A. Approve the revised Alameda Corridor East (ACE) program scope; and

Size: px
Start display at page:

Download "A. Approve the revised Alameda Corridor East (ACE) program scope; and"

Transcription

1 One Gateway Plaza Los Angeles, CA Tel metro. net 25 PLANNNG AND PROGRAMMNG COMMTTEE OCTOBER 17, 2012 SUBJECT: ACTON: ALAMEDA CORRDOR EAST PROGRAM APPROVE SCOPE CHANGE AND WORKNG CAPTAL LOAN RECOMMENDATON A. Approve the revised Alameda Corridor East (ACE) program scope; and B. Approve Working Capital Loan ("Loan") of up to $45 million and authorize the Chief Executive Officer (CEO) to enter into the appropriate agreements SSUE n their August 2, 2012 letter (Attachment A), the ACE Construction Authority requested approval to modify the scope of the ACE program and a working capital loan of $45 million from Metro to assist them with their cash flow needs due to significantly increasing construction activity in the near future. The revised program scope is the result of a recently completed Phase 2 grade separation study which updates and further refines the grade separation projects ACE adopted in their original program in As a result of this study, grade separations have been dropped and added for a total program cost of $1.597 billion, down from the $1.613 billion program adopted by the Board in The Loan is requested to accommodate the increasing level of construction activity ACE will be undertaking in the next several fiscal years. The Loan of up to $45 million from Metro is the most efficient and cost effective means of maintaining the program's schedule. Board approval of the scope modification and the Loan is being requested. DSCUSSON n November 2007, the Board approved a total Metro contribution to ACE of $274.3 million which reflects 17% of the total ACE program cost of $1.613 billion. Since then, the ACE program has made significant progress in designing and constructing projects as well as planning for future projects. ACE is constructing grade separations along both the Union Pacific Alhambra line that traverses the cities of Alhambra, San Gabriel, Rosemead, El Monte, ndustry, and Pomona as well as the Union Pacific Los Angeles

2 subdivision line that traverses the cites of Montebello, Pico Rivera, ndustry, and Pomona. Attachment B contains a map of the ACE project. To date, ACE has completed seven grade separations (Nogales Alhambra line, East End/Reservoir, Ramona, Temple Avenue, Brea Canyon Road, and Sunset), is nearing construction on three other projects (Baldwin, San Gabriel Trench, and Nogales Los Angeles subdivision line), and is in design for two other projects (Puente and Fairway Los Angeles subdivision line). Status The ACE Construction Authority recently completed a Phase 2 study that examined the remaining unconstructed grade separations in their program. This study, which is an update to the original 1998 grade separation study, examined vehicular and train volumes and delay, accident history and other safety factors, and prepared conceptual plans for each of the potential grade separations. As a result of these analyses, grade separation projects on Fullerton Road (Los Angeles subdivision) in the City of ndustry, Hamilton Blvd in Pomona, and Durfee Avenue in Pico Rivera ranked highly and have been added to the ACE program. Conversely, Rose Hills Road in the City of ndustry has been removed from the program. Furthermore, in the City of Montebello the Montebello Blvd. grade separation project has been substituted with the Greenwood Avenue underpass project. The Phase 2 study and the changes to the ACE program were approved by the ACE Construction Authority Board in October Due to these changes as well as refinement of project costs resulting from projects being completed or nearing construction, ACE has updated its overall program costs. The ACE program is now estimated to cost $1.596 billion, which is a decrease of $17 million from its previous estimate of $1.613 billion in Per existing Metro policy, Metro would be responsible for 17% of ACE program costs. Based on the current $1.596 billion cost estimate, Metro's 17% ACE funding commitment is estimated to be $271.4 million as opposed to the $274.3 million anticipated in t should also be noted that in addition to Metro's 17% commitment, Measure R provides $400 million for the ACE program. To date, $42 million of these funds have been committed to the San Gabriel Trench project with the remaining $358 million unallocated. Cash Flow The ACE Construction Authority is expecting to begin construction on three projects during Fall 2012: the Baldwin Avenue grade separation in El Monte, the Nogales Street grade separation in the City of ndustry, and the San Gabriel Trench project in San Gabriel. n total, the construction cost for these three projects is approximately $335 million. Added to these expenses are design and right-of-way acquisition activities for future grade separation projects which has an estimated cost of $93 million. This level of construction activity will have a significant impact on ACE's cash flow requirements. Al ameda Corridor East Program Page 2

3 Currently, the ACE Construction Authority pays its contractors/vendors and is reimbursed by Metro within thirty days of receipt of an invoice from ACE. However, due to the time needed by ACE to process and submit invoices to Metro for reimbursement, there is a day delay between the time ACE pays its invoices and is reimbursed by Metro. To bridge this gap, ACE currently utilizes a $20 million Grant Anticipation Note (GAN) issued through the San Gabriel Valley Council of Governments. However, this will not be sufficient for ACE's cash flow needs given its upcoming construction schedule. Furthermore, ACE reports that securing a GAN for an amount sufficient to meet their projected cash flow needs might not be possible or significantly more costly than their current GAN. As a result, ACE is requesting a $45 million Loan from Metro to cover their cash flow needs in lieu of seeking a new GAN. The Loan for ACE of up to $45 million will be provided by Metro's issuance(s) of Proposition C taxable commercial paper. The actual "all in" costs of this borrowing, including interest, liquidity and issuance costs, will be reimbursed by ACE. ACE may apply any interest earnings on unexpended loan proceeds to pay for its obligations under the Loan. DETERMNATON OF SAFETY MPACT Approval of the ACE program update and Loan will have no impact on the safety of our employees and/or patrons. FNANCAL MPACT Approval of the $45 million Loan has no budget or adverse programmatic impact on the Measure R Highway sub-fund since it will be repaid in full, including interest and other costs. nterest will be paid on a monthly basis using a variable interest rate on the $45 million over the estimated 10 years of its program. Because the interest rate will vary, it is not possible to quantify the total amount of interest that will be incurred. n addition, there will be issuance costs of about $20,000 per commercial paper drawdown, of which there will not be more than three. Since ACE will be paying these costs from its future budget allocations, Metro's risk exposure is minimal and there is no cost to Metro for making this loan. mpact to Budget The Loan would have no impact on the budget. Additionally, the Loan cannot be used for bus and/or rail capital or operating expenditures. Alameda Corridor East Program Page 3

4 ALTERNATVES CONSDERED The Board could choose not to approve the scope modification or the Loan to the ACE Construction Authority. This is not recommended since it could significantly increase ACE's program costs, delay projects which would benefit from the current favorable construction climate and jeopardize other State and Federal funding, i.e., Proposition 1 B, Trade Corridor mprovement Fund (TCF), etc. Not approving the change in scope is not recommended because this change is consistent with the ACE Phase 2 grade separation study that utilized updated data and reflects current operating conditions. n addition, these changes are supported by both the ACE Board of Directors and San Gabriel Valley Council of Governments Governing Board. NEXT STEPS Upon Board approval we will prepare the agreements and/or amendments necessary for execution by the CEO. ATTACHMENTS A. ACE August 2, 2012 Request letter B. ACE Project Map C. ACE Project mplementation Prepared by: Philbert Wong, Transportation Planning Manager, (213) Shahrzad Amiri, Deputy Executive Officer, (213) Diego Cardoso, Executive Officer, (213) Alameda Corridor East Program Page 4

5 Mart Executive Director Countywide Planning Alameda Corridor East Program Page 5

6 Alameda Corridor-East Construction Authority Attachment A 4900 Rivergrade Rd. Ste. A120 rwindale, CA (626) fax (626) August 2, 2012 Mr. Arthur T. Leahy Chief Executive Officer Los Angeles County Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA Dear Art: The purpose of this letter is twofold - to request approval of the revised scope of the Alameda Corridor-East (ACE) Project as recently adopted by the ACE Construction Authority Board of Directors and the San Gabriel Valley Council of Governments and to request approval of a $45 million working capital loan. Revised ACE Project Scope n April of this year the ACE Construction Authority and the San Gabriel Valley Council of Governments (SGVCOG) completed an analysis of the remaining grade separations in the originally adopted project scope and approved a modified scope for completion of the project. The modified scope actually results in a modest overall program cost estimate reduction when compared to the previous program approved by MTA in The changes were made based on updated grade crossing delay forecasts and project costs and expanded evaluation criteria to include the California Public Utilities Comm ission (CPUC) project ranking methodology. Attachment A1 to this letter lays out the program modifications and estimated project costs. Working Capital Loan We currently accommodate the project cash flow requirements through $20 million in Grant Anticipation Notes (GAN) issued by the San Gabriel Valley Council of Governments with credit enhancement provided by a bank letter of credit. Our level of construction activity will be substantially increasing in the near future which will require a significantly higher amount of cash flow financing. A significant portion of our increased workload is made possible by MeasureR funding. Our existing letter of credit will expire in the relatively near future and we have been cautioned that obtaining a new one of the size we will need would be unlikely in the current financing environment and substantially more expensive in any event. Use of a working capital loan is a much more efficient and cost effective method of generating the necessary working capital. We have shared with your staff a cash flow estimate for five active projects over the next two year period which demonstrates the need for approximately $45 million in working capital.

7 Mr. Arthur T. Leahy, CEO LACMTA August 2, 2012 Page 2 We have greatly appreciated the MTA staff's support for the ACE Project over the last 13 years and thanks to Measure R we are about to embark on an accelerated pace of project development. Positive consideration of these requests would be a critical element of our continued success. Please let me know if you or your staff needs any further information. Sincerely, 12-ll; Rick Richmond Chief Executive Officer Attachment cc: Terry Matsumoto Shahrzad Amiri

8 To Ports LEGEND - Existing Single Track ALHAMBRA MONTEREY PARK - Existing Double Track ---- Proposed Double Track * Grade Separation Completed 0 Awa tng Fuel L ne Relocation Grade Separation 2012 Construction SAN GABREL ==..:::a= e g. C) (j) ia;m g S' D8. )>C. Adopted Future Grade Separations A Street Closure/Grade Crossing E:limination Safely and/or T raflic Signal Con trot Measures TEMPLE CTY? iii ft q; "'. ' b : q, "' ro ro f?s. Los Angel!es County, CA :<ii 1'11 <!>,;:) <!> "',;:). ' WN <:-,... '!::" ro "f' "' i:i ;::. "< BALD r,; -$' -,J: ",:;.'1;):). e- ' ljj.::r <Q'i # :!"..,... Q;. " "f'v! vo q, 'lj '?'...;- q, ):). 9.'?' 'll,l;..q_ $ ;!' '?' 'lj 'lj q;.''ljrll.!f' '<.;:; t:i; -.. tj-'li t' cj t:.;,'lio v'li RWNDALE "TT =.. (j) 5' NDUSTRY t:$.t;. iff Q. "TT 5.. (j) 8- ::1 \A/EST COVNA COVNA WALNUT A),-. c9 0 <:>,.;. -1> 0. ( 9> "\'\ <.:..!'/ (>' :z - 13.>. -a "' (>' if ;! z 0 (Q "" ;;; "' sa f.o, "\'\ -a ;! POMONA D!AMOND BAR 19 <.: 9' ( <g,. 9' "'o ':>. ; "'0 / o- f L- 1 \ ( Uli llf) '.;. ( 0/ifH)' ' LAVERNE "'0 "" (1) 3::: :X: 2!. "" ::> 3 (J'J - g:... :::s o:l ' :c, c.. - w ' ' ' "'0 ::0., 0 J) 3.,... "" 0., < ll... - sa., en m "' :::s ll "" )>, - ::>,.../ :s m o ; c. )>., < (1)..;;..; ; - r 1,. \::..., l - 'l '-'i. t f - CLAREMONT ONTARtO Combiued Alhambra and Los Angeles Subdivision, >, N ' ' A " ' ' Ala,meda Corridor-East Project Area

9 ATTACHMENT C ACE Project lmlementation ($000)! Current Project Grade Cost (Act./Est.) MTA 17% City Project Status Seps Safety mprovements $34,141 $5,804 Various Completed January 2004 Nogales Street (Alhambra) ndustry/west $49,698 $8,449 Covina Completed AuQust East End/Reservoir $79,012 $13,432 Pomona Completed June Ramona Boulevard $51,350 $8,730 El Monte Completed April Temple Avenue ncludes Temple Ave. 4t Track Project. Completed Winter $92,126 $15,660 Pomona Brea Canyon Road ndustry/diamond $67,396 $11,457 Bar Completed October Sunset Avenue $87,359 $14,851 ndustry Completed Winter Baldwin Avenue $80,665 $13,713 El Monte Construction expected to beqin Fall San Gabriel Trench 9, 10, 11, $330,300 $56,151 San Gabriel Construction expected to begin Fall Puente Avenue lndustry/la $ $ County n Design 13 Fairway Drive (Los lndustry/la Angeles) $106,073 $18,032 County n Design 14 Fairway Drive (Alhambra) $82,828 $14,081 ndustry n Planning 15 Fullerton Road (Los Angeles) $142,517 $24,228 ndustry n Design 16 Hamilton Boulevard $79,080 $13,444 Pomona n Design 17 Durfee Avenue $69,723 $11,853 Pico Rivera n Design 18 Turnbull Canyon Road lndustry/la $96,027 $16,325 County n PlanninQ 19 Rose Hills Rd. - - ndustry Project removed from program. Greenwood Avenue Montebello Boulevard $ $ Montebello Montebello Blvd. project replaced by Greenwood Ave. project. 20 $1,596,470 $271,400

APPROVE ACE MEASURE R EXPENDITURE PLAN AND AUTHORIZE CEO TO EXECUTE MASTER AGREEMENT AND PROJECT ADDENDUMS

APPROVE ACE MEASURE R EXPENDITURE PLAN AND AUTHORIZE CEO TO EXECUTE MASTER AGREEMENT AND PROJECT ADDENDUMS One Gateway Plaza Los Angeles, CA 90012-2952 2 1J.922.2000 Tel metro. net t6 PLANNING AND PROGRAMMING COMMITTEE MAY 15,2013 SUBJECT: ACTION: ALAMEDA CORRIDOR EAST PROGRAM APPROVE ACE MEASURE R EXPENDITURE

More information

Projects must have a Municipal (permittee) sponsor. Projects must be in an approved stormwater management plan.

Projects must have a Municipal (permittee) sponsor. Projects must be in an approved stormwater management plan. June 14, 2018 OFFICERS President Cynthia Sternquist 1 st Vice President Margaret Clark 2 nd Vice President Joe Lyons 3 rd Vice President Becky Shevlin MEMBERS Alhambra Arcadia Azusa Baldwin Park Bradbury

More information

Beverly Hills Unified School District

Beverly Hills Unified School District Beverly Hills Unified School District February 13, 2018 June 2018 Bond Election & Parcel Tax Considerations Section I Bond Election Considerations Bond Program Considerations General obligation bond programs

More information

@ Metro FINANCE, BUDGET AND AUDIT COMMITTEE FEBRUARY 15,2012 SUBJECT: ALAMEDA CORRIDOR EAST APPROVE MOU WITH THE CITY OF SAN GABRIEL ISSUE DISCUSSION

@ Metro FINANCE, BUDGET AND AUDIT COMMITTEE FEBRUARY 15,2012 SUBJECT: ALAMEDA CORRIDOR EAST APPROVE MOU WITH THE CITY OF SAN GABRIEL ISSUE DISCUSSION @ Metro Los Angeies County One Gateway Plaza 213.1 Metropotitan Transportation Authority Los Angeles, CA 90012-2952 metro.net FINANCE, BUDGET AND AUDIT COMMITTEE FEBRUARY 15,2012 SUBJECT: ALAMEDA CORRIDOR

More information

Advanced Construction & Engineering

Advanced Construction & Engineering Advanced Construction & Engineering 4900 Rivergrade Rd. Ste. A120 Irwindale, CA 91706 (626) 962-9292 fax (626) 962-3552 www.theaceproject.org San Gabriel Valley Council of Governments Capital Projects

More information

LACMTA Presentation Outline. > Agency Overview. > Key Projects / Initiatives. > Credit Profile, Current Debt & Debt Issuance Outlook

LACMTA Presentation Outline. > Agency Overview. > Key Projects / Initiatives. > Credit Profile, Current Debt & Debt Issuance Outlook 1 LACMTA Presentation Outline > Agency Overview > Key Projects / Initiatives > Credit Profile, Current Debt & Debt Issuance Outlook 2 LACMTA Overview Transportation planner and coordinator, designer, builder

More information

FY METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM

FY METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM 9 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2ooo Tel metro. net FINANCE, BUDGET AND AUDIT COMMITTEE JUNE 19, 2013 SUBJECT: ACTION: FY 2013-14 METROLINK BUDGET AND LACMTA'S COMMUTER RAIL PROGRAM

More information

One Gateway PI; Metropolitan Transportation Authority Los Angeles, CA goulr-~y,~...-.

One Gateway PI; Metropolitan Transportation Authority Los Angeles, CA goulr-~y,~...-. Metro Los Angeles County One Gateway PI; Metropolitan Transportation Authority Los Angeles, CA goulr-~y,~...-. REVISED PLANNING AND PROGRAMMING COMMITTEE APRIL 20, 201 1 SUBJECT: EASTERN OPERATION AND

More information

ALAMEDA CORRIDOR-EAST CONSTRUCTION AUTHORITY

ALAMEDA CORRIDOR-EAST CONSTRUCTION AUTHORITY ALAMEDA CORRIDOR-EAST CONSTRUCTION AUTHORITY FINANCIAL STATEMENTS WITH INDEPENDENT AUDITOR'S REPORT For the Fiscal Year Ending Nogales Grade Separation Before After Alameda Corridor East Construction Authority

More information

Staff Report City of Manhattan Beach

Staff Report City of Manhattan Beach Agenda Item #: Staff Report City of Manhattan Beach TO: Honorable Mayor Ward and Members of the City Council THROUGH: Richard Thompson, Interim City Manager FROM: Jim Arndt, Public Works Director Anna

More information

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA ACTION: AUTHORIZATION FOR LIFE OF PROJECT BUDGET INCREASE

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA ACTION: AUTHORIZATION FOR LIFE OF PROJECT BUDGET INCREASE Metro Los Angeles County One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA 90012-2952 213.922.9200 Tel 213-922.9201 Fax metro. net 48 CONSTRUCTION COMMITTEE APRIL 17, 2014 SUBJECT:

More information

Measure R Oversight Committee Annual Report on FY13 Audits

Measure R Oversight Committee Annual Report on FY13 Audits metro.net/measurer Measure R Oversight Committee Annual Report on FY13 Audits April 1, 2014 Measure R Independent Taxpayers Oversight Committee of Metro On November 4, 2008, Los Angeles County voters approved

More information

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA goo REQUIRES 213 VOTE PER Administrative Code , Part D

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA goo REQUIRES 213 VOTE PER Administrative Code , Part D Metro Los Angeles County One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA goo12 2952 OPERATIONS COMMITTEE OCTOBER 15,2009 SUBJECT: LINE 910 FARE STRUCTURE ACTION: APPROVE PROPOSED

More information

Los Angeles County One Gateway Plaza z.i Metropolitan Transportation Authority Los Angeles, CA gooi~-zg5z rnetro.net

Los Angeles County One Gateway Plaza z.i Metropolitan Transportation Authority Los Angeles, CA gooi~-zg5z rnetro.net @ Metro Los Angeles County One Gateway Plaza 213.92z.i Metropolitan Transportation Authority Los Angeles, CA gooi~-zg5z rnetro.net FINANCE AND BUDGET COMMITTEE January 19,201 1 SUBJECT: FYI1 FIRST QUARTER

More information

RE: CORRECTIONS to the 3/29/18 BHUSD Statement Regarding Impasse

RE: CORRECTIONS to the 3/29/18 BHUSD Statement Regarding Impasse DATE: APRIL 2, 2018 TO: BHEA MEMBERS FROM: BHEA LEADERSHIP RE: CORRECTIONS to the 3/29/18 BHUSD Statement Regarding Impasse On 3/29/18, BHUSD emailed parents of our students a lengthy and misleading document

More information

REVISED Supplemental Agenda

REVISED Supplemental Agenda REVISED Supplemental Agenda One Gateway Plaza 3 rd Floor Boardroom PLANNING AND PROGRAMMING COMMITTEE Wednesday, May 20, 2009 1:00 P.M. 6.1 RECEIVE AND FILE status report on the Metro Gold Line Foothill

More information

BOARD OF DIRECTORS MEETING

BOARD OF DIRECTORS MEETING Revised 12/10/14 See Item No. 11 SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY BOARD OF DIRECTORS MEETING FRIDAY, DECEMBER 12, 2014 10:00a.m. LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO)

More information

Los Angeles County One Gateway Plaza ~ Metropolitan Transportation Authority Los Angeles, CA metro.net

Los Angeles County One Gateway Plaza ~ Metropolitan Transportation Authority Los Angeles, CA metro.net @ Metro Los Angeles County One Gateway Plaza 213.922.200~ Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.net FINANCE, BUDGET AND AUDIT COMMITTEE APRIL 18, 2012 SUBJECT: MEASURE

More information

Table of School Districts listing STIPENDS FOR ADVANCED DEGREES

Table of School Districts listing STIPENDS FOR ADVANCED DEGREES Unified School districts or union high school districts are regular type. ELEMENTARY school districts in Italics South Bay s highlighted in BLUE As of 6/16/18 Antelope Valley Union HSD $127,275 38 step

More information

Los Angeles County One Gateway Plaza 213.gzz.z1 Metropolitan Transportation Authority Los Angeles, CA metro.net

Los Angeles County One Gateway Plaza 213.gzz.z1 Metropolitan Transportation Authority Los Angeles, CA metro.net @ Metro Los Angeles County One Gateway Plaza 213.gzz.z1 Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.net FINANCE, BUDGET AND AUDIT COMMITTEE JANUARY 18,201 2 SUBJECT: IMMIGRANT

More information

Does use of the variable crowd out or diminish the weight in the formula of a more representative variable?

Does use of the variable crowd out or diminish the weight in the formula of a more representative variable? Funding Plan Does use of the variable crowd out or diminish the weight in the formula of a more representative variable? As the underlying data for the variables could change over time (e.g., number of

More information

BEVRLYRLY STAFF REPORT. Meeting Date: April 10, 2018 To: From: Subject:

BEVRLYRLY STAFF REPORT. Meeting Date: April 10, 2018 To: From: Subject: BEVRLYRLY STAFF REPORT Meeting Date: April 10, 2018 To: From: Subject: Honorable Mayor & City Council Cynthia Owens, Senior Management Analyst Request for the City Council to Take a Positon on (a) Proposition

More information

Metro. Board Report. File #: , File Type: Formula Allocation / Local Return Agenda Number: 8.

Metro. Board Report. File #: , File Type: Formula Allocation / Local Return Agenda Number: 8. Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2015-0704, File Type: Formula Allocation / Local Return Agenda

More information

Met r () M hopoliho r.. o.portotioo AuU.orit,

Met r () M hopoliho r.. o.portotioo AuU.orit, Lo..., eo""'' Met r () M hopoliho r.. o.portotioo AuU.orit, On e Gateway Plaza Los Angeles, CA 90012-2952 2 13-922.2000 Tel metro. net 57 EXECUTVE MANAGEMENT COMMTTEE CONSTRUCTON COMMTTEE JANUARY 15, 2015

More information

REQUEST FOR PROPOSALS FOR BUS SHELTER ADVERTISING AND MAINTENANCE SERVICES

REQUEST FOR PROPOSALS FOR BUS SHELTER ADVERTISING AND MAINTENANCE SERVICES REQUEST FOR PROPOSALS FOR BUS SHELTER ADVERTISING AND MAINTENANCE SERVICES Issue Date: March 10, 2013 Proposals Due: March 28, 2014, 5 p.m. PST Send Proposals: Debbie Ingram, Administrative Coordinator

More information

Metro. Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room. Los Angeles, CA. RECAP of Proceedings

Metro. Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room. Los Angeles, CA. RECAP of Proceedings Metro Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA RECAP of Proceedings Thursday, May 26, 2016 9:00 AM One Gateway Plaza, Los Angeles,

More information

APPROVE INCREASE TO L1FE-OF-PROJECT BUDGET

APPROVE INCREASE TO L1FE-OF-PROJECT BUDGET 44 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net CONSTRUCTION COMMITTEE JANUARY 16, 2014 PROJECT: ACTION: PATSAOURAS PLAZA BUSWAY STATION (PPBS) APPROVE INCREASE TO L1FE-OF-PROJECT

More information

Measure R Oversight Committee Annual Report on FY11 Audits

Measure R Oversight Committee Annual Report on FY11 Audits metro.net/measurer Measure R Oversight Committee Annual Report on FY11 Audits April 4, 2012 Measure R Independent Taxpayers Oversight Committee of Metro On November 4, 2008, Los Angeles County voters approved

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS JAMES A. NOYES, Director 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 ADDRESS ALL CORRESPONDENCE TO: P.O. BOX 1460

More information

Metro. Board Report. File #: , File Type: Budget Agenda Number: 3.

Metro. Board Report. File #: , File Type: Budget Agenda Number: 3. Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2015-0444, File Type: Budget Agenda Number: 3. SAFE BOARD MEETING

More information

SONOMA-MARIN AREA RAIL TRANSIT DISTRICT. Single Audit Report. For the Year Ended June 30, 2016

SONOMA-MARIN AREA RAIL TRANSIT DISTRICT. Single Audit Report. For the Year Ended June 30, 2016 SONOMA-MARIN AREA RAIL TRANSIT DISTRICT Single Audit Report For the Year Ended June 30, 2016 SONOMA-MARIN AREA RAIL TRANSIT DISTRICT For the Year Ended June 30, 2016 Table of Contents Page Independent

More information

A. Approve updated Measure R Early Action Project list (Attachment A) ; and

A. Approve updated Measure R Early Action Project list (Attachment A) ; and One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Te metro. net 21 PLANNING AND PROGRAMMING COMMITTEE OCTOBER 17, 2012 SUBJECT: ACTION: MEASURER 1-710 EARLY ACTION PROJECT LIST UPDATE APPROVE RECOMMENDATION

More information

Ordinance # Traffic Relief and Rail Expansion Tax Extension Ordinance

Ordinance # Traffic Relief and Rail Expansion Tax Extension Ordinance Ordinance # 1201 Mobility in Los Angeles County is a necessity and requires an aggressive, responsible and accountable plan to meet the transportation needs of its more than 10 million residents. By accelerating

More information

SUMMARY OF ALLOCATION ALTERNATIVES

SUMMARY OF ALLOCATION ALTERNATIVES 1 Population Source: Department of Finance (DOF) Guaranteed Minimums 1a A guaranteed minimum will be established. $50K $210K Additional funding to 1b benefitting cities to be $100K shared proportionately

More information

STAFF REPORT. Attachments: 1. Local Streets and Roads Projected. Revenues

STAFF REPORT. Attachments: 1. Local Streets and Roads Projected. Revenues STAFF REPORT To: From: Subject: Honorable Mayor & City Council Cynthia Owens, Senior Management Analyst Request for the City Council to Take a Position on (a) Proposition 68 California Drought, Water,

More information

FY19 Budget - Discussion. April 2018

FY19 Budget - Discussion. April 2018 FY19 Budget - Discussion April 2018 FY19 Proposed Budget: $6.6 Billion General Planning & Programs 3% Identify regional mobility needs and solutions Debt Service 6% Obligations from current and past projects

More information

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT - PRELIMINARY ENGINEERING OPTION II

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT - PRELIMINARY ENGINEERING OPTION II One Gateway Plaza Los Angeles. CA 90012-295; 16 MEASURE R PROJECT DELIVERY COMMITTEE SEPTEMBER 16, 2010 SUBJECT: ACTION: CRENSHAW/LAX TRANSIT CORRIDOR PROJECT - PRELIMINARY ENGINEERING OPTION II APPROVE

More information

Los Angeles County Metropolitan Transportation Authority (MTA)

Los Angeles County Metropolitan Transportation Authority (MTA) Los Angeles County Metropolitan Transportation Authority (MTA) Agency Introduction March 9, 2012 Overview > MTA Role: Planning Construction Operation/Maintenance > 1,433 square-mile service area > Clean-air

More information

APPROVE FISCAL YEAR 2012 TRANSIT FUND ALLOCATIONS AND RELATED ACTIONS

APPROVE FISCAL YEAR 2012 TRANSIT FUND ALLOCATIONS AND RELATED ACTIONS Los Angei,es eunly One Gateway Plaza ZT~.CJ~Z.ZOO MetropolJtan Tmnspwtation Uho@ Los Angeles, CA 90012-2952 metro.net PLANNING AND PROGRAMMING COMMIlTEE May 18,201 1 SUBJECT: FISCAL YEAR 2012 TRANSIT FUND

More information

@ Metro OPERATIONS COMMITTEE MAY 19,201 1 SPACE PLANNINGIINSTALLATION SERVICES, AND WORKSTATIONS AWARD FIVE YEAR CONTRACT

@ Metro OPERATIONS COMMITTEE MAY 19,201 1 SPACE PLANNINGIINSTALLATION SERVICES, AND WORKSTATIONS AWARD FIVE YEAR CONTRACT @ Metro Metropolitan Transportation Authority One Gateway Plaza zi3.9zz.zooo Tel Los Angeles, CA gooiz-2952 metro.net OPERATIONS COMMITTEE MAY 19,201 1 SUBJECT: ACTION: SPACE PLANNINGIINSTALLATION SERVICES,

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Item 42 Program Management Project Budget and Schedule Status October 20 2011 Project Schedules* Project 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Expo Phase I Orange Line Extension

More information

Metro VIA ELECTRONIC SUBMISSION. January 10, Municipal Securities Rulemaking Board Electronic Municipal Market Access (EMMA) System

Metro VIA ELECTRONIC SUBMISSION. January 10, Municipal Securities Rulemaking Board Electronic Municipal Market Access (EMMA) System ~~ Metro Los Angels County One Gateway Plaza zi3.922.z000 Tel Metropolitan Transportation Authority Los Angeles, CA 9oo~2-x952 metro.net VIA ELECTRONIC SUBMISSION January 10, 2014 Municipal Securities

More information

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS FISCAL YEAR 2018-2019 FUNDING AND ALLOCATION GUIDELINES CLAIMING TDA ARTICLE

More information

City of Azusa Opportunity Zone Investment Prospectus

City of Azusa Opportunity Zone Investment Prospectus City of Azusa Opportunity Zone Investment Prospectus Welcome to Azusa, California With a population of 49,864, Azusa has projected population growth of 6% in the coming years. The average Azusa median

More information

RECAP OF PROCEEDINGS LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

RECAP OF PROCEEDINGS LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY SUBJECT 1 APPROVE CONSENT CALENDAR S: 2, 6, 7, 8, 13, 18**, 19, 20, and 26 S 17, 32, 33, 35, 37**, 42 AND 44 WERE REMOVED FROM CONSENT CALENDAR. **REQUIRES 2/3 VOTE OF THE BOARD APPROVED A Y Y A Y Y Y

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.14 Economic and Fiscal Impacts This section evaluates potential impacts to local and regional economies during construction and operation of each project alternative.

More information

CITY OF POMONA. Financial Update Community Meetings

CITY OF POMONA. Financial Update Community Meetings CITY OF POMONA Financial Update Community Meetings TONIGHTS PRESENTATION 1 Historical Outlook 2 2019 Operating Budget 3 UFI Recommendations 4 CIP Budget Millions POMONA S HISTORICAL OUTLOOK $110 General

More information

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA 900l THIRD PARTY ADMINISTRATION

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA 900l THIRD PARTY ADMINISTRATION Metro Los Angeles County One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA 900l2-2952 213.9~ 213.9~ metrq 32 CONSTRUCTION COMMITTEE SEPTEMBER 20, 2012 SUBJECT: ACTION: THIRD PARTY

More information

Debt. Summary of Policy. utilized in, lead and senior manager roles when appropriate

Debt. Summary of Policy. utilized in, lead and senior manager roles when appropriate Debt Summary of Policy The Debt Policy governs the issuance and management of all debt, including the investment of bond and lease proceeds not otherwise covered by the Investment Policy. The process for

More information

COST REIMBURSABLE CONTRACT

COST REIMBURSABLE CONTRACT LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. TBD (SOLICITATION TITLE) BETWEEN LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY AND (NAME OF CONTRACTOR TO BE FILLED IN AT

More information

APPROVE CONTRACT AWARD FOR INSURANCE BROKERAGE SERVICES

APPROVE CONTRACT AWARD FOR INSURANCE BROKERAGE SERVICES Metro Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213. 922. 2000 Tel metro. net FINANCE AND BUDGET COMMITTEE NOVEMBER 18, 2004 SUBJECT: CONTRACT NO. PS-5310-1573,

More information

WHITTIER CITY SCHOOL DISTRICT

WHITTIER CITY SCHOOL DISTRICT WHITTIER CITY SCHOOL DISTRICT $5,000,000 GENERAL OBLIGATION BONDS (2000 ELECTION, SERIES E) LOS ANGELES COUNTY, CALIFORNIA DATED: MARCH 11, 2004 BASE CUSIP NO: 966765 2010/11 ANNUAL CONTINUING DISCLOSURE

More information

AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4

AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4 AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4 SCRRA File No. SCRRA Project/Task No. Subdivision Mile Post The Contractor, hereby requests permission to cross the

More information

Regional Transportation District FasTracks Financial Plan. April 22,

Regional Transportation District FasTracks Financial Plan. April 22, Regional Transportation District FasTracks Financial Plan April 22, 2004 2-1 Executive Summary The Regional Transportation District (the District or RTD ), has developed a comprehensive $4.7 billion Plan,

More information

Metro Orange Line Extension

Metro Orange Line Extension Metro Orange Line Extension quarterly project status report 10-1265cmc 2010 lacmta Santa Susana Wash STRATHERN SATICOY SHERMAN VANOWEN ERWIN TOPANGA CYN BL TOPANGA CYN BL 27 ROSCOE BL Roscoe ROSCOE BL

More information

PURCHASE ALL RISK PROPERTY AND BOILER AND MACHINERY INSURANCE

PURCHASE ALL RISK PROPERTY AND BOILER AND MACHINERY INSURANCE 6 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net FINANCE, BUDGET AND AUDIT COMMITTEE APRIL 15, 2015 SUBJECT: ACTION: PROPERTYINSURANCEPROGRAM PURCHASE ALL RISK PROPERTY AND BOILER

More information

Transportation Committee Meeting

Transportation Committee Meeting Transportation Committee Meeting Chair: Francine Oschin (Oschin Partners) Vice Chairs: Mark Hardyment (Bob Hope Airport) Jaime Rojas (Rojas Communications) TUESDAY, MAY 13, 2014 8:00 10:00 a.m. PLEASE

More information

UCLA Working Paper Series

UCLA Working Paper Series UCLA Working Paper Series Title The 2000 Census Undercount in Los Angeles County Permalink https://escholarship.org/uc/item/0h89w4n9 Authors Ong, Paul M. Houston, Douglas Publication Date 2002-12-01 escholarship.org

More information

Office Hours, Scheduling Appointments, Attorney Fees, Directions to Office and Courts, Office Parking, and Other Office Services and Information

Office Hours, Scheduling Appointments, Attorney Fees, Directions to Office and Courts, Office Parking, and Other Office Services and Information Office Hours, Scheduling Appointments, Attorney Fees, Directions to Office and Courts, Office Parking, and Other Office Services and Information OFFICE HOURS 9:00 a.m. - 5:00 p.m. Monday Friday. Closed

More information

PROJECT: CONSTRUCTION CHANGE ORDER STREAMLINING INITIATIVE - PHASE I

PROJECT: CONSTRUCTION CHANGE ORDER STREAMLINING INITIATIVE - PHASE I 59 One Gateway Plaza Los Angeles, CA 90012-2952 213-922.: metro. net CONSTRUCTION COMMITTEE JULY 17, 2014 PROJECT: CONSTRUCTION CHANGE ORDER STREAMLINING INITIATIVE - PHASE I ACTION: AUTHORIZE CHANGES

More information

Project ID No. FCC Belton Drain, City of Bellflower (4), to Herman Weissker, Inc., in amount of $353,

Project ID No. FCC Belton Drain, City of Bellflower (4), to Herman Weissker, Inc., in amount of $353, The Honorable Board of Supervisors County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, CA 90012 Dear Supervisors: AWARD OF PUBLIC WORKS CONSTRUCTION CONTRACTS

More information

GENERAL MOBILITY PROGRAM

GENERAL MOBILITY PROGRAM GENERAL MOBILITY PROGRAM Current Proposals: Transit Implications Greater Houston Partnership Transportation Policy Advisory Committee Friday - July 27, 2012 1 Member Entities Spring Valley Village Humble

More information

Los Angeles County Metropolitan Transportation Authority California. COMPREHENSIVE ANNUAL FINANCIAL REPORT For The Fiscal Year Ended June 30, 2003

Los Angeles County Metropolitan Transportation Authority California. COMPREHENSIVE ANNUAL FINANCIAL REPORT For The Fiscal Year Ended June 30, 2003 Los Angeles County Metropolitan Transportation Authority California COMPREHENSIVE ANNUAL FINANCIAL REPORT For The Fiscal Year Ended June 30, 2003 Prepared by: Accounting Department Josie V. Nicasio Controller

More information

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT State Clearinghouse Number: 2009031043 April 2010 Prepared for Los Angeles County Metropolitan

More information

Metro. Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room. Los Angeles, CA. RECAP of Proceedings

Metro. Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room. Los Angeles, CA. RECAP of Proceedings Metro Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA RECAP of Proceedings Thursday, January 25, 2018 9:00 AM One Gateway Plaza, Los Angeles,

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

TAX INCREMENTAL PROJECT PLAN

TAX INCREMENTAL PROJECT PLAN TAX INCREMENTAL PROJECT PLAN TAX INCREMENT DISTRICT #77 RUSHMORE GATEWAY CORRIDOR CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department April 2016 INTRODUCTION

More information

City Council Agenda Report October 16, 2018

City Council Agenda Report October 16, 2018 City Council Agenda Report October 16, 2018 TO: FROM: BY: Honorable City Council Jesus M. Gomez, City Manager Gary DiCorpo, Deputy City Manager James C. Parker, Executive Director of Regional Transportation

More information

BUDGET AND REVENUE HIGHLIGHTS

BUDGET AND REVENUE HIGHLIGHTS . -J,.r1L- 21-11 PROPOSED BUDGET BUDGET AND REVENUE HGHLGHTS Miguel Santana City Administrative Officer Date: i to. [L Submitted in. Committee,-7 council File No: / l?,... & OV /7_... / tem No.-=,;;;.-

More information

WHEREAS, after due notice, the City Planning Commission and the City Council did conduct public hearings on this matter; and,

WHEREAS, after due notice, the City Planning Commission and the City Council did conduct public hearings on this matter; and, ORDINANCE NO. An ordinance authorizing the execution of the development agreement by and between the City of Los Angeles and Sunset Studios Holdings, LLC, a Delaware limited liability company relating

More information

Transportation Committee

Transportation Committee Business Item No. 2013-341 Consent Transportation Committee Meeting date: December 9, 2013 For the Metropolitan Council meeting of January 15, 2014 Subject: 2014-2017 TIP Amendment for North Urban Regional

More information

Authorize the Chief Executive Officer to establish a bench of financial advisors with each of the recommended firms in two categories as follows:

Authorize the Chief Executive Officer to establish a bench of financial advisors with each of the recommended firms in two categories as follows: One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net 11 FINANCE, BUDGET AND AUDIT COMMITTEE JULY 17, 2013 SUBJECT: ACTION: FINANCIAL ADVISORS APPROVE BENCH CONTRACTS RECOMMENDATION

More information

STAFF REPORT. Daren Grilley, Public \X'orks Director/City Enginee~

STAFF REPORT. Daren Grilley, Public \X'orks Director/City Enginee~ STAFF REPORT Ptlblic Works Department Date: August 19, 2014 To: From: Steven A. Preston, City ~1anager Daren Grilley, Public \X'orks Director/City Enginee~ Subject: Approval of First Amendment to the Reimbursement

More information

1-605 CORRIDOR "HOT SPOT" INTERCHANGES - MEASURE R HIGHWAY PROGRAM

1-605 CORRIDOR HOT SPOT INTERCHANGES - MEASURE R HIGHWAY PROGRAM 14 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net PLANNING AND PROGRAMMING COMMITTEE OCTOBER 16, 2013 SUBJECT: ACTION: 1-605 CORRIDOR "HOT SPOT" INTERCHANGES - MEASURE R HIGHWAY

More information

bos Angefes County One Gateway Plaza i Metropolitan Transportation Authority Los Angeles, CA g0012-2g52 rnetro.net

bos Angefes County One Gateway Plaza i Metropolitan Transportation Authority Los Angeles, CA g0012-2g52 rnetro.net @ Metro bos Angefes County One Gateway Plaza 213.922 i Metropolitan Transportation Authority Los Angeles, CA g0012-2g52 rnetro.net FINANCE & BUDGET COMMITTEE JULY 20,201 1 SUBJECT: GENERAL LIABILITY CLAIMS

More information

SONOMA-MARIN AREA RAIL TRANSIT DISTRICT. Single Audit Report. For the Year Ended June 30, 2015

SONOMA-MARIN AREA RAIL TRANSIT DISTRICT. Single Audit Report. For the Year Ended June 30, 2015 SONOMA-MARIN AREA RAIL TRANSIT DISTRICT Single Audit Report For the Year Ended June 30, 2015 SONOMA-MARIN AREA RAIL TRANSIT DISTRICT For the Year Ended June 30, 2015 Table of Contents Page Independent

More information

Los Angeles County One Gateway Plaza z13.9zz.20~ Metropolitan Transportation Authority Los Angeles, CA metro.net

Los Angeles County One Gateway Plaza z13.9zz.20~ Metropolitan Transportation Authority Los Angeles, CA metro.net @ Metro Los Angeles County One Gateway Plaza z13.9zz.20~ Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.net FINANCE, BUDGET AND AUDIT COMMITTEE APRIL 18, 2012 SUBJECT: ACTION: PROPERTY

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

RESOLUTION NO. A. In 2008, Los Angeles County voters approved Measure R, a sales tax based transportation improvement program.

RESOLUTION NO. A. In 2008, Los Angeles County voters approved Measure R, a sales tax based transportation improvement program. RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF BURBANK APPROVING MEASURE R FUNDING AGREEMENTS BETWEEN THE CITY OF BURBANK AND THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

More information

CVS/Pharmacy. Absolute NNN Lease IREA. Actual Photo S Garey Ave, Pomona, CA 91766

CVS/Pharmacy. Absolute NNN Lease IREA. Actual Photo S Garey Ave, Pomona, CA 91766 CVS/Pharmacy Absolute NNN Lease 1485 S Garey Ave, Pomona, CA 91766 IREA Actual Photo IREA INVESTMENT REAL ESTATE ASSOCIATES OFFICE 16501 Ventura Blvd. Suite 448 Encino, CA 91436 Phone: 818.386.6888 Fax:

More information

AWARD CONTRACTS TO REPLACE EXPIRING LIQUIDITY FACILITY

AWARD CONTRACTS TO REPLACE EXPIRING LIQUIDITY FACILITY @ Metro Los Angeks County Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA gooi2-2g52 FINANCE, BUDGET AND AUDIT COMMITTEE NOVEMBER 16,2011 I, SUBJECT: PROP C BONDS ACTION: AWARD

More information

Proposition 53 Public Vote on State Revenue Bonds (Official Title: Revenue Bonds. Infrastructure Projects. State Legislature and Voter Approval.

Proposition 53 Public Vote on State Revenue Bonds (Official Title: Revenue Bonds. Infrastructure Projects. State Legislature and Voter Approval. Proposition 53 Public Vote on State Revenue Bonds (Official Title: Revenue Bonds. Infrastructure Projects. State Legislature and Voter Approval.) CALTAX POSITION: NEUTRAL The California Taxpayers Association

More information

FY19 Budget Development -Process -Outreach -Assumptions

FY19 Budget Development -Process -Outreach -Assumptions Los Angeles County Metropolitan Transportation Authority FY19 Budget Development -Process -Outreach -Assumptions February 12, 2018 Board Staff Briefing The Office of Management and Budget Board Staff Briefing

More information

RE: Board Memo 5G 2: Adopt resolution maintaining the tax rate for fiscal year 2013/14 OPPOSE

RE: Board Memo 5G 2: Adopt resolution maintaining the tax rate for fiscal year 2013/14 OPPOSE August 16, 2013 John (Jack) V. Foley and Members of the Board of s Metropolitan Water District of Southern California P.O. Box 54153 Los Angeles, CA 90054 0153 RE: Board Memo 5G 2: Adopt resolution maintaining

More information

Request for Proposals (RFP) For Services as General Counsel San Gabriel River Discovery Center Authority

Request for Proposals (RFP) For Services as General Counsel San Gabriel River Discovery Center Authority Request for Proposals (RFP) For Services as General Counsel San Gabriel River Discovery Center Authority 1. PURPOSE The Board (Board) of the San Gabriel River Discovery Center Authority (the Authority

More information

AWARD CONTRACT FOR CONSTRUCTION MANAGEMENT SUPPORT

AWARD CONTRACT FOR CONSTRUCTION MANAGEMENT SUPPORT . ' Metra Los Angeks County One Gateway Plaza zi3.gzz.zooo Tel Metropolitan Tnnsportation Authority Los Angeles, CA 90012-2952 rnetro.net CON5 CONSTRUCTION COMMITTEE APRIL 21,201 1 SUBJECT: BUS FACILITIES

More information

The CoStar Industrial Report

The CoStar Industrial Report The CoStar Industrial Report Y E A R - E N D 2 0 0 9 YEAR-END 2009 LOS ANGELES Table of Contents Table of Contents.................................................................... A Methodology........................................................................

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director www.ladpw.org ADDRESS ALL CORRESPONDENCE TO:

More information

APPENDIX D PUBLIC SERVICES LETTERS AND CORRESPONDENCE

APPENDIX D PUBLIC SERVICES LETTERS AND CORRESPONDENCE LSA ASSOCIATES, INC. SEPTEBER 2016 DRAFT ENVIRONMENTAL IMPACT REPORT GENERAL PLAN LAND USE & URBAN DESIGN ELEMENTS CITY OF LONG BEACH, CALIFORNIA APPENDIX D PUBLIC SERVICES LETTERS AND CORRESPONDENCE P:\CLB1505\Preprint

More information

IMPACTS OF PROPOSITION 90 TAX PORTABILITY IN EL DORADO COUNTY REVISED

IMPACTS OF PROPOSITION 90 TAX PORTABILITY IN EL DORADO COUNTY REVISED County of El Dorado Chief Administrative Office 330 Fair Lane Placerville, CA 95667-4197 Don Ashton, MPA Chief Administrative Officer Phone (530) 621-5530 Fax (530) 626-5730 TO: FROM: SUBJECT: Members,

More information

The Cost of Doing Business in Los Angeles

The Cost of Doing Business in Los Angeles Economic Alliance of the San Fernando Valley Information Summit 2002 The Cost of Doing Business in Los Angeles Presented By: Larry J. Kosmont, CRE, President & CEO Thursday, March 28, 2002 601 S. Figueroa

More information

SHARE OF 10% RETENTION COSTS DWR)

SHARE OF 10% RETENTION COSTS DWR) I j ITEM 4.6 ', CITY MANAGER' S REPORT MAY 16, 2016, CITY COUNCIL MEETING ITEM: APPROVE RESOLUTION ACKNOWLEDGING ADEQUATE FUNDING TO COVER THE STATE' S SHARE OF 10% RETENTION COSTS RECOMMENDATION: Adopt

More information

Baldwin Park Unified School District Los Angeles County, California Continuing Disclosure Annual Report - REVISED - January 19, 2013

Baldwin Park Unified School District Los Angeles County, California Continuing Disclosure Annual Report - REVISED - January 19, 2013 Los Angeles County, California 2011-12 Continuing Disclosure Annual Report - REVISED - January 19, 2013 3699 N. Holly Avenue Baldwin Park, CA 91706-0946 Attn: Chief Business Official/Senior Director of

More information

Proposed Annual Financing Plan 2013

Proposed Annual Financing Plan 2013 SFMTA Municipal Transportation Agency Image: Historic Car number 1 and 162 on Embarcadero Proposed Annual Financing Plan 2013 02 19 2013 SAN FRANCISCO, CALIFORNIA Proposed Financing Plan Overview SFMTA

More information

EL MONTE UNION HIGH SCHOOL DISTRICT

EL MONTE UNION HIGH SCHOOL DISTRICT EL MONTE UNION HIGH SCHOOL DISTRICT BOARD OF TRUSTEES MEETING OF MARCH 7, 2012 El Monte Union High School District 3537 Johnson Avenue El Monte, CA 91731 The Honorable Members of the Board of Trustees

More information

Cordova Street Road Diet Project

Cordova Street Road Diet Project Department of Transportation Cordova Street Road Diet Project Finance Committee and City Council February 22, 2016 Recommendation Department of Transportation It is recommended that the City Council: 1.

More information

1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment

1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment 1 EXECUTIVE SUMMARY The Transportation Agency for Monterey County (TAMC) Board commissioned a Level 2 Traffic and Revenue study on the feasibility of collecting tolls to fund the proposed new SR156 connector

More information

West Covina, California

West Covina, California West Covina, California Comprehensive Annual Financial Report For the Fiscal Years Ended June 30, 2012 and 2011 Prepared by: Finance Department Richard Hasenohrl Finance Director THIS PAGE INTENTIONALLY

More information

Los Angeles County Metropolitan Transportation Authority Office of the Inspector General

Los Angeles County Metropolitan Transportation Authority Office of the Inspector General Los Angeles County Metropolitan Transportation Authority Office of the Inspector General Review of Staffing Plans, Compensation, and Expenditure Policies of the Metro Gold Line Foothill Extension, the

More information

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY INDEPENDENT AUDITOR S REPORT ON SCHEDULE OF REVENUES AND EXPENDITURES FOR MEASURE R SPECIAL REVENUE FUND FOR THE YEAR ENDED JUNE 30, 2013 (WITH

More information