1 RISK-BASED AUDIT PLAN Executive Summary Audit Branch June 2010
2 Executive Summary Natural Resources Canada s three year risk-based audit plan has been prepared in accordance with the applicable requirements of the revised July 2009 Treasury Board Policy on Internal Audit and related directives and guidelines, and the professional standards of the Institute of Internal Auditors. The risk-based audit plan includes internal audit projects for a 3 year period from to The Planning Context The Audit Branch is in its third year of formalizing a more systematic and transparent approach to risk-based audit planning since the adoption of the 2006 Treasury Board Policy on Internal Audit. In preparing the Audit Plan 1, planning principles were applied in a consistent manner with the prior two years. Building on previous work, the Audit Branch has continued to refine its approach each year with further improvements consistent with Treasury Board guidance to Chief Audit Executives (CAE). The Audit Branch uses a similar audit planning approach as the Office of the Comptroller General, which is based on the planning guidance provided by its Internal Audit Sector. All audit projects were discussed with senior management and the Audit Committee, with particular emphasis on the projects planned for (first year of the three-year Audit Plan), given that future year projects are re-assessed on an annual basis. Government and departmental priorities were validated with senior management and the Audit Committee to ensure greater alignment of planned audits to the key and highest priority areas. Opportunities for improvement were identified regarding the Audit Plan in the 2009 Management Accountability Framework (MAF) assessment (Round VII) provided in April The Audit Plan was assessed as not clearly demonstrating the results of its risk assessment process, not providing additional resourcing information and was received by the Office of the Comptroller General (OCG) in an untimely manner. The Audit Branch believes it has addressed all three matters in this year s report. A quality review process was applied throughout the planning cycle, to ensure that the Audit Plan: Is risk-based; Covers audit and management priorities; Is reviewed by senior management and the audit committee; Is focused predominantly on the provision of assurance on risk management, control and governance processes; Has a multi-year horizon; Addresses risks and internal audits identified by the Comptroller General as part of government-wide coverage; and Supports annual assurance reporting by the Chief Audit Executive on departmental risk management, control and governance processes. 1 The risk-based audit plan (RBAP) prepared by the Audit Branch of Natural Resources Canada (NRCan) is also referred to as the Audit Plan within this document. June 2010 Executive Summary Only 1
3 The Planning Process The starting point for the risk-based selection process is NRCan s internal audit universe. The audit universe represents a potential range of all audit activities and is comprised of a number of auditable entities. The Audit Branch uses the departmental Program Activity Architecture (PAA) to help assess completeness of the audit universe. The next stage is to prioritize the audit universe based on a risk assessment. This is a two step process and involves preliminary and final prioritization. This includes management consultations, review and consideration of available departmental risk information, including the Corporate Risk Profile (CRP), the latest Management Accountability Framework assessment, strategic review, business planning, the Report on Plans and Priorities (RPP), departmental and government priorities, the most recent tabled financial statements, and other considerations such as previous audit results (both internal and external). Consideration is given to other factors such as senior management requests; the Departmental Audit Committee (DAC) advice and recommendations; mandated audits such as Office of the Comptroller General s horizontal directed audits; audits resulting from the Budget 2009 Economic Action Plan; planned audits by other assurance providers. Finally the draft audit plan is distributed to Departmental Audit Committee for review and recommended to the Deputy Minister for approval. The following diagram highlights the four key phases used in the selection process for the development of a robust risk-based audit plan. AUDIT UNIVERSE (Represen ts po tential range of aud ita ble co mpon ents p rog rams, activities, processes, structures and in itiative s) 38 area s base d o n P AA a nd Se ctors Almo st 10 0 a ud it able entit ies Core Audits Grants & Contributions Financ ial IM/IT Othe r AUDIT RISK ASSESSMENT Impact x Likelihood 30 highest priority audit projects covering 3 years AUD IT RANK ING: PROPOSED AUDIT PROJECTS Environmental Scanning G overnment Priorities Departmental Priorities Corporate Risks Strategic Review Business Planning M AF A s sess m ent Consultations with management Other Considerations Core audit requirements CAE annual assurance perspective Mandated priorities Central Agencies audits Previous NRCan internal audits Time since last audit Audit Branch capacity Pr ioritizatio n Final discussions with senior management Senior management requests Audit Committee requests Focus on first year proposed audit projects June 2010 Executive Summary Only 2
4 The Planning Results In total, almost 30 new highest priority internal audit projects are planned for the next three years. The following table summarized the number of new internal audit projects selected for each year along with the number of special advisory projects, carry-forward audits from and scheduled Office of the Comptroller General horizontal directed audits. Type of Audit Project Core grant and contribution (G&C) programs Core financial Core information management and technology (IM/IT) Other audit projects NEW INTERNAL AUDIT PROJECTS SUB-TOTAL Special advisory projects Carry-forward audits from OCG Horizontal directed audits TOTAL The following four tables provide a listing of audit projects being carried forward from and the new highest priority internal audit projects for fiscal years , and ecoenergy for Biofuels Carry Forward Financial Statement Preparation and Reporting Accounts Receivable and Revenue Management Physical Security Horizontal Audit of Transfer Payments (G&C Programs) Pulp and Paper Green Transformation Program (PPGTP) - Black Liquor Production Clean Energy Fund Financial Statement Reporting (Asset) - Investments Payroll and Benefits Overtime, Vacation and Other Benefits Asset Management Real Property and Fleet Professional Services Operating Expenditures SAP System (Felix Project Planning & Delivery) Accelerated Infrastructure Program (Phase II - Delivery) 2 2 Modernizing Federal Labs & Invasive Species Research Centre (project #63) has been included in the Accelerated Infrastructure Program (AIP) Phase II audit for June 2010 Executive Summary Only 3
5 Expenditure Management (Strategic Review Reallocations) Felix Implementation ecoenergy Technology Initiative Business Continuity Management Management of Information Holdings CANMET - Materials Technology Lab: Relocation United Nations Convention on the Law of the Sea (UNCLOS) Geo-Mapping for Energy & Minerals (GEM) Environmental Liabilities Strategic Planning Operating Expenditures (Transportation, Information, Rentals, and Repairs and Maintenance) ecoenergy Renewable Power Identity and Access Management (Privacy/Access Acts, User Identification /Password Controls) Budgeting and Forecasting Servers Administration and Security Systems and Application Controls (HR / Payroll / Procurement) Interest / Transfer Payments (Offshore) Natural Hazards Information and Response Loans and Advance Receivables IT Infrastructure and Governance In preparation of the Audit Plan, an estimate of total resource capacity available was determined and allocated to all Branch activities using metrics based from prior experience. Taking into account the budget available for internal and external resources, a total of approximately 4,700 person days of capacity for 26 professional positions was estimated for (i.e., direct audit time, excluding leave provisions and time for administration, professional development and language training). June 2010 Executive Summary Only 4
Final Preliminary Survey Report Audit of Budgeting and Forecasting. June 19, Office of Audit and Evaluation
2013-705 Audit of Budgeting and Forecasting June 19, 2014 Office of Audit and Evaluation TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND... 1 OBJECTIVE, SCOPE AND APPROACH... 3 RISK ASSESSMENT... 4 PRELIMINARY
More informationTreasury Board of Canada Secretariat. Performance Report. For the period ending March 31, 2005
Treasury Board of Canada Secretariat Performance Report For the period ending March 31, 2005 Reg Alcock President of the Treasury Board and Minister responsible for the Canadian Wheat Board Departmental
More informationAuditor General of Canada to the House of Commons
2010 Report of the Auditor General of Canada to the House of Commons SPRING Chapter 1 Aging Information Technology Systems Office of the Auditor General of Canada The Spring 2010 Report of the Auditor
More informationTreasury Board of Canada Secretariat
Treasury Board of Canada Secretariat 2007 08 A Report on Plans and Priorities The Honourable Vic Toews President of the Treasury Board Table of Contents Section I: Overview... 1 Minister s Message...
More informationTreasury Board of Canada Secretariat Departmental Performance Report
Treasury Board of Canada Secretariat 2009 10 Departmental Performance Report Original Signed By The Honourable Stockwell Day, P.C., M.P. President of the Treasury Board Table of Contents President s Message...
More informationDepartmental Audit Committee Annual Report. March 2015
2014-2015 Departmental Audit Committee Annual Report March 2015 Cette publication est également disponible en français. This publication is available in accessible HTML format on the Internet at: http://pch.gc.ca/eng/1341323450886
More informationFinal Audit Report. Audit of Financial Forecasting and Year-End Expenditures
Health Canada Santé Canada Final Audit Report Audit of Financial Forecasting and Year-End Expenditures September 2009 Table of Contents Executive Summary... ii Introduction... 1 Background... 1 Objectives...
More informationInternal Audit s Role in the Implementation of the Deficit Reduction Action Plan (DRAP)
Internal Audit s Role in the Implementation of the Deficit Reduction Action Plan (DRAP) Presentation to FMI Focus on Value November 29, 2012 Presented by: Nancy J. Rector, CA, CISA, CIA, CISSP, CIPP/C,
More informationFor help accessing information in this document, please contact 311.
For help accessing information in this document, please contact 311. City of Toronto Service Efficiency Study Program: Cross-Corporate Organizational Review Environmental & Energy Efficiency Incentives
More informationAudit of the Accelerated Infrastructure Program 2 Governance Phase 1 and 2
Final Report Audit of the Accelerated Infrastructure Program 2 Governance Phase 1 and 2 October 11, 2016 Office of Audit and Evaluation Table of contents Executive summary... i Introduction... 1 Focus
More informationDEPARTMENTAL QUARTERLY FINANCIAL REPORT Q1/
DEPARTMENTAL QUARTERLY FINANCIAL REPORT Q1/2013-2014 Quarterly Financial Report Q1/2013-2014 Page 1 of 10 Quarterly Financial Report Q1/2013-2014 Page 2 of 10 Introduction Quarterly Financial Report Statement
More informationFramework for Government Crown Agency Relationship
Framework for Government Crown Agency Relationship A Good Practices Checklist Crown Agencies Secretariat Board Resourcing and Development Office Introduction Framework for Government Crown Agency Relationship,
More informationOFFICE OF THE PUBLIC SECTOR INTEGRITY COMMISSIONER OF CANADA AUDIT AND EVALUATION COMMITTEE TERMS OF REFERENCE
OFFICE OF THE PUBLIC SECTOR INTEGRITY COMMISSIONER OF CANADA AUDIT AND EVALUATION COMMITTEE TERMS OF REFERENCE December 2017 INTRODUCTION This document establishes the responsibilities and operating arrangements
More informationPublic Safety Canada Internal Audit of Grants and Contributions Audit Report
Public Safety Canada Internal Audit of Grants and Contributions Audit Report November 2017 Her Majesty the Queen in Right of Canada, 2016 PS4-233/2017E-PDF ISBN: 978-0-660-24066-4 This material may be
More informationResource Alignment Reviews
Resource Alignment Reviews The Role of Business Modeling and Technology Enablement Mike Haley Performance Architect Landmark Decisions Inc. 22 nd Annual Performance and Planning Exchange Symposium AGENDA
More informationSHARED SERVICES CANADA. Financial Statements
SHARED SERVICES CANADA Financial Statements March 31, 2017 Statement of Management Responsibility Including Internal Control Over Financial Reporting Responsibility for the integrity and objectivity of
More informationAudit of PCH Responsibilities related to the Roadmap for Canada s Official Languages : Education, Immigration, Communities
D.2.1D Audit of PCH Responsibilities related to the Roadmap for Canada s Official Languages 2013-2018: Education, Immigration, Communities Office of the Chief Audit Executive Audit and Assurance Services
More informationOffice of the Auditor General of Canada Performance Audit Yukon Housing Corporation February Implementation Plan
Office of the Auditor General of Canada Performance Audit Yukon Housing Corporation February 2010 Implementation Plan 2010 2013 YUKON HOUSING CORPORATION IMPLEMENTATION PLAN Section #19 Recommendation
More informationScheduled Land Tenure
Scheduled Land Tenure A Holistic Overview of the C-NLOPB s New Petroleum Licencing Process Craig Rowe, M. Sc., P. Geo Director of Exploration crowe@cnlopb.ca www.cnlopb.ca Twitter: @cnlopb DISCLAIMERS
More informationReport of the Commissioner of the Environment and Sustainable Development
Fall 2013 Report of the Commissioner of the Environment and Sustainable Development CHAPTER 8 Federal and Departmental Sustainable Development Strategies Office of the Auditor General of Canada The Report
More informationAudit of Grants and Contributions
Audit of Grants and Contributions May 1, 2013 Key Dates Opening conference (launch memo) May 2011 Audit plan sent to management September 2011 End of fieldwork July 2012 Audit report sent to management
More informationAudit of the Department of Finance s Economic Action Plan: Governance, Risk management and Control Framework
Audit of the Department of Finance s Economic Action Plan: Governance, Risk management and Control Framework Final Report May 31 st, 2010 Prepared by Internal Audit and Evaluation for the: Audit and Evaluation
More informationPublic Safety Canada Internal Audit of Financial Management Governance. February 2014 RDIMS #
Public Safety Canada Internal Audit of Financial Management Governance February 2014 RDIMS #1016220 TABLE OF CONTENTS EXECUTIVE SUMMARY... I 1. INTRODUCTION... 1 1.1 Background... 1 1.2 Legislative Framework...
More informationCANADIAN ENVIRONMENTAL ASSESSMENT AGENCY REPORT ON PLANS AND PRIORITIES
CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY 2010-2011 REPORT ON PLANS AND PRIORITIES The Honourable Jim Prentice Minister of the Environment and Minister responsible for the Canadian Environmental Assessment
More informationPublic Appointments Commission Secretariat
2009-10 The Right Honourable Stephen Harper Prime Minister of Canada Christine Miles Deputy Executive Director Public Appointments Commission Secretariat Table of Contents SECTION I... 1 DEPARTMENTAL
More informationQuarterly Financial Report of TRANSPORT CANADA. (Unaudited) For the quarter ended June 30th, 2014
of TRANSPORT CANADA (Unaudited) For the quarter ended June 30th, 2014 Table of contents STATEMENT OUTLINING RESULTS, RISKS AND SIGNIFICANT CHANGES IN OPERATIONS, PERSONNEL AND PROGRAM - 3-1. INTRODUCTION
More informationOffice of Audit and Evaluation. Audit of Major Capital Project Management
Office of Audit and Evaluation Audit of Major Capital Project Management August 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY AND CONCLUSION...I 1.0 INTRODUCTION... 1 2.0 BACKGROUND AND CONTEXT... 1 3.0 AUDIT
More informationExpenditure Management System
Expenditure Management System Financial Management Institute of Canada Ottawa, Ontario November 26, 2014 Brian Pagan Assistant Secretary Expenditure Management Sector Treasury Board of Canada Table of
More informationOffice of the Superintendent of Financial Institutions (OSFI) - Enterprise-wide Risk Management (ERM)
Office of the Superintendent of Financial Institutions (OSFI) - Enterprise-wide Risk Management (ERM) Michele Bridges, Managing Director of Finance and Corporate Planning Financial Management Institute
More informationExpected Final Completi on Date
PSPC MANAGEMENT ACTION PLAN to the recommendations from the Audit of Building and Implementing Phoenix Spring 2018 Reports of the Auditor General of Canada Repo rt Ref. No. OAG Recommendation Departmental
More informationThe Financial Management Advisory (FMA) Oversight Role within the Investment Management Process
The Financial Management Advisory (FMA) Oversight Role within the Investment Management Process Omar Najm, CMA Director, Financial Management Advisory Services - Enabling Services Renewal Program; Chief
More informationCanadian Developments in Oil and Gas Taxation
Canadian Developments in Oil and Gas Taxation Jim Greene Tax Policy Branch OECD Workshop - November 18-19, 2010 Outline Oil and gas federal and provincial roles Corporate tax treatment of oil and gas production
More informationCopyright Board of Canada
Copyright Board of Canada 2014-15 Report on Plans and Priorities! James Moore Minister of Industry Her Majesty the Queen in Right of Canada, represented by the Minister of Public Works and Government Services,
More informationChapter. Acquisition of Leased Office Space
Chapter Acquisition of Leased Office Space All of the audit work in this chapter was conducted in accordance with the standards for assurance engagements set by the Canadian Institute of Chartered Accountants.
More informationStatement of Management Responsibility
Statement of Management Responsibility Responsibility for the integrity and objectivity of the accompanying financial statements for the year ended March 31, 2010 and all information contained in these
More informationFINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS
42 FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS. FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS BACKGROUND.1 This Chapter describes the results of our government-wide
More informationImplementing Strategic Environmental Assessment (SEA) at Agriculture and Agri-Food Canada
Implementing Strategic Environmental Assessment (SEA) at Agriculture and Agri-Food Canada Kathy Wilson, Agri-Environmental Policy Bureau Global Conference on SEA, Prague, Czech Republic September 26-30,
More informationStatement of Management Responsibility Including Internal Control Over Financial Reporting
Statement of Management Responsibility Including Internal Control Over Financial Reporting Responsibility for the integrity and objectivity of the accompanying financial statements for the year ended March
More informationLee County Port Authority 2018 Annual Audit Plan
Inspector General Department Tim Parks, Chief Internal Audit Officer/Inspector General To: Linda Doggett, Lee County Clerk of Circuit Court & Comptroller Jeff A. Mulder, Executive Director, Lee County
More informationProvincial Debt Summary
Provincial Debt Summary PROVINCE OF BRITISH COLUMBIA 0 Overview of Provincial Debt The provincial government, its Crown corporations, agencies and government organizations incur debt to finance operations
More informationBranch Urban Planning and Environment
Introduction Mandate: The Urban Planning and Environment Branch implements Council s Vision for Edmonton by delivering land use and environmental policy, plans, guidelines and programs to support Council
More informationPART 3.3 DEPARTMENT OF NATURAL RESOURCES NEWFOUNDLAND AND LABRADOR ENERGY PLAN
PART 3.3 DEPARTMENT OF NATURAL RESOURCES NEWFOUNDLAND AND LABRADOR ENERGY PLAN ` Summary Introduction The Newfoundland and Labrador Energy Plan (the Plan) was released in September 2007 and is defined
More information2 Subject to the other sections of this Schedule, a cost is an allowed cost of a Project only to the extent that:
Oil Sands Division 6th Floor, North Petroleum Plaza 9945-108 Street Edmonton, Alberta T5K 2G6 Canada http://www.energy.alberta.ca/ May 2, 2013 OIL SANDS INFORMATION BULLETIN 2013-10 Subject: GUIDELINES
More informationSpecial Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process
City of Saint John Common Council Meeting Wednesday, July 18, 2012 Special Meeting of Council 1. Call to Order Prayer 9:30 a.m. Council Chamber 1.1 Strategic Decision Making; Council Priorities, Core Service
More informationAudit of Regional Operations Manitoba Region
Audit of Regional Operations Manitoba Region WESTERN ECONOMIC DIVERSIFICATION CANADA Audit & Evaluation Branch December 2010 Table of Contents 1.0 Executive Summary 2 Findings 2 Statement of Assurance
More informationHouse Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.
House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: June 17, 2014 Agenda Item #: 17.2 Business Plan and Budget Implementation Project Update Report Purpose To provide an update to the Priorities Committee on the
More informationAudit Report. Canada Small Business Financing Program
Audit Report Canada Small Business Financing Program June 2013 Recommended for Approval to the Deputy Minister by the Departmental Audit Committee on July 10, 2013. Approved by the Deputy Minister on July
More informationPresentation Overview
Canada s Application of Strategic Environmental Assessment: An Audit George G. Stuetz, Director International Experience and Perspectives in SEA IAIA Conference, Prague, Czech Republic September 26-30,
More informationLee County Port Authority 2017 Annual Audit Plan Internal Audit/Inspector General Department
Internal Audit/Inspector General Department Tim Parks, Chief Internal Audit Officer/Inspector General Date: November 1, 2016 To: Linda Doggett, Lee County Clerk of Circuit Court & Comptroller Robert Ball,
More information2018 Divisional Budget. Financial and Strategic Management Division
2018 Divisional Budget Financial and Strategic Management Division 2018 Divisional Budget Financial and Strategic Management Division Introduction to the Financial and Strategic Management Division The
More informationGeneral management: update
PROGRAMME, BUDGET AND ADMINISTRATION EBPBAC16/2 COMMITTEE OF THE EXECUTIVE BOARD 3 May 2012 Sixteenth meeting Provisional agenda item 4.1 General management: update Report by the Secretariat 1. This document
More informationThe Ministry of Energy, Utilities and Climate 8 th Licensing Round, Denmark
NOTE: This translation is provided for convenience only, and in the event of any conflict between the wording of the Danish and English versions, the wording of the Danish version shall prevail in all
More informationANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.
ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date
More informationExecutive Summary. Preliminary Financial Forecast
Executive Summary The purpose of this report is to obtain directions from City Council regarding development of the 2019 Budget. It includes: a) A description of the proposed 2019 Budget development process
More informationADVANCED EDUCATION CHILDREN S SERVICES COMMUNITY DEVELOPMENT ECONOMIC DEVELOPMENT EDUCATION ENERGY ENVIRONMENT FINANCE GAMING GOVERNMENT SERVICES.
rge ge RGE Restructuring ABORIGINAL AFFAIRS AND NORTHERN DEVELOPMENT ADVANCED EDUCATION AGRICULTURE, FOOD AND RURAL DEVELOPMENT CHILDREN S SERVICES COMMUNITY DEVELOPMENT ECONOMIC DEVELOPMENT EDUCATION
More informationCanadian International Trade Tribunal
Canadian International Trade Tribunal 2014-15 Report on Plans and Priorities The original version was signed by: The Honourable James M. Flaherty Minister of Finance Her Majesty the Queen in Right of Canada,
More informationTHE FINANCIAL SYSTEM WE NEED ALIGNING THE FINANCE SYSTEM FOR SUSTAINABLE DEVELOPMENT MARCH 2016
THE FINANCIAL SYSTEM WE NEED ALIGNING THE FINANCE SYSTEM FOR SUSTAINABLE DEVELOPMENT MARCH 2016 EELLIOTT HARRIS ELLIOTT HARRIS UN ASSISTANT SECRETARY-GENERAL DIRECTOR, NY OFFICE, UNEP UNEP CONVENES FINANCIAL
More informationEX22.2v REPORT FOR ACTION. TransformTO Short-term Strategies Financial Estimates SUMMARY
EX22.2v REPORT FOR ACTION TransformTO Short-term Strategies Financial s Date: January 9, 2017 To: Budget Committee From: Chief Corporate Officer Wards: All SUMMARY This report responds to City Council's
More informationOffice of the Privacy Commissioner of Canada
Office of the Privacy Commissioner of Canada 2014-15 Report on Plans and Priorities The original version was signed by The Honourable Peter MacKay, P.C., Q.C, M.P. Minister of Justice and Attorney General
More informationReport by the Comptroller and Auditor General
Department for Work & Pensions 2016-17 Accounts Report by the Comptroller and Auditor General Fraud and error in benefit expenditure 1 Fraud and error in benefit expenditure Introduction 1. The Department
More informationPublic Private Partnerships. Alberta Infrastructure Guidance Document
P3 Public Private Partnerships Alberta Infrastructure Guidance Document P3 Public Private Partnerships Alberta Infrastructure Guidance Document Excerpt from the February 18, 2003 Speech from the Throne
More informationOffice of the City Auditor 2018 Annual Work Plan and Long Term Audit Plan
1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor and Long Term Audit Plan November 14, 2017 This page is intentionally blank. Introduction Bylaw 12424, City
More informationOffice of the Correctional Investigator
Office of the Correctional Investigator 2013-14 Report on Plans and Priorities The Honourable Vic Toews, P.C., Q.C., M.P. Minister of Public Safety Table of Contents Correctional Investigator s Message...
More informationNational Research Council Canada
National Research Council Canada Statement outlining results, risks and significant changes in operations, personnel and programs Table of Contents 1. Introduction... 2 1.1 NRC Mandate... 2 1.2 Basis of
More informationSTAR Contribution to Indonesia PFM
State Accountability Revitalization (RRP INO 38354) STAR Contribution to Indonesia PFM Public financial management (PFM) includes all phases of the budget cycle, including the preparation of the budget,
More informationDEPARTMENTAL FINANCIAL STATEMENTS (unaudited)
DEPARTMENTAL FINANCIAL STATEMENTS (unaudited) 2015-2016 4 Statement of Operations and Departmental Net Financial Position (Unaudited) Planned For the year ended March 31 results (Note 2a) (in thousands
More informationExtractive Sector Transparency Measures Act Report
Extractive Sector Transparency Measures Act Report Reporting Year From: 1/1/2016 To: 12/31/2016 Reporting Entity Name Black Swan Energy Ltd. Reporting Entity ESTMA Identification Number E838558 Subsidiary
More informationLee County Board of County Commissioners 2018 Annual Audit Plan
Lee County Board of County Commissioners Inspector General Department Tim Parks, Chief Internal Audit Officer/Inspector General Date: June 11, 2018, To: Linda Doggett, Lee County Clerk of Circuit Court
More informationOffice of the Auditor-General Briefing to the Local Government and Environment Committee. Vote Conservation. 2010/11 Year.
Office of the Auditor-General Briefing to the Local Government and Environment Committee Vote Conservation 1 2010/11 Year 17 June 2010 2 Assistance to the Committee The Local Government and Environment
More informationAUDIT REPORT. Travel and Hospitality
AUDIT REPORT Travel and Hospitality Table of Contents 1.0 Executive Summary... 1 1.1 Background and Context... 1 1.2 Overall Assessment / Audit Opinion... 1 1.3 Strengths... 2 1.4 Main Observations...
More informationMinistry of Environment. Plan for saskatchewan.ca
Ministry of Environment Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 9 Financial Summary...10
More informationResource Management in Defence
ASSISTANT DEPUTY MINISTER (FINANCE) Director General Financial Management Resource Management in Defence Briefing to Financial Management Institute October 22, 2015 Brigadier-General Werner Liedtke Director
More informationQuarterly Financial Report Office of the Secretary to the Governor General
2018-2019 Office of the Secretary to the Governor General For the quarter ended 2018 for the Quarter ended 2018 Statement outlining results, risks and significant changes in operations, personnel and program
More informationINTERNAL AUDIT PLAN OF ACTIVITIES
SDCERA INTERNAL AUDIT PLAN OF ACTIVITIES Fiscal Years 2012-2015 CHRISTINA MCGOUGH, INTERNAL AUDIT MANAGER 12 Table of Contents Executive Summary... 1 Overview... 2 Risk assessment... 2 The audit plan...
More informationManagement Compensation Framework
Reference Job #6 Manager, Highway Design & Traffic Engineering MINISTRY Transportation MANAGEMENT ROLE: 2 DIVISION: Highway Operations ROLE PROFILE A BRANCH: Engineering Services, South Coast Region POSITION
More informationUNITED NATIONS JOINT STAFF PENSION FUND. Enterprise-wide Risk Management Policy
UNITED NATIONS JOINT STAFF PENSION FUND Enterprise-wide Risk Management Policy 15 April 2016 Page 1 Table of Contents Page Preface I. Introduction 3 II. Definition 4 III. UNSJFP Enterprise-wide Risk Management
More informationPublic Appointments Commission Secretariat
Public Appointments Commission Secretariat 2011 12 Departmental Performance Report The Right Honourable Stephen Harper Prime Minister of Canada Patricia Hassard Deputy Secretary to the Cabinet Senior Personnel
More informationCanada. 1. Noteworthy practices for project preparation. Case Study
Case Study Canada 1. Noteworthy practices for project preparation EXISTING ENABLING ENVIRONMENT Decentralised planning process with strong collaboration between provincial levels and the national government
More informationAttached you will find our final report for the Citywide Risk Assessment.
TO: THRU: FROM: OFFICE OF THE CITY AUDITOR Mayor and Council Members / Margaret L. Krym, City Audi;aA'V Oscar B. Claudio, Assistant Ci~Aud ito~ DATE: July 19, 2012 SUBJECT: Citywide Risk Assessment Report
More informationGovernment of Canada Performance Reporting. 10 th Annual OECD Public Sector Accruals Symposium March 2010
Government of Canada Performance Reporting 10 th Annual OECD Public Sector Accruals Symposium March 2010 1 Presentation outline Canadian context Reporting Cycle History Building blocks: Management, Resources
More informationAgriculture and Agri-Food Canada s Guide on the Environmental Assessment of Policy, Plan and Program Proposals - Strategic Environmental Assessments
Agriculture and Agri-Food Canada s Guide on the Environmental Assessment of Policy, Plan and Program Proposals - Strategic Environmental Assessments (SEAs) This Guide has been prepared by: Kathy Wilson
More informationHead 06: Service Commissions
Head 06: Service Commissions A summary of the Service Commissions Expenditure, Divisions and Projects Financial Scrutiny Unit, Parliament of the Republic of Trinidad and Tobago Table of Contents About
More informationIntroduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.
ESG / CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com September 2017 Introduction This ESG / CSR / Sustainability Governance
More informationTREASURY BOARD SECRETARIAT
THE ESTIMATES, 1 The Treasury Board Secretariat provides planning, expenditure management and controllership oversight across the OPS. The Secretariat provides support and due diligence for decision-making,
More informationAn Overview: Responsibility Center Management (RCM) Treasurer s Town Hall January 15, 2015
An Overview: Responsibility Center Management (RCM) Treasurer s Town Hall January 15, 2015 Common University Budget Models EVERY TUB ON ITS OWN BOTTOM INCREMENTAL FORMULA-BASED RESPONSIBILITY CENTER MANAGEMENT
More informationCanadian Northern Economic Development Agency (CanNor)
Canadian Northern Economic Development Agency (CanNor) Departmental Performance Report The Honourable Navdeep Singh Bains, P.C., M.P. Minister of Innovation, Science and Economic Development Departmental
More informationThe Financial System We Need Aligning the financial system with sustainable development
The Financial System We Need Aligning the financial system with sustainable development Nick Robins, GLOBE EU, Paris, December 2015 GREENING THE FINANCIAL SYSTEM A systemic approach: Financing for sustainable
More informationMilitary Police Complaints Commission of Canada
Military Police Complaints Commission of Canada 2016 17 Report on Plans and Priorities The Honourable Harjit S. Sajjan Minister of National Defence Her Majesty the Queen in Right of Canada, represented
More informationRunning Your Business for Growth
Accenture Insurance Running Your Business for Growth Could Your Operating Model Be Standing in the Way? 1 95 percent of senior executives are not certain their companies have the right operating model
More informationFor further information, please contact Guy Leroux at
BChydro m R GENE IONS Joanna Sofield Chief Regulatory Officer Phone: (604 623-4046 Fax: (604 623-4407 bchyd roregulatorygroup@bchydro.com July 13 2009 Ms. Erica M. Hamilton Commission Secretary British
More informationEnergy ACCOUNTABILITY STATEMENT MINISTRY OVERVIEW
Energy ACCOUNTABILITY STATEMENT This business plan was prepared under my direction, taking into consideration the government s policy decisions as of March 3, 2017. original signed by Margaret McCuaig-Boyd,
More informationCanadian Grain Commission
Canadian Grain Commission 2016 17 Report on Plans and Priorities The Honourable Lawrence MacAulay P.C., M.P., Minister of Agriculture and Agri-Food Her Majesty the Queen in Right of Canada, represented
More informationThe Recordkeeping Regime: Overcoming RK Challenges in the Public Service
The Recordkeeping Regime: Overcoming RK Challenges in the Public Service Recordkeeping: A framework of accountability and stewardship in which records are created, captured, and managed as a vital business
More informationANNUAL REPORT
2015-2016 ANNUAL REPORT Highways and Public Works Office of the Deputy Minister Box 2703, Whitehorse, Yukon Telephone: 867-667-3732 Fax: August 8, 2016 The Honourable Scott Kent Minister of Highways and
More informationCITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Transportation Division
CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transportation Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: February 4, 2013 SUBJECT/REPORT NO: Transit Bus
More informationThe Role of Quality Risk Management in the Manufacture of Biological Products CBER Perspective
The Role of Quality Risk Management in the Manufacture of Biological Products CBER Perspective CASSS CMC Strategy Forum: Practical Applications of Quality Risk Management 27-28 28 July 2009 Nancy Waites
More informationOffice of the Superintendent of Financial Institutions FUTURE-ORIENTED STATEMENT OF OPERATIONS. For the years ending March 31, 2016 and 2017
FUTURE-ORIENTED STATEMENT OF OPERATIONS For the years ending March 31, 2016 and 2017 Statement of Management Responsibility for the Future-Oriented Statement of Operations Responsibility for the compilation,
More informationEconomic Development Agency of Canada for the Regions of Quebec
Economic Development Agency of Canada for the Regions of Quebec 2014-15 Report on Plans and Priorities Denis Lebel Minister of Infrastructure, Communities and Intergovernmental Affairs and Minister of
More informationTreasury and Policy Board Office Accountability Report
Treasury and Policy Board Office 2003-2004 Accountability Report TABLE OF CONTENTS Accountability Statement... 1 Message from the Minister... 2 Introduction... 3 Progress and... 5 Financial Results...
More information