PROJECT FINANCIAL STATEMENTS ENERGY EFFICIENCY PROJECT FOR THE YEARS ENDED DECEMBER 31, 2015 AND DECEMBER 31, 2016

Size: px
Start display at page:

Download "PROJECT FINANCIAL STATEMENTS ENERGY EFFICIENCY PROJECT FOR THE YEARS ENDED DECEMBER 31, 2015 AND DECEMBER 31, 2016"

Transcription

1 Public Disclosure Authorized Report on the Republika Srpska part of the Public Disclosure Authorized Public Disclosure Authorized PROJECT FINANCIAL STATEMENTS of the ENERGY EFFICIENCY PROJECT financed by: - IDA LOAN No BA - IDA LOAN No BA FOR THE YEARS ENDED DECEMBER 31, 2015 AND DECEMBER 31, 2016 Public Disclosure Authorized

2 CONTENTS 1 IntroductIon 1 2 Independent Auditor's Report 5 3 Project financial statements for the years 2015 and Notes to the project financial statements 12 APPENDICES A. I Designated account statement - IDA Credit No BA 14 A.2 Designated sub-account statement - IDA Credit No BA 15 A5 Local bank account - IDA Credit No BA 16 SoE Withdrawal Schedule of IDA Credit No BA for the years ended December 31, 2015 and B.1 December 31, C.1 Reconciliation between World Bank's disbursement statements in XDR and IDA Credit account in EUR according to the balance sheet as of ; SoE Withdrawal Schedule of IDA Credit No BA 19 C.2 Reconciliation between World Bank's disbursement statements in EUR and IDA Loan account in EUR according to the balance sheet as of ; SoE Withdrawal Schedule of IDA Loan No BA 21

3 1. Introduction 1.1 Objectives and activities of the Project The objective of the OM is to specify all key elements for implementation of the Bosnia-Herzegovina Energy Efficiency Project (BEEP) in the Republika Srpska (RS) in order to help guide all key stakeholders in project implementation. The OM specifies the project components and implementation cycle, institutional and implementation arrangements, including the role and responsibilities of all stakeholders involved, procurement arrangements, financial management arrangements, environmental management arrangements, as well as the reporting, monitoring and evaluation framework. This OM and subsequent revisions to it are to be adopted by the Ministry of Physical Planning, Civil Engineering and Ecology of Republika Srpska. The OM will be updated regularly. Major changes in the content of this document, including its annexes, shall not be revised without noobjection of the World Bank. The Project is made up of three components, the first aimed at specific investments that would improve energy efficiency in public buildings - specifically education, health and social issues sector, throughout Bosnia and Herzegovina. These buildings shall, after renovation aimed at improving energy efficiency, also be used as demonstration projects, and will be chosen by the respective line ministries using the system of scoring against a set of established criteria. Activities to be included within this component are (i) insulation of walls, roofing and attics, (ii) improvements and replacement of windows and doors, (iii) thermostatic vents and automated temperature controls, (iv) lighting systems, (v) refurbishment of the heating systems and building-based boilers, including use of cleaner fuels where it is economically and technically feasible. The Project will not involve other reconstruction activities that are not directly related to energy efficiency (bathrooms, floors, etc.) unless those activities are also aimed at improvement of energy efficiency (repairs of gutters, etc.). The second component shall be based on technical assistance for building capacity for monitoring and evaluation, and organization of trainings and support to public awareness activities that are aimed at increasing awareness of the energy efficiency activities. 1.2 Components of the Project The total amount allocated to this component in the RS is US$ million. This component will support energy efficiency investments ('subprojects') in schools, hospitals and clinic centers. A small number of other public facilities (e,g., elderly homes, orphanages, other administrative buildings) may also be included.

4 1. Introduction (continued) 1.2 Components of the Project (continued) The component will finance energy efficiency upgrades, as well as related technical consultancy services (e.g., energy audits, technical and social' M&E before and after subproject implementation, technical designs, supervision and subproject commissioning). These investments will reduce the energy consumption of selected public buildings, and demonstrate the economic viability of energy efficiency improvements, including reduced recurring energy costs and associated public expenditures. In addition, the subprojects will generate demonstrable co-benefits, such as reduced C02 emissions and improved indoor comfort levels (e.g., improved indoor temperature, better lighting and indoor air quality). Component 1: Energy efficiency investments in public facilities (estimated costs of US$ 27,37 million IDA credit, with US$ million allocated to the FBH and US$ million to the RS). This component will support energy efficiency investments ('subprojects') in schools, hospitals and clinic centers. A small number of other public facilities (e.g., elderly homes, orphanages, other administrative buildings) may also be included. The component will finance energy efficiency upgrades (including building envelop measures, heating and cooling systems, lighting, upgrading of electrical network if capacity is increased, and other financially viable energy efficiency measures) as well as related technical consultancy services (e.g., energy audits, technical and social monitoring and evaluation, technical designs, supervision and subproject commissioning). Component 2: Capacity Building (USD 2.71 million). Support for the development of scalable financing mechanisms and capacity building (estimated costs of US$ 2.71 million IDA credit, with US$ 1.51 million allocated to the FBH and US$ 1.2 million to the RS). This component will support the development of sustainable energy efficiency financing mechanisms in the public sector, strengthen implementation capacity and help to increase public awareness on energy efficiency. The main activities supported under this component will include: Issues and Options Study on scalable financing mechanisms, On-the-job-trainings for municipal energy managers, On-the-job-trainings for issuing energy labels for public buildings, Database for public buildings in the RS, Communication activities and Other technical assistance and trainings. 1 Social M&E will include end-user satisfaction surveys before and after subproject implementation to assess perceived improvements in comfort levels and working conditions, changes in behavior, and changes in awareness on energy efficiency In addition, awareness surveys will be conducted in the local community where subprojects are implemented in order to assess changes in awareness and behavior of the broader local community as well as the effectiveness of communications and information campaigns- 2

5 1. Introduction (continued) 1.2 Components of the Project (continued) Component C: Project Management and Operating Cost (USD 1,92 million). Project Management (estimated costs of US$ 1.92 million IDA credit, with US$ 1.27 million allocated to the FBH and US$ 0 65 million to the RS). This component will ensure effective project management by the PlUs through financing additional experts, trainings for PlU staff, and covering incremental operating costs. Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank's Guidelines: Procurement under IBRD Loans and IDA Credits (current edition), and is open to all eligible bidders as defined in the guidelines. Consulting services will be selected in accordance with the World Bank's Guidelines: Selection and Employment of Consultants by World Bank Borrowers (current edition). Specific procurement notices for contracts to be bid under the World Bank's international competitive bidding (ICB) procedures and for contracts for consultancy services will be announced, as they become available, in UNDB Development Business as well as in local media or electronic portals. However, given the high cost of wild dump closures, the Project will accept funding requests for closure of wild dumps in individual municipalities, if (a) the municipality is a member of the intermunicipal board of a regional solid waste utility, and (b) solid waste originally disposed at the wild dump site is managed at a regional sanitary landfill. The regional utility should be the borrower and agreements between the utility and municipality must be established bilaterally. Overall project size equals USD 32,0 million, of which USD 32 million will be provided by the World Bank and USD 32,00 million by the Borrower/Recipient. For RS 40% amount in USD IDA Credit No BA and No BA The State of Bosnia and Herzegovina is the borrower of the International Development Association (IDA) Credit No BA, and 5538 BA amounting to the equivalent of XDR 20,800,000. (5393 BA amount XDR and BA 5538 BA amount XDR ) Under the terms of a subsidiary finance agreement between State of Bosnia and Herzegovina and Republika Srpska ("RS"), funds of the equivalent of 5393 RS XDR and RS 5538/BA amount XDR have been lent to RS. Categories of cost items to be financed out of the proceeds of the Credit, the allocation of the amounts of the Credit to each category and the percentage of expenditure for cost items so to be financed in each category are as follows: 3

6 1. Introduction (continued) IDA Credit No BA and No BA Amount Amout ofthe % of expenditure Item Credit allocated to exped (in XDR) (in TJR) to be financed (2) Goods, works, consultants' services and operating costs for the Project (5393/BA) 7,280, % (2) Goods, works, consultants' services and operating costs for the Project (5538/BA) 1 040, % Subtotal 8,320,000 Amount of the % of expenditure Item Credit allocated to be financed (in USD) (5) Goods, works, Part 2.B of the Project 10,950, % (6) consultants' services for Part 2.B and 1.200, % (7) Operating costs for Part 2.B of the Project 650, % Subtotal 12,800,000 4

7 Deloitte d.o.o. Zmaja od Bosne 12c Sarajevo Bosnia and Herzegovina Tel: +387 (0) Fax: +387 (0) Independent Auditor's Report To the State of Bosnia and Herzegovina, Ministry of Finance and Treasury Attn. of Minister of Finance and Treasury H.E. Mr. Vjekoslav Bevanda Report on the project financial statements We have audited the accompanying project financial statements of the Republika Srpske part of the Energy Efficiency Project (the "Project"), which comprise of Summary of sources and uses of funds, Balance sheet, Designated account and Credit account statements, Statements of Credit withdrawals as of and for the period ended December 31, 2016, and a summary of significant accounting policies and other explanatory notes for the year then ended, financed under IDA Credit agreement No BOS, IDA Credit agreement No BA and CEB Credit agreement FP1520 and CEB Credit agreement LD1747. These project financial statements have been prepared on the cash basis of accounting based on International Public Sector Accounting Standard ("IPSAS"), as described in Note 4.1. Responsibility for the project financial statements The State of Bosnia and Herzegovina, i.e. the management of the project implementation team (the "Management") is responsible for the preparation and fair presentation of these project financial statements on the cash basis of accounting based on IPSAS, as described in Note 4.1, and on "Guidelines: Annual Financial Reporting and Auditing for World Bank - Financed Activities" issued by Financial Management Sector Board ("FMSB"), and for such internal control as the Management determines is necessary to enable the preparation of the project financial statements that are free from material misstatement, whether due to fraud or error. Auditor's responsibility Our responsibility is to express an opinion on the project financial statements based on our audit. We conducted our audit in accordance with the International Standards on Auditing and "Guidelines: Annual Financial Reporting and Auditing for World Bank - Financed Activities" issued by FMSB. Those Standards and Guidelines require that we plan and perform the audit to obtain reasonable assurance about whether the project financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the special purpose project financial statements. An audit also includes assessing of the accounting principles used and significant estimates made by the Management, as well as evaluating the overall statement presentation. We believe that our audit provides a reasonable basis for our opinion. Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee ("DTTL" or "Deloitte Global"), its network of member firms, and their related entities (collectively, the "Deloitte Network"). DTTL and each of its member firms are legally separate and independent entities DTTL does not provide services to clients, Please see com/ba/about for a more detailed description of DTTL and its member firms. In Bosnia and Herzegovina, the services are provided by Deloitte Ltd. and Deloitte Advisory Services Ltd. (jointly referred to as "Deloitte Bosnia and Herzegovina") which are affiliates of Deloitte Central Europe Holdings Limited Deloitte Bosnia and Herzegovina is one of the leading professional services organizations in the country providing services in audit, tax, consulting, financial advisory and legal services through over 45 national and specialized expatriate professionals ) 2017 Deloitte Bosnia and Herzegovina

8 Report on the project financial statements (continued) Opinion In our opinion, the accompanying project financial statements present fairly, in all material aspects, the financial position of the Project as of and of the funds received and disbursed during the years then ended, in accordance with basis of accounting described in Note 4.1. Basis of Accounting Without modifying our opinion, we draw attention to Note 4.1 of these project financial statements, which describes the basis of accounting. Report on other requirements In addition, with respect to the Statements of Expenditure, adequate supporting documentation has been maintained to support claims to the World Bank for reimbursements of expenditures incurred; and all expenditures included in withdrawal applications and reimbursed against are eligible for financing under the Project. Deloitte d.o.o. Sead Bahtano ic, director and licensed auditor Adna Valjevac, licensed auditor Sarajevo, Bosnia and Herzegovina June 23,

9 3. Project financial statements for the years 2015 and Summary of sources and uses of funds under the IDA Credit No BA, IDA Loan No. 5538BA FINANCING Actual Cumulative Actual Cumulative Cumulative Ref budget variance IDA Credit No.5393 BA 3,241,438 3,842, ,252 9,083,540 IDA Credit No.5538 BA ,467,460 IDA Co-financing 60,875 60, TOTAL FINANCING 3.2 3,302,313 3,903, ,252 10,551,000 6,647,435 PROJECT EXPENDITURE By Category (2)Goods, works, consultants' services and operating costs for Part 2.B2of the Project 3,227,861 3,528, TOTAL BY CATEGORY 3.2 3,227,861 3,528, ,718 10,551,000 7,022,421 PROJECT EXPENDITURE By Component Investments in public facilities 3,000,051 3,150, ,065 8,968,000 Financing mechanisms and capacity building 115, , , ,600 Project Management costs 112, , ,400 TOTAL BY COMPONENT 3.2 3,227,861 3,528, ,718 10,551,000 7,022,421 7

10 3. Project financial statements for the years 2015 and 2016 (continued) Summary of sources and uses of funds under the IDA Credit No BA FINANCING Actual Cumulative Actual Cumulative Cumulative Ref budget variance IDA Credit No.5393 BA 9,083,540 Initial deposit 500,000 1,000, ,000 Direct payment 770, ,502 SOE replenishments 1,970,936 2,072, ,252 TOTAL IDA LOAN 3,241,438 3,842, ,252 9,083,540 5,240,850 PROJECT EXPENDITURE By Category (2)Goods, works, consultants' services and operating costs for Part 2.B of the Project 3,169,268 3,469, ,083,540 5,613,554 TOTAL BY CATEGORY 3,169,266 3,469, ,718 9,083,540 5,613,554 8

11 3. Project financial statements for the years 2015 and 2016 (continued) Summary of sources and uses of funds under the IDA Credit No BA FINANCING Actual Cumulative Actual Cumulative Cumulative Ref budget variance IDA Credit No.5538 BA TOTAL IDA LOAN ,467,460 1,467,460 PROJECT EXPENDITURE By Category (2)Goods, works, consultants' services and operating costs for Part 2.B of the Project 1,467,460 TOTAL BY CATEGORY 1,467,460 1,467,460 9

12 3. Project financial statements for the years 2015 and 2016 (continued) Summary of sources and uses of funds under the IDA Co-financing Actual Cumulative Actual Cumulative Cumulative Ref budget variance FINANCING IDA Co-financing A.3 60,875 60,875 -(60875) TOTAL IDA LOAN 60,875 60,875 - (80,875) PROJECT EXPENDITURE By Category (2)Goods, works, consultants' services and operating costs for Part 2.B of the Project A,3 58, (58 593) TOTAL BY CATEGORY 58,593 58, (58,593) 10

13 3. Project financial statements for the years 2015 and 2016 (continued) 3.2 Balance sheet as of showing accumulated funds of the Project and bank balances concerning World Bank funding December 31, December 31, Ref ASSETS Project expenditure Project expenditure under IDA Credit No ,469, ,718 Project expenditure under IDA Credit No IDA Co-financing , ,528, Designated account - IDA Credit No BA A.1 372, ,626 Designated sub-account - IDA Credit No BA A.2 Local bank account - IDA Credit No BA A.3 2,282 Receivables for paid VAT - under IDA Credit No BA - 46, , ,534 Total assets 3,903, ,252 LIABILITIES IDA Credit No BA C.1 3,842, ,252 IDA Credit No BA C IDA Co-financing A.3 60,875 - Total liabilities 3,903, ,252 Signed and puthorisecd by, Milo- Jokid PMU Director Banja Luka, June 23, 2017 Grozda$aro Financil Manager 11

14 4. Notes to the project financial statements 4.1 Basis of preparation and accounting records These project financial statements have been prepared on the cash basis of accounting based on International Public Sector Accounting Standards issued by the Public Sector Committee of the International Federation of Accountants, and incorporate the accounting policies below, which have been consistently followed in all material respects and comply with the "Guidelines: Annual Financial Reporting and Auditing for World Bank - Activities", issued by the Financial Management Sector Board. 4.2 Accounting policies The Project's fiscal year is January 1 to December 31 for the recording of all transactions. Cash basis of accounting Financed All receipts and expenses under IDA Credit is recorded on actual receipt and payment basis of accounting as per approved categories. Project expenditure is stated at original cost on the balance sheet Direct payments Direct payments concern the amounts paid directly from the IDA Credit accounts of the World Bank. Statement of Expenditure (SoE) Statements of Expenditure are used to state the expenditure under IDA Credit during a certain period. These statements are sent to the World Bank's disbursement department who authorises the payment of the expenditure through the Designated accounts. Currency conversions The reporting currency is Euro (EUR). Sources and use of funds (payments to suppliers and contractors) in currencies other than EUR have been converted to EUR using the currency rate at the moment of the transaction. Bank balances, recorded on the balance sheet at year-end, have been converted at year-end rate. Designated accounts This is the total amount of the withdrawals from the IDA Credit accounts for the Project. IDA Credit account is in XDR. 12

15 4. Notes to the project financial statements (continued) 4.2 Accounting policies (continued) Local bank accounts This concerns bank accounts at local banks (other than Designated accounts) in local currency translated at the exchange rate at the date of the balance sheet. Other income Other income includes interest earned on cash funds at the bank accounts. Interest on Designated accounts Interest earned on the Designated accounts belongs to the Borrower. Interest on local bank accounts Interest earned on the local bank accounts used for the payments from IDA Credit funds belongs to the Borrower. 13

16 APPENDIX A.1 DESIGNATED ACCOUNT STATEMENT Account owned by: Ministry of Finance and Treasury of Bosnia and Herzegovina Account No.: Depository Bank: Sber Bank a.d. Banja Luka Address: Jevrejska 71, Banja Luka Related Credit: IDA Credit No BA Currency: EUR Ref. EUR Opening balance January 1, 2015 Add: World Bank replenishments 601, ,252 Deduct: Payments to suppliers - Expenditure under IDA Credit 332 Transfers to Designated sub-account 347, ,626 Ending balance December 31, ,626 Opening balance January 1, ,626 Add: World Bank replenishments B.1 2,470,936 Transfers from Designated sub-account - IDA Credit A ,471,000 Deduct: Payments to suppliers - Expenditure under IDA Credit 1,822 Transfers to Designated sub-account - IDA Credit A.2 2,350,100 2,351,922 Ending balance December 31, ,704 14

17 APPENDIX A.2 Account owned by: DESIGNATED SUB-ACCOUNT STATEMENT Ministry of Finance and Treasury of Bosnia and Herzegovina Account No.: Depository Bank: Sber Bank a.d. Banja Luka Address: Jevrejska 71, Banja Luka Related Credit: IDA Credit No BA Currency: BAM Opening balance January 1, 2015 Ref. BAM EUR Add: Transfer from Designated account - IDA Credit A , , ,294 Deduct: Payments to suppliers - Expenditure under IDA Credit 587, ,386 VAT payments 91,744 46, , ,294 Ending balance December 31, 2015 Opening balance January 1, Add: Transfer from other Accounts A.1 4,596,396 2,350,100 VAT returns 947, ,636 5,544,262 2,834,736 Deduct: Payments to suppliers - Expenditure under IDA Credit 4,688,015 2,396,944 Transfers to other account - IDA Credit A VAT payments 856, ,728 5,544,262 2,834,736 Ending balance December 31,

18 APPENDIX A.3 Account owned by: LOCAL ACCOUNT STATEMENT Ministry of Finance of Republika Srpska Account No.: Depository Bank: Address: Related Credit: NLB Bank a.d. Banja Luka Milana Tepid br 2, Banja Luka Co-financing IDA Credit No BA Currency: BAM Ref. BAM EUR Opening balance January 1, Add: VAT return A.1 119,061 60, ,061 60,875 Deduct: VAT payments A. 114,597 58, ,597 58,593 Ending balance December 31, ,464 2,282 16

19 -D Oc C 'n N In 0 O 0O n 3LO 3- O 0N 0 co M I 4N 0 0 o N CY - - C: o C r- " " 0 0D N OCN N 0CD 0 CD L q 0 M (c) - W-ooo 0 p- LnL L O n C> O N -- c a) CD O C CD co O O - M LO c Orr 0 CD 0 O M c,) N - 1 M 0 m 0:.cq Lq -c1, cq CD-CNO1ýO COC cqcq W L.mC) - - 0C 0 0 N C N q-cd 0 C C O LI) 0 c, C) D r- - - C c N O N - N - - E~ LL CDC cu C> M0 N C - o cit c-o + C o c c E2 G). ) co Co <D Co CD M LO r- o cm Q c - 0 co L 4>å~>co~c ~r 3, Cco cr'~o Cc) Ln CO 0 0 N O N N O CD r- O u> CLM zz M ND c 1 cao o -10 cd r >G ON O 1- ø O Q~ ~ o< - 0 m Q) C 0 0 e.. %-. -. E c, %- 0 ci -< ø- -. 0r CL u. CL LC LCL C ý Z ~ ~ ~ i cl 0 -C LC 0 30 C -CL D. -C.Q L0C w o c M N<< << < <<< <c WE - (D N M CD r NCD NQ -J E o O) OO On O) OO MI>: w.. -- OM,-;l- l(. ca o N. c.. "; - - CO O CD U. CD 0 <D l'-' N (n <N N N C\- N- N

20 M o 0 o M - - M 0 N LO ' M 0 L C m C 0 - (D O CD o -.c r.-: t r.. L6 &. coi C cý cý; co fo ý (6 ;i o. C t. ;tl )C 0 C) le 1- -e a a t o~4 o - o e o to N in o to0. o Co coc N CN N 0-.i cl 0 ( o0 r- 00LO COD0ýt00LO " t - ( G)N r-- cm~ a) cmc * ' (1c) W M Q~N LO MCDCOr- (0 COOCD (0 (D CO D.2 co M o N oo moø <0 og-r--l & ac6 o co o f o to,4 & co o f cn 6r o m n0 N * o ) C) CD o o N <Y w (D i.-c. C> coecj ~ o æ 0 D O ' to C < æe E octa 0 0 ø 0 C cg.12.1 u Lr CY < c: D - O C )( CO wø.c o E r L--rC ;- 0 ;r C ) C ~ ~ C [-- COIt[-m o t <0 r5uli C 0 m 4) 00 0> 0 e G o( N -~ >> r m o 10> * Co L- n C ) m r:: N5 L c o on CL C.r CM.. O z C 0- c:) 0 ' ~ 0 C o s.. e - - e o o oya a 0> e~ e ~CD a o c ' O.- o o "ECL. 0. z E n - o Q, coø <D LO o~ 4-,,_ ~ LO U L W 00 C «««N - 0 o w - CO (0 r M M W N c 4 LO M LO n M M 0Oc) C C CO C C C M Q- (9 "-- O OC)2 e de o z o8s _ D a) E u. >~~~~~ c- LF cc= :c cm Eoo o o o o o o o _ LLo 0.. a.. c < < < < < < < < < < < < < < < < < < <- O

21 APPENDIX CA Reconciliation between World Bank's disbursement statements in XDR and IDA Credit account in EUR according to the balance sheet as of December 31, 2015; SoE Withdrawal Schedule of IDA Credit No BA Changes in E Changes in IDA Credit Exchange IDA Credit (in XDR) rate used (in EUR) Original amount 7,280, ,083,540 Withdrawal , ,000 Withdrawal 02 43, ,689 Withdrawal 03 36, ,563 Total disbursed in , ,252 Cumulative disbursements as of December 31, , ,252 Calculated undisbursed amount as of December 31, ,799,708 8,482,288 Undisbursed amount per WB statements as of December 31, ,799, ,654,872 19

22 APPENDIX C.1 Reconciliation between World Bank's disbursement statements in XDR and IDA Credit account in EUR according to the balance sheet as of December 31, 2016; SoE Withdrawal Schedule of IDA Credit No BA (continued) Changes in Changes in IDA Credit Exchange IDA Credit (in XDR) rate used (in EUR) Withdrawal 04 32, ,166 Withdrawal ,320 1, ,300 Withdrawal 06 6, ,655 Withdrawal 07 5, ,123 Withdrawal 08 68, ,071 Withdrawal 09 8, ,721 Withdrawal 10 34, ,840 Withdrawal 11 21, ,589 Withdrawal , ,641 Withdrawal 13 88, ,002 Withdrawal 14 67, ,495 Withdrawal 15 64, ,898 Withdrawal , ,570 Withdrawal , ,680 Withdrawal 18 78, ,266 Withdrawal 19 84,056 1, ,447 Withdrawal 20 87, ,730 Withdrawal 21 88, ,221 Withdrawal 22 81, ,949 Withdrawal 23 82, ,915 Withdrawal 24 79, ,697 Withdrawal , ,476 Withdrawal , ,000 Withdrawal 27 83, ,310 Withdrawal 28 80, Withdrawal 29 83, Total disbursed in ,565,463 3,241,438 Cumulative disbursements as of December 31, ,045,755 3,842,690 Calculated undisbursed balance as of December 31, ,234,245 5,240,850 Undisbursed balance as per World Bank Summary for December ,428,345 Potential exchange rate gain 187,495 20

23 APPENDIX C.2 Reconciliation between World Bank's disbursement statements in XDR and IDA Credit account in EUR according to the balance sheet as of December 31, 2015 and December 31, 2016; SoE Withdrawal Schedule of IDA Credit No BA Changes in Changes in IDA Credit Exchange IDA Credit (in XDR) rate used (in EUR) Original amount 1,040, ,467,460 Total disbursed as of December Cumulative disbursements as of December 31, 2015 Total disbursed as of December 31, Cumulative disbursements as of December 31,

PROJECT FINANCIAL STATEMENTS IRRIGATION DEVELOPMENT PROJECT FOR THE YEAR ENDED DECEMBER 31, Report on the Republika Srpska part of the.

PROJECT FINANCIAL STATEMENTS IRRIGATION DEVELOPMENT PROJECT FOR THE YEAR ENDED DECEMBER 31, Report on the Republika Srpska part of the. Public Disclosure Authorized Report on the Republika Srpska part of the Public Disclosure Authorized Public Disclosure Authorized PROJECT FINANCIAL STATEMENTS of the financed by: - IDA Credit No. 5098-BA

More information

CONSOLIDATED PROJECT FINANCIAL STATEMENTS ENHANCING SMALL AND MEDIUM ENTERPRISES ACCESS TO FINANCE PROJECT. Report on the. of the

CONSOLIDATED PROJECT FINANCIAL STATEMENTS ENHANCING SMALL AND MEDIUM ENTERPRISES ACCESS TO FINANCE PROJECT. Report on the. of the Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report on the CONSOLIDATED PROJECT FINANCIAL STATEMENTS of the ENHANCING SMALL AND MEDIUM

More information

TECHNICAL ASSISTANCE FOR IMPROVING INVESTMENT CLIMATE AND INSTITUTIONAL STRENGTHENING PROJECT

TECHNICAL ASSISTANCE FOR IMPROVING INVESTMENT CLIMATE AND INSTITUTIONAL STRENGTHENING PROJECT Public Disclosure Authorized Report on the Republika Srpska part of the Public Disclosure Authorized PROJECT FINANCIAL STATEMENTS of the TECHNICAL ASSISTANCE FOR IMPROVING INVESTMENT CLIMATE AND Public

More information

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8380-GE GRANT NO.TF (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT)

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8380-GE GRANT NO.TF (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT) Public Disclosure Authorized Public Disclosure Authorized MUNICIPAL DEVELOPMENT FUND OF GEORGIA (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT) Special Purpose Project Financial Statements

More information

O GrantThornton. Project's Financial Statements and Independent Auditors' Report

O GrantThornton. Project's Financial Statements and Independent Auditors' Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized O GrantThornton Project's Financial Statements and Independent Auditors' Report Project for support of the implementation

More information

Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P LOAN AGREEMENT No 8324-ME

Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P LOAN AGREEMENT No 8324-ME Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P107992 LOAN AGREEMENT No

More information

Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Montenegro Institutional Development and Agriculture Strengthening Project MIDAS Project ID: P107473 GLOBAL ENVIRONMENT

More information

IBRD LOAN No AM

IBRD LOAN No AM E-SOCIETY AND INNOVATION FOR COMPETITIVENESS PROJECT IBRD LOAN No. 7963-AM IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA SPECIAL PURPOSE

More information

HEALTH RESULTS-BASED FINANCING PROJECT

HEALTH RESULTS-BASED FINANCING PROJECT HEALTH RESULTS-BASED FINANCING PROJECT IDA GRANT NUMBER TF013310 IMPLEMENTED BY RESULT-BASED FINANCING SECRETARIAT UNIT UNDER THE MINISTRY OF HEALTH OF THE KYRGYZ REPUBLIC SPECIAL PURPOSE PROJECT FINANCIAL

More information

REPUBLIC OF TURKEY PRIME MINISTRY Undersecretariat of Treasury. Implemented by. And Financed Under World Bank Loan No TU

REPUBLIC OF TURKEY PRIME MINISTRY Undersecretariat of Treasury. Implemented by. And Financed Under World Bank Loan No TU Public Disclosure Authorized REPUBLIC OF TURKEY PRIME MINISTRY Undersecretariat of Treasury INDEPENDENT AUDITOR'S REPORT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (IBRD) LOAN No. 8286-AZ REPORT OF INDEPENDENT

More information

INTEGRATED LAND ADMINISTRATION SYSTEM PROJECT

INTEGRATED LAND ADMINISTRATION SYSTEM PROJECT Public Disclosure Authorized Public Disclosure Authorized INTEGRATED LAND ADMINISTRATION SYSTEM PROJECT PROJECT FINANCIAL STATEMENTS DESIGNATED ACCOUNT STATEMENT TOGETHER WITH INDEPENDENT AUDITORS' REPORT

More information

Special Purpose Project Financial Statements and Independent Auditor's Report

Special Purpose Project Financial Statements and Independent Auditor's Report IDF GRANT FOR STRENGTHENING TRAINING CAPACITY OF THE SCHOOL OF ADVOCATES PROJECT IDF GRANT No. TF013656 IMPLEMENTED BY JUDICIAL PROJECT IMPLEMENTATION UNIT SA OF THE MINISTRY OF JUSTICE OF THE REPUBLIC

More information

IDF GRANT No. TF013658

IDF GRANT No. TF013658 ENVIRONMENTAL GOVERNANCE, INCLUSION AND TRANSPARENCY IN MINING SECTOR PROJECT F, IDF GRANT No. TF013658 IMPLEMENTED BY ENVIRONMENTAL PROJECT IMPLEMENTATION UNIT STATE AGENCY UNDER THE MINISTRY OF NATURE

More information

AUDITOR'S REPORT "NIISLEL-AUDIT" LLC. Ulaanbaatar Clean Air Project No.5039-MN Financial statements as of December 31, 2016

AUDITOR'S REPORT NIISLEL-AUDIT LLC. Ulaanbaatar Clean Air Project No.5039-MN Financial statements as of December 31, 2016 "NIISLEL-AUDIT" LLC Public Disclosure Authorized AUDITOR'S REPORT No.5039-MN Financial statements as of December 31, 2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

Montenegro Energy Efficiency Project - MEEP Project ID: P LOAN AGREEMENT No ME

Montenegro Energy Efficiency Project - MEEP Project ID: P LOAN AGREEMENT No ME Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Montenegro Energy Efficiency Project - MEEP Project ID: P107992 LOAN AGREEMENT No 07637-ME Financial Statements for

More information

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8148-GE (REGIONAL DEVELOPEMENT PROJECT)

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8148-GE (REGIONAL DEVELOPEMENT PROJECT) MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8148-GE (REGIONAL DEVELOPEMENT PROJECT) Public Disclosure Authorized Special Purpose Project Financial Statements and Independent Auditor's Report For the

More information

JUDICIAL MODERNIZATION PROJECT OF THE REPUBLIC OF AZERBAIJAN CREDIT NUMBER 4209 AZ, 4961 AZ AND LOAN NUMBER 8068 AZ

JUDICIAL MODERNIZATION PROJECT OF THE REPUBLIC OF AZERBAIJAN CREDIT NUMBER 4209 AZ, 4961 AZ AND LOAN NUMBER 8068 AZ Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JUDICIAL MODERNIZATION PROJECT OF THE REPUBLIC OF AZERBAIJAN CREDIT NUMBER 4209 AZ, 4961

More information

FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA

FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT MDPTF GRANT No. TF012529 IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA Special Purpose

More information

ENHANCED ROAD ACCESS PROJECT IDA GRANT H884-WS and PRIF TF Project Financial Statements for the Financial Year ended 30 June 2016

ENHANCED ROAD ACCESS PROJECT IDA GRANT H884-WS and PRIF TF Project Financial Statements for the Financial Year ended 30 June 2016 Public Disclosure Authorized Public Disclosure Authorized 1. Management Verification ENHANCED ROAD ACCESS PROJECT IDA GRANT H884-WS and PRIF TF 017563 Project Financial Statements for the Financial Year

More information

"Additional Financing for Land Registration and Cadastre System for Sustainable Agriculture Project" Grant No. H758-TJ

Additional Financing for Land Registration and Cadastre System for Sustainable Agriculture Project Grant No. H758-TJ Public Disclosure Authorized Public Disclosure Authorized "Additional Financing for Land Registration and Cadastre System for Sustainable Agriculture Project" Grant No. H758-TJ Special Purpose Project

More information

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3533 BOS Public Disclosure Authorized RS Project Agreement (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT

More information

SPECIAL PURPOSE FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT. YEREVAN April 2016 ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND

SPECIAL PURPOSE FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT. YEREVAN April 2016 ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND Public Disclosure Authorized ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND ENERGY EFFICIENCY PROJECT GEF GRANT NUMBER TF012163 Public Disclosure Authorized D SPECIAL PURPOSE FINANCIAL STATEMENTS

More information

K For the period from II February 2013 to 16 March 2016

K For the period from II February 2013 to 16 March 2016 Public Disclosure Authorized IDF GRANT FOR ELECTRONIC PROCESSING AND ONE-STOP SHOP FOR CONSTRUCTION PERMITS PROJECT IDF GRANT No. TF012782 L. Public Disclosure Authorized I IMPLEMENTED BY FOREIGN FINANCING

More information

IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA

IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA 1 Public Disclosure Authorized STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT MDPTF GRANT No. TF012529 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTED BY FOREIGN FINANCING PROJECTS

More information

REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION

REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION Public Disclosure Authorized ~~Igl- 23c?a/ 34$ or. Public Disclosure Authorized REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION LOAN (8261-RO) FOR THE REVENUE ADMINISTRATION

More information

U Ostschweizerische Treuhand ZUrich AKTIENGESELLSCHAFT

U Ostschweizerische Treuhand ZUrich AKTIENGESELLSCHAFT Public Disclosure Authorized U Ostschweizerische Treuhand ZUrich AKTIENGESELLSCHAFT WENGISTRASSE 7-8026 ZORICH - POSTFACH TELEFON 044 298 88 44 - FAX 044 298 88 55 Public Disclosure Authorized Public Disclosure

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

REPUBLIC OF SRPSKA DEBT MANAGEMENT STRATEGY FOR THE PERIOD

REPUBLIC OF SRPSKA DEBT MANAGEMENT STRATEGY FOR THE PERIOD REPUBLIC OF SRPSKA GOVERNMENT REPUBLIC OF SRPSKA DEBT MANAGEMENT STRATEGY FOR THE PERIOD 2018-2021 September, 2018 Contents 1. Goals and assumptions... 2 2. Existing debt... 4 3. Medium term debt management

More information

Special Purpose Financial Statements Second Science and Technology Project

Special Purpose Financial Statements Second Science and Technology Project Public Disclosure Authorized Public Disclosure Authorized Special Purpose Financial Statements Public Disclosure Authorized Public Disclosure Authorized Contents Independent Auditor's report 1-2 Summary

More information

Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (IBRD) LOAN No. 8286 - AZ REPORT OF INDEPENDENT AUDITORS AND SPECIAL PURPOSE FINANCIAL STATEMENTS

More information

CAPITAL MARKETS MODERNIZATION PROJECT LOAN NUMBER 8024-AZ

CAPITAL MARKETS MODERNIZATION PROJECT LOAN NUMBER 8024-AZ Public Disclosure Authorized Public Disclosure Authorized CAPITAL MARKETS MODERNIZATION PROJECT LOAN NUMBER 8024-AZ Special-Purpose Financial Statements and Independent Auditors' Report For the Period

More information

TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT)

TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT) Special Purpose

More information

Nl N N N. "National Agency of Investment and Privatization"

Nl N N N. National Agency of Investment and Privatization Public Disclosure Authorized Public Disclosure Authorized M Public Disclosure Authorized State institution "National Agency of nvestment and Privatization" Special-purpose financial statements on the Project

More information

Special Purpose Project Financial Statements and Independent Auditor's Report

Special Purpose Project Financial Statements and Independent Auditor's Report COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT GEF MSP GRANT NUMBER TF013724 IMPLEMENTED BY "AGRICULTURAL PROJECTS IMPLEMENTATION UNIT" STATE AGENCY UNDER THE MINISTRY OF AGRICULTURE

More information

REPUBLIC OF SRPSKA DEBT MANAGEMENT STRATEGY FOR THE PERIOD

REPUBLIC OF SRPSKA DEBT MANAGEMENT STRATEGY FOR THE PERIOD REPUBLIC OF SRPSKA GOVERNMENT REPUBLIC OF SRPSKA DEBT MANAGEMENT STRATEGY FOR THE PERIOD 2016-2019 December, 2016 Contents 1. Goals and assumptions... 2 2. Existing debt... 4 3. Medium term debt management

More information

RECEIVED. loss 19 APR 2017

RECEIVED. loss 19 APR 2017 19 APR 2017 RECEIVED Public Disclosure Authorized Ministry of Industry and Commerce (TDF-2) Financial Statements and Independent Auditors' Report Year ended 30 September 2016 Public Disclosure Authorized

More information

AND AUDITOR'S REPORT

AND AUDITOR'S REPORT Public Disclosure Authorized Public Disclosure Authorized COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT IDA Credit No. 4891-AM IMPLEMENTED BY "AGRICULTURAL PROJECTS IMPLEMENTATION

More information

[DF GRANT No. TF Special Purpose Project Financial Statements and Independent Auditor's Report

[DF GRANT No. TF Special Purpose Project Financial Statements and Independent Auditor's Report IDF GRANT FOR STRENGTHENING TRAINING CAPACITY OF THE SCHOOL OF ADVOCATES PROJECT [DF GRANT No TF013656 IMPLEMENTED BY JUDICIAL PROJECT IMPLEMENTATION UNIT SA OF THE MINISTRY OF JUSTICE OF THE REPUBLIC

More information

PUBLIC COMPANY PUTEVI REPUBLIKE SRPSKE BANJA LUKA. Independent Auditors Report and Financial Statements For the Year Ended December 31, 2008

PUBLIC COMPANY PUTEVI REPUBLIKE SRPSKE BANJA LUKA. Independent Auditors Report and Financial Statements For the Year Ended December 31, 2008 PUTEVI REPUBLIKE SRPSKE BANJA LUKA Independent Auditors Report and Financial Statements For the Year Ended 2008 PUTEVI REPUBLIKE SRPSKE, BANJA LUKA CONTENTS Page Independent Auditors Report 1-3 Financial

More information

2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA AND PREPARATION OF NATIONAL REPORT PROJECT

2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA AND PREPARATION OF NATIONAL REPORT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA

More information

L'O 0FFICE ' V" Public Disclosure Authorized. Phone: (+675) Fax: (+675) Website:

L'O 0FFICE ' V Public Disclosure Authorized. Phone: (+675) Fax: (+675) Website: Public Disclosure Authorized AUDIT PAPUA NEW GUINEA L'O 0FFICE ' V" Phone: (+675) 3012200 Fax: (+675) 325 2872 Email: agopng@ago.gov.pg Website: www.ago.gov.pg Public Disclosure Authorized Public Disclosure

More information

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ Public Disclosure Authorized Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No. 099848, Grant No. H679-TJ Financial statements Public Disclosure Authorized For the year ended 31

More information

I iania satmetsfor thle %ea r fifmledl Nor embier- 25, 20 15

I iania satmetsfor thle %ea r fifmledl Nor embier- 25, 20 15 Public Disclosure Authorized (ONH(CM I--\NAtlDIf TIlL.)J\P\ P01.1CN \NI) 111..\lAN R11:4(tl Di \ l I.OPM \L.M GR \km No.T1-011184 I\MPRO\lM\G Il,[ \ l-l.r R[lik ln\i E..!N NIOMGMI. \ PRO.11l CT Pk\R,i

More information

UZB: Kashkadarya Regional Road Project

UZB: Kashkadarya Regional Road Project Audited Project Financial Statements Project Number: 50063-001 Loan: 3481-UZB Period covered: 01 January 2017 to 31 December 2017 UZB: Kashkadarya Regional Road Project Prepared by the Republican Road

More information

Central Finance and Contracting Unit Ministry of Finance of Albania. Capacity Building Support to Implement the Integrated Planning System (IPS)

Central Finance and Contracting Unit Ministry of Finance of Albania. Capacity Building Support to Implement the Integrated Planning System (IPS) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Central Finance and Contracting Unit Ministry of Finance of Albania Capacity Building Support to Implement the Integrated

More information

"Public Institution EMP Management Durabil POP" Project ECAPDEV Grant no.: TF0A2544

Public Institution EMP Management Durabil POP Project ECAPDEV Grant no.: TF0A2544 "Public Institution EMP Management Durabil POP" Project ECAPDEV Grant no.: TF0A2544 Public Disclosure Authorized Special purpose project financial statements for the period November 14, 2016 to March 15,

More information

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7928-MK Public Disclosure Authorized Public Disclosure Authorized Loan Agreement (Real Estate Cadastre and Registration Project Additional Financing)

More information

REELIH FINANCIAL MODELING OPTIONS FOR FINANCING ENERGY EFFICIENCY MEASURES IN TUZLA CANTON

REELIH FINANCIAL MODELING OPTIONS FOR FINANCING ENERGY EFFICIENCY MEASURES IN TUZLA CANTON REELIH FINANCIAL MODELING OPTIONS FOR FINANCING ENERGY EFFICIENCY MEASURES IN TUZLA CANTON Contents 1. Financing options for energy efficiency measures for households in Bosnia and Herzegovina... 4 1.1.

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of the The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER INTERNATIONAL DEVELOPMENT

More information

Dve lment [IGAD] Intergovernmental Authority on

Dve lment [IGAD] Intergovernmental Authority on Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Intergovernmental Authority on Dve lment [IGAD] Building Resilience to Disasters through Risk Management and Climate

More information

Ministry of Education and Higher Education Republic of Lebanon - Second Education Development Project - EDP I - Loan# 7966

Ministry of Education and Higher Education Republic of Lebanon - Second Education Development Project - EDP I - Loan# 7966 Public Disclosure Authorized Public Disclosure Authorized Ministry of Education and Higher Education Republic of Lebanon - Second Education Development Project - EDP I - Loan# 7966 Report and financial

More information

GLOBAL ENVIRONMENT FACILITY SPECIAL CLIMATE CHANGE FUND GRANT No. TF010940

GLOBAL ENVIRONMENT FACILITY SPECIAL CLIMATE CHANGE FUND GRANT No. TF010940 Public Disclosure Authorized Public Disclosure Authorized GLOBAL ENVIRONMENT FACILITY SPECIAL CLIMATE CHANGE FUND GRANT No. TF010940 IMPLEMENTED BY EUROPA REINSURANCE FACILITY LIMITED REPORT OF INDEPENDENT

More information

Im t. Audit Report of JACPA Capacity Building Project IDF Grant # TF Jordan Association of Certified Public Accountants

Im t. Audit Report of JACPA Capacity Building Project IDF Grant # TF Jordan Association of Certified Public Accountants Audit Report of JACPA Capacity Building Project DF Grant # TF1 1789 Jordan Association of Certified Public Accountants Amman - Jordan for the period 1 Jan 2014 to 31 July 2015 Public Disclosure Authorized

More information

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between CREDIT NUMBER 4912-BA Project Agreement (Additional Financing for Health Sector Enhancement Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION and REPUBLIKA SRPSKA Dated / '-,!, 2011 PROJECT AGREEMENT

More information

IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE

IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE Public Disclosure Authorized IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE Public Disclosure Authorized IMPLEMENTED BY DONORS PROJECTS MANAGEMENT AND MONITORING UNIT (DPMMU)

More information

IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER

IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER PENSION PUBLIC AWARENESS AND LITERACY PROJECT IDF GRANT NUMBER TF013654 IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER - - OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA Special Purpose

More information

JUDICIAL SERVICES AND SMART INFRASTRUCTURE PROJECT OF THE REPUBLIC OF AZERBAIJAN LOAN NUMBER 8407 AZ

JUDICIAL SERVICES AND SMART INFRASTRUCTURE PROJECT OF THE REPUBLIC OF AZERBAIJAN LOAN NUMBER 8407 AZ Public Disclosure Authorized Public Disclosure Authorized JUDICIAL SERVICES AND SMART INFRASTRUCTURE PROJECT OF LOAN NUMBER 8407 AZ Special-Purpose Financial Statements and Independent Auditors' Report

More information

Independent Auditor's Report and Project Financial Statements

Independent Auditor's Report and Project Financial Statements Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Independent Auditor's Report and Project Financial Statements State Agency "Healthcare Project Implementation Unit"

More information

GOVERNANCE e-transformation PROJECT

GOVERNANCE e-transformation PROJECT Public Disclosure Authorized Public Disclosure Authorized GOVERNANCE e-transformation PROJECT IDA CREDIT NO. 5000-MD Public Disclosure Authorized Public Disclosure Authorized CONTENTS: Independent Auditors'

More information

JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT

JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT JSDF GRANT NO. TF014029 IMPLEMENTED BY AGRIBUSINESS COMPETITIVENESS CENTER SPECIAL PURPOSE FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT

More information

Development Credit Agreement. (Basic Health Project) between BOSNIA AND HERZEGOVINA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement. (Basic Health Project) between BOSNIA AND HERZEGOVINA. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3202 BOS Public Disclosure Authorized Development Credit Agreement (Basic Health Project) between BOSNIA AND HERZEGOVINA and INTERNATIONAL DEVELOPMENT

More information

ESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF

ESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF ESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF 014110 Special-Purpose Financial Statements and Independent Auditors' Report

More information

Second National Water Supply and Sanitation Project Implementation Unit under State Amelioration and Water Management Open Joint Stock Company

Second National Water Supply and Sanitation Project Implementation Unit under State Amelioration and Water Management Open Joint Stock Company Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Second National Water Supply and Sanitation Project Implementation Unit under State Amelioration and Water Management

More information

THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, FINANCIAL STATEMENTS

THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, FINANCIAL STATEMENTS THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, Public Disclosure Authorized FINANCIAL STATEMENTS For the period from December 10, 2013 to December 09, 2015 Auditor's

More information

MKD. Republic of Macedonia Ministry of education and science SERTIFIKAT. To: The World Bank 34 Leninova Street 100 Soj Ss. Cyril and Method ius No.

MKD. Republic of Macedonia Ministry of education and science SERTIFIKAT. To: The World Bank 34 Leninova Street 100 Soj Ss. Cyril and Method ius No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Macedonia Ministry of education and science Ministry of Education and Science of the Republic of Macedonia

More information

Unitary Enterprise "Talimarjan Thermal Power Plant"

Unitary Enterprise Talimarjan Thermal Power Plant Public Disclosure Authorized Unitary Enterprise "Talimarjan Thermal Power Plant" Public Disclosure Authorized Talimarjan Transmission Project ("Construction Of 500 Kv High Voltage Line "Talimarjan TPP

More information

UNICREDIT BANK A.D., BANJA LUKA. Financial statements for the year ended 31 December 2012

UNICREDIT BANK A.D., BANJA LUKA. Financial statements for the year ended 31 December 2012 UNICREDIT BANK A.D., BANJA LUKA Financial statements for the year ended 31 December 2012 This version of our report is a translation from the original, which was prepared in the Serbian language. All possible

More information

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1 of16 November 2009 Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1. INTRODUCTION The Swedish International Development Cooperation Agency (Sida) will support

More information

Financial Statement for the year ended December 31, And Independent Auditors' Report. Public Disclosure Authorized. Public Disclosure Authorized

Financial Statement for the year ended December 31, And Independent Auditors' Report. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project "Small and Medium nterprises Competitiveness Project" financed under Agreement No. 8477-KZ between the Government

More information

Agency for the Delivery of Integrated Services Albania. Citizen-Centric Service Delivery Project (Part 1 b-c, 2 b-c, 3b, 4)

Agency for the Delivery of Integrated Services Albania. Citizen-Centric Service Delivery Project (Part 1 b-c, 2 b-c, 3b, 4) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Agency for the Delivery of Integrated Services Albania Citizen-Centric Service Delivery Project (Part 1 b-c, 2 b-c,

More information

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects - 2018 IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects 1 The IFAD Handbook for Financial Reporting and Auditing for IFAD-Financed Projects is available online for public use

More information

EMP MANAGEMENT DURABIL POP

EMP MANAGEMENT DURABIL POP Public Disclosure Authorized Public Disclosure Authorized EMP MANAGEMENT DURABIL POP "DISASTER AND CLIMATE RISK MANAGEMENT PROJECT" IDA CREDIT NO. 4794-MD & IDA CREDIT NO. 5637-MD PROJECT FINANCIAL STATEMENTS

More information

Financial Sector Modernization Project. SECO Grant No TF011975/Component 2

Financial Sector Modernization Project. SECO Grant No TF011975/Component 2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Financial Sector Modernization Project SECO Grant No TF011975/Component 2 Special Purpose

More information

Supreme Audit Office 0 Government of Islamic Republic of Afghanistan

Supreme Audit Office 0 Government of Islamic Republic of Afghanistan Public Disclosure Authorized To Supreme Audit Office 0 Government of Islamic Republic of Afghanistan INDEPENDENT AUDITORS' REPORT The President of the Government of Islamic Republic of Afghanistan { Public

More information

Freetown GOVERNMENT OF SIERRA LEONE

Freetown GOVERNMENT OF SIERRA LEONE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Our Ref: 4144/ask/aiw 22nd July 2015 The Financial Management Specialist World Bank Country

More information

Setting up business in... Bosnia and Herzegovina

Setting up business in... Bosnia and Herzegovina Setting up business in... Bosnia and Herzegovina General Aspects Bosnia and Herzegovina: sovereign republic independent since 1992 3 entities: Republic of Srpska, Federation of Bosnia and Herzegovina,

More information

Ministry of Education and Higher Education, Republic of Lebanon - Second Education Development Project - EDP II - Loan# 7966

Ministry of Education and Higher Education, Republic of Lebanon - Second Education Development Project - EDP II - Loan# 7966 Public Disclosure Authorized Public Disclosure Authorized Ministry of Education and Higher Education, Republic of Lebanon - Second Education Development Project - EDP II - Loan# 7966 Report and financial

More information

REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION

REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION LOAN (8261-RO) FOR THE REVENUE ADMINISTRATION MODERNIZATION PROJECT (RAMP) FOR THE PERIOD STARTING WITH 8 MAY 2013

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

IT RPORT OF if ATOR GENERA

IT RPORT OF if ATOR GENERA Public Disclosure Authorized SUPREME AUDIT OFFICE ISLAMIC REPUBLIC OF AFGHANISTAN Public Disclosure Authorized IT RPORT OF if ATOR GENERA Public Disclosure Authorized Volume - 26 PROJECT ID GRANT NUMBERS

More information

GOVT. OF ASSAM DIRECTORATE OF HEALTH SERVICES, ASSAM, HENGRABARI, GUWAHATI-36 (State TB Cell)

GOVT. OF ASSAM DIRECTORATE OF HEALTH SERVICES, ASSAM, HENGRABARI, GUWAHATI-36 (State TB Cell) Public Disclosure Authorized Public Disclosure Authorized GOVT. OF ASSAM DIRECTORATE OF HEALTH SERVICES, ASSAM, HENGRABARI, GUWAHATI-36 (State TB Cell) NO. JDTB/RNTCP/Acetts/2000/Pt/1048 Dated Guwahati

More information

MDTF GRANT No. TF017411

MDTF GRANT No. TF017411 Public Disclosure Authorized EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (EITI) - POST COMPLIANCE PHASE II IN KYGYZ REPUBLIC IN KYRGYZ REPUBLIC MDTF GRANT No. TF017411 Public Disclosure Authorized IMPLEMENTED

More information

WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION TECHNOLOGY (THE GAMBIA)

WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION TECHNOLOGY (THE GAMBIA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION

More information

AUDIT UNDP MOLDOVA. BIOMASS HEATING SYSTEM (Directly Implemented Project No ) Report No Issue Date: 21 October 2013

AUDIT UNDP MOLDOVA. BIOMASS HEATING SYSTEM (Directly Implemented Project No ) Report No Issue Date: 21 October 2013 UNITED NATIONS DEVELOPMENT PROGRAMME Office of Audit and Investigations AUDIT OF UNDP MOLDOVA BIOMASS HEATING SYSTEM (Directly Implemented Project No. 77341) Report No. 1197 Issue Date: 21 October 2013

More information

REPUBLIC AGENCY FOR SMALL AND MEDIUM-SIZED ENTERPRISES, BANJA LUKA. Financial Statements Year Ended December 31, 2015 and Independent Auditors Report

REPUBLIC AGENCY FOR SMALL AND MEDIUM-SIZED ENTERPRISES, BANJA LUKA. Financial Statements Year Ended December 31, 2015 and Independent Auditors Report REPUBLIC AGENCY FOR SMALL AND MEDIUM-SIZED ENTERPRISES, BANJA LUKA Financial Statements and Independent Auditors Report CONTENTS Page Independent Auditors Report 1-2 Financial Statements: Balance of Income,

More information

The city housing accounts for 36% of energy consumption

The city housing accounts for 36% of energy consumption Riga, Latvia I Key figures BUILDING STOCK OPTION 3 23,353 residential buildings 241,520 individual apartments PEOPLE Population of 647,424 16,243 million m 2 total floor area Average thermal energy consumption:

More information

KOMERCIJALNA BANKA A.D., BEOGRAD. Financial Statements Year Ended December 31, 2014 and Independent Auditors Report

KOMERCIJALNA BANKA A.D., BEOGRAD. Financial Statements Year Ended December 31, 2014 and Independent Auditors Report KOMERCIJALNA BANKA A.D., BEOGRAD Financial Statements Year Ended and Independent Auditors Report KOMERCIJALNA BANKA A.D., BEOGRAD CONTENTS Page Independent Auditors' Report 1 Financial Statements: Balance

More information

FINANCIAL SCHEDULES Moldova Energy Sector Reform and Efficiency Improvements Project

FINANCIAL SCHEDULES Moldova Energy Sector Reform and Efficiency Improvements Project Public Disclosure Authorized Energy Sector Reform and Efficiency Improvements (ESREI) Project Grant No. TF099139 Public Disclosure Authorized Public Disclosure Authorized FINANCIAL SCHEDULES Moldova Energy

More information

2014 Gas Tax Annual Expenditure Report January 1, December 31, 2014

2014 Gas Tax Annual Expenditure Report January 1, December 31, 2014 2014 Gas Tax Annual Expenditure Report January 1, 2014 - December 31, 2014 UBCM January 1, 2014 to December 31, 2014 Cumulative Date of Signing Opening Balance of Unspent Funding 325,401,993.65 325,401,993.65

More information

"Global Partnership for Education Project (Early Education Project)" Grant No. TF016201, Grant No. TF016209

Global Partnership for Education Project (Early Education Project) Grant No. TF016201, Grant No. TF016209 Public Disclosure Authorized Public Disclosure Authorized "Global Partnership for Education Project (Early Education Project)" Grant No. TF016201, Grant No. TF016209 Special purpose project financial statements

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects The IFAD Handbook for Financial Reporting and Auditing of is available online for public use and dissemination. It is primarily

More information

PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor

PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor I I.1) Name: PUBLIC PARTNER PUBLIC PARTNER NAME, ADDRESS AND CONTACT Javno preduzeće Autoputevi

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7888-HR Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Justice Sector Support Project) between REPUBLIC OF CROATIA and

More information

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P Public Disclosure Authorized Public Disclosure Authorized Rural Renewable Energy Agency (RREA) Financial Audit Report for the period from 1 March 2016 to 30 June 2017 Public Disclosure Authorized Liberia

More information

6FFICIAL DOCUMENTS THE WORLD BANK IBRD - DA I RLDBANKGROUP. May 9, Letter No. CD-089/WB/DOISP II/V/2017

6FFICIAL DOCUMENTS THE WORLD BANK IBRD - DA I RLDBANKGROUP. May 9, Letter No. CD-089/WB/DOISP II/V/2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RODRIGOA CHAVES Country Director, Indonesia Letter No. CD-089/WB/DOISP II/V/2017 Mr.

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 59729 Health

More information

UNICREDIT BANK A.D., BANJA LUKA

UNICREDIT BANK A.D., BANJA LUKA UNICREDIT BANK A.D., BANJA LUKA Financial statements Year ended December 31, and Independent Auditors Report Translation of the Auditors Report issued in the Serbian language Table of Contents Page Independent

More information

TSIAR-FINANS, LLC H 2a, Chust street, Tashkent, , Uzbekistan

TSIAR-FINANS, LLC H 2a, Chust street, Tashkent, , Uzbekistan 4CIAR GROUP Public Disclosure Authorized TSIAR-FINANS, LLC H 2a, Chust street, Tashkent, 100077, Uzbekistan R Tel/Fax: (998-71) 262-50-70, 262-50-90, 262-08-47 H E-mail: reception(aciar.uz; reception(wciargroup.net

More information