1 Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF THE No: TN SECON NATURAL RESOURCES MANAGEMENT PROJECT LOAN 7921 TN AN GRANT FROM THE GLOBAL ENVIRONMENTAL FACILITY TRUST FUN TF June 17, 2010 TO THE REPUBLIC OF TUNISIA January 2, 2013 This document has a restricted distribution and may be used by Borrowers only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY EQUIVALENTS (Exchange Rate Effective September 30, 2012) Currency Unit = Tunisian inar (TN) 1 TN = US$0.64 US$1.00 = 1.57 TN FISCAL YEAR January 1 ecember 31 ABBREVIATIONS AN ACRONYMS AC Annual Contract / Contrat programme (CP) AG Agricultural evelopment Groups / Groupement de éveloppement Agricole (GA) CCU Central Coordination Unit / Unité Centrale de Coordination (UCC) EQL irectorate of Environment and Quality of Life / irection Générale de l Environnement et de Qualité de la Vie (GEQV) FIPO irectorate of Finance, Investments, and Professional Organizations / irection générale du Financement, des Investissements et des Organismes Professionnels (GFIOP) ECI Extended evelopment Committee of the Imada / Comité de éveloppement Elargi de l Imada (CEI) GEF Global Environment Facility / Fonds pour l Environnement Mondial (FEM) GEO Global Environmental Objective GoT Government of Tunisia IBR International Bank for Reconstruction and evelopment IGA Income Generating Activities / Activités génératrices de revenu (AGR) Imada Administrative Sector IPA Integrated Participatory Approach / Approche Participative Intégrée (API) LC Local evelopment Council / Conseil Local de éveloppement (CL) M&E Monitoring & Evaluation / Suivi-évaluation (SE) NRMP2 Second Natural Resource Management Project / euxième Projet de Gestion des Ressources Naturelles (PGRN2) NSU National Sanitation Utility/Office National de l Assainissement (ONAS) PA Project Appraisal ocument PO Project evelopment Objective / Objectif de éveloppement du Projet (OP) PP Participatory evelopment Plans / Plans de éveloppement Participatifs POPM Project Operational Procedures Manual / Manuel des Procédures Opérationnelles du Projet (MPOP) RC Regional Council/ Conseil Régional (CR) RCA Regional Commissariat for Agricultural evelopment/ Commissariat Régional de éveloppement Agricole (CRA) RC Regional evelopment Council / Conseil Régional de éveloppement Vice President: Country irector: Sector irector Sector Manager: Task Team Leader: Inger Andersen Neil Simon M. Gray Junaid Kamal Ahmad Lia Sieghart (acting) Garry Charlier i

3 REPUBLIC OF TUNISIA SECON NATURAL RESOURCES MANAGEMENT PROJECT (NRMP2) CONTENTS Restructuring Paper ata Sheet iii Restructuring Paper 1 A. Summary 1 B. Project Status 2 C. Proposed Changes 3. Appraisal Summary 7 Annex 1: Revised Results Framework 8 Annex 2: Costs and isbursement Projections by Components 13 ii

4 REPUBLIC OF TUNISIA SECON NATURAL RESOURCES MANAGEMENT PROJECT (NRMP2) Restructuring: Level 1 1. Basic Information Project I & Name Country Team Leader Country irector Sector irector Sector Manager Original Board Approval ate Original Closing ate Current Closing ate Proposed Closing ate EA Category Revised EA Category EA Completion ate Revised EA Completion ate ATA SHEET Second Natural Resources Management Project (NRMP2), P and P Republic of Tunisia Garry Charlier Neil Simon M. Gray Junaid Kamal Ahmad Lia Sieghart (acting) 06/17/ /31/ /31/2015 N/A B-Partial Assessment N/A 12/07/2009 N/A 2. Revised Financing Plan (US$ Million) Source Original Revised Borrower Community IBR GEF Total Project Cost Borrower Organization epartment Location Republic of Tunisia - Tunis - Tunisia 4. Implementing Agency Organization epartment Location Ministry of Investment and International - Tunis - Tunisia Cooperation (MICI) Ministry of Agriculture (MA), former Ministry of Agriculture, Water Resources, and Fisheries (MAWRF) irectorate of Finance, Investments, and Professional Organizations (FIPO) and Regional Commissariats for Agriculture Tunis - Tunisia iii

5 Ministry of Environment (ME), former Ministry of Environment and Sustainable evelopment (ME) 5. isbursement Estimates (US$ Million) evelopment (RCAs) irectorate of Environment and Quality of Life (EQL) Tunis - Tunisia Actual amount disbursed as of 12/10/2012: US$ 2.02 million from the IBR Loan, and US$ 0.93 million from the GEF Grant 5.1 isbursement Estimates - IBR Loan Fiscal Year Annual Cumulative Total isbursement Estimates - GEF Grant Fiscal Year Annual Cumulative Total Policy Exceptions and Safeguard Policies oes the restructured project require any exceptions to the Bank policies? oes the restructured project trigger any new safeguard policies? If yes, please select from the checklist below and update ISS accordingly before submitting the package 7a. Original Project evelopment Objectives/Outcomes The Project evelopment Objective is to improve living conditions for rural communities in the Project Area inter alia by fostering increased access to basic infrastructure and services, sustainable increase of income, improved natural resource management practices and promotion of an integrated approach to community-based development among various stakeholders. The Global Environmental Objective is to reduce the threat of land degradation and climate change to vulnerable agricultural production systems in the target areas while developing options to address land-based pollution affecting the Mediterranean Sea. 7b. Revised Project evelopment Objectives/Outcomes The revised Project evelopment Objective and Global Environmental Objective is to improve access to basic infrastructure and production means, and to improve management of natural resources, using a participatory approach in the project area. N N iv

6

7 REPUBLIC OF TUNISIA SECON NATURAL RESOURCES MANAGEMENT PROJECT (NRMP2) A. SUMMARY RESTRUCTURING PAPER 1. This restructuring paper proposes to restructure the Tunisia Second Natural Resource Management Project (NRMP2) through changes to : (i) the Project evelopment Objective (PO) and the Global Environmental Objective (GEO); (ii) the Results Framework and Monitoring; (iii) the project components, including cancellation of Component 2 and modifications of the project activities; (iv) the project implementation arrangements; and (v) the project financing (costs, financing plan, and reallocation of proceeds). This would be a level 1 restructuring, as it involves changes in the PO. 2. The NRMP2 (US$ million) is a fully blended operation financed in part by the IBR Loan No TN in the amount of US$36.10 million and the GEF Grant No. TF in the amount of US$9.73 million. The project was approved by the Board of Executive irectors on June 17, 2010, declared effective on February 19, 2011, and its implementation was launched in late May The mid-term review is planned for the second semester of 2013 and the Closing ate is ecember 31, The project consists of the following components: (1) Financing for Execution of Investments Selected under the Participatory evelopment Plans (PP) Framework; (2) evelopment and Promotion of Use of Treated Wastewater in Agriculture; and (3) Institutional Strengthening and Sensitization to Environmental Issues and Integrated Participatory Approach (IPA) Methodology. The Ministry of Agriculture is responsible for the project coordination through the Project Central Coordination Unit (CCU) of the irectorate of Finance, Investments, and Professional Organizations (FIPO), as well as the implementation of project activities at the level of the three targeted governorates (Jendouba, Kasserine, and Médenine) through its Regional Commissariats for Agricultural evelopment (RCAs). The Ministry of the Environment through the General irectorate of the Environment and the Quality of Life (EQL) is responsible for the implementation of various activities linked to environmental aspects. 4. Since the launch of its implementation in the aftermath of the January 2011 Tunisian Revolution, the NRMP2 has been experiencing severe and persistent startup delays, with very limited progress and results achieved on the ground to this date. The proposed restructuring stems from the agreement reached between the Tunisian authorities and the World Bank on the need to simplify the project design, approach, methodology, and operational procedures in order to facilitate and to accelerate the pace of its implementation with the aim of achieving in a timely fashion meaningful results on the ground to benefit the poor population of the lagging regions targeted by the project. All elements of the restructuring have been discussed in detail during the restructuring mission (August 31 to September 12, 2012) and presented in the correspondent Aide-Memoire. The Government of Tunisia (GoT) has requested this restructuring in its letter dated November 22, This will be the first restructuring of the NRMP2. 1

8 PROJECT STATUS 5. More than a year and a half after effectiveness, the implementation of the NRMP2 remains at a very incipient stage. Implementation progress and results are very limited and well below the expected targets. A critical mass of project staff at the regional level (field and outreach workers in particular) has only been appointed recently (September 2012). As a result, progress is limited, as reflected by the monitoring indicators, and the actual commitments and disbursements to this date can be illustrated as follows: (i) the number of PP prepared and validated stands at 13 and three respectively (instead of a cumulative total of 56 planned for the first two years of the project); (ii) the number of signed annual contracts (ACs) to implement the corresponding PP is limited at three (instead of 56 for the same period); (iii) the actual levels of cumulative commitments and disbursements under the project remain low at about US$2,110,000 and US$930,000 respectively (the initial estimates of cumulative disbursements for the period was US$14.9 million: US$10.26 million for the loan and US$4.64 million for the GEF grant). Moreover, achievement of meaningful results on the ground is lacking. To date, no construction works associated with PP investments are underway in the targeted regions; no farmer has benefited from agricultural advice and vulgarization, which could limit the impact of the project on improving agricultural production and access to basic infrastructure in the medium term. Income generating activities (IGA) have yet to be initiated. 6. Key factors that contributed to the excessive startup delays and to the poor implementation performance of the project include: (i) the disturbances and, at times, security concerns associated with the ongoing socio-political transition following the early-2011 Tunisian Revolution; (ii) the weakening or dissolution of several local and regional organizations (AGs, RCs, and LCs) representing key institutional actors or stakeholders involved in the project; (iii) the new challenges of involving the local population in the participatory process, stemming from security concerns in the field for the local staff of the Ministry of Agriculture combined with their lack of experience in dealing with social tensions and conflicts; (iv) the frequent turnover of staff of the RCAs and other partner institutions at the local or regional levels; (v) the inadequate staffing of the project units and excessive delays in the appointment or recruitment of personnel dedicated to project implementation at the regional level; (vi) the relative complexity of the project design and the need for adjustments to the post-revolution environment; and (vii) the weaknesses in the overall administration of the project and insufficient capacities and mastering of project operational procedures, notably in procurement. 7. Currently progress towards achievement of the development objective (O) and the overall implementation progress (IP) are both rated unsatisfactory. Yet in spite of its implementation shortcomings, the NRMP2 remains very relevant in the current sociopolitical context, and the project continues to represent an important instrument for the GoT to respond to the needs and demands of the rural population in lagging regions targeted by the project. In the context of the post-revolution Tunisia, there has been an increase in social demands for prompt remedial actions to increase voice and participation, to improve rural livelihoods, and to generate new opportunities for income generation. The Integrated Participatory Approach (IPA) for rural development promoted by the NRMP2 thus remains of particular relevance in the present context. Both the Client and the World Bank are addressing the above-mentioned challenges to improve the project implementation performances. 2

9 8. The Borrower is in compliance with the Loan and Grant covenants. There are no overdue audits reports. The Borrower has prepared an updated action plan (as reflected in the Cost and isbursement Projections Table summarized in Annex 2) together with a revised procurement plan. It should also be highlighted that in addition to these changes described below, other changes and simplifications introduced also in the operational procedures of the project are recorded at the level of the Project Operational Procedures Manual (POPM). B. PROPOSE CHANGES 9. Project evelopment Objective: The proposed changes entail the reformulation of the PO and GEO to ensure that it is more realistic and better in line with the modifications proposed in the project description, activities, and expected results. This will also provide an opportunity to correct the slight discrepancy noted between the original PO as stated in the Project Appraisal ocument (PA) and in the legal agreements (See Table 1 below). The proposed changes, which require also a modification and adaptation of the project indicators and target values listed in the result framework, will have to be reflected as well in amendments to the corresponding Loan and Grant agreements (Schedule 1, Project description). Table 1: Project evelopment Objective (PO) and Global Environmental Objective (GEO) Initial PO per PA Initial PO per Loan and Grant Agreements Revised PO/GEO per Restructuring Paper and Legal The PO is to improve the living conditions of rural communities in three governorates in terms of access to basic infrastructure and services, sustainable increase in income, and improved natural resource management practices by fostering an integrated approach to community-based development. Initial GEO per PA The GEO is to reduce the threat of land degradation and climate change to vulnerable agricultural production systems in the target areas while developing options to address land-based pollution affecting the Mediterranean Sea. The PO is to improve living conditions for rural communities in the Project Area inter alia by fostering increased access to basic infrastructure and services, sustainable increase of income, improved natural resource management practices and promotion of an integrated approach to community-based development among various stakeholders. Initial GEO per Legal Agreement Not referred to in the GEF Grant agreement Agreements The PO is to improve access to basic infrastructure and production means, and to improve management of natural resources, using a participatory approach in the project area. 10. Results/ Indicators: The proposed changes include: a) In general - (i) the removal and addition of indicators to ensure they are fully aligned and consistent with the revised PO while reducing where warranted the number of indicators to simplify project monitoring; (ii) the reformulation of certain indicators to clarify their definition, and to take into account the proposed changes in the institutional arrangements; and (iii) the inclusion of core indicators. 3

10 b) At the level of Component 2 (evelopment and Promotion of Use of Treated Wastewater in Agriculture) As an adjustment to the proposed cancellation of all treated wastewater use activities under this Component, the two related indicators have been removed. c) Target values These values corresponding to the revised indicators have been set or adjusted as to reflect the current implementation status, and the revised projections for the remaining duration of the project. The revised arrangements for results monitoring, indicators, and target values are presented in Annex Components: The main change proposed in the project components is the cancellation of the initial Component 2 (evelopment and Promotion of Use of Treated Wastewater in Agriculture), following a change in the Government s priorities in this area and the challenges (technical, environmental, and institutional) encountered in targeted pilot sites that are no longer compatible with the remaining implementation period of the project. This change will also allow a better focus of implementation efforts on the core activities of the project while simplifying the institutional arrangements for implementation by reducing the number of entities involved in project execution. This cancellation implies: (i) a modification of the project description in accordance with the cancellation of Component 2, the renumbering of Component 3 to now Component 2, and the corresponding amendment to the Loan and Grant agreements (Schedule 1, Project description); and (ii) the reallocation of corresponding proceeds of the GEF grant to Component 1 to increase support for eligible environmental activities prioritized by the beneficiary population, and to enhance environmental knowledge management, communication, and training activities under Component Institutional Arrangements: While no change is proposed for the implementing entities, some stakeholders are no longer involved in the institutional arrangements. The Loan and Grant agreements will be amended to specify the existing role of the RCAs as implementing entities responsible for project implementation at the local level, and to ensure that they are adequately staffed for this purpose. 13. Furthermore, the following changes are also proposed with reference to some stakeholders involved in the institutional arrangements, and they will be reflected in the revised POPM. a) At the national level With the elimination of Component 2 (evelopment and Promotion of Use of Treated Wastewater in Agriculture): (i) the National Sanitation Utility (NSU) initially responsible to carry out treated wastewater use activities no longer plays a role in the implementation of the NRMP2 due to the annulment of the related study; and (ii) the Ministry of Environment through the irectorate of Environment and Quality of Life (EQL) will now only be responsible for the implementation of activities under what is to become sub-component 2.3 (Environmental Knowledge Management). b) At the regional level and local level With the Regional evelopment Council (RC) and Local evelopment Council (LC) no longer in existence since the Revolution, the validation and/or signing of the PP and AC with these entities is no longer feasible. Instead, the RCAs shall validate the ACs and PPs with the legally constituted beneficiaries Agricultural evelopment Groups (AG) where feasible or with informal community organizations such as the Extended evelopment Committee of the Imada (ECI) to be established by the project. 4

11 14. Financing: The proposed changes include: a) Project Costs The project costs will be reduced by US$4.58 million as a result of the corresponding reduction in the Government s contributions due to the proposed increase to 100 percent of the percentage of expenditures to be financed (exclusive of tax) for all categories of expenditures under the loan and the grant. This is in response to the Government s request to the World Bank to increase the financing percentage of projects supported by the World Bank in Tunisia in order to reduce the pressure on the national budget in the post-revolution context. Accordingly, the percentage of financing under the only category of the loan not financed at 100 percent (category (1) for works) will increase from 70 percent to 100 percent exclusive of taxes. The table in Section IV.A.2 of Schedule 2 (Project Execution) to the Loan Agreement will be amended accordingly. Furthermore, the cost of Component 2 (evelopment and Promotion of Use of Treated Wastewater in Agriculture) proposed for cancellation will be redistributed among the remaining components (see Table 2 below for details). The original amount of the loan and of the GEF grant would remain unchanged. Table 2: Project Costs (US$ million) Components Current Revised 1. Financing for Execution of Investments Selected under the PP Framework evelopment and Promotion of Use of Treated Wastewater in Agriculture Institutional Strengthening and Sensitization to Environmental Issues and IPA Methodology Total baseline cost Physical Contingencies Price Contingencies Total Project Costs Interest during construction 0 0 Front-end Fee Total Financing Required b) Financing Plan The effects of the increase in the percentage of financing under the loan and the corresponding reduction of the Government contribution to the project financing is summarized in the revised financing plan in Table 3 below. 5

12 Table 3: Financing Plan (US$ million) Project Components Current Revised Borr. Comm. GEF IBR Total Borr. Comm. GEF IBR Total 1. Financing for Execution of Investments Selected under the PP Framework 2. evelopment and Promotion of Use of Treated Wastewater in Agriculture 3. Institutional Strengthening and Sensitization to Environmental Issues and IPA Methodology Front-End Fee Total c) Reallocations Proceeds of Loan no TN and of GEF Grant no. TF will be reallocated according to Tables 4 and 5. Table 4: Reallocation of IBR Loan Proceeds Category of Expenditure Allocation % of financing (in US$) (exclusive of Taxes) Current Revised Current Revised Current Revised (1) Works under part (1) Works under part 15,000,000 17,500,000 70% 100% A and B of the Project A of the Project (2) Goods, Consultants Services and training (2) Goods, Consultants Services and training 17,500,000 14,600, % 100% (3) Front-end Fee (3) Front-end Fee 90,250 90,250 Amount payable according to Section 2.03 of the current Agreement in conformity with Section 2.07 (b) of the General Conditions (4) Unallocated (4) Unallocated 3,509,750 3,909,750 TOTAL 36,100,000 36,100,000 6 Amount payable according to Section 2.03 of the current Agreement in conformity with Section 2.07 (b) of the General Conditions Table 5: Reallocation of GEF Proceeds (in US$) Category of Expenditure Allocation % of financing (in US$) (exclusive of Taxes) Initial Revised Initial Revised Initial Revised (1) Works under part (1) Works under part 3,800,000 4,500, % 100% A and B of the Project A of the Project (2) Goods, (2) Goods, 5,000,000 4,100, % 100% Consultants Services and training Consultants Services and training (3) Unallocated 930,000 1,130,000 TOTAL 9,730,000 9,730,000

13 15. Procurement: The proposed change entails the introduction of a new procurement method named Community Participation. Procedures will be described in the POPM, satisfactory to the Bank. This method will be used for procurement of goods and works to allow more operational flexibility as well as the greater participation of targeted populations in the implementation of community investments prioritized in the PP. C. APPRAISAL SUMMARY 16. Risks: espite the simplifications introduced by the restructuring, project implementation risks remain high due to the relative instability associated with the ongoing political transition in Tunisia. More specifically, risks that could further jeopardize project implementation include: (i) a persistent general lack of adequate know-how in the application of procurement procedures; (ii) a persistence to apply national procedures even when the World Bank procedures prevail; (iii) problems of information flow between the regional and central levels; and (iv) the insufficient and inadequate staffing of the project. Moreover, the current transition context results in uncertainty at the institutional, administrative, operational, and security levels that can in principle adversely impact project implementation and associated efforts in the institutionalization of the Integrated Participatory Approach (IPA) beyond the duration of the project. Mitigation measures identified for the project implementation risks mentioned above include: (i) the additional training provided by the World Bank on fiduciary aspects; (ii) the increased support and closer monitoring of the project unit at the central level to the local units, and for which adequate funding has been budgeted; and (iii) the allocation of adequate budget to access external expertise through consultants to support the project units. 7

14 ANNEX 1: Results Framework and Monitoring TUNISIA: Second Natural Resources Management Project (NRMP2) Project evelopment Objective: The Project evelopment Objective is to improve living conditions for rural communities in the Project Area inter alia by fostering increased access to basic infrastructure and services, sustainable increase of income, improved natural resource management practices and promotion of an integrated approach to community-based development among various stakeholders. The Global Environmental Objective is to reduce the threat of land degradation and climate change to vulnerable agricultural production systems in the target areas while developing options to address land-based pollution affecting the Mediterranean Sea. Revised Project evelopment Objective: The revised Project evelopment Objective and Global Environmental Objective is to improve access to basic infrastructure and production means, and to improve management of natural resources, using a participatory approach in the project area. PO Level Indicators Core = ropped C= Continue N= New R= Revised Unit of Measure Baseline Sept 2012 Cumulative Target Values ec 2012 ec 2013 ec 2014 ec 2015 Responsibility ata Source/ Frequency for ata Methodology Collection efinition Beneficiaries having improved access to basic infrastructures R Number ,800 13,000 21,000 Annual Project Sheet These infrastructures include : - Rural roads ; and - rinking water supply systems. RCAs Results will be collected (M&E Units) on a disaggregated basis, but presented cumulatively. If possible, disaggregation by gender will be included. 8

15 Beneficiaries having access to improved production means N Number ,000 10,300 17,500 Area of land protected N Hectares 0 0 1,500 8,200 23,100 34,300 irect project beneficiaries (number), of which female (percentage) % of targeted rural Imadas targeted with improved access to basic infrastructure and services. % of IGAs introduced generating positive income flow for the N Number Percent ,000 60, ,000 20% 20% 20% Annual Annual Annual Project Sheet Contracts ACs These activities include : - IGAs ; - Agricultural extension services; - Arboriculture production ; - Animal production ; and RCAs - Creation and (M&E Units) rehabilitation of irrigated perimeters. Results will be collected on a disaggregated basis, but presented cumulatively. If possible, disaggregation by gender will be included. Conservation activities include : - Soil and water RCAs conservation works ; (M&E Units) - Land consolidation; and - Rangeland and forestry management RCAs (M&E Units) 9

16 beneficiaries. % of rural Imadas which have a PP validated by the Regional Council implemented through ACs. % of ACs that include investments in sustainable land management measures, including climate change adaptation measures. Indicators Core = ropped C= Continue N= New R= Revised Unit of Measure Baseline Sept 2012 INTERMEIATE RESULTS ec 2012 ec 2013 ec 2014 ec 2015 Component 1 : Financing for Execution of Investments Selected under the PP Framework Signed ACs R Number Area provided with new and improved irrigation Rural roads built or rehabilitated Collective water points created or rehabilitated Number of ACs implemented % of total ACs requested by R Hectares N Kilometers N Number Responsibility ata Source/ Frequency for ata Methodology Collection Biannual Biannual Biannual Biannual Minutes Contract Contract Contract efinition Number of signed ACs RCAs (M&E and Action Contracts Units) with a signed PV by the AG and the RCA. RCAs (M&E Units) RCAs (M&E Units) Number of water points RCAs (M&E plus number of water Units) tanks created. 10

17 communities implemented under the Project Water storage capacity improved (m3) Irrigation efficiency improved (ha) No. farmers contracting with advisory services. Vulnerable beneficiaries organized into interest groups and manage: - Agricultural IGAs; and - Non-agricultural IGAs : IGAs which are managed by women and young graduates Number of small employment contracts (tâcherons) generated by project activities. % of all IGAs that include climate change adaptation techniques Increased area protected from erosion (ha) Reduction in soil loss in areas protected from erosion (% decrease in tons/ha) Component 2: evelopment and Promotion of Use of Treated Wastewater in Agriculture Wastewater reuse options and specifications 11

18 identified for investments and implementation. Increase in treated wastewater reuse in agriculture in Kasserine and Medenine Component 3: [to become Component 2 following the restructuring]: Institutional Strengthening and Sensitization to Environmental Issues and IPA Methodology Operational ECI N Number Implementation rate of ACs N Percentage 0 6% 50% 70% 80% 90% Persons trained N Number % of 72 targeted Imadas with operational AGs (technical director, action plan implemented, adequate working equipment). ata/indicators regularly updated into national M&E system. Safeguards have been implemented in line with the FESP Performance reports and periodic reports on project activities and indicators produced and disseminated on time. 12 Biannual Biannual Biannual ACs Contracts List of Participants UCC (M&E Unit) RCAs (M&E Units) UCC (M&E Unit) RCAs (M&E Units) Number of ECI which have a working plan and are applying it Percentage of engagements at the level of the ACs Values will be collected on a disaggregated by staff from ECI, UCC, RCAs, EQL, but presented cumulatively

19 ANNEX 2 Revised Costs and isbursements Projections by Components Source: Revised COSTAB of the project 13

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

Loan Agreement. (Natural Resources Management Project) between REPUBLIC OF TUNISIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Natural Resources Management Project) between REPUBLIC OF TUNISIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4162 TUN Loan Agreement Public Disclosure Authorized (Natural Resources Management Project) between REPUBLIC OF TUNISIA and INTERNATIONAL BANK FOR

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Loan Agreement. (Water Sector Investment Project) between REPUBLIC OF TUNISIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Water Sector Investment Project) between REPUBLIC OF TUNISIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7025-TUN Public Disclosure Authorized Loan Agreement (Water Sector Investment Project) between REPUBLIC OF TUNISIA and Public Disclosure Authorized

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Evaluation Study. Midterm Review Process. Operations Evaluation Department

Evaluation Study. Midterm Review Process. Operations Evaluation Department Evaluation Study Reference Number: SES:REG 2008-78 Special Evaluation Study Update December 2008 Midterm Review Process Operations Evaluation Department ABBREVIATIONS ADB Asian Development Bank BTOR back-to-office

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679)

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Operation

More information

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 12-Apr-2016 ISR23062 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 15 ARCHIVED on 26-May-2017 ISR27925 Implementing Agencies:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase GCF/B.10/05 21 June 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Provisional Agenda item

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 46396-TN Public Disclosure Authorized Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN

More information

Key Dates. Global Development Objectives. Components. Overall Ratings

Key Dates. Global Development Objectives. Components. Overall Ratings Public Disclosure Authorized AFRICA Cameroon Environment & Natural Resources Global Practice Global Environment Project Specific Investment Loan FY 2012 Seq No: 10 ARCHIVED on 19-Apr-2017 ISR27535 Implementing

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3691 TUN Public Disclosure Authorized Project Agreement (Northwest Mountainous Areas Development Project) between Public Disclosure Authorized INTERNATIONAL

More information

The World Bank DTF: MA-Local Government Support Program (P144438)

The World Bank DTF: MA-Local Government Support Program (P144438) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Update on the work of the Standing Committee. on Finance related to the Fifth Review of the. Financial Mechanism of the Convention

Update on the work of the Standing Committee. on Finance related to the Fifth Review of the. Financial Mechanism of the Convention Update on the work of the Standing Committee on Finance related to the Fifth Review of the Financial Mechanism of the Convention 13 June, 2014 Mandates of the SCF related to the review of the Financial

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Southeast Asia Country Management Unit East Asia and

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING

More information

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Preparations for IPA II - EU State Enlargement. Iwona Lisztwan European Commission Directorate General Agriculture and Rural development

Preparations for IPA II - EU State Enlargement. Iwona Lisztwan European Commission Directorate General Agriculture and Rural development Preparations for IPA II - EU State Enlargement of play Iwona Lisztwan European Commission Directorate General Agriculture and Rural development A new set of instruments for external action for the period

More information

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme Document: Agenda: 14(c)(iii) Date: 15 December 2010 Distribution: Public Original: English E President s report Proposed grant to Solomon Islands for the Solomon Islands Rural Development Programme Note

More information

MADAGASCAR PORTFOLIO REVIEW REPORT

MADAGASCAR PORTFOLIO REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Loans for rural development , Estonia. Case Study. - EAFRD - EUR 36 million - Rural enterprise support - Estonia

Loans for rural development , Estonia. Case Study. - EAFRD - EUR 36 million - Rural enterprise support - Estonia - EAFRD - EUR 36 million - Rural enterprise support - Estonia Loans for rural development 2014-2020, Estonia... supporting rural growth and investment through financial instruments... DISCLAIMER This document

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Africa Environment & Natural Resources Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 13 ARCHIVED on 29-Dec-2016 ISR26629 Implementing Agencies: Ministry

More information

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015 Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020377 Public Disclosure Authorized Public Disclosure Authorized Project ID P118145 Country Middle East

More information

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/29/2008 Report Number : ICRR12989 PROJ ID : P067770 Appraisal Actual Project Name : Mn - Sustainable Project Costs (US$M US$M):

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 10-Aug-2015 ISR18623 Implementing

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming

More information

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming PAGE 1 OF 12 Country (or region) Executive Summary (in one page) Union of the Comoros Submission Date 29/05/2015

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 8 ARCHIVED on 29-Feb-2016 ISR22549 Implementing

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Progress on the Strengthening of the European Integration Structures

Progress on the Strengthening of the European Integration Structures TENTH MEETING OF THE STABILISATION AND ASSOCIATION PROCESS TRACKING MECHANISM CONCLUSIONS PRISTINA, 14 JULY 2006 The tenth meeting of the Stabilisation and Association Process Tracking Mechanism was held

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility GCF/B.07/08 12 May 2014 Meeting of the Board 18-21 May 2014 Songdo, Republic of Korea

More information

2015 Development Policy Financing Retrospective: Preliminary Findings

2015 Development Policy Financing Retrospective: Preliminary Findings 2015 Development Policy Financing Retrospective: Preliminary Findings Purpose of this Consultation Meeting on the DPF Retrospective The 2015 Retrospective will focus on the Bank s experience with Development

More information

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment Environmental Assessment S o u r c e b o o k UPDATE Environment Department June 2002 The World Bank Number 27 Financial Intermediary Lending and Environmental Assessment The World Bank supports economic

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF054531 SE Public Disclosure Authorized Public Disclosure Authorized Global Environment Facility Trust Fund Grant Agreement (Integrated

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

3 rd Call for Project Proposals

3 rd Call for Project Proposals IPA CROSS-BORDER PROGRAMME "GREECE THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA 2007-2013" 3 rd Call for Project Proposals Project Selection Criteria CCI: 2007 CB 16 I PO 009 The following Project Selection

More information

US$M): US$M): (US$M. Cofinancing (US$M US$M):

US$M): US$M): (US$M. Cofinancing (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14162 1. Project Data: Date Posted : 05/20/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq

More information

US$M): Sector Board : Agriculture and Rural (US$M US$M): Cofinancing (US$M

US$M): Sector Board : Agriculture and Rural (US$M US$M): Cofinancing (US$M Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 06/30/2014

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

MEMORANDUM OF UNDERSTANDING. between. THE EUROPEAN UNION as Lender. and. THE REPUBLIC OF TUNISIA as Borrower

MEMORANDUM OF UNDERSTANDING. between. THE EUROPEAN UNION as Lender. and. THE REPUBLIC OF TUNISIA as Borrower Ref. Ares(2017)2248200-02/05/2017 Macro-financial assistance for the Republic of Tunisia Loan from the European Union of up to EUR 500 million MEMORANDUM OF UNDERSTANDING between THE EUROPEAN UNION as

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

CTF-SCF/TFC.4/Inf.2 March 13, Joint Meeting of the CTF and SCF Trust Fund Committees Manila, Philippines March 16, 2010

CTF-SCF/TFC.4/Inf.2 March 13, Joint Meeting of the CTF and SCF Trust Fund Committees Manila, Philippines March 16, 2010 CTF-SCF/TFC.4/Inf.2 March 13, 2010 Joint Meeting of the CTF and SCF Trust Fund Committees Manila, Philippines March 16, 2010 BENCHMARKING CIF'S ADMINISTRATIVE COSTS 2 Background 1. The Joint Trust Fund

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,906,927.80

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,906,927.80 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021425 Public Disclosure Authorized Public Disclosure Authorized Project ID P088520 Country India Project Name IN: Biodiver Cons & Rural

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

2014 ANNUAL PROJECT PROGRESS REPORT

2014 ANNUAL PROJECT PROGRESS REPORT Strengthening the Resilience of Rural Livelihood options for Afghan Communities in Panjshir, Balkh, Uruzgan and Herat Provinces to manage Climate Change-induced Disaster Risks 2014 ANNUAL PROJECT PROGRESS

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015

More information

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG) UNDP Initiation Plan to programme the project preparation grant received from the GEF (otherwise called GEF PPG) effective for all PIFs approved as of GEF November work programme 2017 A. Background: The

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 8035-PH Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Additional Financing for Laguna de Bay Institutional Strengthening

More information

RESTRUCTURING PAPER ON A SECOND PROPOSED PROJECT RESTRUCTURING DAKAR DIAMNIADIO TOLL HIGHWAY PROJECT CREDIT 4579-SN BOARD APPROVAL DATE JUNE 2, 2009

RESTRUCTURING PAPER ON A SECOND PROPOSED PROJECT RESTRUCTURING DAKAR DIAMNIADIO TOLL HIGHWAY PROJECT CREDIT 4579-SN BOARD APPROVAL DATE JUNE 2, 2009 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Country Department AFCF1 Africa Region Document of The World Bank RESTRUCTURING

More information

Definitions. Terms of Reference

Definitions. Terms of Reference Terms of Reference National or International consultants: International Description of the assignment (Title of consultancy): Mid-Term Review of the LEPAP project Project Title: Lebanon Environmental Pollution

More information

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Water and Sanitation in Tourist Areas (P054221) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information