reviewed, verified and approved by Drew Anwyll, P.Eng., Senior Vice President Technical Services, a Qualified Person as defined by Canadian Securities Administrators National Instrument Standards of Disclosure for Mineral Projects. All costs are presented in Canadian dollars except as noted. 4

5 Where Are We After 3 Years? Delivered strong performance in 2015 Gold production >500,000 oz Mining rates at 250,000 tpd; achieved 280,000 tpd in Q2 Throughput rates exceeding design capacity Proven higher grades (>0.95 g/t) in Detour Lake pit AISC trending down Gold Production (k oz) ,000 oz is within reach

6 Goals of the LOM Plan De-risk execution plan Incorporate gained experience Include West Detour Improve production profile Defer near-term capital New LOM Plan: DE-RISK With WEST DETOUR Optimize CASH FLOW IMPROVE NPV 6

7 7 The LOM Plan

8 Completed over 15 detailed LOM Plan September 2014 Good understanding of Detour Lake and West Detour pits Optimize strip ratio Allowed for reduce max. mining rate Costs reflective of actuals and productivities Confidence in ultimate plant capacity September Delivered Optimal LOM Plan

9 LOM Plan Assumptions and Outcomes Assumptions Reserves 2016 Long-Term Gold price (US$/oz) 1,000 1,075 1,200 US$/C$ Gold price (C$/oz) 1,100 1,430 1,476 Diesel 2016 LOM $0.75 /L $0.80 / L Power cost costs $0.04 /kwh $0.08 /kwh Outcomes Reserves Proven & Probable Mine Life LOM average annual gold production Average annual production (next 9 years) Total Site Costs Moz 23 years ~10 years for West Detour 655 koz 648 koz US$690/oz 9 (1) Total site costs are reported in per ounce produced. Definition of this Non-IFRS Financial Performance Measures defined on slide 3.

10 LOM Plan Assumptions and Outcomes Key Operating Parameters Annual 124 Mtpa Mine Tonnage Daily 340 ktpd Max. Strip Ratio waste:ore 3.5:1 Avg. Feed Grade Ore 1.01 g/t Including LG fines 0.99 g/t Mill Throughput Annual 23 Mtpa Daily 63 ktpd Avg. Max. Mill Recovery 92.0% Max. 10

11 Increased Reserve Reserves 1 Tonnes (millions) Grade (g/t) Contained Gold Ounces (koz) Detour Lake pit ,480 West Detour pit ,529 Low Grade fines Total Proven and Probable ,395 Reserves shell at US$1,000/oz and US$/C$ of 1.10 (C$1,100/oz) Elevated cut-off grade of 0.50 g/t Au Long-term dilution of 4% (@ 0.2 g/t) and 5% ore loss 11 (1) Only Probable LG Fines scheduled in the mine plan were reported as mineral reserves. The LG Fines uses a CoG of 0.40 g/t Au.

12 W Increased Reserve Resource / Reserve Shells E Resource Shell (at US$1,200/oz and US$/C$ 1.10) West Detour including North Satellite pit Detour Lake pit 12

13 LOM Plan High Level Summary Units 3-Year Average LOM Average Production Tonnes Mined millions Head Grade g/t Au Tonnes Milled millions Recovery % Gold Production k oz Site Costs Site Operating Costs 1 $ M Capital Costs 2 $ M Total Site Costs 3,4 $ M US$/oz (1) Includes all site costs including bullion delivery, refining and costs related to agreements with Aboriginal communities. (2) Includes closure costs. (3) Refer to Non-IFRS Financial Performance Measures defined on slide 3. (4) US$/C$ exchange rate of 1.33 in 2016, 1.25 in 2017, and 1.23 in

14 Improved Production Profile Addition of West Detour provides a second feed source to smooth production Approx. 10 year mine life Mined with smaller fleet Equipment shared between Detour Lake and West Detour pits West Detour pit available for long-term storage of tailings and waste Stockpiling strategy allows for additional flexibility Gold Production ~650 koz / year for next 9 years 14

15 West Detour Into the LOM Plan 160 Mt less stripping in the next 9 years Lower Strip Ratio in next 9-Years West Detour allows lower strip ratio (4.0) Prior fleet expansion not required Less CAT 795 trucks Reduction of 160 Mt of waste In 9-Year window 2016LOM 2014LOM Prior Plan High mining rate to maintain ore feed High strip ratio (4.8) Required mining at 140 Mtpa 15

16 Incorporating Learnings - Fleet Productivity Decreased risk for fleet productivities Prior LOM had 38 x CAT 795 trucks in 2017 Improved modelling of truck cycle time Fleet productivities based on actuals with slight improvements to 2020 Adjusted shovel productivity with O/B mining Shared mining fleets for Detour Lake and West Detour pit West Detour uses smaller equipment (CAT6030 / CAT777) Equipment CAT 7495 Rope Shovel CAT 6060 Hydraulic Shovel CAT 6030 Excavator Cat 795 Haul Trucks CAT 777 Haul Trucks 30 Mtpa 15 Mtpa 7 Mtpa 300 t capacity 85 t capacity 16

17 Processing Plant Capacity Plant already tested beyond LOM assumption Processed up to 72,000 tonnes in a day no volumetric issues Averaged above 60,000 tpd for complete months (best month >62,700 tpd) LOM is 60,000 tpd ROM + 3,000 tpd LG Fines Equivalent to 60,700 tpd ROM LG Fines require only 22% of ROM ore energy Proven milling rate above LOM assumption Increase operating time to 92% over next 3 years First priority: 410-conveyor in

18 LG Fines into Production Profile Natural Segregation Process Actual Size Distribution Addition of LG Fines Gold concentrates in the fines Grade in the fines is concentrated at a factor of 35% Fines recovered from stockpile with flitch mining of top portion When trickle fed only displaces approx. 25% of fresh feed LG Fines include $3/t rehandling and incremental feed cost LOM plan includes 1 Mt per year starting in

19 19 Costs

20 Incorporating Learnings - Operating Cost Mining Costs Drivers Material movement tonnage Fleet efficiency Fleet operating and maintenance costs Truck cycle times and diesel fuel consumptions Long-term diesel price at $0.80/L Tonnage processed Plant Costs Drivers Reagent and consumable (CN, SO 2, grinding media) Power costs at $40/MWh until 2025 Maintenance and operating time Past Quarterly Performance Proves the Operation Can Deliver Operating Costs in LOM 20

21 Improved Capital Allocation Looking at the next 9 years ( ) 2014 LOM 2016 LOM Comments Mining Detour Lake West Detour $214 M $148 M $104 M $252 M Reduced number of CAT 795 trucks Not previously in mine plan / De-risk Plant $65 M $33 M Reduced debottlenecking costs TMA $245 M $264 M More accurate costs, increased tonnage G&A $17 M $34 M Increase in Camp capacity / quality Total $540 M $583 M Overall $43 M Additional Capital With an Increase of 1.5 Moz and Reduced Risk 21

22 Improved Capital Allocation Capital costs maintained with reduced risk Lower mining tonnage, less CAT 795 truck numbers = decreased Detour Lake pit capital 8 Less CAT 795 trucks in the next 9 years West Detour pit uses smaller equipment 15 additional CAT 777 included Less capital required for plant debottleneck Camp size and quality improvements included 22

23 Improved Capital Allocation Mining Largely related to pit equipment replacement costs Includes truck shop expansion, pit electrical expansion Equipment shared between pits are largely accounted for in Detour Lake pit capital CAT 795 Trucks priced in US$ does not benefit from the weaker C$ dollar Plant Costs for 410-conveyor system improvements Lead nitrate and oxygen system optimization projects Debottlenecking projects to get to 23 Mtpa General Cost for Walter Lake compensation, allowances and contingency included in estimates Annual US$ exposure changes with timing of equipment purchases LOM capital US$ exposure approx. 40% 23

24 24 Economic Analysis

25 Economic Analysis Detour Lake Operation Economic Evaluation Description Unit Yearly Average per Period LOM Total LOM Gold production k oz Moz Revenue $ M , $21.8 B Operating costs $ M $11.8 B Capital costs 1 $ M $1.2 B Pre-tax cash flow $ M $8.8 B NPV 5% (pre-tax) NPV 5% (after tax) $4.8 B $3.9 B This NPV is based on long-term gold price: C$1,476 / oz Spot Gold Price on last Friday: +C$1,550 / oz (1) Includes closure costs. 25

26 Sensitivity Sensitivity of NPV on Gold Price and F/X Rate Gold price and Exchange Rate 1 After Tax NPV 5% (C$ Billion) US$1,000/oz US$1,100/oz US$1,200/oz US$1,300/oz US$1,400/oz Increase in $100/oz Au Increase $500 M After-Tax NPV5% (1) Long-term gold price (2018+) and long-term exchange rate (2018+). 26

27 27 Risks and Opportunities

28 LOM Main Risks and Uncertainties Risk Description Potential Impact Risk Mitigation Delay in West Detour Permitting Declining gold price or increase value of C$ vs US$ Change to production profile Higher variability in the years (depending on the delay) Reduced capital and operating costs without the stripping of West Detour overburden Decrease in US$ revenue in the event of a falling gold price or a strengthening C$ Increase priority on Detour Lake Stage 2 pit Total value will be impacted by timing of benefit Re-allocation of capital Pit shell selected is robust at low gold price Opportunistic gold, currency and diesel hedging strategy 28

29 LOM Main Mine Opportunities Description Comment Open pit unit costs Open pit fragmentation Block model reconciliation Potential to lower maintenance costs Improved productivity Continuous Improvement (CI) projects focusing on costs improvements and productivity gains Improved blasting to increase number of fines will increase plant throughput Block model gives additional ore tonnage to date Continued trend would extend mine life or add to increased ore production 29

30 LOM Main Plant Opportunities Description LG Fines prior to 2019 Medium grade fines Comment Bringing LG Fines earlier will bring benefits earlier. Using same methodology recover fines from medium grade stockpiles at a similar concentration of grade Additional tonnage possible with: Throughput above 23Mtpa Recovery beyond 92% - Improved crushers operating times - Increased power draw on Ball Mills - MG Fines - Improved Pit Fragmentation Metallurgical Improvement Plan - Leach circuit optimization (lead nitrate, oxygen control and grind/recovery relationship) - Gravity circuit optimization - Carbon circuit management 30

31 2016 Guidance 31

32 2016 Guidance 2016 Strong production growth ESTIMATED PRODUCTION Gold ounces 540, ,000 ESTIMATED COSTS AISC/oz sold 1 US$840-$940 TCC 1 US$675- $750 Cost assumptions: Gold price of US$1,075/oz, diesel fuel price of $0.75 per litre, power cost of $0.04 per kilowatt hour and a US$/C$ exchange rate of (1) Definition of Non-IFRS Financial Performance Measures defined on slide 3. 32

33 2016 Operating Plan 1 MINE 2 PLANT Mining target: Mt total Strip ratio (SR) projected: 3.3:1 Milling target: >20 Mt ore Plant improvement plan 410-conveyor: modify to 2 separate conveyor units 33

34 2016 All-in Sustaining Costs (AISC) 2016 Sustaining Capital (US$) Forecast (US$) Total Cash Costs (TCC) $ /oz sold 1 Sustaining Capital $60-70 M Capitalized Stripping $5-10 M Corporate G&A $25 M Exploration $2-4 M AISC US$ /oz sold 1 TMA $30 M Mine $15 M Other $10 M Mill $10 M Additional non-sustaining expenditures of US$16-18 M for West Detour development & Lower Detour definition drilling (1) Definition of Non-IFRS Financial Performance Measures defined on slide

35 35 Exploration

36 Exploration Focus Qtz-tourmaline veining in altered feldspar porphyry Balanced Approach in Organic Growth Regional Exploration Target delineation Predominantly through geophysics Lower Detour Drill testing Test IP anomalies and structural trend Zone 58N Definition drilling Assess mining potential 36

37 450m 250m Exploration Zone 58N 58N Infill Program ~30,000 m winter drilling program 25-metre in-fill program Upper 250 metres Test continuity of geology and grade 50-metre in-fill program Lower 450 metres Define extent and tonnage Currently drilling with 5 drills Prioritize areas not accessible during summer season 37

38 Exploration Lower Detour 8,000 m winter drilling program on Lower Detour Most prospective area at this time Trend is over 25 km long on the property Significantly underexplored Focus of regional drilling with up to 14,000 m for

39 Regional Exploration Completed property-wide airborne survey in Year Plan Prioritization of prospective areas Use of geophysics to identify main structures and geology Follow up with local IP surveys, prospecting and trenching 39

40 40 Q&A

41 Contact Information Paul Martin President and Chief Executive Officer Phone: Laurie Gaborit Director Investor Relations Phone:

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Detour Gold Announces 2016 Operating Results and 2017 Guidance January 30, 2017 NEWS RELEASE Detour Gold Announces 2016 Operating Results and 2017 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth quarter and full year

More information

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance January 16, 2018 NEWS RELEASE Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Fourth Quarter and Year-End 2017 Results Conference Call & Webcast March 9, 2018 1 Forward Looking Information This presentation contains certain forward-looking information

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2017 Results Conference Call & Webcast October 26, 2017 1 Forward Looking Information This presentation contains certain forward-looking information and

More information

Detour Gold Updates Life of Mine Plan for Detour Lake

Detour Gold Updates Life of Mine Plan for Detour Lake February 4, 2012 NEWS RELEASE Detour Gold Updates Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce an updated life of mine plan

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2018 Results Conference Call & Webcast October 25, 2018 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER European Gold Forum Zurich April 4-6, 2017 1 Forward Looking Information This presentation contains certain forward-looking information and forward-looking statements,

More information

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 NEWS RELEASE Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 April 26, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Second Quarter 2018 Results Conference Call & Webcast July 26, 2018 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking

More information

Detour Gold Reports Second Quarter 2017 Results

Detour Gold Reports Second Quarter 2017 Results July 26, 2017 NEWS RELEASE Detour Gold Reports Second Quarter 2017 Results Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports its operational and financial results for the second

More information

Detour Gold Reports Third Quarter 2018 Results

Detour Gold Reports Third Quarter 2018 Results NEWS RELEASE Detour Gold Reports Third Quarter 2018 Results October 24, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports its operational and financial results for the third

More information

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates March 6, 2015 NEWS RELEASE Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates Detour Gold Corporation (TSX: DGC) ( Detour Gold or the

More information

Detour Gold Reports 2017 Fourth Quarter and Year-End Results

Detour Gold Reports 2017 Fourth Quarter and Year-End Results NEWS RELEASE Detour Gold Reports 2017 Fourth Quarter and Year-End Results March 8, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports its financial results for the fourth quarter

More information

Revenues of $152.0 million on gold sales of 113,845 ounces at an average realized price of $1,281 per ounce

Revenues of $152.0 million on gold sales of 113,845 ounces at an average realized price of $1,281 per ounce TORONTO, ONTARIO--(Marketwired - Nov 1, 2016) - Detour Gold Corp. (TSX:DGC) ("Detour Gold" or the "Company") reports its operational and financial results for the third quarter of 2016. This release should

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Denver Gold Forum September 24-26, 2018 Colorado Springs 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER 2019 Guidance Conference Call & Webcast January 23, 2019 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information

More information

Q MANAGEMENT S DISCUSSION AND ANALYSIS

Q MANAGEMENT S DISCUSSION AND ANALYSIS Q1 2018 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE QUARTER ENDED MARCH 31, 2018 MANAGEMENT S DISCUSSION AND ANALYSIS This ( MD&A ) of Detour Gold Corporation ( Detour Gold, we, our or the Company ) provides

More information

Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018

Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018 NEWS RELEASE Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018 July 25, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports its operational and

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Updated LOM Plan Detour Lake June 28, 2018 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information and forward-looking

More information

Q MANAGEMENT S DISCUSSION AND ANALYSIS

Q MANAGEMENT S DISCUSSION AND ANALYSIS Q3 2018 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2018 MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis ( MD&A ) of Detour Gold Corporation

More information

DETOUR GOLD CORPORATION

DETOUR GOLD CORPORATION DETOUR GOLD CORPORATION YEARS ENDED DECEMBER 31, 2017 AND 2016 MANAGEMENT S DISCUSSION AND ANALYSIS This ( MD&A ) of Detour Gold Corporation ( Detour Gold, we, our or the Company ) provides information

More information

CANADA S INTERMEDIATE GOLD PRODUCER Global Metals, Mining & Steel Conference May 9-12, 2016

CANADA S INTERMEDIATE GOLD PRODUCER Global Metals, Mining & Steel Conference May 9-12, 2016 CANADA S INTERMEDIATE GOLD PRODUCER 1 2016 Global Metals, Mining & Steel Conference May 9-12, 2016 Forward Looking Information This presentation contains certain forward-looking information and statements

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Scotiabank Mining Conference Toronto December 5-6, 2017 1 Forward Looking Information This presentation contains certain forward-looking information and forward-looking

More information

DETOUR GOLD CORPORATION

DETOUR GOLD CORPORATION DETOUR GOLD CORPORATION YEARS ENDED DECEMBER 31, 2016 AND 2015 MANAGEMENT S DISCUSSION AND ANALYSIS This ( MD&A ) of Detour Gold Corporation ( Detour Gold, we, our or the Company ) provides information

More information

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Spanish Mountain Gold Announces Results of New PEA for the First Zone 1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain

More information

Detour Gold Provides Updated Life of Mine Plan and Reaffirms Commitment to Optimizing Detour Lake Operation

Detour Gold Provides Updated Life of Mine Plan and Reaffirms Commitment to Optimizing Detour Lake Operation NEWS RELEASE Detour Gold Provides Updated Life of Mine Plan and Reaffirms Commitment to Optimizing Detour Lake Operation Detour Lake is a unique asset in a good jurisdiction with a long mine life and a

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER CIBC 2018 Whistler Institutional Investor Conference January 24-27, 2018 Forward Looking Information This presentation contains certain forward-looking information and

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Denver Gold Forum Colorado Springs September 25-27, 2017 1 Forward Looking Information This presentation contains certain forward-looking information and forward-looking

More information

CANADA S INTERMEDIATE GOLD PRODUCER. Laurentian Bank Annual Institutional Investor Conference April 4-6, 2018 Montreal, QC

CANADA S INTERMEDIATE GOLD PRODUCER. Laurentian Bank Annual Institutional Investor Conference April 4-6, 2018 Montreal, QC CANADA S INTERMEDIATE GOLD PRODUCER Laurentian Bank Annual Institutional Investor Conference April 4-6, 2018 Montreal, QC Forward Looking Information This presentation contains certain forward-looking

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER RBC Capital Markets Global Mining & Materials Conference Boston June 13-14, 2017 1 Forward Looking Information This presentation contains certain forward-looking information

More information

CANADA S INTERMEDIATE GOLD PRODUCER. Investor Presentation February 6, 2019 Toronto

CANADA S INTERMEDIATE GOLD PRODUCER. Investor Presentation February 6, 2019 Toronto CANADA S INTERMEDIATE GOLD PRODUCER Investor Presentation February 6, 2019 Toronto Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information and

More information

Q MANAGEMENT S DISCUSSION AND ANALYSIS

Q MANAGEMENT S DISCUSSION AND ANALYSIS Q2 2018 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE QUARTER ENDED JUNE 30, 2018 MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis ( MD&A ) of Detour Gold Corporation ( Detour

More information

CANADA S INTERMEDIATE GOLD PRODUCER. 21 st Annual Canada Mining Conference Bank of America Merrill Lynch Toronto September 10-11, 2015

CANADA S INTERMEDIATE GOLD PRODUCER. 21 st Annual Canada Mining Conference Bank of America Merrill Lynch Toronto September 10-11, 2015 CANADA S INTERMEDIATE GOLD PRODUCER 1 21 st Annual Canada Mining Conference Bank of America Merrill Lynch Toronto September 10-11, 2015 Forward Looking Information This presentation contains certain forward-looking

More information

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained

More information

Kişladağ Expansion Project

Kişladağ Expansion Project Kişladağ Expansion Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private

More information

For further information: Investor Relations (416)

For further information: Investor Relations (416) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO EAGLE COMPLETES UPDATED NI 43-101 TECHNICAL REPORT ON THE MELIADINE GOLD

More information

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia News Release B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia Vancouver, March 12, 2014 B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX:

More information

POSITIONING FOR SUSTAINABLE GROWTH

POSITIONING FOR SUSTAINABLE GROWTH POSITIONING FOR SUSTAINABLE GROWTH Island Gold Mine Expansion Case PEA May 29, 2017 TSX NYSE : RIC RICHMONT MINES FORWARD-LOOKING STATEMENTS Safe Harbor Statement & Cautionary Note to U.S. Investors Concerning

More information

Côté Gold Project Feasibility Study Conference Call

Côté Gold Project Feasibility Study Conference Call Côté Gold Project Feasibility Study Conference Call November 2, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

SECOND QUARTER 2018 RESULTS. August 10, 2018

SECOND QUARTER 2018 RESULTS. August 10, 2018 SECOND QUARTER 2018 RESULTS August 10, 2018 FORWARD LOOKING STATEMENTS Certain statements and information contained in this presentation constitute forward-looking statements within the meaning of applicable

More information

Forward Looking Statement

Forward Looking Statement Certej Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities

More information

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario September 9, 2009 NEWS RELEASE Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased

More information

YEAR END 2015 CONFERENCE CALL

YEAR END 2015 CONFERENCE CALL YEAR END 2015 CONFERENCE CALL February 26, 2015 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking information within

More information

CANADA S INTERMEDIATE GOLD PRODUCER. Raymond James Texas Gold Investor Forum November 16, 2018 Austin

CANADA S INTERMEDIATE GOLD PRODUCER. Raymond James Texas Gold Investor Forum November 16, 2018 Austin CANADA S INTERMEDIATE GOLD PRODUCER Raymond James Texas Gold Investor Forum November 16, 2018 Austin Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking

More information

Saramacca Reserve Declaration

Saramacca Reserve Declaration Saramacca Reserve Declaration September 24, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information

More information

Boto Gold Project Feasibility Study Conference Call

Boto Gold Project Feasibility Study Conference Call Boto Gold Project Feasibility Study Conference Call October 23, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

ANNUAL GENERAL MEETING APRIL 28, 2017

ANNUAL GENERAL MEETING APRIL 28, 2017 ANNUAL GENERAL MEETING APRIL 28, 2017 Forward Looking Statements The information in this presentation has been prepared as at April 28, 2017. Certain statements contained in this presentation constitute

More information

GOODMAN GOLD CHALLENGE GROUP LU

GOODMAN GOLD CHALLENGE GROUP LU GOODMAN GOLD CHALLENGE GROUP LU1 17-02-25 0 GROUP LU1 17-02-25 1 Company Overview 17-02-25 2 Canadian Intermediate gold producer Long life large scale open pit operations One of the largest gold producing

More information

Marigold Life of Mine Plan

Marigold Life of Mine Plan Marigold Life of Mine Plan October 7, 2014 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking statements within the meaning

More information

Skouries Update March 2018

Skouries Update March 2018 Skouries Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

Kişladağ Update March 2018

Kişladağ Update March 2018 Kişladağ Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

Alio Gold Reports Second Quarter 2018 Results

Alio Gold Reports Second Quarter 2018 Results Alio Gold Reports Second Quarter 2018 Results VANCOUVER, British Columbia, g. 10, 2018 -- Alio Gold Inc. (TSX, NYSE AMERICAN: ALO) ( Alio Gold or the Company ) today reported its second quarter 2018 financial

More information

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION News Release TSX: LMC March 14, 2019 LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION (All amounts in US dollars, unless otherwise indicated) 2018 Highlights

More information

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland TORONTO, ON October 30, 2018 - Marathon Gold Corporation

More information

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation

More information

HBM. Creating Sustainable Value through High Quality Long Life Deposits

HBM. Creating Sustainable Value through High Quality Long Life Deposits HBM Creating Sustainable Value through High Quality Long Life Deposits Q1 2012 Conference Call, May 10, 2012 Forward Looking Information This presentation contains contains forward-looking statements and

More information

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK September 15, 2016 News Release 16 22 SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK VANCOUVER, B.C. -- Silver Standard Resources Inc. (NASDAQ: SSRI) (TSX: SSO) ( Silver Standard ) is pleased to report

More information

CANADA S INTERMEDIATE GOLD PRODUCER. Bank of America Merrill Lynch Canada Mining Fireside Chat Event Toronto September 8, 2016

CANADA S INTERMEDIATE GOLD PRODUCER. Bank of America Merrill Lynch Canada Mining Fireside Chat Event Toronto September 8, 2016 CANADA S INTERMEDIATE GOLD PRODUCER 1 Bank of America Merrill Lynch Canada Mining Fireside Chat Event Toronto September 8, 2016 Forward Looking Information This presentation contains certain forward-looking

More information

TSX:AR CORPORATE PRESENTATION

TSX:AR CORPORATE PRESENTATION TSX:AR CORPORATE PRESENTATION Second Quarter 2018 Conference Call August 10, 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information

More information

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 89521 USA NEWS RELEASE Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns October

More information

FOURTH QUARTER 2017 RESULTS. February 21, 2018

FOURTH QUARTER 2017 RESULTS. February 21, 2018 FOURTH QUARTER 2017 RESULTS February 21, 2018 FORWARD LOOKING STATEMENTS Certain statements contained herein may constitute forward-looking statements (or forward looking information ) and are made pursuant

More information

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results PRESS RELEASE Banro Announces Record Q1 2015 Production and Revenue Results Toronto, Canada May 13, 2015 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX - "BAA") today announced its

More information

Pretivm Reports Third Quarter 2018 Results

Pretivm Reports Third Quarter 2018 Results November 8, News Release 18-18 Pretivm Reports Third Quarter Results Brucejack Mine delivers profitability; significant cash build Vancouver, British Columbia, November 8, ; Pretium Resources Inc. (TSX/NYSE:PVG)

More information

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project DENVER, COLORADO. SEPTEMBER 24, 2018: ROYAL GOLD, INC. (NASDAQ:RGLD) (together with its subsidiaries, Royal Gold or the Company

More information

YEAR END 2016 CONFERENCE CALL. February 24, 2017

YEAR END 2016 CONFERENCE CALL. February 24, 2017 YEAR END 2016 CONFERENCE CALL February 24, 2017 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking information within the meaning of Canadian

More information

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO-EAGLE FILES NEW TECHNICAL REPORT ON GOLDEX

More information

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland TORONTO, ON May 17, 2018 - Marathon Gold Corporation ( Marathon or the Company ) (TSX: MOZ) is pleased to announce the

More information

SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS

SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS NEWS RELEASE All dollar amounts are stated in Canadian dollars, unless otherwise indicated SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS Toronto, Canada May 12, 2015 St Andrew Goldfields Ltd. (T-SAS),

More information

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017 GROWTH THROUGH CASH FLOW 2017 Results 3 August 2017 2 DISCLOSURES Forward Looking Statements: There are risks associated with an investment in the shares of Centamin. Recipients of this presentation should

More information

Q OPERATING & FINANCIAL RESULTS. Conference Call & Webcast Presentation

Q OPERATING & FINANCIAL RESULTS. Conference Call & Webcast Presentation Q1 2017 OPERATING & FINANCIAL RESULTS Conference Call & Webcast Presentation FORWARD LOOKING INFORMATION This presentation has been prepared by Asanko Gold Inc. (the Company ) solely for informational

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 27, 2019 N E W S R E L E A S E Avino

More information

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars) Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts

More information

Exploration Projects September 30, 2014

Exploration Projects September 30, 2014 Exploration Projects September 30, 2014 Agnico Eagle Forward-Looking Statements The information in this presentation has been prepared as at September 30, 2014. Certain statements contained in this document

More information

Gold production for the quarter of 38,500 ounces with cash flow generation from operations of $18.9 million ( M ).

Gold production for the quarter of 38,500 ounces with cash flow generation from operations of $18.9 million ( M ). Guyana Goldfields Inc. Reports First Quarter 2018 Results; Sold 38,000 oz Au Generating US$18.9M in Operating Cash Flow and Net Earnings of US$0.05 Per Share Toronto, Ontario (April 30, 2018) Guyana Goldfields

More information

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN OSISKO UPDATES CANADIAN MALARTIC MINE PLAN Average Annual Gold Production of 610,000 ounces at US$516 per ounce (2014 2018) Average Annual Gold Production of 597,000 ounces at US$525 per ounce Life of

More information

Eldorado Gold Reports Results of Technical Studies

Eldorado Gold Reports Results of Technical Studies NEWS RELEASE TSX: ELD NYSE: EGO March 21, 2018 Eldorado Gold Reports Results of Technical Studies VANCOUVER, BC Eldorado Gold Corporation, ( Eldorado or the Company ) today announces the release of three

More information

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012 THE ELEMENTS OF VALUE CREATION Revised Prefeasibility Study Results Dumont Nickel Project May 14, 2012 Disclaimer Cautionary Statements Concerning Forward Looking Statements This presentation contains

More information

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866) FOR IMMEDIATE RELEASE ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) 368-9932 or 1 (866) 788-8801 (All amounts are expressed in United States dollars, unless

More information

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Q4 and Year End 2012 Conference Call. ArgonautGold.com Q4 and Year End 2012 Conference Call Forward Looking Statement FORWARD LOOKING INFORMATION ALL MONETARY AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED This document contains certain forward-looking statements

More information

A Canadian Focused Gold Producer

A Canadian Focused Gold Producer A Canadian Focused Gold Producer CORPORATE PRESENTATION Denver Gold Forum September 2018 1 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED CAUTIONARY NOTE REGARDING FORWARD-LOOKING

More information

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs EDV EVR Toronto Stock Exchange For additional information, contact: Doug Reddy SVP Business Development +1 604 609 6114 dreddy@endeavourmining.com Endeavour Mining Corporation Corporate Office Suite 3123,

More information

FOCUSED ON OPERATIONAL DELIVERY

FOCUSED ON OPERATIONAL DELIVERY FOCUSED ON OPERATIONAL DELIVERY Investor Presentation August 2018 FORWARD LOOKING STATEMENTS This document has been prepared by Asanko Gold Inc. (the Company ) solely forinformational purposes. This presentation

More information

2018 SECOND QUARTER RESULTS WEBCAST. July 26, 2018

2018 SECOND QUARTER RESULTS WEBCAST. July 26, 2018 2018 SECOND QUARTER RESULTS WEBCAST July 26, 2018 1 Speakers Ray Threlkeld President and CEO Cory Atiyeh EVP Operations Paula Myson EVP and CFO 2 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS

More information

Orezone Announces Positive Preliminary Economic Assessment

Orezone Announces Positive Preliminary Economic Assessment Orezone Announces Positive Preliminary Economic Assessment January 22, 2014 - Orezone Gold Corporation (ORE:TSX) is pleased to announce the results of an independent Preliminary Economic Assessment (the

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com N E W S R E L E A S E November 7, AVINO REPORTS

More information

Mining High Grade Gold in Burkina Faso

Mining High Grade Gold in Burkina Faso Mining High Grade Gold in Burkina Faso 2017 Third Quarter Financial Results November 16, 2017 1 Cautionary Statement This presentation contains forward-looking information. Forward looking information

More information

ASANKO GOLD REPORTS Q RESULTS

ASANKO GOLD REPORTS Q RESULTS PRESS RELEASE ASANKO GOLD REPORTS Q3 2018 RESULTS Vancouver, British Columbia, November 8, 2018 Asanko Gold Inc. ( Asanko or the Company ) (TSX, NYSE American: AKG) reports its third quarter ( Q3 ) 2018

More information

November 10, 2017 News Release Pretivm Reports Third Quarter Results

November 10, 2017 News Release Pretivm Reports Third Quarter Results November 10, 2017 News Release 17-20 Pretivm Reports Third Quarter Results Vancouver, British Columbia November 10, 2017; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or the Company ) is pleased to

More information

KINROSS GOLD CORPORATION

KINROSS GOLD CORPORATION April 1 2014 KINROSS GOLD CORPORATION Results of the Tasiast feasibility study 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained

More information

Centerra Gold Inc. Management s Discussion and Analysis For the fiscal year ended December 31, 2007

Centerra Gold Inc. Management s Discussion and Analysis For the fiscal year ended December 31, 2007 Centerra Gold Inc. Management s Discussion and Analysis For the fiscal year ended December 31, 2007 CENTERRA S BUSINESS...1 GOLD INDUSTRY AND KEY ECONOMIC TRENDS...2 GROWTH AND STRATEGY...3 SELECTED ANNUAL

More information

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars)

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars) Suite 900-999 West Hastings Street Vancouver, BC, V6C 2W2, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com March 26, 2014 Capstone Extends Pinto Valley Mine Life to 2026 (all amounts

More information

CANADA S NEXT INTERMEDIATE GOLD PRODUCER

CANADA S NEXT INTERMEDIATE GOLD PRODUCER CANADA S NEXT INTERMEDIATE GOLD PRODUCER 1 Forward Looking Information This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as forward-looking

More information

BMO CAPITAL MARKETS 27 TH GLOBAL METALS AND MINING CONFERENCE

BMO CAPITAL MARKETS 27 TH GLOBAL METALS AND MINING CONFERENCE T S X K D X N Y S E A M E R I C A N K L D X BMO CAPITAL MARKETS 27 TH GLOBAL METALS AND MINING CONFERENCE PAUL HUET, PRESIDENT AND CEO F E B R U A R Y 2 8, 2 0 1 8 T S X K D X N Y S E A m e r i c a n :

More information

May 31, 2017 News Release SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT

May 31, 2017 News Release SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT May 31, 2017 News Release 17 18 SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT VANCOUVER, B.C. -- Silver Standard Resources Inc. (NASDAQ: SSRI)

More information

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 10, 2018 Capstone Mining 2017 Production Results and 2018 Operating

More information

PRESS RELEASE TSX NYSE: RIC

PRESS RELEASE TSX NYSE: RIC PRESS RELEASE TSX NYSE: RIC Richmont Mines Reports Strong Results from the Island Gold Mine Expansion Case Preliminary Economic Assessment Positive First Step in a Multi-Phased Transformation of the Island

More information

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts Hudbay Announces 206 Production Guidance and Capital and Exploration Expenditure Forecasts Summary (all amounts are in US dollars, unless otherwise noted) 205 production of all key metals was within guidance

More information

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING For Immediate Release TSX:ORV Date: July 4, 2017 #07-2017 ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING TORONTO, ONTARIO, July 4, 2017 - Orvana Minerals Corp.

More information

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES $2.2 Billion After-Tax NPV@8 and IRR of 20. 3.6 Year Payback at $3.00/lb. Copper and 36 Year Mine Life 45 Million lbs. Average

More information

January 11, 2017 News Release SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE

January 11, 2017 News Release SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE January 11, 2017 News Release 17 01 SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE VANCOUVER, B.C. -- Silver Standard Resources Inc. (NASDAQ: SSRI) (TSX: SSO) ( Silver

More information