1 This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue assumed to be available for future capital projects helps to provide an understanding of the City s capacity for constructing the transportation improvement projects identified to be needed to support future growth. The revenue forecast conducted for the City of Sandy TSP accounted for the four regular income sources currently used to fund and maintain public transportation infrastructure. The State Gas Tax, Local Option Fuel Tax, and ODOT FAU STP Fund revenue streams were forecast by calculating the average income from these sources over the last 10 years and projecting it through the year The projected revenue stream from transportation system development charges was calculated using the forecasted net new trips from development within the City over the next 20 years. The current SDC rates were applied to these new trips based on trip type, with a 45% reduction for pass by trips applied to the retail and service type land uses. The split between maintenance expenses and capital projects was determined by City staff and was based on the City s history of transportation expenditures. Table 13 summarizes the funding collected for transportation related costs in the year 2008, and the projected total available revenue for the period between 2009 and As shown, the City is assumed to have approximately $10.2 million available for capital transportation improvements through Table 13: Transportation Revenue Projection from Current Sources to 2029* Funding Source Total Collected Total Forecast 2009 to 2029* Maintenance and Other Expenses 2009 to 2029* Capital Projects Only State Shared - Gas Tax $294,987 $ 5,900,000 $ 4,425,000 $ 1,475,000 Local Option Fuel Tax $131,410 $ 2,482,000 $ 2,482,000 - ODOT FAU-STP Funds $79,500 $ 1,934,000 - $ 1,934,000 Systems Development Charges $338,765 $ 6,762,000 - $ 6,762,000 Total $765,162 $ 17,078,000 $ 6,907,000 $ 10,171,000 Notes: A portion of the projected revenue will be required for the maintenance of existing facilities, street lighting, staff salaries, as well as other miscellaneous transportation expenses, and thus not available for capital projects. * Forecast revenue is displayed in 2009 dollars. December 2011 Page 44

2 Project Programming The TSP Preferred Plan consists of all transportation improvements identified to meet future needs through the year Because the cost to fund all Preferred Plan projects is far greater than the City s projected revenue for such improvements, the Preferred Plan has been separated into near term and long term lists (Tables 14 through 16), where the near term projects include those that could be funded through a combination of the City s projected revenue for capital transportation projects and other reasonable funding strategies. The identification of near term project lists informs future budgeting decisions and does not preclude any project in the Preferred Plan from being eligible for inclusion on the City s Capital Improvement Program at any time. Lead agencies have been identified for Preferred Plan projects according to jurisdiction of the roadway affected; the designation of a lead agency does not create an obligation or commitment for funding, but is intended to refine the projection of transportation funding needs for the City. Table 14: Pedestrian System Projects Preferred Plan Project ID* Project Segment Description Local System Improvements (Lead Agency City of Sandy) Project Costs (2009 Dollars) Near-Term Projects P2 Bluff Rd. Hood St. to Green Mountain St. Infill sidewalk gaps $520,000 P10 Langensand Rd. Dubarko Rd. to US 26 Infill sidewalk gaps $82,000 P11 Pleasant St. Beers Ave. to Revenue Ave. Infill sidewalk gaps $173,000 P13 Sandy Heights St. Dubarko Rd to Tupper Rd Infill sidewalk gaps $176,000 P14 Downtown Core Pedestrian Side streets perpendicular to US 26 Infill sidewalk gaps $287,000 P15 Vista Loop US 26 to US 26 Construct Sidewalk $600,000 P1 362 nd Dr. Chinook St. to Industrial Way Infill sidewalk gaps $1,230,000 P3 Bluff Rd. Green Mountain St. to Northern UGB Infill sidewalk gaps $716,000 P4 Bornstedt Rd. Cascadia Village Dr. to UGB Infill sidewalk gaps $1,420,000 P5 Dubarko Rd. East of Melissa Ave. to East of OR 211 Infill sidewalk gaps $3,240,000 P6 Dubarko Rd. Langensand Rd. to Antler Ave. Infill sidewalk gaps $39,000 P7 Industrial Way 362 nd Dr. to US 26 Infill sidewalk gaps $1,790,000 P8 Jacoby Rd. Dubarko Rd. to Cascadia Village Dr. Infill sidewalk gaps $40,000 P9 Jewelberry Ave. Penny Ave. to Kelso Rd. Infill sidewalk gaps $194,000 P13 Ruben Ln. US 26 to Dubarko Rd. Infill sidewalk gaps $51,000 P16 New Accessway / Infill of Tickle Creek Trail south of Dubarko Rd and Ruben Ln Accessway / Trail $75,000 December 2011 Page 45

3 Table 14 (continued): Pedestrian System Projects Preferred Plan Project ID* Project Segment Description P17 New Accessway / Extension of Tickle Creek Trail to OR 211 Accessway / Trail $100,000 Project Costs (2009 Dollars) P18 New Accessway / P21/362 nd Ave North to Orient Dr Accessway / Trail $540,000 P19 New Accessway / North of Kate Schmitz Ave. to P21/362 nd Ave North Accessway / Trail $980,000 P20 New Accessway / P21 New Accessway / Industrial Way to Eastern UGB Accessway / Trail $1,310, nd Ave north to new trail P19 Accessway / Trail $300,000 P22 New Accessway / Extension of Tickle Creek Trail from OR 211 to Jacoby Rd Highway Improvements (Lead Agency Oregon Department of Transportation) Accessway / Trail $320,000 P23 OR 211 OR 211 Parkway Path Construct Bike/Ped Accessway $325,000 P24 OR 211 South UGB to US 26 Construct sidewalk (see B11)** P25 US 26 Royal Ln. to 362 nd Dr. Infill sidewalk gaps and add landscaping P26 US nd Dr. to West UGB Infill sidewalk gaps and add landscaping $440,000 $990,000 P27 US 26 Ruben Ln. to University Ave. Infill sidewalk gaps $510,000 P28 US 26 Ten Eyck Rd. to eastern UGB Infill sidewalk gaps (see B12)** Near-Term Projects Total Cost $1,823,000 Total Cost $14,610,000 Notes: * Projects illustrated in Figure 2. **Cost is covered in the Bicycle System Project Costs. ***Park project with potential transportation benefit. Transportation funding will be determined during project development. December 2011 Page 46

4 Table 15: Bicycle System Projects Preferred Plan Project ID* Project Segment Description Local System Improvements (Lead Agency City of Sandy) Project Costs (2009 Dollars) Near-Term Projects B4 Dubarko Rd.** 362 nd Dr. to Eldridge Dr. Re-stripe/widen Rd. $36,000 B5 Dubarko Rd.** Sandy Heights St. to Melissa Ave. Re-stripe/widen Rd. $36,000 B6 Langensand Rd.** US 26 to UGB Re-stripe/widen Rd. $61,200 B7 Meinig Ave.** Scenic St. to US 26 Re-stripe/widen Rd. $61,000 B9 Sandy Heights St.** Bluff To End Re-stripe/widen Rd. $40,000 B10 Tupper Rd.** Long Circle to OR 211 Re-stripe/widen Rd. $59,000 B1 362 nd Dr. Dubarko Rd. to UGB Widen shoulder to 6 $1,230,000 B2 Bluff Rd.** US 26 to Miller Rd. Re-stripe/widen Rd. $40,000 B3 Bornstedt Rd.** OR 211 to UGB Re-stripe/widen Rd. $32,000 B8 Meinig Ave.** Barker Ct. to Dubarko Rd. Re-stripe/widen Rd. $17,000 Highway Improvements (Lead Agency Oregon Department of Transportation) B11 OR 211 UGB to US 26 Widen shoulder to 6 $28,200,000*** B12 US 26 Ten Eyck Rd. to UGB Widen shoulder to 6 $3,260,000 Near-Term Projects Total Cost $293,200 Total Cost $32,799,000 Notes: * Projects illustrated in Figure 3. **May require the elimination of on street parking (cost estimate for restripe only). ***Includes drainage, lighting, bicycle and pedestrian elements. December 2011 Page 47

5 Table 16: Motor Vehicle System Projects Preferred Plan Project ID Improvement(s) Description Local System Improvements (Lead Agency City of Sandy) Near-Term Projects Project Cost (2009 Dollars) Improvement Type M2 M13 M16 M12 362nd Dr./Dubarko Road Construct a single-lane roundabout Dubarko Road Connect to Champion Way Kate Schmidt Avenue Extend. from US 26 to the proposed Bell Street extension Industrial Way Extend to Jarl Road/ US 26 $1,165,000 Intersection $6,105,000 Roadway $7,345,000 Roadway $10,800,000 Roadway M14* Bell Street Extend. to Orient Drive M15* 362nd Drive Extend to Kelso Road M18* Olson Road Extend from 362 nd Drive to Jewelberry Avenue $50,905,000 Roadway $26,620,000 Roadway $12,890,000 Roadway M17 M19 M20 M21 M22 M1 Industrial Way North Extend to Bell Street extension Agnes Street Extend to Jewelberry Avenue Dubarko Road Extend to US 26 opposite Vista Loop Drive (West) Various Roads Gunderson Rd., 370 th Avenue, Cascade Village Drive, Cascade Village Boulevard, New Collector New Road New road extension from Dubarko Road to US 26 opposite Vista Loop Drive (East) Industrial Way/362 nd Drive Realign Industrial Way East to connect into the intersection of Industrial Way west Construct a single lane roundabout $3,820,000 Roadway $4,870,000 Roadway $3,200,000 Roadway $20,000,000 Roadway $16,390,000 Roadway $3,390,000 Intersection December 2011 Page 48

6 Table 16 (continued): Motor Vehicle System Projects Preferred Plan Project ID Improvement(s) Description Highway Improvements (Lead Agency Oregon Department of Transportation) Project Cost (2009 Dollars) Improvement Type M3 M4 M5 US 26 at 362 nd Drive Construct a second westbound left turn lane Construct an acceptance lane for second westbound left turn lane to drop at southern access to Fred Meyer property Construct a northbound through lane Construct southbound through, right turn and left turn lanes US 26 at Industrial Way Change southbound approach to dual left turn lanes and a shared through/right lane Construct a northbound left turn lane US 26 at Ruben Lane Change southbound approach to dual left turn lanes and a shared through/right lane Change northbound approach to left turn lane, and shared through/right lane $5,350,000 Intersection $780,000 Intersection $770,000 Intersection M6 Proctor Boulevard (US 26)/OR 211 Construct a northbound left turn lane (restriping only) $5,000 Intersection M7 M8 M9 M10 Orient Drive to Ten Eyck Road) US 26 Adaptive Signal Timing US 26 at Ten Eyck Road Construct a northbound left turn lane Construct a southbound left turn lane OR 211 at Dubarko Road Construct a northbound right turn lane Construct a southbound left turn lane Construct a northbound left turn lane Construct a traffic signal Bornstedt Road** Prohibit left turns out $400,000 Intersection $1,220,000 Intersection $10,150,000 Intersection $16,000 Intersection M11 Arletha Court/OR 211 Realign approach from the south $2,570,000 Intersection Near-Term Projects Total Cost $14,615,000 December 2011 Page 49

7 Total Cost $174,146,000 Notes: *Sections of these projects are outside the City s UGB. **Project would be necessary only if mobility standard is not met. Potential alternative projects are available. Understanding the magnitude of the difference between what projects are desired (Preferred Plan) and the capacity to fund them informs future decisions regarding the need for local tax and fee rate changes, alternate financing strategies, or approaches to allocating limited resources to where they are needed most. For example, the total cost of the near term projects identified ($16.7 million) is approximately 65% greater than the amount of revenue that was projected to be available for transportation improvements ($10.2 million). This is an indication that reliance on the revenue streams identified in Table 13 will not be sufficient over the long term. Therefore, the City will need to explore a range of complimentary funding strategies, such as those described below. Potential New Funding Sources Consideration of new funding sources to increase revenue for transportation projects is recommended to implement needed improvements in a timely manner to that supports the demands of growth and community livability. Any potential funding source is constrained based on a variety of factors, including the willingness of local leadership and the electorate to burden citizens and businesses, the availability of local funds to be dedicated or diverted to transportation from other competing City programs, and the availability and competitiveness of state and federal funds. Nonetheless, it is important for the City to consider all of its options and understand where it may be possible to provide and enhance funding for its transportation programs. This section describes several potential transportation funding sources, including State and County contributions, City sources (i.e., residents, businesses, and/or developers), grants, and debt financing. Many of these sources have been used in the past by other agencies in Oregon, and in most cases, when used collectively, are sufficient to fund transportation improvements for a local community. State and County Contributions Within Sandy there are multiple roadways that are not under City jurisdiction but instead are the responsibility of either ODOT or Clackamas County. The City should seek contributions (i.e., funding partnerships) from ODOT and Clackamas for projects located on their respective roadways. City advocacy for direct appropriations from the state or federal legislatures could be another funding strategy. ODOT Contributions The Oregon Department of Transportation (ODOT) funds projects on state highways under three primary programs: modernization, preservation and maintenance, and grants (see Grant Programs below). Programmed projects are included in the four year Statewide Transportation Improvement Program (STIP), which is updated every two years. ODOT maintenance districts (District 2C for Sandy) also have available funds that may be used for small scale projects such as in fill sidewalks or culvert repair on a state highway. December 2011 Page 50

8 When considering proposed land use actions such as subdivisions or site development, the City should not assume that TSP projects on US 26 or OR 211 will be in place to support the proposed development unless the project is programmed in the current STIP. For proposed comprehensive plan amendments, which must consider the long term adequacy of the transportation system for TPR compliance, ODOT must be consulted to make a determination whether a highway project is reasonably likely to be funded based on funding projections at that time. Clackamas County Contributions Potentially, Clackamas County may contribute funds to projects located on County roadways. Clackamas County TSP 20 year Capital Improvement Plan (CIP) includes the following three projects that affect intersections identified in the Motor Vehicle Preferred Plan: Project #217: Remove or decrease horizontal and vertical curves on 362 nd Drive between Colorado Road and Dubarko Road. Project #218: Remove or decrease horizontal and vertical curves on 362 nd Drive and relocated intersection of 362 nd Drive/Deming Road. Project #220: Reconstruct and widen Ten Eyck Road between Lusted Road and US 26. The above listed projects are complementary to the projects identified in the City s TSP. For proposed land use actions, projects on County roads should not be considered available to serve development unless they are programmed in the County s Five Year Transportation CIP. When considering comprehensive plan amendments, the City should consult with the County regarding the likelihood of County funding for projects contained in the TSP 20 year CIP list. City should also participate in the next update of the County TSP. Direct Appropriations The City may also seek direct appropriations from the State Legislature and/or the United States Congress for transportation capital improvements. There may be projects identified in the plan for which the City may want to pursue these special, one time appropriations. In particular, projects that support economic development may gain support for direct appropriations. City Sources The City can also look to local residents, business owners, and developers to raise additional funds that can be designated for transportation related uses. Some optional sources include developer exactions, Urban Renewal District (URD) fund increases, transportation systems development charge (SDC) increases, local improvement district (LID) funds, General Fund revenue transfers, special assessments, and employment taxes. Developer Exactions Exactions are roadway and/or intersection improvements that are partially or fully funded by developers as conditions of development approval. Typically, all developers are required to improve the roadways along their frontage upon site redevelopment. In addition, when a site develops or redevelops, the developer may be required to provide off site improvements depending upon the expected level of December 2011 Page 51

9 traffic generation and the resulting impacts to the transportation system. City may utilize the Zone of Benefit process to address proportionate contribution by development. Urban Renewal District (URD) A URD is a tax funded district within the City. The URD is funded with the incremental increases in property taxes that result from the construction of applicable improvements. As desired, the funds raised by a URD can be used for, but are not limited to, transportation projects. These projects must be located within the URD boundaries. In 1998, the City created a URD for its downtown core, which has been a funding source for several successful projects including utility undergrounding, streetscapes, and the construction of a civic plaza. Transportation System Development Charges (SDCs) SDCs are a funding source collected from new development that can be used to fund projects that increase the transportation system s capacity (not for projects that target maintenance or operations). While the methodologies for determining the SDC rate vary, a commonly used method is to base the rate on the estimated p.m. peak hour vehicle trips generated by a proposed development. A singlefamily home generates approximately one p.m. peak hour vehicle trip, so it is often considered the base unit. The City of Sandy has a current SDC rate of approximately $1,943 per single family residence and $203 per daily trip for all other uses, which is lower than most Metro area cities, but comparable to many similarly sized cities outside of the Metro area. For every increase in SDC rates of $100 for single family households and $10 per daily trip for all other trip types, there would be an additional $362,000 available for transportation improvements over a 20 year period. Local Improvement District (LID) The City may set up Local Improvement Districts (LIDs) to fund specific capital improvement projects within defined geographic areas, or zones, of benefit. LIDs impose assessments on properties within its boundaries and may only be spent on capital projects within the geographic area. Because LIDs may not fund ongoing maintenance costs, they require separate accounting. Furthermore, because citizens representing 33% of the assessment can terminate a LID and overturn the planned projects, LID projects and budgets must obtain broad approval of those within the LID boundaries. General Fund Revenues At the discretion of the City Council, the City can allocate General Fund revenues to pay for its transportation program. General Fund revenues primarily include property taxes, use taxes, and any other miscellaneous taxes and fees imposed by the City. This allocation is completed as a part of the City s annual budget process, but the funding potential of this approach is constrained by competing community priorities set by the City Council. General Fund resources can fund any aspect of the program, from capital improvements to operations, maintenance, and administration. Additional revenues available from this source to fund new aspects of the transportation program are only available to the extent that either General Fund revenues are increased or City Council directs and diverts funding from other City programs. December 2011 Page 52

10 Special Assessments A variety of special assessments are available in Oregon to defray costs of sidewalks, curbs, gutters, street lighting, parking, and central business district (CBD) or commercial zone transportation improvements. These assessments would likely fall within the Measure 50 limitations. One example is the 50/50 program. This is a match program for sidewalk infill projects where property owners pay half the cost of a sidewalk improvement and the City matches the investment to complete the project. Employment Taxes Employment taxes may be levied to raise additional funds. For example, in the Portland region, payroll and self employment taxes are used to generate approximately $145 million annually for TriMet operations. It should be noted that Sandy currently collects a 0.6% payroll tax to fund SAM transit operations Grants The City of Sandy should actively pursue State and Federal grants, in particular to complete desired pedestrian and bicycle projects. Current grant opportunities include funding for pedestrian, bicycle, Intelligent Transportation System (ITS), and Safe Routes to School (SRTS) and Scenic Byway improvements. Current grant programs include: Federal Funding Sources Highway Safety Improvement Program Transportation Enhancements Recreational Trails Program Safe Routes to School (SRTS) New Freedom Initiative Community Development Block Grants Land and Water Conservation Fund National Scenic Byways Program Transportation, Community and System Preservation Program State of Oregon Funding Sources Immediate Opportunity Fund Transportation Infrastructure Bank Special Transportation Fund Bicycle and Pedestrian Program Grants Pedestrian Safety Mini Grant Program Business Energy Tax Credits (BETC) Safe Routes to School (OSRTS) Other Funding Sources American Greenways Program Bikes Belong Grant Program December 2011 Page 53

11 Debt Financing While not a direct funding source, debt financing is another funding method. Through debt financing, available funds can be leveraged and project costs can be spread over the projects useful lives. Though interest costs are incurred, the use of debt financing can serve not only as a practical means of funding major improvements, but it is also viewed as an equitable funding source for larger projects because it spreads the burden of repayment over existing and future customers who will benefit from the projects. One caution in relying on debt service is that a funding source must still be identified to fulfill annual repayment obligations. Two methods of debt financing are voter approved general obligation bonds and revenue bonds. Voter Approved General Obligation Bonds Subject to voter approval, the City can issue General Obligation (GO) bonds to debt finance capital improvement projects. GO bonds are backed by the increased taxing authority of the City, and the annual principal and interest repayment is funded through a new, voter approved assessment on property throughout the City (i.e., a property tax increase). Depending on the critical nature of projects identified in the Transportation Plan and the willingness of the electorate to accept increased taxation for transportation improvements, voter approved GO bonds may be a feasible funding option for specific projects. Proceeds may not be used for ongoing maintenance. Revenue Bonds Revenue bonds are debt instruments secured by rate revenue. For the City to issue revenue bonds for transportation projects, it would need to identify a stable source of ongoing rate funding. Interest costs for revenue bonds are slightly higher than for general obligation bonds due to the perceived stability offered by the full faith and credit of a jurisdiction. Implementation As part of the process to update the City of Sandy TSP, the City s Development Code (Title 17 of the City of Sandy Municipal Code) was audited to provide recommended regulatory language that will implement the TSP, as well as ensure consistency with the Transportation Planning Rule (OAR ). Through this audit, several recommendations were made that would amend the City s Development Code. The complete code analysis and recommended amendments have been included in the appendix (Implementation Element Memorandum) for reference. The recommended code amendments can be adopted through a separate public hearing process or concurrently with the TSP. December 2011 Page 54

The Oregon Department of Transportation Budget

The Oregon Department of Transportation Budget 19 20 The Oregon Department of Transportation Budget The Oregon Department of Transportation was established in 1969 to provide a safe, efficient transportation system that supports economic opportunity

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project Agenda Bill City Council Regular Meeting June 19, 2018 SUBJECT: 2019-2024 Six-Year Transportation Improvement Plan (TIP) DATE SUBMITTED: June 12, 2018 DEPARTMENT: Public Works NEEDED FROM COUNCIL: Action

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital

More information

implementation CHAPTER FOUR IN THIS CHAPTER... General Plan Consistency Plan Administration

implementation CHAPTER FOUR IN THIS CHAPTER... General Plan Consistency Plan Administration CHAPTER FOUR implementation IN THIS CHAPTER... General Plan Consistency Plan Administration Phasing Strategy Financing Strategy For the vision, goals and policies described in the body of the San Pablo

More information

Report Accompanying the Diamond Lake Urban Renewal Plan

Report Accompanying the Diamond Lake Urban Renewal Plan Report Accompanying the Diamond Lake Urban Renewal Plan Adopted by the City of Roseburg July 9, 2018 Ordinance No. 3502 Diamond Lake Urban Renewal Area Consultant Team Elaine Howard Consulting, LLC Elaine

More information

Route Route Z Intersection Realignment

Route Route Z Intersection Realignment Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS TABLE OF CONTENTS SPECIAL REVENUE FUNDS Public Works Fund History... 74-81 Grant Special Revenue Fund... 82-84 Hotel/Motel Tax Fund... 85-86 Street Lights and Sidewalk Fund... 87-89 Bike Trail Fund...

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

System Development Charge Methodology

System Development Charge Methodology City of Springfield System Development Charge Methodology Stormwater Local Wastewater Transportation Prepared By City of Springfield Public Works Department 225 Fifth Street Springfield, OR 97477 November

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

INVESTMENT STRATEGIES

INVESTMENT STRATEGIES 3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This

More information

Financial Capacity Analysis

Financial Capacity Analysis FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is

More information

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND OCTOBER 2012 PREPARED BY: LEWIS YOUNG ROBERTSON & BURNINGHAM IMPACT FEE CERTIFICATION Impact Fee Facilities Plan (IFFP) Certification

More information

Public Works Transportation Infrastructure Study. Minneapolis Public Works Transportation Infrastructure Study

Public Works Transportation Infrastructure Study. Minneapolis Public Works Transportation Infrastructure Study Minneapolis Public Works Transportation Background Study Objective Summary of Results Next Steps and Policy Questions Background: Currently, funding availability drives infrastructure investment decisions.

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

CHAPTER 4 1 Transportation Financial Analysis

CHAPTER 4 1 Transportation Financial Analysis CHAPTER 4 1 Transportation Financial Analysis COMPASS commissioned a financial analysis, finalized in 2012, to support the CIM 2040 update. The analysis, Financial Forecast for the Funding of Transportation

More information

FY Transportation Improvement Program (TIP)

FY Transportation Improvement Program (TIP) Corvallis Area Metropolitan Planning Organization (CAMPO) FY2018-2021 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board May 17, 2017

More information

GRASS VALLEY TRANSPORTATION IMPACT FEE PROGRAM NEXUS STUDY

GRASS VALLEY TRANSPORTATION IMPACT FEE PROGRAM NEXUS STUDY HEARING REPORT GRASS VALLEY TRANSPORTATION IMPACT FEE PROGRAM NEXUS STUDY Prepared for: City of Grass Valley Prepared by: Economic & Planning Systems, Inc. March 2008 EPS #17525 S A C R A M E N T O 2150

More information

ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30TH, 2017

ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30TH, 2017 ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30TH, 2017 2016/2017 Sandy Urban Renewal Agency This report fulfills the requirements, prescribed in ORS.457.460, for the filing of an annual report detailing

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000 CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION On-Going Pavement Management Program: In 2009/2010 the city completed the initial 3-year plan

More information

Planning Board Worksession No.6: Transportation and Staging

Planning Board Worksession No.6: Transportation and Staging Planning Board Worksession No.6: Transportation and Staging Prior Worksessions January 27: Focused on transportation analysis and staging recommendations in the Draft Plan. February 9: Reviewed the Executive

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

Portland Community College

Portland Community College Portland Community College Public Hearing $185 million General Obligation Bond Measure No. 26-196 For the November 17, 2017 Special Election Bonds to construct job training space, improve classrooms, safety,

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

Minimum Elements of a Local Comprehensive Plan

Minimum Elements of a Local Comprehensive Plan Minimum Elements of a Local Comprehensive Plan Background OKI is an association of local governments, business organizations and community groups serving more than 180 cities, villages, and townships in

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

Self-Supported Municipal Improvement districts

Self-Supported Municipal Improvement districts Self-Supported Municipal Improvement districts Combined Annual Report Downtown Highland Park Ingersoll Sherman Hill June 30, 2012 FAQ s What is a self-supported municipal improvement district or SSMID?

More information

CHAPTER 11: Economic Development and Sustainability

CHAPTER 11: Economic Development and Sustainability AGLE AREA COMMUNITY Plan CHAPTER 11 CHAPTER 11: Economic Development and Sustainability Economic Development and Sustainability The overall economy of the Town and the Town government s finances are inextricably

More information

Five-Year Capital Improvement Plan

Five-Year Capital Improvement Plan FiveYear Capital Improvement Plan 2016 2020 CITY OF RANCHO CORDOVA City of Rancho Cordova Council: Mayor:. Robert J. McGarvey Vice Mayor: David Sander Council Member:.. Linda Budge Council Member:.. Dan

More information

Merced County Transportation Sales Tax Expenditure Plan

Merced County Transportation Sales Tax Expenditure Plan Merced County Transportation Sales Tax Expenditure Plan November 2005 Prepared by Merced County Association of Governments 369 West 18 th Street Merced, CA 95340 209-723-3153 http://mcag.cog.ca.us Summary

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Transportation Package HB 2017

Transportation Package HB 2017 Transportation Package HB 2017 Increases in Rates and Revenue Raised Some traditional, and some new and innovative Commonly considered increases: Gas Tax and use fuel increase (Total 10 cents increase)

More information

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation 2016 Bond Referenda 1. Metro and Transportation bonds in the maximum principal amount of $58,785,000 to finance, together with other available funds, the cost of various capital projects for the Washington

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

Planning Board Worksession No.1-Transportation and Staging

Planning Board Worksession No.1-Transportation and Staging Planning Board Worksession No.1-Transportation and Staging Planning Board Worksession No.1: Transportation and Staging Public Hearing: January 12, 2017 Public Record Closes: January 26, 2017 Sector Plan

More information

CHAPTER 5 INVESTMENT PLAN

CHAPTER 5 INVESTMENT PLAN CHAPTER 5 INVESTMENT PLAN This chapter of the 2014 RTP/SCS plan illustrates the transportation investments for the Stanislaus region. Funding for transportation improvements is limited and has generally

More information

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004)

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004) City of St. Petersburg FY15 Adopted Fiscal Plan Fiscal Year 2015 R-1 CIP Other Funds City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian

More information

2012 Ballot Initiatives Report

2012 Ballot Initiatives Report 2012 Ballot Initiatives Report Voters on November 6 showed once again the importance of transportation by approving 68 percent of the measures to or extend funding for highways, bridges and transit. This

More information

Implementation Project Development and Review 255

Implementation Project Development and Review 255 Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

Lincoln City Urban Renewal Agency Budget Message April 9, 2018

Lincoln City Urban Renewal Agency Budget Message April 9, 2018 Lincoln City Urban Renewal Agency 2018-19 Budget Message April 9, 2018 This budget represents the Agency s fourth year of its Underlevy Plan, which is a ten-year extension of the Agency s activities and

More information

DESCRIPTIONS OF BUDGET TERMS

DESCRIPTIONS OF BUDGET TERMS DESCRIPTIONS OF BUDGET TERMS Ad Valorem Tax A tax based on the assessed value of a property. Adopted Budget Financial plan which forms the basis and limits for appropriations and is adopted by the City

More information

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205 Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.

More information

Chapter 6 Transportation Improvements & Financial Plan

Chapter 6 Transportation Improvements & Financial Plan Chapter 6 Transportation Improvements & Financial Plan Introduction Up to this point, this plan has provided a regional profile (the population, employment, and commuting patterns) of the RTPO and MPO

More information

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary The adopted FY 2018 FY 2022 CIP is $138 million (including prior year expenditures) and is $100 million lower than the previous CIP due

More information

REVENUE IMPACT OF PROPOSED LEGISLATION 79th Oregon Legislative Assembly 2017 Regular Session Legislative Revenue Office

REVENUE IMPACT OF PROPOSED LEGISLATION 79th Oregon Legislative Assembly 2017 Regular Session Legislative Revenue Office REVENUE IMPACT OF PROPOSED LEGISLATION 79th Oregon Legislative Assembly 2017 Regular Session Legislative Revenue Office Bill Number: Revenue Area: Economist: Date: HB 2017 A Transportation Mazen Malik

More information

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July

More information

TAX INCREMENT FINANCING (T.I.F.)

TAX INCREMENT FINANCING (T.I.F.) TAX INCREMENT FINANCING (T.I.F.) Tax Increment Financing (T.I.F.) is a financing technique that can be used to pay for costs associated with the renovation of conservation areas. Funding is done by designating

More information

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards; DIVISION 4.200 CAPITAL IMPROVEMENTS ELEMENT SECTION 4.201 INTRODUCTION The purpose of the Capital Improvements Element (CIE) is to tie the capital improvement needs identified in the other elements to

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund Capital Improvement Program (CIP) Overview The Capital Improvement Program provides funding for streets, public buildings (both governmental and school facilities), land,

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS A. GOALS, OBJECTIVES, AND POLICIES... 3 B. SUMMARY... 17 LIST OF TABLES Table IX 1: City of Winter Springs Five-Year Schedule of Capital Improvements (SCI) FY 2013/14-2017/18... 11 Table

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

Chapter 5. REMAINING REVIEW FACTORS

Chapter 5. REMAINING REVIEW FACTORS Chapter 5. REMAINING REVIEW FACTORS Section 5.1 Finance Constraints and Opportunities Chapter 5 REMAINING REVIEW FACTORS Introduction The remaining review factors required by the Cortese Knox Hertzberg

More information

Approved by the Roanoke Valley-Alleghany Regional Commission April 25, 2013

Approved by the Roanoke Valley-Alleghany Regional Commission April 25, 2013 FY 2014 Rural Transportation Planning Assistance Program SCOPE OF WORK For the Roanoke Valley-Alleghany Regional Commission (July 1, 2013 June 30, 2014) Approved by the Roanoke Valley-Alleghany Regional

More information

1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local

1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local 1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local government efforts to fund local transportation 4 projects that

More information

D R A F T APPENDIX A. Future Employment Forecast Methodology

D R A F T APPENDIX A. Future Employment Forecast Methodology Transit Development Plan Memo #3: Planning Framework Appendix A APPENDIX A Future Employment Forecast Methodology Transit Development Plan Memo #3: Planning Framework Appendix A APPENDIX A FUTURE EMPLOYMENT

More information

FY Transportation Improvement Program (TIP)

FY Transportation Improvement Program (TIP) Corvallis Area Metropolitan Planning Organization (CAMPO) FY2015-2018 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board July 27, 2016

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

Transportation Trust Fund Overview

Transportation Trust Fund Overview Transportation Trust Fund Overview Created pursuant to New Jersey Transportation Trust Fund Authority Act of 1984 Established to finance the cost of planning, acquisition, engineering, construction, reconstruction,

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

Technical Report No. 4. Revenue and Costs

Technical Report No. 4. Revenue and Costs Technical Report No. 4 Revenue and Costs Technical Report No. 4 REVENUE AND COSTS PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph (727) 847-8140, fax (727)

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

Your Consultant Team

Your Consultant Team Your Consultant Team Kimley Horn Keith Greminger, Jared Schneider, Dawn Dodge Fred Hearns Tours, LLC Fred Hearns Ferrell Redevelopment Stephanie Ferrell Urbanomics Ken Creveling, Tony Mondae Community

More information

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District EXHIBIT A DONATIONS NO. DONOR D/D/O COUNTY DESCRIPTION 1 9607 Cullen Blvd, An Individual Series of Forefunders Partners, LLC 2 Apache Corporation Houston District Harris The donor is donating the design

More information

Chapter 3: Regional Transportation Finance

Chapter 3: Regional Transportation Finance Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the

More information

North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017

North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 1 M e e t i n g P u r p o s e a n d O b j e c t i v e s PURPOSE: Present project timeline and next steps Present Proposed Improvements

More information

TOWN OF JUPITER Community Redevelopment Agency

TOWN OF JUPITER Community Redevelopment Agency TOWN OF JUPITER Community Redevelopment Agency DATE: September 14, 2012 TO: THRU: FROM: Honorable Chair and Commissioners of the Community Redevelopment Agency Andrew D. Lukasik, Executive Director Brenda

More information

I. Introduction and Background

I. Introduction and Background I. Introduction and Background The purpose of the Midterm Review of the 2007 Five-Year Implementation Plan (Implementation Plan) is to provide a review of the current status of the goals, programs and

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

INTRODUCTION. Nearly one third of a million people call the 1,893 square miles of Clackamas County home.

INTRODUCTION. Nearly one third of a million people call the 1,893 square miles of Clackamas County home. INTRODUCTION Nearly one third of a million people call the 1,893 square miles of Clackamas County home. The County's settlement pattern has resulted in small communities, most of which are clustered in

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

3 YEAR BUDGET FORECAST

3 YEAR BUDGET FORECAST 3 YEAR BUDGET FORECAST City of Fairview Heights, IL FISCAL YEARS: 2014 2015 2015 2016 2016-2017 Report Date: 6/20/2013 07/03/2013 Page 1 of 16 Revenue Forecast The City of Fairview Heights is a fiscally

More information

Glossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17

Glossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17 Kitsap County Public Works Transportation Project Evaluation System 2017 Table of Contents Introduction... 1 Four-Tier system... 4 Tier 1 - Transportation Improvement Program (TIP)... 4 Tier 2 Prioritized

More information

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Discussion: In 1986, voters approved Measure B, a 1/2 cent sales tax, to fund transportation

More information

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM

More information

S h e l b y v i l l e, K Y E A S T E N D S T U D Y L A N I M P L E M E N TAT I O N

S h e l b y v i l l e, K Y E A S T E N D S T U D Y L A N I M P L E M E N TAT I O N S h e l b y v i l l e, K Y 8 P L A N I M P L E M E N TAT I O N Sh e l b y v i l l e, K Y 8 P l a n I m p l e m e n t a t i o n I n t r o d u c t i o n In order to realize the vision and goals established

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017 Fiscal Responsibility to Further Invest in the Future Executive Committee Department of Finance May 4, 2017 1 Asset Inventory Denver s Assets Parks and Recreation $1.8B Transportation $4.7B Buildings $1.9B

More information

2017 Congestion & Freight Mobility Workgroup. Senator Boquist Senator Johnson Representative Smith Warner Representative McLain

2017 Congestion & Freight Mobility Workgroup. Senator Boquist Senator Johnson Representative Smith Warner Representative McLain 2017 Congestion & Freight Mobility Workgroup Senator Boquist Senator Johnson Representative Smith Warner Representative McLain 1 Presentation Format: Work Group Report: Senator Boquist Director Garrett

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

Transportation Improvement Program Project Priority Process White Paper

Transportation Improvement Program Project Priority Process White Paper Transportation Improvement Program Project Priority Process White Paper Pierce County Public Works- Office of the County Engineer Division Introduction This paper will document the process used by the

More information

Total Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60%

Total Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60% Chris E. Bauserman, P.E., P.S., Delaware County Engineer, President CEAO Testimony House Bill 26 Ohio House of Representatives Finance Committee February 14, 2017 Chairman Smith, Ranking Member Cera, Sub.

More information

FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014

FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014 FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014 I. INTRODUCTION A. Background The Sonoma County Board of Supervisors (the Board of Supervisors

More information

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process CHAPTER 2 BACKGROUND What Is the 2030 TSP? Update of Previous Planning Work Plan Development Process Public Involvement and Review Process Hennepin County Transportation Systems Plan (HC-TSP) Chapter 2

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities