1 Project n TF Interim Unaudited Financial Report 1st semester 2012 For the period ending June 30 th, Financial information for the semester ending June 30 th, 2012 a. Sources and utilization of funds per category, in Euro 1 Semester Cumulative 6 months Actual Budget Actual Budget Forecast Total disbursement received Financing from The World Bank (GEF) Total expenditures per category (1) Goods, non-consulting services, consultants services, Training and Studies under components 1 and 2 of the Project (1.a) Goods, non-consulting services (1.b) Consulting Services and Studies (1.c) Trainings (2) Incremental operating costs Net evolution of Designated Account (disbursement received - total expenditures) * * Opening balance of the Designated Account Add net evolution of Designated Account * * Closing Balance of the Designated Account * * * Note: The net evolution and closing balance of the Designated Account are negative because Plan Bleu had received no advance payments or reimbursements from the grant proceeds on the designated account at the time when the expenses of the first semester occurred. In other words, during the reporting period, Plan Bleu has advanced from its own budget. 1 Initial forecasts and budget allocations have been converted from USD to EUR with the exchange rate 1USD=0,77223 EUR from January 24 th, 2012, date of the signature of the grant (oanda.com). 2 Due to long processes required to access resources from the trust fund, the Project s designated account has not yet been replenished. The first advance payment will soon be transferred to the Project s designated account. Interim Unaudited Financial Report 1st semester /08/2012 1
2 b. Sources and utilization of funds per component, in Euro 1 Semester Cumulative 6 months Actual Budget Actual Budget Forecast Total disbursement received Financing from The World Bank (GEF) Total expenditures per component (1) Governance (2) Knowledge generation* (3) Project Coordination and Management Net evolution of Designated Account (disbursement received - total expenditures) Opening balance of the Designated Account Add net evolution of Designated Account Closing Balance of the Designated Account Component Activity c. Utilization of funds per component and per activity, in Euro 1 Initial Semester Cumulative Forecast Forecast Paid Forecast Paid (1) Governance Translation of PAD and PIM Steering Committee meeting Steering Committee meeting 2 Green growth conference participation + workshop (2) Knowledge generation* (3) Project Coordination and Management Lumpsum Non lumpsum Total project * Note: During the reporting period, no activities have taken place under component 2 Knowledge generation. Activities under this component are planned to be initiated during the next reporting period. 3 Eligible lumpsum expenses are : Plan Bleu staff salaries; strengthening of fiduciary capacities of Plan Bleu staff and related travels; local and international travels in relation to the implementation of the Project; electricity, phone, office supplies and equipment, software licenses, rental and maintenance of photocopy machines and computer equipment. 4 Eligible non lumpsum expenses are: Incremental Operating Costs related to strengthening of fiduciary capacities of Plan Bleu staff and related travels, and local and international travels in relation to the implementation of the Project; and the carrying out of the audits for the Project. Interim Unaudited Financial Report 1st semester /08/2012 2
3 Initial Allocation of Budget in USD, by component TOTAL Budget Governance Knowledge generation Project Coordination and Management d. Cumulated payments by component, in Euro 1 Component Allocated Engagements (signed contracts) % All. % All. % Engage ments (1) Governance % % 100% (2) Knowledge generation % 0 0% 0% (3) Project Coordination and Management % % 100% TOTAL % % 100% Categories e. Cumulated payments by category, in Euro 1 Initial Allocation (1) Engage ments semester Cumulated (2) / grant (2) / (1) en% (1) Goods, non-consulting services, consultant services, Trainings and Studies under Parts 1 and 2 of the Project % (1.a) Goods, non-consulting services N/A N/A (1.b) Consulting Services and Studies N/A N/A (1.c) Trainings N/A N/A (2) Incremental operating costs % TOTAL % Interim Unaudited Financial Report 1st semester /08/2012 3
4 Initial Allocation of Budget in USD TOTAL Budget (1) Goods, non-consulting services, consulting services, Trainings and Studies under components 1 and 2 of the Project (2) Incremental Operating Costs and audits under component 3 of the Project f. Brief description of the Project s progress during the reporting period The reporting period refers to the first semester of the Regional Governance and Knowledge generation Project (ReGoKo). Throughout this period, the activities financed under the ReGoKo were: the launch of the Project and the related translation of the PAD and PIM 5, two Project Steering Committee (PSC) meetings, the participation of about 30 stakeholders from the ReGoKo s eligible countries to the green growth conference-forum in Marseille and a subsequent workshop on green growth and the exploration of possibilities to bring forward the green growth agenda in the Mediterranean region under the ReGoKo. During the reporting period, other activities have been identified and are currently in the pipeline. More information on the activities can be found in the quarterly ReGoKo Project Reports. Throughout the first semester of implementation, around 4% of the grant proceeds have been disbursed, whereas the planned disbursement is 9% of the grant proceeds 6. The ReGoKo is therefore a little slow on disbursement which is the result of the efforts required to agree on implementation procedures that cater to the Beneficiaries, the World Bank s and Plan Bleu s needs at the same time. Expenses made during the reporting period have been advanced by Plan Bleu, as lengthy procedures to transfer the first advance payment to the Designated Account delayed the replenishment of the Designated Account. The Designated Account will however be replenished at the beginning of the next reporting period and advances made by Plan Bleu will be reimbursed. 5 PAD= Project Appraisal Document. PIM = Project Implementation Manual 6 The PAD prescribes a planned disbursement of 0, 27 million US$ for the World Bank fiscal year 2012 (ending June 30 th, 2012), which approximately equals 9% of the grant proceeds. Interim Unaudited Financial Report 1st semester /08/2012 4
5 1 2. Annex a. In-kind co-financing from the Center for Mediterranean Integration (CMI), in Euro Item Date Event (incl. tax) Simultaneous January Project Launch and Steering translation services 2012 Committee meeting Audio-visual 2 equipment January 2012 Project Launch and Steering Committee meeting Video-conference 7 29 March 2012 Project Steering Committee meeting 154 Simultaneous 4 translation services 22 May 2012 Project Steering Committee meeting Simultaneous 5 translation services 8 24 May 2012 Workshop Green Economy TOTAL Initially 205,00 USD. Exchange rate 1 USD = 0,75039 EUR ( 8 Costs covered by green growth conference (multi-partner financing from CMI, OCEMO, Plan Bleu, FEMISE, City of Marseille). Interim Unaudited Financial Report 1st semester /08/2012 5
1. Financial information for the semester ending December 31 st, a. Sources and utilization of funds per category, in Euro 1
Project n TF011513 Interim Unaudited Financial Report 2nd semester 2012 For the period ending December 31 st, 2012 1. Financial information for the semester ending December 31 st, 2012 a. Sources and utilization
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020377 Public Disclosure Authorized Public Disclosure Authorized Project ID P118145 Country Middle East
More informationDocument reference IMI2/INT/
Based on the third amended Annual Work Plan and Budget for 2018 (Annex to the Decision of the IMI2 JU Governing Board No. IMI2-GB-DEC-2018-23 of 13.07.2018) Document reference IMI2/INT/2018-01807 1 Table
More informationPublic Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Montenegro Institutional Development and Agriculture Strengthening Project MIDAS Project ID: P107473 GLOBAL ENVIRONMENT
More informationCOMMISSION DECISION. Having regard to the Treaty establishing the European Community,
EN EN EN COMMISSION DECISION of approving the programme for agriculture and rural development of the Republic of Croatia under the instrument for pre-accession assistance (IPA) THE COMMISSION OF THE EUROPEAN
More informationCentral Finance and Contracting Unit Ministry of Finance of Albania. Capacity Building Support to Implement the Integrated Planning System (IPS)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Central Finance and Contracting Unit Ministry of Finance of Albania Capacity Building Support to Implement the Integrated
More informationBudget & Finances. Interreg Europe Secretariat. 23 March 2016 Lead applicant workshop. Sharing solutions for better regional policies
European Union European Regional Development Fund Sharing solutions for better regional policies Budget & Finances Interreg Europe Secretariat 23 March 2016 Lead applicant workshop Session content 1. Preliminary
More informationImplementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility
More informationThe World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)
EUROPE AND CENTRAL ASIA Albania Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 17-Oct-2017 ISR29727 Implementing Agencies: Key Dates
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Financial Intermediary Loan FY 2008 Seq No: 11 ARCHIVED on 16-Dec-2015 ISR21909
More informationSecretariat of the Scaling Up Nutrition (SUN) Movement. Annual Financial Report of Expenditures 1 January December 2017.
Secretariat of the Scaling Up Nutrition (SUN) Movement Annual Financial Report of Expenditures 1 January 31 December 1 P a g e Contents About this Report... 3 Key financial elements of the year ()... 3
More informationREGIONAL WATER AUTHORITY POLICIES AND PROCEDURES MANUAL
REGIONAL WATER AUTHORITY POLICIES AND PROCEDURES MANUAL Policy Type : Fiscal Management Policy Title : Financial Designation/Reserve Policy Policy Number : 500.1 Date Adopted : May 12, 2005 Date Amended
More informationWorld Bank HIV/AIDS Program
blic Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank HIV/AIDS Program A Guidance Note on Disbursement Procedures This document was
More informationESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF
ESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF 014110 Special-Purpose Financial Statements and Independent Auditors' Report
More informationSPECIFIC AGREEMENT No XXXX/XXXXX..
Education, Audiovisual And Culture Executive Agency Unit SPECIFIC GRANT AGREEMENT FOR AN ACTION CREATIVE EUROPE PROGRAMME (2014-2020) Cinema Networks Call for Proposals EACEA.10.2016 SPECIFIC AGREEMENT
More informationClimate Funds AfDB Mobilizing Concessional Finance for NDC Implementation
Climate Funds AfDB Mobilizing Concessional Finance for NDC Implementation Davinah Milenge Uwella Senior Climate Change Officer Climate Change and Green Growth Department Presentation Outline Preamble Climate
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 10-Aug-2015 ISR18623 Implementing
More informationAnnex 1 Citizen s summary 1
Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic
More informationwith the Peruvian Trust Fund for National Parks and Protected Areas (Profonanpe) for the Republic of Peru 22 December 2018 Entity Support
with the Peruvian Trust Fund for National Parks and Protected Areas (Profonanpe) for the Republic of Peru 22 December 2018 Entity Support Programme title: Country: National designated authority: Implementing
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT Directorate E. Economic analysis, perspectives and evaluation; communication E.5. Internal and external communication GRANT
More information(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7928-MK Public Disclosure Authorized Public Disclosure Authorized Loan Agreement (Real Estate Cadastre and Registration Project Additional Financing)
More informationMulti-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MDTF GRANT NUMBER TF013825 Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program
More informationAnnex III Model specific grant agreement
Model specific agreement: December 2016 Annex III Model specific grant agreement SPECIFIC AGREEMENT No./.. This Specific agreement ("the Specific agreement") is concluded between the following parties:
More informationIN2IT FINANCIAL WORKSHOP
IN2IT FINANCIAL WORKSHOP DR. VERED HOLZMANN IN2IT PROJECT MANAGER MTA, 13 MARCH 2016 Agenda Part A: Erasmus+ Office: Rationale of the Erasmus+ budget management Unit costs vs. Actual costs Control unit
More informationWSSCC, Global Sanitation Fund (GSF)
Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in
More informationDOCUM ENTS OFFICIAL EUROPEAN COMMISSION
Amendment I to Administration Agreement SRSS/S2016/005 EUROPEAN COMMISSION STRUCTURAL REFORM SUPPORT SERVICE The Director OFFICIAL DOCUM ENTS ADMINISTRATION AGREEMENT FOR EU CONTRIBUTIONS PROVIDED TO THE
More informationWORKSHOP MANUAL FINAL Strengthening the uptake of EU funds for Natura 2000 (ENV.B.3/SER/2012/002)
WORKSHOP MANUAL FINAL 30.04.2013 Strengthening the uptake of EU funds for Natura 2000 (ENV.B.3/SER/2012/002) CONTENT INTRODUCTION 34 WORKSHOP PREPARATION 67 WORKSHOP CONTENT 89 WORKSHOP ASSESSMENT 1112
More informationOFFICIAL Woch DOCUM ENTS
Public Disclosure Authorized SAMIA MSADEK Director, Governance Global Practice THE WORLD BANK IBRD* IDA I WORLD BANKGROUP OFFICIAL Woch DOCUM ENTS December 02, 2016 Public Disclosure Authorized Public
More information(Donor Reference No )
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Administration Arrangement between Government of the Netherlands,
More informationSAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only
SAICM/ICCM.4/INF/9 Distr.: General 11 August 2015 English only International Conference on Chemicals Management Fourth session Geneva, 28 September 2 October 2015 Item 5 (a) of the provisional agenda Implementation
More informationThe World Bank Building a Modern Fiscal System Technical Assistance (P154694)
Public Disclosure Authorized EAST ASIA AND PACIFIC China Macro Economics & Fiscal Management Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 15-Jun-2017 ISR26699 Implementing
More informationFinancial workshop. Creative Europe - Culture 10 October 2018
Financial workshop Creative Europe - Culture 10 October 2018 OBJECTIVES of workshop Awareness and clarification about key financial issues Recommendations on the financial management Preparation of the
More informationGCF/B.22/15/Rev February Summary
Meeting of the Board 26 28 February 2019 Songdo, Incheon, Republic of Korea Provisional agenda item 23 20 February 2019 Review of the amounts to be set aside for the operating costs of the Green Climate
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
L 46/8 Official Journal of the European Union 19.2.2013 REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 135/2013 of 18 February 2013 amending Implementing Regulation (EU) No 926/2011 for the purposes
More informationMid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies
Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:
More informationAgenda. GCF/B.08/01/Rev.01 * 14 October Meeting of the Board October 2014 Bridgetown, Barbados Agenda item 2
Agenda * 14 October 2014 Meeting of the Board 14-17 October 2014 Bridgetown, Barbados Agenda item 2 * The provisional agenda as contained in document GCF/B.08/01 was adopted without amendment. Page 1 Agenda
More informationPublic Disclosure Copy
AFRICA Sudan Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 09-Jul-2018 ISR33326 Implementing Agencies: Ahmed Hashem
More informationConsolidated Financial Statements for the Year ended December 31, 2003 and Auditors Report
IUCN International Union for the Conservation of Nature and Natural Resources, Gland (Switzerland) Consolidated Financial Statements for the Year ended December 31, 2003 and Auditors Report FINANCIAL
More informationREPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION
REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION LOAN (8261-RO) FOR THE REVENUE ADMINISTRATION MODERNIZATION PROJECT (RAMP) FOR THE PERIOD STARTING WITH 8 MAY 2013
More informationEuropean Insurance and Occupational Pensions Authority (EIOPA) Budget 2018
Corporate Support Department EIOPA-18/104 1 March 2018 European Insurance and Occupational Pensions Authority (EIOPA) Budget 2018 Adopted by the EIOPA Board of Supervisors on 29 January 2018 EIOPA Westhafen
More informationProject Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation
Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation ARMENIA De-risking and Scaling-up Investment in Energy Efficient Building Retrofits UNDP-GCF Project INCEPTION WORKSHOP Cynthia Page,
More informationNCF 7 Project Implementation Manual
NCF 7 Project Implementation Manual November 2017 Table of Contents 1 INTRODUCTION... 4 2 GRANTEES RESPONSIBILITIES... 4 3 PROGRESS REPORTING... 4 3.1 Progress report... 4 3.2 Project completion report...
More informationENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS
ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS August 2016 Background 1. Tier 1 'Support to National Implementation Arrangements (NIAs)' projects (hereinafter
More informationANNEX. to the COMMISSION IMPLEMENTING DECISION
EUROPEAN COMMISSION Brussels, 24.1. C() 245 final ANNEX 1 ANNEX to the COMMISSION IMPLEMENTING DECISION concerning the adoption of the work programme and the financing for the year of activities in the
More informationTHE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, FINANCIAL STATEMENTS
THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, Public Disclosure Authorized FINANCIAL STATEMENTS For the period from December 10, 2013 to December 09, 2015 Auditor's
More informationHEALTH RESULTS-BASED FINANCING PROJECT
HEALTH RESULTS-BASED FINANCING PROJECT IDA GRANT NUMBER TF013310 IMPLEMENTED BY RESULT-BASED FINANCING SECRETARIAT UNIT UNDER THE MINISTRY OF HEALTH OF THE KYRGYZ REPUBLIC SPECIAL PURPOSE PROJECT FINANCIAL
More informationwith the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming
with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)
More informationLoan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and
CONFORMED COPY LOAN NUMBER 7716-ME Loan Agreement (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated May
More informationHow to plan your budget and project management?
European Union European Regional Development Fund Sharing solutions for better regional policies How to plan your budget and project management? Ilaria Piazza Interreg Europe Secretariat i.piazza@interregeurope.eu
More informationMANUAL OF PROCEDURE. Contracts, Agreements, and Leases - Signature Requirements and Procedures CHAPTER 6A STATE BOARD OF EDUCATION RULES
MANUAL OF PROCEDURE PROCEDURE NUMBER: 6300 PAGE 1 of 6 PROCEDURE TITLE: Contracts, Agreements, and Leases - Signature Requirements and Procedures STATUTORY REFERENCE: FLORIDA STATUTE 287.017 CHAPTER 6A-14.0734
More informationPolicy on Petty Cash Fund
Policy on Petty Cash Fund Department responsible: Finance and Administrative Services Effective date: December 8, 2005 Amended on: March 1, 2014 and February 17, 2016 Approved by: Resolution #EC 2016-050
More informationCOMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015
EUROPEAN COMMISSION Brussels, 7.12.2015 C(2015) 8777 final COMMISSION IMPLEMENTING DECISION of 7.12.2015 adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EN EN COMMISSION
More informationEducation, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES
Education, Audiovisual and Culture Executive Agency Erasmus+: Higher Education - Knowledge Alliances, Bologna Support, Jean Monnet GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES Financing exclusively
More informationProject Management and Financial Reporting
Horizon 2020 and ERC Project Management and 11-13 April 2018 Brussels Horizon 2020 Project Management and AGENDA DAY 1 08:30 09:00 Registration 09:00 09:30 Event opening 09:30 10:30 How to Coordinate and
More informationCTF-SCF/TFC.4/Inf.2 March 13, Joint Meeting of the CTF and SCF Trust Fund Committees Manila, Philippines March 16, 2010
CTF-SCF/TFC.4/Inf.2 March 13, 2010 Joint Meeting of the CTF and SCF Trust Fund Committees Manila, Philippines March 16, 2010 BENCHMARKING CIF'S ADMINISTRATIVE COSTS 2 Background 1. The Joint Trust Fund
More informationBangladesh Insurance Sector Development Project (P156823)
SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 11-Oct-2018 ISR34079 Implementing Agencies: PEOPLE'S REPUBLIC
More informationSecond Science & Technology Project (P127308)
EUROPE AND CENTRAL ASIA Croatia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 12 ARCHIVED on 31-Oct-2018 ISR33160 Implementing Agencies:
More informationOFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and
Public Disclosure Authorized OFFICIAL IDOCUMENTS Public Disclosure Authorized MDTF-HRI GRANT NUMBER TF017128 Multi-donor Trust Fund for Health Results Innovation Grant Agreement (Additional Financing for
More informationOFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)
Public Disclosure Authorized OFFICIAL DOCUMENTS CREDIT NUMBER 6343-RW Public Disclosure Authorized Financing Agreement (Housing Finance Project) between Public Disclosure Authorized REPUBLIC OF RWANDA
More informationFP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services
FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting
More informationThe World Bank NP: Strengthening the Office of the Auditor General (P127040)
Public Disclosure Authorized SOUTH ASIA Nepal Financial Management Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 3 ARCHIVED on 20-Feb-2015 ISR18017 Implementing
More informationCOMMUNICATION AND VISIBILITY GUIDE. FOR EU-FUNDED PROJECTS IMPLEMENTED by International Organizations in Cape Verde.
Visibility and communication are among the requirements for all EU funded projects. Implementers of EU funded projects often have issues related to the visibility and communication aspects, which have
More informationANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.
EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority
More informationGLOBAL ENVIRONMENT FACILITY SPECIAL CLIMATE CHANGE FUND GRANT No. TF010940
Public Disclosure Authorized Public Disclosure Authorized GLOBAL ENVIRONMENT FACILITY SPECIAL CLIMATE CHANGE FUND GRANT No. TF010940 IMPLEMENTED BY EUROPA REINSURANCE FACILITY LIMITED REPORT OF INDEPENDENT
More informationPEOPLE S REPUBLIC OF CHINA
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7529-CN Public Disclosure Authorized Loan Agreement (Energy Efficiency Financing Project) Public Disclosure Authorized between PEOPLE S REPUBLIC
More informationArrangements for the revision of the terms of reference for the Peacebuilding Fund
United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the
More informationEstablishment of the Independent Secretariat
Establishment of the Independent Secretariat GCF/B.02 12/07 8 October 2012 Meeting of the Board 18 20 October 2012 Songdo, Republic of Korea Agenda item 10 Page b Recommended action of the Board It is
More informationGeneral principles and indicative list of eligible costs covered under GCF fees and project management costs
General principles and indicative list of eligible costs covered under GCF fees and project management costs This document is as adopted by the Board in decision B.19/09. It was sent to the Board for consideration
More informationSupport to the Scaling Up Nutrition (SUN) Movement Secretariat. Annual Financial Report of Expenditures 1 January December 2013
Support to the Scaling Up Nutrition (SUN) Movement Secretariat Annual Financial Report of Expenditures 1 January 2013 31 December 2013 1 Table of contents Background... 3 Financial and administrative hosting
More informationEducation, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES
Education, Audiovisual and Culture Executive Agency «DEFU_UNOP» GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES Financing exclusively by unit costs contribution(s) AGREEMENT NUMBER «NO_REF» PROJECT
More informationKA2 Strategic Partnerships Financial Management. 21st September
KA2 Strategic Partnerships Financial Management 21st September 2017 Leargas.Ireland @Leargas www.leargas.ie 1 Overview General Principles of Financial Management Eligibility of Expenses (eligible and ineligible
More informationINTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7888-HR Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Justice Sector Support Project) between REPUBLIC OF CROATIA and
More informationAnnex II Draft specific grant agreement
Model specific agreement: December 2016 Annex II Draft specific grant agreement SPECIFIC AGREEMENT No./.. This Specific agreement ("the Specific agreement") is concluded between the following parties:
More informationService Users and Carers Guidance on Reimbursement of Out of Pocket Expenses
Service Users and Carers Guidance on Reimbursement of Out of Pocket Expenses This guidance, as a supplement to Interim Service User, Carer and Stakeholder Reimbursement Guidelines and Procedures for Health
More informationConsulting Contract between Matt H. Evans and
Blank Service Contract April 1, 1999 Consulting Contract between Matt H. Evans and Consulting Services Related to Creating Increased Value for the Client in the area of Financial Management Section 1:
More informationLoans, Credits, and Grants Assumption and Amendment Agreement
Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY IBRD LOAN NUMBER 70890 MOT IBRD LOAN NUMBER 70900 MOT IBRD LOAN NUMBER 70910 MOT IDA CREDIT NUMBER 36510 YF IDA CREDIT NUMBER 3651A
More informationProductive Partnerships In Agriculture (PPAP) PROJECT IMPLEMENTATION MANUAL
Productive Partnerships In Agriculture (PPAP) PROJECT IMPLEMENTATION MANUAL Section 4 Financial Management Manual MARCH 15, 2010 PNG Department of Agriculture and Livestock PO Box 2033 Port Moresby NCD
More informationBudget and Establishment Plan. for 2018
Budget and Establishment Plan for 2018 8 December 2017 BEREC Office is an agency of the EU Contents 1. Explanatory note... 3 1.1. Legal basis... 3 1.2. Budgetary procedure 2018... 3 Table 1: BEREC Office
More informationIII. modus operandi of Tier 2
III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and
More informationInnovative Access to Finance (P147183)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 07-Mar-2018 ISR31622
More informationUNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency
INITIATION PLAN FOR A GEF PROJECT PREPARATION GRANT (PPG) UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency Country Islamic Republic of Iran Expected Outcome(s)/Indicator
More informationMulti-beneficiary Model Grant Agreement
Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants
More informationFinancing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4477-CM Public Disclosure Authorized Financing Agreement (Environmental and Social Capacity Building for the Energy Sector Project) Public Disclosure
More informationThe World Bank Governance and Policy Program for Khyber Pakhtunkhwa (KP) (P156410)
SOUTH ASIA Pakistan Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 18-Aug-2017 ISR29255 Implementing Agencies: Economic Affairs Division,
More informationPublic Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)
SOUTH ASIA Pakistan Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 06-Apr-2017 ISR27349 Implementing Agencies: Economic Affairs Division,
More informationTOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND
TOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND Informal meeting of prospective GCF Board members and other interested parties New York City 22-23 March 2012 MEETING SUMMARY I. Purpose and
More informationHaiti Education for All Multi-donor Trust Fund Grant Agreement
Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF097009 Public Disclosure Authorized Public Disclosure Authorized Haiti Education for All Multi-donor Trust Fund Grant Agreement (Haiti Education
More informationURBACT III Programme Manual
URBACT III Programme Manual Fact Sheet 4B National URBACT Points Section 1. National URBACT Points in the URBACT III Operational programme: context and objective Section 2. Role of National URBACT Points
More informationEducation, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ]
Education, Audiovisual and Culture Executive Agency Erasmus+ : Prospective Initiatives, Policy Networks, Programme and Linguistic Support GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT
More information(2) The CIP programme entrepreneurship and innovation (p.m.) 2 ;
EN EN EN COMMUNICATION TO THE COMMISSION ON DG ECFIN'S ANNUAL WORK PROGRAMME 2011, INCLUDING PROCUREMENT AND GRANTS, IN THE FIELD OF ECONOMIC AND FINANCIAL AFFAIRS, AND CONSTITUTING A FINANCING DECISION
More informationGuidelines and how to prepare and carry out a SLIC Campaign
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Health, Safety and Hygiene at Work Adopted at the 66th SLIC Plenary Athens, Greece 27
More informationHundred and Fifty-seventh Session. Rome, 9-13 March Financial Position of the Organization
February 2015 FC 157/3 E FINANCE COMMITTEE Hundred and Fifty-seventh Session Rome, 9-13 March 2015 Financial Position of the Organization Queries on the substantive content of this document may be addressed
More informationReport on budgetary and financial management. ENISA - Financial Year 2013 Version May
Report on budgetary and financial management ENISA - Financial Year 2013 Version 2.0 05 May 2014 www.enisa.europa.eu Table of Contents 1. Introduction 3 2. Finance and Accounting functions 3 3. Budgetary
More informationInterim Report Q4 FY 17
Interim Report Q4 FY 17 Quarter 4 / Fiscal Year 2017 Sustained positive development Sivantos delivered 3.1% organic growth 1) in Q4 FY2017. The moderate growth rate compared to previous quarters was a
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Congo, Republic of Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 07-Jan-2016 ISR22324 Implementing Agencies:
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE
Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY
More informationREPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION
Public Disclosure Authorized ~~Igl- 23c?a/ 34$ or. Public Disclosure Authorized REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION LOAN (8261-RO) FOR THE REVENUE ADMINISTRATION
More informationPolicies for Contributions to the Green Climate Fund: Recommendations by Interested Contributors
Policies for Contributions to the Green Climate Fund: Recommendations by Interested Contributors GCF/B.08/16 * 1 October 2014 Meeting of the Board 14-17 October 2014 Bridgetown, Barbados Agenda item 14
More informationDemocratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement
Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme
More informationwith the United Nations Environment Programme (UNEP) for the Republic of South Sudan 01 June 2018 NDA Strengthening & Country Programming
with the United Nations Environment Programme (UNEP) for the Republic of South Sudan 01 June 2018 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT/PROPOSAL PAGE 1 OF 15 ver. 19
More information