1 Standard Summary Project Fiche Basic Information 1.1 CRIS Project Number: 2003/ Title: Completing preparation for the implementation of the Customs acquis 1.3 Sector: Customs 1.4 Location: Hungary Objectives 2.1 Overall Objective(s): The complete adoption of the relevant fields of acquis communautaire and its ensured implementation by the Hungarian Customs and Finance Guard. 2.2 Project purpose: To contribute to the complete development of the Hungarian NCTS system To ensure that customs free zone legislation is implemented in accordance with the acquis. To facilitate the EU-standard examination and classification of alcohol products and other food products. 2.3 Accession Partnership (AP) and NPAA priority The project is in line with the following short-term priorities stated in the Action Plan: A.P : Hungary should strengthen the administrative capacity, including continued training of customs officers and the computerisation process of the Hungarian customs administration. A.P. 25.2: Hungary should develop IT systems to allow for the exchange of computerised data between the EC and Hungary. (in need of particularly urgent action). Measures for implementation of commitments taken by Hungary in negotiations (A.P. Chapter 25) include: further development of the Customs Laboratory. Chapter 8.2 of the NPAA declares the further improvement of customs administration to adopt the EU-conform standard IT systems. 1

2 2.4 Contribution to National Development Plan (and/or Structural Funds Development Plan/SDP) Not applicable. 2.5 Cross Border Impact Not applicable. 3. Description 3.1 Background and justification: In accordance with the requirements related to Hungary s accession to the EU, legal harmonisation, inter-operability of IT systems and establishment of required organisational units form an essential part of preparation. In order to achieve the above goal, better preparation and sound implementation of all the national systems at the Hungarian Customs and Finance Guard are required to ensure the proper exchange of information with the European Union and the Member States. As a requirement for accession HCFG should harmonise EU legislation related to the field of customs through the establishment of inter-operability with the Member States. This harmonisation process has almost been finished and HCFG has already started its own projects regarding the corresponding IT systems, but the exchange of views and practical experience would be essential for the proper founding and use of appropriate legislation and the sound management of the IT systems. The inter-operability programme of the Hungarian Customs and Finance Guard based upon the guidelines set up by the DG TAXUD within the Suggested Approach of the Inter-Operability Implementation Strategy has also been launched recently. The implementation of the Interoperability Strategy of HCFG is now underway. To contribute to this, the NCTS Project has been set up. After making the necessary organisational arrangements the first steps were taken to carry out the tasks of the project. A contract was concluded and the requirements and functional specification have been elaborated. A most recent and currently ongoing task is the preparation of plans ensuring the proper introduction of NCTS and in the near future the first steps of the testing phase will be implemented. Based on training plans the training of users would start in January 2003 so as to allow enough time until the first phase of the system s introduction: 9 th June The overall introduction of the system (affecting every customs office) must be completed at the latest by 1 st July In order to meet the requirements set by the European Commission the final deadline of operating NCTS in all Hungarian customs offices was brought forward from 1 st January 2004 to 1 st July According to this the Hungarian NCTS project had to re-schedule most of its activities. Thus, training should be started at the end of 2002 already. These changes affect the timing of the risk analysis development and the set-up of a web-site and make it indispensable that these tasks are fulfilled in the shortest time possible after the start of the system. The MCC (Minimum Common Core) system representing the core of NCTS contains only the most basic functions that can be applied similarly by every user country and secures the operation of those 2

3 basic functions. The adoption of this MCC system is obligatory for Hungary in order to meet the criteria for Accession. The EU Commission gives support to the application of this common core. However, there are such functions related to the NCTS system, which are not identical in every country, they are designed and developed according to unique national needs. Those functions, the application of which is desirable but is highly dependent on the national needs and characteristics (e.g. risk analysis), do not form a part of the centrally developed common system, they should be developed at national level. The present Hungarian customs data processing system does have such a function so it is absolutely indispensable for the Hungarian Customs Administration that the NCTS system should be supplemented by a module for risk analysis. To elaborate this HCFG would like to get acquainted with the results of other user countries in this field and to make use of their experience and information at the development of our own system. The elaboration of the risk analysis module would start in the 2 nd half of Furthermore, HCFG would like to get acquainted with the experience of other countries about how with what supplementary programmes the NCTS can be enabled to manage national transit procedure or other transportation modes, e. g. water transport or normal procedure air transport after The contracting country should have similar IT and business structures concerning the NCTS like Hungary. It should be at an advanced stage in the implementation process of NCTS with sufficient experience in operating the system and in developing a risk analysis module / an information website. According to the law applicable in the EU the tariff classification of goods is based on compulsory analysis. Only on the basis of such examinations can the customs tariff number be defined with absolute certainty. The incorrect classification may cause significant differences regarding authorisation for importing, control, customs revenues, subsidisation and payments. For any product that falls under the Act on Excise and also for determining the tax rate of VAT for imported goods the Commercial Customs Tariff gives the basis for classification. In the case of sampling based on its official competence connected to the export-import trade and inland control, the Customs Laboratory carries out the product classification according to the Commercial Customs Tariff, on the basis of 46. (9) of Act no. C. of 1995, as well as 67/A. and 68. of Government Decree 45/1996. (III. 25.). The Act No. CIII. of 1997 on Excise Taxes regulates the official activities of HCFG (e.g. sampling excise goods) in order to ensure the legalised manufacturing, distribution, circulation and usage of excise goods. Based on the results of negotiations between the Central Customs Laboratory and the National Wine Qualification Institute (NWI), and also bearing in mind the recommendations of the external expert, who had been hired by the EU Commission Services to assess laboratory equipment-purchase projects in Hungary, HCFG would like to use the NMR equipment operating now at the NWI in a form of co-operation for some of its analysis purposes. In order to fully utilise this co-operation it would be necessary to purchase some items for the preparation of samples and some types of software for the analyses to be done at the request of HCFG. The SNIF-NMR is a method regulated by Regulation EEC No. 2348/91 for the examination of wines but the applicability of the method is not confined to wines, also other food products can be effectively examined by it. Most European customs laboratories prefer this method. SNIF is an abbreviation from Site-Specific Natural Isotope Fractionation. It means that the proportion of stable isotopes being built into the sugar in plants and fruits is characteristic of the given location and product. This phenomenon is the basis for determining the place of origin of wines. In practice 3

4 the SNIF-NMR measuring method has been elaborated for a number of products, such as: wines, liquors, other alcoholic beverages; vinegar (biological or synthetic vinegar), fruit juices and concentrates (tracing additional beet sugar, determining place of origin), honey (tracing additional beet sugar), aromas, fragrant substances (natural or synthetic origin), oils, fats, milk, lipids, etc. With the NMR equipment the ratio of isotopes can be measured by way of analysing the alcohol. If a sample is not in a form to be directly analysed, it must be distilled or fermented to receive alcohol that can be analysed with the equipment. A SNIF-NMR apparatus is used at the National Wine Qualification Institute. However, that equipment is exclusively designated to the analysis of wine and grape juice. In the case of the Customs Laboratory the examination of other types of products beside the analysis of wine would be necessary. Out of the annually planned approx analyses that the Customs Laboratory would require an NMR for this number not containing the tasks arising from CAP about 20 % is the analysis of various wine samples but the remaining 80 % would be from other product circles. Products other than wine and grape-juice to be analysed by the Customs Laboratory need sample-preparing modules. The preparation of samples would be done at the Customs Laboratory and the analysis at the Wine Qualification Institute. In order that the NWI would be able to analyse other than wine samples at the request of HCFG, special software would be procured. This assessment software and database makes possible the evaluation of the results of the analysis. There are various applications for the various product circles. This would be installed at the NWI on the NMR equipment but it would be the property of HCFG. (This also provides for the sustainability of development process at the Customs Laboratory. If in the future HCFG would buy an NMR equipment from Hungarian budgetary resources then this software would be already available.) By the co-operation between the Customs Laboratory and NWI the capacity of the NMR equipment at the NWI would be utilised almost to full extent. In this case if HCFG requests approx analyses yearly from the NWI the NWI could give priority to 20 % - 25 % of HCFG s samples. Priority scheduling means the results would be available on the next working day. The remaining samples of HCFG would be scheduled among all the other samples to be analysed by the NWI this normal scheduling means a maximum 30-day time-span. Currently the cost of analysis by the NWI s NMR equipment is rather high for HCFG: one analysis costs HUF. This cost would be definitely lower as a result of implementation of this project because sample preparation would be done very economically at HCFG and thus the cost of analysis by NWI could be reduced. The final settlement of this issue would be done by way of concluding a co-operation agreement between HCFG and the NWI. The agreement will be concluded before the tender for the equipment is launched. Based on the recommendations of the external expert HCFG would like to procure an IRMS equipment. The IRMS would be located at the Customs Laboratory and the Customs Laboratory would do analyses on it also at the request of NWI, based on the above-mentioned co-operation agreement. IRMS is an abbreviation of Isotope-ratio Mass Spectrometer. This measuring technique is an important and very precise method of determining the chemical structure of various substances. It 4

5 is a known scientific fact that by measuring the ratio of isotopes in molecules it is possible to discern chemically identical molecules that came into existence during different processes. In practice the IRMS method has been elaborated for a number of products, such as: wines, liquors, other alcoholic beverages; fruit juices and concentrates (tracing additional beet sugar), honey (synthetic, artificial, tracing additional beet sugar), aromas, fragrant substances (natural or synthetic origin), pharmaceuticals (synthetic, artificial), vegetable oils and fats, (the origin of fatty acids, amino-acids). The IRMS method means the measuring of isotopes but it concerns different isotopes than the NMR technique. This means that the analysis of a sample can provide answers from different points of view and other information can be obtained by it than by NMR. The advantage of having an IRMS equipment would be that it complements very well the NMR measuring technique and it could be used in the same way of co-operation between the HCFG and the NWI. BTI and BOI decisions administrative decisions that have a binding effect for six years both on the customs authority and the holder are issued by the HCFG Customs Laboratory now and these decisions are going to be issued by the Customs Laboratory after EU Accession as well. The legal background of issuing the decisions is given by the regulations of the Commercial Customs Tariff. Taking a look at BTI and BOI decisions made by the HCFG Customs Laboratory it was found that a large number of goods falling under the effect of the Act on Excise, on Wine and the Act on Consumables are affected. On the basis of the Hungarian Act No. I. of 1973 on Criminal Procedures the HCFG has authority to investigate certain criminal acts described in the Hungarian Criminal Code. These include the following: abuse with excise, excise secretion, encouragement of abuse with excise, smuggling and customs secretion, foreign trade activity without license, counterfeit marking of excise- or customs goods. In the case of a based suspicion for one of these criminal acts HCFG must initiate the investigation. The currently used mobile laboratories for oil analysis examine random samples on the whole territory of Hungary and the results are instantly available for starting legal proceedings. HCFG has experienced their significant preventive effect. Taking into consideration the opinion of the independent expert, HCFG would procure some equipment for the analysis of alcoholic products. This would mean the type of equipment that could be located in a mobile laboratory but in this case it would not be mobile the equipment would be placed at the Central Customs Laboratory. There would be a unit set up in the Customs Laboratory who would analyse the samples of alcoholic substances arriving from the countryside as a result of HCFG s crime-detection and prevention activity. The number of samples to be analysed in a given year is determined by risk analysis that is carried out by several HCFG organisations. There is no pre-set number of samples, it depends always on known needs but there is a growing need for more analyses. In year 2001 there were over samples overall analysed by the Customs Laboratory. More than half (approximately 60 %) of the annual samples are product analyses connected to export-import circulation, 30 % is covered by product analysis related to posterior and excise controls, and 10 % is made up of other sample analysing assignments (assignments by clients for delivering an expert opinion). The oil laboratory of HCFG analysed 3800 samples of mineral oil in year

6 The three mobile laboratories analysed an additional 6400 samples. Before the mobile laboratories were put to use this amount of samples had had to be sent for analysis to outside laboratories and institutes which had raised a cost of 100 million HUF yearly. The number of samples to be analysed by the NWI s NMR equipment is approx annually. There are chemists who are professionals in customs matters at HCFG Customs Laboratory and the operation of the mobile laboratories is done by well-trained staff. The Customs Laboratory continuously trains the staff based on the training plan approved by the National Headquarters of HCFG. Moreover, the Customs Laboratory takes part in training programmes realised by EU assistance (e.g. Twinning programme, EBTI/EBOI training). The staff doing the analyses takes part in training programmes organised by universities/professional organisations. When launching an equipment procurement tender HCFG always requires training beside the supply of equipment. The training forms an integral part of complying with contract obligations. The training is sometimes done not only at the site of installation but at the premises or research laboratory of the manufacturer. The staffing of the Customs Laboratory is done on the basis of the recruitment schedule approved by the Human Resources Department of HCFG. The additional human resources are provided by selecting the applicants. For the posts requiring professional knowledge applicants with middle-level or high-level chemist qualification will be chosen. Recruitment of the staff for operating the IRMS technique and the other laboratory equipment will be run parallel to the equipment purchase, so by the time the equipment is installed and training can be started the staff will be available. The necessary operational costs for the equipment are allocated. As it could be seen by the expert in liaison with the EU Delegation on his visit to the Customs Laboratory, the proper site is ensured to place the equipment in the Laboratory and the physical infrastructure of the Customs Laboratory is adequate to allow for proper operation of the equipment. 3.2 Linked activities: HCFG has been a recipient of Phare support since Funding among others has involved modernisation of border crossing points on future EU borders, supply of equipment to fulfil requirements arisen from harmonisation of EU legislation. The Customs Laboratory has received Phare support for the procurement of laboratory equipment also in the frame of the HU and HU programmes. The equipment greatly helped the Laboratory to reach the technical level required by preparation for EU Accession. The list of equipment procured by the HU and HU Phare programmes is enclosed as Appendix 6. The HU Twinning project of HCFG on Approximation of Customs Legislation has been launched in February It contains activities on customs related field such as TARIC, QUOTA, origin and others, but customs free zones, payment of customs duty and customs guarantee are not involved, however these are issues highly differing from former Hungarian legislation. Experts from the Spanish Customs Laboratory visited Hungary and prepared an assessment report about the Needs and Official Competence of the Hungarian Customs Laboratory. In the report the Spanish expert emphasised that considering the practice of European customs authorities the 6

7 Hungarian Customs Laboratory is able to undertake the workload posed by the CAP analytical control tasks. Bearing in mind the type of products that would be controlled, the analytical parameters necessary for CAP control would require (among others) the following specific equipment: Equipment of Isotopic Mass Spectroscopy for the analysis of wine identity. (The Report of the Spanish experts is enclosed as an Appendix 4.). In the framework of 2002 Phare National Program Unallocated Institution Building Envelope a Twinning Light project has been approved regarding NCTS. However, the project only involves activities regarding the planning, programming and development phase of the system, whereas this project fiche deals with the gaps and needs arisen after the implementation of the first phase. Close co-ordination with the Twinning Light project shall be ensured. The training organised by DG TAXUD cannot replace the requested seminars and study tours, nor can they be compared. The number of participants on DG TAXUD s training courses is limited. The knowledge that can be gained there is of high level but rather IT-related and operational type. However, HCFG could get answers to the more professional, and especially the practice-related professional questions from those Member State customs administrations that already use the system or at least that are more ahead in introducing it. HCFG will ensure the required co-ordination among all those projects in order to avoid unnecessary duplication and overlapping of activities. The HCFG Integration Office uses a list about all the participants of the programmes and it will pay attention to the fact that the widest possible circle of customs officers would take part in the programmes, different persons for each training session. Sustainability will be provided because every participant has to write reports on his/her experience and the knowledge acquired on the training activities. Based on the new Training and Human Development Strategy of HCFG all information gained with the help of Phare and other EU-related programmes must be collected at the Integration Office and it will be disseminated by the EU-Integration Liaison Officers network throughout the whole HCFG. The expertise acquired by this project will be transferred into the regular internal training activities of HCFG because the updating of the Training Strategy of HCFG is facilitated by the now ongoing HU Twinning programme. 3.3 Results: HCFG staff is trained concerning the operational characteristics of NCTS and the development of the interactive web-site Assessment Report prepared by expert. HCFG staff is trained in the relevant fields of the Customs Code. IRMS equipment, additional elements to the NMR and laboratory equipment for examination of alcohol products are installed and operational at the Customs Laboratory (and at the NWI). 3.4 Activities: Twinning Light Project: Inter-operability of IT systems and harmonisation of customs legislation Part I. - Inter-operability of IT systems 7

8 One week study visit to an EU country and one week seminar in Budapest on operation of NCTS (especially on MCC Minimum Common Code and ECN EDI Communication Node systems) regarding preparation to the second introduction phase. One week study visit to an EU country examining the additional programs (e.g.. riskanalysis) installed as parts/additional programs to NCTS. The study visit should first of all provide information on how risk assessment has been planned and implemented, including the problems and difficulties and risks in the development and the proof of effectiveness. Based on this study visit the Hungarian NCTS project should be able to plan, develop and implement an own risk analysis module. An Assessment Report prepared by the expert about how the NCTS system of the Partner Country was supplemented by nationally developed elements. In what respect does their system differ or offers more than the common core of NCTS. The Assessment Report should detail in particular what problems did the Partner Country meet on the way of developing its system, what decisions were made and which solutions were chosen and why. This would be a sustainable way of gaining insight into the activities of an EU Member State in developing its own system. One week study visit to an EU country and one week seminar in Budapest on the development of an interactive web-site providing wide range of information, legislative background and direct help from the expert of a given field for the MCC system. According to plans of the NCTS_HU Project this web-site would be set up beside the National NCTS Help Desk function. The web-site would play the role of an information portal accessible by clients. Pieces of legislation, their modifications, information materials, links etc. would be placed on this web-site. The web-site would provide for the publication of information materials accessible by clients who may decide to connect to the system. On the other hand, the NCTS Help Desk would deal only with specific, technical and procedural problems and would be accessible only for authorised NCTS users. Both the Help Desk and the web-site are now in the starting phase of development. The contracting country should have similar IT and business structures concerning the NCTS like Hungary. It should be at an advanced stage in the implementation process of NCTS with sufficient experience in operating the system and in developing a risk analysis module / an information web-site. Part II. - Harmonisation of Customs Legislation One week study visit to an EU country and one week seminar in Budapest on practical experiences regarding the legislation of customs free zones and provisions on payment of customs duty and customs guarantee. The legislation of customs free zones in Hungary is quite different now from the current EU legislation. Harmonisation will take place from 1 st January 2003 for the payment of customs duty and for the newly established customs free zones. The free zones now existent will be phased out by the Accession. While HCFG carries on with the harmonisation process 8

9 and the training of the staff about EU legislation on the whole is being done, HCFG has no practical experience regarding the implementation and procedural rules of this part of EU legislation. That is the reason why a hands-on experience and an exchange of expertise is needed. The study visit would take place in the partner country with which the Twinning Light would be conducted, on the European continent. The questions to be answered include the following: the difference between customs free zones and customs free warehouses, the conditions of the establishment of a customs free zone/warehouse, the guarantees needed for authorisation, the origin of goods processed in customs free zones, the special legislation for agricultural goods in connection with customs free zones, the rules on payment of duties, the practical side of payment of duties, in what form is guarantee required etc. Equipment procurement project Supply of one IRMS equipment for EU standard examination of wines and other food products. Supply of additional elements to the NMR equipment of the National Wine Qualification Institute (these elements will be the property of HCFG and used by the NWI). Supply of laboratory equipment for the examination of alcohol products. A detailed list of equipment to be procured can be found in Appendix Lessons learned: HCFG has no experience in managing Twinning Light projects, and the HU Twinning project is a currently ongoing project. Its preparation process was rather problematic and the difficulties that arose at the beginning had really slowed down the implementation of the programme at first. By now HCFG has gained some experience in managing such activities and HCFG Departments are committed to co-operate closely in defining the exact needs and to harmonise the planned activities of the programme in order to ensure its smooth and effective realisation. On several occasions in the past HCFG had problems with obtaining and securing the cofinancing amount at the right time for the project. Now HCFG has a commitment from the Ministry of Finance supporting the allocation of the necessary amount of co-financing for this project from the 2003 National Budget. Co-operation between the Departments of HCFG has not always been very effective regarding Phare programmes, which hindered the management capacity of HCFG on the whole. To solve this problem the Phare Monitoring Sub-Committee was set up inside HCFG, with the participation of all the relevant Departments. It holds meetings monthly to discuss and sort out issues endangering the successful implementation of HCFG s Phare programmes. 9

10 In the EMS Report dated 25 th September 2002 it is stated that HCFG should ensure that all Phare-funded physical works and equipment are labelled in accordance with Phare specifications, as detailed in Annex 3 of the Financing Memorandum. The tables have already been ordered and the installation has been finished at some border crossing points. The labels were ordered by 8 th November Another recommendation of the EMS report is that HCFG should introduce a system to ensure that professionals with adequate technical and English language skills and trained in Phare procedures are available for tender evaluation. The HCFG Integration Office asked all the relevant departments of HCFG to provide information on the staff that fulfil these requirements and also the staff that can substitute them in their absence. In this case the Integration Office will have a proper list of experts suitable for being appointed for the different kinds of tender evaluation procedures. The EMS report also recommended that HCFG should pay special attention to the fact that the time lost with the preparation of the technical specifications does not adversely impact the implementation. HCFG will pay special attention to this problem. 4. Institutional Framework Professional aspects of implementation shall be the responsibility of the HCFG Customs Directorate, the NCTS Project Team, the IT Department and the Central Customs Laboratory. The HCFG Integration Office will be responsible for the co-ordination and management of the programme. The Customs Directorate (as one of the departments of the National Headquarters of HCFG) is responsible for the customs legal harmonisation issues inside HCFG and for defining procedural rules for HCFG operations. It oversees and co-ordinates professional activities regarding the application of laws. In this respect the Customs Directorate is responsible for the professional aspects of the Twinning Light component on Harmonisation of Customs Legislation. The NCTS Project Team was set up at the launch of the Inter-operability Strategy of HCFG. Its specific task is to develop the NCTS system in Hungary. It is composed of staff coming from various HCFG organisations, among them the Customs Directorate and the IT Department. They are now assigned only to this project, thus realising the most efficient co-operation form between the two departments. The IT Department (as one of the departments of the National Headquarters of HCFG) is responsible for all the technical aspects of implementation of IT strategy and it also hosts the NCTS Project Team. They are together the actual recipients of the Twinning Light component on Interoperability of IT systems. The Central Customs Laboratory is a middle-level organisation in HCFG with official competence. Its task is to perform the required goods analyses for the control of foreign trade and for excise tax duties in accordance with the relevant Hungarian and EU legislation and to make decisions on product classification in connection with tax regulations. The Central Customs Laboratory plays a leading role in the implementation of the equipment procurement project. The tender dossier for the equipment procurement will be prepared by the Customs Laboratory in close co-operation with the Integration Office. If necessary, an outside expert will be hired to help in this task. 10

11 The Integration Office (as one of the departments of the National Headquarters of HCFG) carries out the managerial tasks of the two Twinning Light projects and also the equipment procurement. The Integration Office will keep contacts with the CFCU and the EU Commission Delegation, it will ensure co-ordination of the activities and observance of Phare rules by HCFG. The HCFG will continuously co-ordinate the planned Twinning Light projects with the Spanish PAA of the currently ongoing HU Twinning project. The Central Finance and Contracting Unit (CFCU) will be responsible for contracting and payment. 5. Detailed Budget Phare Investment Support Support Institution Building Total Phare (=I+IB) National Public Cofinancing* IFI TOTAL Twinning Light: Inter-operability of IT systems and harmonisation of customs legislation Laboratory Supply Total The HCFG will cover costs that are not eligible under Twinning projects, e.g. the travel costs of the participating Hungarian customs officers. Co-financing for the equipment component is joint. The ratio between the Phare and national cofinancing is binding and has to be applied to the final contract price. The national co-financing part of the budget does not include the VAT, which will be paid separately from the Hungarian State budget. 6. Implementation Arrangements 6.1 Implementing Agency The Implementing Agency of the project is the Central Finance and Contracting Unit (CFCU). The CFCU will be the Contracting Authority and in that capacity will issue and evaluate tenders, conclude contracts and make contractually related payments. The Director of the CFCU will act as PAO of the project. Her contacts are: PAO: Ms. Judit Rózsa, Director of CFCU Address: Deák Ferenc u. 5. SPO: Telephone: (361) H-1052 Budapest Fax: (361) Mr. Lajos Rajczy, Director General for EU Accession and International Affairs Address: Delej u. 20 Telephone: (361)

12 H-1089 Budapest Fax: (361) Twinning The contracting authority and financial management of the twinning components will be the responsibility of the CFCU, headed by Ms Judit Rózsa. The Beneficiary institution will be the HCFG. The HCFG Integration Office (supervised by Mr. Lajos Rajczy, Director General for EU Accession and International Affairs and SPO of the programme) will ensure co-ordination among the professional departments of HCFG. Contact person Ms. Mónika Váradi Tarjányiné Head of EU Assistance Unit of HCFG Integration Office Address: H-1089, Budapest, Delej u. 20. Telephone: (+36-1-) , Fax: (+36-1-) Non-standard aspects During the implementation of the project the Practical Guide for Phare, ISPA and SAPARD contracts will be strictly followed. 6.4 Contracts The available budget for the Twinning Light Covenant is Euro.. The IRMS equipment and the laboratory equipment for alcoholic products will be acquired through international open tendering, with a planned maximum value of 1,0 M Euro. 7. Implementation Schedule Contract Start of Tendering Start of Project Activity Project Completion Twinning Light 6/2003 9/2003 2/2004 Equipment Supply 7/ /2003 9/ Equal Opportunity All participating Hungarian institutions are equal opportunity employer. No discrimination of whatever nature will be applied. 9. Environment The project has no measurable effect on the environment 12

13 10. Rates of Return n.a. 11. Investment Criteria n.a. 12. Conditionality and sequencing Phare support will be conditional upon the provision of Hungarian co-financing in the case of the supply of the equipment. The further strengthening of the HCFG s management capacity ensures the successful implementation of the project. Recruitment of the staff for operating the IRMS technique and the other laboratory equipment will be run parallel to the equipment purchase, so by the time the equipment is installed and training can be started the staff will be available. The launch of the tender for the purchase of laboratory equipment will be conditional to a cooperation agreement between HCFG and the NWI on the current use of the SMR equipment and the future use of the NWQI. In the framework of the Inter-operability Strategy the NCTS project must develop the Hungarian NCTS system by the prescribed time in order to make possible the realisation of this Twinning Light project. The NCTS system must be operating before the development of the risk analysis module and the web-site could be done. 13

14 Annexes to the Project Fiche 1. Logical framework matrix in standard format 2. Detailed implementation chart 3. Cumulative contracting and disbursement schedule by quarter for full duration of programme (including disbursement period) 4. Reference to feasibility studies: Report on the operational needs and powers of Hungary s Customs Laboratory prepared by Miguel Párraga, the Director of the Spanish Central Customs Laboratory 5. List of relevant laws and regulations 6. List of the equipment of Customs Laboratory procured in the HU and HU Phare programmes 7. List of equipment to be procured under this project 14

15 Phare log frame LOGFRAME PLANNING MATRIX FOR Programme name and number: 2003/ Completing preparations for the implementation of the Customs 15 acquis Contracting period expires: 30/11/2005 Total budget : Euro Overall objective Objectively verifiable indicators Sources of Verification The complete adoption of the relevant fields of acquis communautaire and its ensured implementation by the Hungarian Customs and Finance Guard. Structural requirements of the relevant field of acquis achieved by the time of Accession. HCFG customs operations regarding the fields addressed in this project are equal to the practice of other MS Customs Authorities Improved rating in EU Commission Reports and fulfilled requirements of the Action Plan in the areas covered by the project. Government screening and reports Commission reports on Hungary s Progress towards Accession Disbursement period expires: 30/11/2006 Phare budget : Euro Project purpose Objectively verifiable indicators Sources of Verification Assumptions To contribute to the complete development of the The 100% successful development of the NCTS system is Regular Report on Continued commitment to Hungarian NCTS system carried out in time for the Accession. Hungary achieve the Acquis in the field To ensure that customs free zone legislation is Assessment Report on of customs. implemented in accordance with the acquis. At the time of Accession the application of EU legislation Interoperability To facilitate the EU-standard examination and in the relevant field is in line with EU requirements Revised Action Plan classification of alcohol products and other food Examination of alcohol products and other food products is products. in line with the relevant EU directive. After installing the procured equipment HCFG is able to make its official decisions on the basis of 100% EUconform analysis carried out by the Customs Laboratory using the equipment delivered within the project Results Objectively verifiable indicators Sources of Verification Assumptions HCFG staff is trained concerning the operational characteristics of NCTS and the development of the interactive web-site. HCFG staff is trained in the relevant fields of the Customs Code. IRMS equipment, additional elements to the NMR and laboratory equipment for examination of alcohol products are installed and operational at the Customs Laboratory (and at the NWI). The number of samples analysed yearly reaches between samples. The laboratory unit for alcohol products is ready to analyse approximately 2000 more samples. The number of samples analysed in co-operation with the NWI on the NMR equipment and the IRMS equipment Assessment Report prepared by expert by the end of the Twinning project. Number of the trained staff: min. 20 people. Development of the web-site based on the experience gained from the Twinning Light. Progress reports by the participating Departments and the Twinning partners. Operating interactive web-site. Issued Final Acceptance for supplies. High-quality co-ordination and co-operation between HCFG Departments ensured. Funds for operating and maintenance of the equipment and operational expertise are available. Trained staff can be retained in the long run. Activities Means Assumptions Interoperability of IT systems 1 Twinning Light Trained staff can be retained. Seminars and study visits, preparing an Assessment Report 1 supply contract Equipment is installed by

16 Harmonisation of Customs Legislation Seminars and study visits Supply of Customs Laboratory Equipment Supply of one IRMS equipment Supply of additional elements to the NMR equipment of the NWI. Supply of laboratory equipment for the examination of alcohol products. Preconditions professional experts. Training concerning the operation of NCTS is followed up by developing own system. Phare support will be conditional upon the provision of Hungarian cofinancing in the case of the supply of the equipment. The further strengthening of the HCFG s management capacity ensures the successful implementation of the project. 16

17 Customs Modernisation 2003 Annex 2 DETAILED IMPLEMENTATION TIME CHART Component TL - Inter-operability of IT systems and harmonisation of customs legislation F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M D D D D T T T I I I I I I Supply D D D D D T T T T T I I* I I I I I I I I The contracted equipment will be delivered and put into use by the end of 2003 but the maximum possible period for payment explains this chart. D D: Design (15%) T T: Tendering and contracting (30%) I I: Implementation (50%) 17

18 Annex 3 Customs Modernisation 2003 CUMULATIVE CONTRACTING AND DISBURSEMENT SCHEDULE Component I II III IV I II III IV I II III IV I II Contracting Interoperability of IT Systems Harmonisation of Customs Legislation Supply Sub-total Disbursement Interoperability of IT Systems Harmonisation of Customs Legislation Supply Sub-total 18

19 Annex 4 REPORT ON THE OPERATIONAL NEEDS AND POWERS OF HUNGARY S CUSTOMS LABORATORY. The purpose of this report is to evaluate the needs and powers of the Hungarian Customs Laboratory, which is run under the auspices of the Chemical Analysis Institute at the Hungarian Customs and Finance Guard (HC&FG), with an eye to the requirements for a possible analytical control on CAP introduction after Hungary has completed the process of joining the European Union. This report was prepared using information provided by the Institute, surveys conducted prior to the preparatory visit and data collected during the preparatory visit. This report basically evaluates the Institute in its role as a chemical laboratory for customs and excise. PART A. STUDY OF THE CURRENT SITUATION 1. LEGISLATION AFFECTING THE INSTITUTE S OPERATION The Institute s activities at the HC&FG are regulated fundamentally by the 1995 Act on Customs Law, Customs Proceedings and Customs Administration and subsequent rules on rates and circulation of goods subject to excise duties. These activities are conducted by civil servants and other staff working under the management and coordination of the Director of the Institute, a Deputy Director and a Main Engineer. 2. CURRENT POWERS The HC&FG s Institute accomplishes the following activities: 1. Issuing Binding Tariff Information (BTI s), conducting any analyses required. 2. Issuing Binding Origin Information (BOI s). 3. Performing the necessary goods analyses for the control of foreign trade and for excise tax duties in accordance with the powers assigned to it. This activity is performed both on Institute premises and in mobile laboratory vans. 4. Drawing up decisions on product classification in connection with tax regulations. 5. Conducting chemical analyses on behalf of outside clients and issuing reports on those analyses. 3. ORGANIZATIONAL STRUCTURE OF THE HC&FG s CHEMICAL ANALYSIS INSTITUTE Managerial responsibility in the Institute falls upon a Director, a Deputy Director and a Main Engineer. The HC&FG s Chemical Analysis Institute has the following divisions: 3.1. Analytical and Quality Assurance Department Management is provided by a Head of Department under the supervision of the Main Engineer. The department comprises the following work groups: a) Mineral Oils Group b) Foods Group c) Organic/ Inorganic Group d) Paper, Textiles and Plastics Group e) Instrumentation Group f) Quality Assurance Group Their main tasks are: - To carry out the necessary analyses for the customs classification of goods and verification of compliance with indirect tax regulations. 19

20 - To gather and fine-tune the necessary analytic methods for the indicated actions. - To store and to eliminate samples, maintaining the specific safety conditions for each. - To apply and to review the scientific literature, internal guidelines and rules concerning the laboratory s activity. - To participate in training and skills-refining activities related with the activities in its area. The Quality Assurance Group in particular maintains the records of results, monitors working procedures and prepares the necessary documents for the laboratory s accreditation Legal, Administration and Secretarial Department This department handles the Institute s legal and clerical work Tariff Classification and Information Department Led by a Head of Department under the Main Engineer s supervision. The main tasks of this department are: - To provide decisions on the classification of goods based on data provided by the different groups of the Analytical Department. - To determine, for each type of goods, the necessary analysis to be conducted by the different groups and to coordinate the work in cases where additional analyses are needed. - To provide clients with information orally (by telephone or in person) and in writing on the classification of goods under the different codes in the Combined Nomenclature. - To maintain connections with other information services. - To examine the band of goods subject to indirect taxes Mobile Services Mobile services are managed by a Head of Department under the supervision of the Director of the Institute and the Deputy Director. Their main tasks are: - To analyse alcoholic products and petroleum products in situ to determine the applicable excise rate. - To analyse and identify goods subject to customs declaration. - To participate in activities conducted in customs enclosures. - To maintain the vehicles and technical gear. - The Institute supports this service if necessary Personnel and Logistics Department This department handles the personnel and organization section of the Institute Binding Tariff Information (BTI) and Binding Origin Information (BOI) Department Led by a Head of Department under the supervision of the Director of the Institute. This department is divided into two groups, one of which is in charge of BTI activities, and the other, of BOI activities. Their main tasks are: - To record and systematize data. - To examine data for the preparation of reports. - To maintain the database. - To prepare BTI s and BOI s authorized at national level. 4. HUMAN AND PHYSICAL RESOURCES The Institute, created only very recently, has the following physical and human resources: 4.1. Building 20

21 The building was created for the purpose of housing the Institute. It was opened in Since it was designed specifically for the main purpose of housing a chemical laboratory and administrative offices, it complies with the proper safety and functionality conditions that this type of building ought to meet. The Institute has 1,000 m 2 of space spread over two stories. Since a large part of the Institute s activity consists of goods analysis, a large proportion of the building s area is occupied by the chemical analysis laboratory and the supporting complementary facilities that all laboratories require Instrumental Resources The Customs Laboratory, which is dependent upon the Institute, is highly specialized thanks to, inter alia, the existence of modern instrumentation recently acquired, in part with aid under the PHARE programme. The instrumentation the laboratory currently owns includes the following: - Three Liquid Chromatography instruments (HPLC), two of them with refractory index, UV and fluorescence detectors. - Three Gas Chromatographs equipped with flame ionisation detector (FID) and Electronic Capture detector. - Two Infrared Spectrophotometers FTIR and one Near Infrared Spectrophotometer. - Two Visible-Ultraviolet Spectrophotometers. - One Inductively Coupled Plasma Spectrophotometer (ICP). - Two Atomic Absorption Spectrophotometers. - One x-rays fluorescence equipment. - Automatic distillation instruments for petroleum products. The laboratory also has low-cost instrumentation such as analytical balances, refractometers, polarimeters, viscosimeters, extractors, stirrers, etc., and analytical instruments for finding parameters related with the mechanical properties of specific materials (paper, textiles, etc.). Furthermore it also has three lorries equipped with laboratory instruments for on-site testing Human Resources The Institute has a workforce of around 70, between functionaries and non-functionary staff. The number of staff members related with the Laboratory s activity is as indicated herein below: - Tariff Classification and Information Department Analytical and Quality Assurance Department Mobile Service THE INSTITUTE S ANALYTICAL ACTIVITY In the year 2000 the laboratory analysed about 17,000 samples, mostly for the purpose of controlling petroleum product related indirect duties. No overall data have been provided on samples analysed in the year 2001, but it appears they are on the same order. The samples are distributed by percentages among the following types of goods: - Foods... 16% - Chemical products... 20% - Solvents... 2% - Petroleum products... 4% - Mineral oils... 42% - Other... 16% A large part of the checks run on petroleum products were performed in the mobile units. 21

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1 Basic Information 1.1 CRIS Number: 2006/01/-176.05.01 1.2 Title: Unallocated IB envelope 1.3 Sector: Other IB actions 1.4 Location: Hungary*

More information

Standard Summary Project Fiche No. HU

Standard Summary Project Fiche No. HU Standard Summary Project Fiche No. HU 98.03.03 1. Title: Reinforcement of institutional and administrative capacity Adaptation and Implementation of the Binding Tariff Information (BTI) and the Binding

More information

04.02 EAGGF EAGGF - p.1

04.02 EAGGF EAGGF - p.1 04.02 EAGGF 1. Basic information 1.1. CRIS Number : 2002/000-605-04.02 Twinning number: PL02-AG-05 1.2. Title: EAGGF 1.3. Sector: Agriculture 1.4. Location: Poland 2. Objectives: 2.1. Overall objective:

More information

Standard Summary Project Fiche. Project Number 2002/

Standard Summary Project Fiche. Project Number 2002/ Standard Summary Project Fiche Project Number 2002/000-180-01-01 1. Basic Information 1.1 Désirée Number: 2002/000-180-01-01 Twinning Number: HU02/IB/AG-01 1.2 Title: Pre-accession introduction of CMO

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1. CRIS Number 2003/004-979-05-01 Twinning Number: LV/2003/IB/EN-01 1.2. Title: Administration of oil stock reserve system 1.3. Sector: Energy 1.4.

More information

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts Standard Project Fiche 1. Basic Information 1.1 Desiree Number: RO-2002/000-586.03.03 1.2 Title: Further Institutional Strengthening of the Court of Accounts 1.3 Sector: Finance 1.4 Twinning component:

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FCHE 1. Basic nformation 1.1 CRS Number: Twinning Light Envelope Comp. 1 2003004-979-08-04 LV2003BTL 1.2 Title: nstitution Building Facility 1.3 Sector: Various 1.4 Location: Latvia

More information

1.2 Title: Project Preparation and Support Facility (PPF)

1.2 Title: Project Preparation and Support Facility (PPF) FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Project Preparation and Support Facility (PPF) 1.3 ELARG Statistical code: 4.40 1.4 Location: Skopje Implementing arrangements:

More information

01.05 Tax administration/1

01.05 Tax administration/1 01.05 Tax Administration 1. Basic Information 1.1 Desiree Number: PL0003.05 1.2 Title: Tax Administration 1.3 Sector: Finance - Twinning code: PL2000/IB/FI04 1.4 Location: Poland 2. Objectives 2.1 Wider

More information

STANDARD PROJECT FICHE

STANDARD PROJECT FICHE STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number : 2004-016-919.04 1.2 Title: Preparation for Extended Decentralized Implementation System (EDIS) in the management of pre-accession funds in

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. Title: Reinforcement of institutional and administrative capacity of the financial sector 2. Project nº: ES 9904 3. Location: Ministry of Finance, Securities Inspectorate, (Bank

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05 Standard Summary Project Fiche 1. Basic Information Project number: TR 0204.04 Twinning number: TR02-JH-05 1.1 Desiree Number 2.1 Title Strengthening the Fight against Money Laundering 3.1 Sector AD 4.1

More information

Standard Summary Project Fiche. The project meets the following Accession Partnership priorities:

Standard Summary Project Fiche. The project meets the following Accession Partnership priorities: Standard Summary Project Fiche 1. Basic Information: 1.1 CRIS Number: BG2003/004-937.10.04 1.2 Title: Setting up a coherent system for the Structural Funds and the Cohesion Fund in Bulgaria for the Managing

More information

Standard Summary Project Fiche. Project PL : Improved Tax Administration

Standard Summary Project Fiche. Project PL : Improved Tax Administration Standard Summary Project Fiche Project PL9904.03: Improved Tax Administration Sub-programme 2: Strengthen institutional and administrative capacity Location: Poland, Ministry of Finance, Tax Chambers,

More information

STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY 1. Basic information: 1.1. CRIS Number: CZ 2004/006-237/02.01 1.2.Title: Strengthening of the Railway Infrastructure Administration (RIA) Functions 1.3

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Title: Development of the VAT Service through a Reform and Modernization programme to apply and enforce the Acquis. 1.2. Code : CY0001.02.02 1.3. Sector:

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 CRIS Number 2006/018-176.04.01 Twinning light HU/2006/IB/FI/01 TWL 1.2 Title: Improvement of the efficiency of risk-based selection of taxpayers

More information

STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE

STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE 1. Basic Information 1.1 CRIS Number 2002/000-624-06 1.2 Title: Project Preparation Facility for

More information

01.02 National Bank of Poland/1

01.02 National Bank of Poland/1 01.02 National Bank of Poland 1. Basic information 1.1 Désirée Number: PL0003.02 1.2 Title : National Bank of Poland 1.3 Sector: Finance Twinning code: PL2000/IB/FI01 1.4 Location: Poland 2. Objectives

More information

Standard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06

Standard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06 Standard Summary Project Fiche Project No. TR 0402.03 Twinning No. TR/2004/IB/EC/06 1. Basic Information 1.1 Title: Strengthening the Ministries of Health, Environment and Forests, and Agriculture and

More information

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise.

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise. SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise. 1.2. Code: CY0001.02.01 1.3 Sector: Indirect Taxation Excise Customs

More information

PROJECT FICHE. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus.

PROJECT FICHE. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus. Updated 20.11.2002 2003 PROJECT FICHE 1. BASIC INFORMATION 1.1 CRIS Number: 2003/004-643. Project 3 1.1. Title: SME Finance Facility in Cyprus 1.3 Sector: Small and Medium-sized Enterprises 1.4 Location:

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 1. Basic information 1.1. CRIS Number: 2010/022-154 1.2. Title: Technical Assistance and Project Preparation Facility (TA&PPF)

More information

PHARE 2004 STANDARD PROJECT FICHE

PHARE 2004 STANDARD PROJECT FICHE PHARE 2004 STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number: Phare 2004/016-772.03.07 1.2 Title: Design and implementation of the INTRASTAT system 1.3 Sector: 1.4 Location: Romania, INS 1.5

More information

Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR

Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR 1. BASIC INFORMATION 1.1 CRIS Number : TR 2009/0740.01 1.2 Title : Support Activities to Strengthen the European Integration

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: CZ 2003/004-338.05.02 1.2 Title: Fight against Money Laundering 1.3 Sector: Finance 1.4. Location: Czech Republic 2. Objectives 2.1.

More information

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY 1. Basic Information 1.1 CRIS Number: CZ 2004/006-237/04.04 1.2 Title: Evaluation of EU-funded measures (Phase I Transition Facility) 1.3 Sector: Internal

More information

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:

More information

PHARE 2003 STANDARD SUMMARY PROJECT FICHE

PHARE 2003 STANDARD SUMMARY PROJECT FICHE PHARE 2003/005-551.06.03 version of 16.06.2003 PHARE 2003 STANDARD SUMMARY PROJECT FICHE 1. Basic information 1.1 CRIS Number: PHARE 2003/005-551.06.03 1.2 Title: Support for improving the participation

More information

Standard Summary Project Fiche Project Number

Standard Summary Project Fiche Project Number Standard Summary Project Fiche Project Number 2003.004-341.07.02 1. Basic Information Objective 7 - Private sector, Restructuring, Privatisation, SM 1.1 CRIS Number: 2003.004-341.07.02 1.2 Title: Support

More information

Standard Summary Project Fiche IPA decentralised National programmes

Standard Summary Project Fiche IPA decentralised National programmes Standard Summary Project Fiche IPA decentralised National programmes 1. Basic information 1.1 CRIS Number : TR2010/0329.01 (under 2010/022-565) 1.2 Title : Modernisation of the Turkish Customs Administration

More information

05.01 Strengthen environmental impact assessment

05.01 Strengthen environmental impact assessment 05.01 Strengthen environmental impact assessment 1. Basic Information 1.1.Desiree Number:PL0007.01 1.2 Title: Strengthen environmental impact assessment 1.3 Sector : Environment Twinning code: PL2000/IB/EN01

More information

Standard Summary Project Fiche

Standard Summary Project Fiche Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: 2003/005-026.07.01 Twinning EE03-IB-AG-02 1.2 Title: Development of an IT System for administration of EAGGF Guarantee section Rural

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility 01. Basic Information Standard Summary Project Fiche for the Transition Facility 01.1. CRIS Number: 2004/16762.04.02. 01.2. Title 01.3. Sector Twinning light: MT04-IB-SO-02 Capacity strengthening of the

More information

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY 1. Basic Information 1.1 CRIS Number: CZ 2004/006-237/04.02 1.2 Title: Financial Stability Issues in the Czech National Bank 1.3 Sector: Internal Market

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: CZ2003/004-338.02.03 1.2 Title: Capital Markets - Central Depository of Securities 1.3 Sector: Internal Market and Economic Criteria

More information

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Désirée Number: RO-2002/ Title: Connection to EU customs systems

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Désirée Number: RO-2002/ Title: Connection to EU customs systems SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Désirée Number: RO-2002/000-586.04.03 1.2 Title: Connection to EU customs systems 1.3 Sector: Customs (Connection of the Romanian Customs systems with the

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA

More information

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02 Local Government Budget Management System 1 Key Information 1.1 CRIS Number: 2006/018-180.01-04 Twinning No: PL/06/IB/FI/02 1.2. Title: Local Government Budget Management System 1.3. Sector: Public Finance

More information

Contacts: Anastasija Trajkovska, Head of Sector, telephone: (0)

Contacts: Anastasija Trajkovska, Head of Sector,   telephone: (0) Project fiche 2.1: Support to the Agency for Supervision of Fully Funded Pension Insurance (MAPAS) 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Support to the Agency for Supervision of

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

Project Fiche IPA National programmes IPA 2012/Component I

Project Fiche IPA National programmes IPA 2012/Component I Project Fiche IPA National programmes IPA 2012/Component I 1 IDENTIFICATION Project Title Strengthening the capacity of the Central Financing and Contracting Unit (CFCU) for efficient implementation of

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication notice reference: EuropeAid/ 137-954/IH/ACT/HR 1.2 Programme: Transition Facility IPA/2013/24986 (Annex of C(2013) 8057 final); Institution

More information

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo STANDARD SUMMARY PROJECT FICHE Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo 1. Basic Information CRIS Number: 2002/000-624-01 Title: Rehabilitation and Partial

More information

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: Upgrade of the Latvian Statistical System in accordance with EU requirements

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: Upgrade of the Latvian Statistical System in accordance with EU requirements 1 01.11.23 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Desiree Number: LE00.11.02 Twinning Component Number: LE.00/IB/FI-02 1.2 Title: Upgrade of the Latvian Statistical System in accordance

More information

IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure "

IPA National Programme 2010 for Albania Project Fiche 09 Support to the Food Safety Infrastructure IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure " 1. Basic information 1.1 CRIS Number: 2010/022-530 1.2 Title: Support to the food safety infrastructure

More information

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING Article 1 - Explanatory Statement The Establishment of a Central Finance and Contracts Unit (CFCU) is to be seen against the

More information

PHARE 2005 PROJECT FICHE

PHARE 2005 PROJECT FICHE PHARE 2005 PROJECT FICHE 1 BASIC INFORMATION 1.1 CRIS Number: HR2005/4/4 1.2 Title: Interoperability of IT Systems with the EU Customs Systems 1.3 Sector: 33110 1.4 Location: Croatian Customs Administration,

More information

Standard Summary Project Fiche. Project number: TR

Standard Summary Project Fiche. Project number: TR Standard Summary Project Fiche Project number: TR 05 03.03 1. Basic Information 1.1. CRIS Number 1.2. Title Reinforcement of Institutional Capacity of the Directorate General for State Aids in the Undersecretariat

More information

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection 1. Basic information 1.1 CRIS Number: 2007/019-301 1.2 Title: Assessment

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

Project Fiche: No. 14 Systematic Electronic Exchange of Data (SEED) in the Western Balkans

Project Fiche: No. 14 Systematic Electronic Exchange of Data (SEED) in the Western Balkans Project Fiche: No. 14 Systematic Electronic Exchange of Data (SEED) in the Western Balkans 1. Basic information 1.1 CRIS Number: 2010/022-030 1.2 Title: Systematic Electronic Exchange of Data (SEED) in

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference Number: EuropeAid/ 136-263/IH/ACT/AL 1.2 Programme: IPA National programmes/component I (2013) 1.3 Twinning Number: AL 13

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 1. Basic information 1.1 CRIS Number: 2009/021-170 1.2 Title: Strengthening the management and control systems for EU financial

More information

Standard Summary Project Fiche IPA decentralised National programmes. Project number: TR

Standard Summary Project Fiche IPA decentralised National programmes. Project number: TR Standard Summary Project Fiche IPA decentralised National programmes Project number: TR 07 02 22 1. Basic information 1.1 CRIS Number: 1.2 Title: Capacity Building of Social Security Institution 1.3 Sector:

More information

2010 IPA Horizontal Programme on Nuclear Safety and Radiation Protection PF1 Albania - Final Project Fiche No. 1

2010 IPA Horizontal Programme on Nuclear Safety and Radiation Protection PF1 Albania - Final Project Fiche No. 1 Project Fiche No. 1 Further steps to approximate the Albanian legislation and regulations in accordance with the EU acquis in the field of radiation protection, nuclear safety and security 1. Basic information

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Project Fiche: No. 15 Systematic Electronic Exchange of Data (SEED) in the Western Balkans

Project Fiche: No. 15 Systematic Electronic Exchange of Data (SEED) in the Western Balkans Project Fiche: No. 15 Systematic Electronic Exchange of Data (SEED) in the Western Balkans 1. Basic information 1.1 CRIS Number: 2010/xxx-xxx 1.2 Title: Systematic Electronic Exchange of Data (SEED) in

More information

Standard Summary Project Fiche

Standard Summary Project Fiche Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: BG2003/004-937.09.04 1.2 Title: Further Development of the Independent Public External Audit Institution 1.3 Sector: Customs and Finance

More information

Table of contents. Introduction Regulatory requirements... 3

Table of contents. Introduction Regulatory requirements... 3 COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming

More information

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) FWC BENEFICIARIES 2009 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/127054/C/SER/multi 1. BACKGROUND

More information

Project Fiche IPA National programmes / Component I. Public Administration Reform Customs

Project Fiche IPA National programmes / Component I. Public Administration Reform Customs Project Fiche IPA National programmes / Component I 1 IDENTIFICATION Project Title Upgrading the capacities of the Albanian Customs Administration CRIS Decision number 2013 / 024-190 Project no. 04 MIPD

More information

Twinning Projects. in the Field of Food and Agriculture

Twinning Projects. in the Field of Food and Agriculture Twinning Projects in the Field of Food and Agriculture What is Twinning? Twinning projects are aimed at assisting countries seeking to join the European Union in adopting the collected body of EU law (

More information

EUROPEAN COMMISSION Enlargement Directorate-General. Brussels, 08 May 2008 ELARG/D(2008) REG Dear Mr Ivanovski,

EUROPEAN COMMISSION Enlargement Directorate-General. Brussels, 08 May 2008 ELARG/D(2008) REG Dear Mr Ivanovski, EUROPEAN COMMISSION Enlargement Directorate-General The Director-General Brussels, 08 May 2008 ELARG/D(2008) REG 102172 Dear Mr Ivanovski, Thank you for your letter of 31 March 2008. We have carefully

More information

2002/ Sulechow by-pass

2002/ Sulechow by-pass 2002/000-606.08 - Sulechow by-pass 1. Basic information 1.1 CRIS Number: 2002/000-606.08 1.2 Title: Sulechow by-pass 1.3 Sector: Cross-Border Co-operation / Infrastructure 1.4 Location: Poland, province

More information

Project Fiche IPA National programmes / Component I

Project Fiche IPA National programmes / Component I 1 IDENTIFICATION Project Fiche IPA National programmes / Component I Project Title Participation in Union programmes and Agencies CRIS Decision number 2012/022-989, 2013/024-109 Project no. 12 MIPD Sector

More information

COMMISSION DELEGATED REGULATION (EU) No /.. of

COMMISSION DELEGATED REGULATION (EU) No /.. of EUROPEAN COMMISSION Brussels, 11.3.2014 C(2014) 1565 final COMMISSION DELEGATED REGULATION (EU) No /.. of 11.3.2014 supplementing Regulation (EU) No 1306/2013 of the European Parliament and of the Council

More information

INTERREG IIIC West Zone. Programme Complement

INTERREG IIIC West Zone. Programme Complement INTERREG IIIC West Zone Table of Content 1. Description of Measures... 1 1.1 Operation Type (a) Regional Framework Operations (RFO)... 2 1.2 Operation Type (b) Individual Co-operation Project:... 3 1.3

More information

Standard Summary Project Fiche

Standard Summary Project Fiche 1. Basic Information Standard Summary Project Fiche 1.1. Désirée Number CZ00-04-02 Twinning number CZ2000/IB/FI/01 1.2. Title Capital Market Legislation & Securities Commission 1.3. Sector Internal Market

More information

EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS

EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS CO-FINANCED BY THE EXTERNAL BORDERS FUND Ref. No. A-089-711/10 Prepared by the responsible authority of the EBF in Sweden The National Criminal Police 1 EVALUATION

More information

(recast) (Text with EEA relevance)

(recast) (Text with EEA relevance) 29.3.2014 Official Journal of the European Union L 96/107 DIRECTIVE 2014/31/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on the harmonisation of the laws of the Member States relating

More information

NOTE BY THE DIRECTOR-GENERAL SUPPORT FOR OPCW ACTIVITIES IN THE FRAMEWORK OF THE EU STRATEGY AGAINST PROLIFERATION OF WEAPONS OF MASS DESTRUCTION

NOTE BY THE DIRECTOR-GENERAL SUPPORT FOR OPCW ACTIVITIES IN THE FRAMEWORK OF THE EU STRATEGY AGAINST PROLIFERATION OF WEAPONS OF MASS DESTRUCTION OPCW Technical Secretariat 25 January 2006 Original: ENGLISH NOTE BY THE DIRECTOR-GENERAL SUPPORT FOR OPCW ACTIVITIES IN THE FRAMEWORK OF THE EU STRATEGY AGAINST PROLIFERATION OF WEAPONS OF MASS DESTRUCTION

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1. Basic Information 1.1 CRIS Number: 2004/16762.06.02. 1.2 Title Building Capacity to introduce the Polluter Pays Principle through Economic

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference number: EuropeAid/ 137-889/IH/ACT/BA 1.2 Programme: IPA 2014 1.3 Twinning Number: BA 14 IB FI 01 R 1.4 Title: Improving capacity

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA A STRATEGIC APPROACH TO COMPETITIVENESS SCOPE, FOCUS AND PROCESS Sofía,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.2.2008 COM(2008) 58 final 2008/0026 (COD) C6-0059/08 Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulation (EC)

More information

PHARE PROJECT FICHE. 2.3 Accession Partnership, NPIEU priority and Croatian Transport Development Strategy

PHARE PROJECT FICHE. 2.3 Accession Partnership, NPIEU priority and Croatian Transport Development Strategy PHARE PROJECT FICHE 1. Basic Information 1.1 CRIS Nr.: HR2006/018-113/5/1 1.2 Title: Restructuring and Development of Croatian Railway System within the framework of EU legislation 1.3 Sector: 43010 1.4

More information

Project fiche IPA National programmes 2012/ Component I

Project fiche IPA National programmes 2012/ Component I Project fiche IPA National programmes 2012/ Component I 1. IDENTIFICATION Project Title Implementation of a modern Financial Management and Control system and Public Financial Inspection in Albania CRIS

More information

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

ERIC. Practical guidelines. Legal framework for a European Research Infrastructure Consortium. Research and Innovation

ERIC. Practical guidelines. Legal framework for a European Research Infrastructure Consortium. Research and Innovation ERIC Practical guidelines Legal framework for a European Research Infrastructure Consortium Research and Innovation EUROPEAN COMMISSION Directorate-General for Research and Innovation Directorate B Innovation

More information

Standard Summary Project Fiche Project number:

Standard Summary Project Fiche Project number: Standard Summary Project Fiche Project number:0802.20 1. Basic Information 1.1 CRIS number: TR080220 1.2 Title : Modernisation of Turkish Customs Administration V 1.3 Sector : 29-Customs 1.4. Location

More information

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ Project Title : Krimov Hora Sv.Šebestiána - Re-laying of Road I/7

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ Project Title : Krimov Hora Sv.Šebestiána - Re-laying of Road I/7 1. Basic Information 1.1 Project Number CZ 01.12.02 1.2 Project Title : Krimov Hora Sv.Šebestiána - Re-laying of Road I/7 1.3 Sector Transport 1.4 Project Location Euroregion: Cross-border region: District:

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

Standard Summary Project Fiche. Project number: TR Twinning number: TR/2004/IB/FI/04

Standard Summary Project Fiche. Project number: TR Twinning number: TR/2004/IB/FI/04 Standard Summary Project Fiche Project number: TR 0403.02 Twinning number: TR/2004/IB/FI/04 1. Basic Information 1.1. Title: Tax Administration capacity building 1.2. Sector: Taxation 1.3. Location: Ankara

More information

Partnership Agreement between the Lead Partner and the other project partners

Partnership Agreement between the Lead Partner and the other project partners Partnership Agreement between the Lead Partner and the other project partners Foreword This Partnership Agreement is signed on the basis of the following documents that form the legal framework applicable

More information

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period Final version of 25/07/2008 COCOF 08/0014/02-EN GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY for the 2007 2013 programming period Table of contents 1. Introduction... 3 2. Main functions

More information

IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management

IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management 1 Basic Information 1.1 CRIS Number: 2009/021-642 1.2 Title: Improvement

More information

Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1.2 Title: Support to regulatory and supervisory bodies

Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1.2 Title: Support to regulatory and supervisory bodies Project fiche 3.1 Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1. Basic information 1.1 CRIS Number: 2007/19297 1.2 Title: Support to regulatory and supervisory bodies

More information

Republic of Serbiap Chapter 33 Financial and budgetary provisions. Traditional Own Resources

Republic of Serbiap Chapter 33 Financial and budgetary provisions. Traditional Own Resources Republic of Serbiap Chapter 33 Financial and budgetary provisions Traditional Own Resources СONTENT: 1. Legislative framework 2. Institutional framework 3. Customs debt and collection of import duties

More information

Challenges Of The Indirect Management Of Eu Funds In Albania

Challenges Of The Indirect Management Of Eu Funds In Albania Challenges Of The Indirect Management Of Eu Funds In Albania Neritan Totozani, Msc Central Financing & Contracting Unit, Ministry of Finance, Albania doi: 10.19044/esj.2016.v12n7p170 URL:http://dx.doi.org/10.19044/esj.2016.v12n7p170

More information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information 1.1 Background information on the Regional School of

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out ESF/PA/2-2001 Eligibility Rules Department of Enterprise, Trade and Employment Circular No. ESF/PA/2-2001 The text of this Circular, with the exception of that in bold & italic, is taken directly from

More information