Global Project Finance Alert

Similar documents
Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria

AZURA-EDO IPP THE BENCHMARK FOR IPP DEVELOPMENT IN NIGERIA

World Bank IBRD and IDA Guarantees: A Triple A Risk Mitigation

Ben Donovan Partner Dewey & LeBoeuf South Africa

What will be covered today? o o o

Utilizing MIGA Products to Support Renewable Energy Projects

LEGAL ASPECTS OF PROJECT FINANCE. Anjan Neupane Partner/Advocate Neupane Law Associates IN NEPAL

PPAs and Tariff Design

LONG TERM FINANCE AND RISK ALLOCATION ENHANCING ENERGY INFRASTRUCTURE AS AN ASSET-CLASS IN BRAZIL

NIGERIAN INFRASTRUCTURE DEBT FUND (NIDF)

Developing the Power Sector through Private Investment in Mongolia. Edgar Saravia Program Manager

Overview of cogeneration project development

Power Purchase Agreement (PPA) Guidelines. Zambia Lusaka August 7 to

Third quarter Mikkel Tørud, CFO. Raymond Carlsen, CEO. Oslo, October 20, 2017

IPP Project Development

Certified Expert in Climate & Renewable Energy Finance. Module 7: Renewable Energy Finance and the Role of Project Finance

The Role of the Bulk Trader in the Transitional Electricity Market and Off-take Security

A HIGH LEVEL RED FLAG REVIEW OF THE NIGERIAN ELECTRIC SUPPLY INDUSTRY

Trinity International LLP. Ana-Katarina Hajduka

Impact Analysis of Implementation of PSRP on 2016 Financials. 1

Nigeria Infrastructure Building Conference 2014

Public-Private Infrastructure Advisory Facility (PPIAF) Presentation to Financing Renewable Energy Projects Training Program October 11, 2012

AVENG CAPITAL PARTNERS Investor conference 19 & 20 October 2015

IFC s Project Financing of Concentrated Solar Power Plants

Executive Summary Federal Government Economic Recovery and Growth Plan Power Sector Reforms Power Sector Constraints and Challenges

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6841. I. Project Context

Manual for the IPP Checklist

The financial engineering of the project in terms of political risk management

Africa Legal Insight. Banking and financial markets. Julian Nichol John Sayers Peter Wright David Nelligan Katia Merlini Simmons & Simmons

Regional Liquidity Support Facility Mitigating risks for private investments in Renewable Energy in Sub-Sahara Africa.

Perspective on Financing Wind Energy Projects. June 16, 2016

INVESTMENT OPPORTUNITIES in Central Asia Power Sector

Investor presentation

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program

Basics of PPA Negotiations. Eng. David M. Mwangi, Individual Energy Consultant Nairobi, Kenya

EPC CONTRACTS FOR WIND ENERGY PROJECTS - SOUTH AFRICAN RE IPP PROGRAMME - LESSONS LEARNED FROM PHASES 1 AND 2 (OCTOBER 2012)

Cost of Equity (USD)

EPC Contracts in the power sector

Project financing: guidelines & best practices

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

LEVERAGING PRIVATE CAPITAL FOR INFRASTRUCTURE FINANCE

Offshore wind Options for non-recourse financing. All photos from Gunnar Britse windpowerphotos.com

Project Finance in Construction

India Infrastructure Debt Fund: A Concept Paper

July 10, FIT prices are indexed, but this is not too relevant for PHRED.

Project Finance Structuring and Risk Analysis Course Outline

renewables Made in Germany Initiative

6 August 2018 Bangkok, Thailand. Noritaka Akamatsu Senior Advisor (Financial Cooperation & Integration) Asian Development Bank

Raising Equity for large biomass to power projects

Investing in Renewable Assets in Emerging Markets

Condensed Quarterly Financial Statements

Financing road concessions in Europe. Guy Chetrit ASECAP Days, Athens, 28 May 2014

9.0 FINANCIAL EVALUATION OF POWER PROJECTS

TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS

IPP s Project Risk Classification

FINANCING OF GEOTHERMAL ENERGY PROJECTS

Understanding Risk and Preparing the RFP

ZAMBEZI RIVER AUTHORITY

Overview of Financing Agreements for Project Finance

MBF1223 Financial Management Prepared by Dr Khairul Anuar

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

Investment Management Alert

CREDIT ENHANCEMENT PRACTICES S U P P O R T I N G I N V E S T M E N T I N I N F R A S T R U C T U R E

Update on the Roadmap for Nigerian Power Sector Reform

Investment Management Alert

CLIMATE INVESTMENT FUNDS

FINANCIAL ANALYSIS A. Introduction

Ventus 2 VCT plc. Strategy Note Executive Summary

Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance. Ana Carvajal

Concession Agreement of IPP

Saudi Arabia Solar Trade Mission: Financing Panel - Introduction. Tim Armsby, Partner and Regional Head of Energy & Infrastructure

Innovation in. Power. Purchase Agreement Structures

AIRPORT BOTS/ CONCESSIONS CHECKLIST OF LEGAL AND REGULATORY ISSUES

RISK MANAGEMENT FOR INFRASTRUCTURE PROJECTS & TERMSHEET DEVELOPMENT

545 FIFTH AVENUE NEW YORK, NEW YORK TELEPHONE: (212) FACSIMILE: (212)

OPPORTUNITIES IN THE ON-GRID RE SECTOR IN NIGERIA

Condensed Quarterly Financial Statements

USAID-Funded Nepal Hydropower Development Project (NHDP)

Condensed Quarterly Financial Statements

Multilateral Investment Guarantee Agency Enhancing Investments in Africa WBG Japan Business Meeting on Investments in Africa Tokyo, March 2014

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

EgyptEra Regulatory Framework to Develop RES Projects in Egypt

Key Elements of a Wind / Solar PPP. Cathy Oxby Commercial Director Mob:

Condensed Quarterly Financial Statements

FISHERMEN S ENERGY OF NEW JERSEY, LLC

Off-Grid Power Sector Opportunities and Project Financing. October 2017

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

Condensed Quarterly Financial Statements

Professional O&M. First Solar: Protecting PV plant prof itability

New Requirements to Hong Kong Professional Investor Regime to Become Effective on 25 March 2016

SunEdison s Comments on NERSA REFIT 2011 Consultation Paper

WORKSHOP ON TRANSMISSION SUPPORT AGREEMENTS

As economies continue to seek private sector participation for developing infrastructure projects,

DEVELOPING WIND AND SOLAR POWER IN VIETNAM: KEY ISSUES

Equitable Financial Evaluation Method for Public-Private Partnership Projects *

PARTNERING WITH IFC (KOREA CASE STUDIES) MAXIMIZING FINANCE FOR DEVELOPMENT

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions

FINANCIAL ANALYSIS: PROJECT 1

WALK-THROUGH THE LEGAL STRUCTURE OF PPA S عرض الهيكل القانوني التفاقيا شراء الطاق

Macquarie Infrastructure Debt Investment Solutions An introduction to infrastructure debt. March An introduction to infrastructure debt

Transcription:

Global Project Finance Alert March 20, 2018 Project Finance: Structuring for Success Mini-Summary This Practice Note considers the meaning of the term structure in a project finance transaction and identifies the key issues that may inform the approach to structuring such a transaction. It explains a plain vanilla project finance structure and then contrasts that with some of the innovations employed in the Azura Edo IPP project, a conventional power project in Nigeria. This Practice Note was produced by Julian Nichol at Akin Gump Strauss Hauer & Feld, who has experience in the EMEA project finance markets and who advised emerging markets investor Actis on its acquisition of a majority stake in the Azura Edo IPP post financial close. 1. Introduction to project finance structures This Practice Note (i) considers what is meant by structure in the context of a project finance transaction and identifies key issues that inform the approach to structuring a project finance transaction, and (ii) looks closely at the Azura Edo independent power project in Nigeria ( Azura Edo IPP ) as a case study to help identify and explain a number of recent and innovative project finance structuring solutions that have been successfully implemented in order to overcome certain identified risks and challenges. This Practice Note is not intended to be a general introduction to project finance and therefore assumes a basic familiarity with its concepts (see Practice Note: Introduction to Project Finance). This Practice Note does not cover those structures peculiar to the U.S. project finance market, such as tax-equity-driven structures for renewable energy project financings or the differing approach in the United States to structuring reserve-based project loans. The focus in this Practice Note is on construction financings that is, new projects being developed from scratch (also known as greenfield projects ), rather than the sale or purchase of existing operating assets (often referred to as secondary market transactions), which account for a lot of the market activity at the time of writing. The content of this Practice Note could generally be applied to the asset class commonly referred to as energy and infrastructure projects, covering projects as diverse as power plants, oil refineries, toll roads and tunnels. There are also: a number of project finance structures used to finance public-private partnerships a number of projects structured and financed using Islamic financing principles 2018 Akin Gump Strauss Hauer & Feld LLP. This document is distributed for informational use only; it does not constitute legal advice and should not be taken as such.

a specific type of resource-linked project financing solution used for financing natural resources projects known as reserve-based lending. All of the above are beyond the scope of this Practice Note. 2. What is project finance? A project financing is essentially a transaction in which the focus is on creating a secure source of revenue from the project in question (which remains to be constructed) to cover operating costs, service debt and deliver a return on investment to sponsors. The reliability of the project s revenue is heavily dependent upon the delicate balance between the project s commercial viability, legal certainty of the risk allocation in the various project documents and the overall structure of the project. Project financings typically involve a combination of third-party debt and sponsor equity, usually provided in a ratio of approximately 80/20 or thereabouts. The debt/equity ratio will change according to the lenders perceived risk profile of the project in question and may also require the sponsors to make standby or contingent equity available in the event of construction delays or cost overruns, or in response to specific in-country risks. Projects in early-stage emerging markets will typically require greater equity commitments as a percentage of overall project costs from the project sponsors. 3. What does project structure mean in the context of project finance? Project structure refers to the way in which the participants in a project have been organized in terms of their risk relationship and how that risk relationship has been reflected in the project and financing agreements for the project in question. In other words, it refers to the project s architecture, that is, everything from the jurisdiction(s) through which sponsors infuse equity into the project (to take advantage of favorable investment treaty protections), to the jurisdictions in which the project company holds its bank accounts (to safeguard project revenues and provide adequate repayment security for lenders), to the way in which the key commercial arrangements for the project (for example, construction, operation and maintenance, fuel supply and power purchase) have been structured to reduce credit risk or promote performance reliability by those parties and therefore create revenue certainty for the project. Taking the economic and commercial viability of the project in question as a given, the creation of a successful project structure is possible only once the sponsors and lenders have gained a thorough understanding of the detailed legal, commercial and political risks affecting that project. This is referred to as the project s risk profile. Such risk profile should cover the relevant project throughout its economic life, from its construction phase through its operating phase (particularly while senior debt remains outstanding). Every project brings with it its own unique risk profile. However, there is a well-trodden path to follow when building up a project s risk matrix: 2

Start with an analysis of country risk (How stable is the country in question, and is there any destabilization risk from neighboring countries?) Then, move to macro political risk (How stable is the country s political regime, and is a change in government imminent or historically frequent?) and macro legal risk (How likely is a change in law that could negatively impact the project? Can an adequate security interest be granted to lenders? What is the track record of the courts of the country in question when adjudicating foreign investment disputes? Can a court or arbitral award be properly enforced in-country?) Then, once a thorough understanding of macro-country, legal and political risk is obtained, move to the micro level: What are the sector risks facing the particular project? For example, if talking about a power project, is there certainty of fuel supply for the project at the required specification? Can the power be readily exported using the existing transmission network, or is substantial grid reinforcement and/or a new and long transmission line required to be constructed? If the latter, how easy (and expensive) will it be to be obtain the land permits to site the necessary transmission line? Is there any technology risk involved in the proposed design solution? In terms of key commercial risks, what is the credit rating or standing of the proposed power purchaser, and is any credit enhancement necessary to ensure that the project revenue stream remains robust? Is there any risk of the contractually agreed tariff being reduced by, for example, removing any subsidy element? (The removal of a subsidy element from a project s offtake tariff has the potential to turn a project into a stranded asset. The experience of renewable energy sponsors in Spain, Italy and Portugal makes for an interesting case study on this point.) How experienced is the proposed operator of the project when taking into account the specific operating conditions of the project in question? Is there a comprehensive legal and regulatory regime underpinning the sector in question, thereby rendering the parties obligations in the contracts clearly and easily enforceable? Is there is a regulator for the sector in question, and, if so, what is the regulator s track record of regulating impartially? The essence of project financing then is the identification of these and other risks and their allocation to the project participants in the optimum way through the project s contractual matrix and structure. For further information, see Practice Note: Project risk and risk allocation. 4. Specific structures used to overcome identified project risks It is useful to consider a plain vanilla project finance structure before contrasting that with the Azura Edo IPP case study, which involves a number of recent and innovative project finance transaction structures that have been developed to overcome specifically identified risks in that project. (i) Basic structure of a project finance transaction A plain vanilla project finance structure is summarized in the diagram below: 3

In essence, the project company SPV is located in the country of the project, and the local and international sponsors infuse equity into that SPV under a shareholders agreement. One or more commercial bank lenders (usually a club of local, regional and international banks) lend money in local and international currencies to the SPV; the offtaker buys the output of the project, usually under a longterm contract at an agreed price and within agreed volume parameters; a series of contracts underpinning the construction (EPC contract) and operation and maintenance (O&M contract) of the project are entered into by the SPV, thereby giving lenders, the offtaker and sponsors certainty that the project will be constructed and operated so as to meet guaranteed performance standards; the SPV s interest in such contracts and the project s insurances will have been assigned to lenders as part of their security package, and the most important of those project contracts (typically EPC, O&M, the offtake and any concession contracts) will be the subject of a direct agreement with the senior lenders via the security trustee. Taking this as our base, it is now possible to examine how this structure needs to be augmented when dealing with particularly challenging project risks. (ii) Case study: Azura Edo IPP, Nigeria The Azura Edo IPP is a high-profile conventional power project that contains a number of innovative and advanced structural support mechanisms. 4

The project comprises a 459 MW gas-fired, open-cycle power plant, transmission line and pipeline located in Benin City, Edo State, Nigeria. The Azura Edo IPP is Nigeria s first large-scale, project-financed independent power plant, a first-of-a-kind. In common with other first-of-a-kind projects, its structure is innovative and responds to a number of specific challenges facing the project in Nigeria. A full discussion of those challenges is beyond the scope of this Practice Note; however, three key structural features of the project are worth focusing on: the equity and debt structure, incorporating commercial and political risk instruments the use of a put and call option agreement structure credit enhancement techniques used for the offtaker and project company (as gas purchaser). (A) Equity and Debt Structure The equity and debt structure in the Azura Edo IPP is summarized in the diagram below 1 : The Azura Edo IPP benefits from substantial World Bank support as follows: political risk support to encourage lending from the commercial lenders through a MIGA insurance policy; the MIGA insurance policy covers currency transfer/inconvertibility issues (given that the project s revenue stream is in naira, the local currency), asset expropriation, war and civil disturbance, and breach of contract by the Nigerian government 5

political risk support through an IBRD partial risk guarantee to encourage lender participation, which covers a breach by the Nigeria Bulk Energy Trader (NBET) of the Power Purchase Agreement (PPA) or a breach by the Government of Nigeria of the Put and Call Option Agreement (PCOA) political risk cover to protect the equity provided by the sponsors through a MIGA equity policy an IBRD partial risk guarantee supporting the letter of credit issued by a major investment bank on behalf of NBET to cover its payment obligations under the PPA. This matrix of World Bank support is comprehensive and was required because the project was exposed to substantial political risk, including: The PPA signed with NBET was the first such PPA to be signed with an independent power producer (IPP). NBET was, at the time, a new government-owned offtaker with thin capitalization and no demonstrable track record of performance under its PPAs. There were, as is common in many firstof-a-kind IPPs, substantial concerns held by sponsors and lenders over NBET s ability to perform its payment and other obligations under the PPA The PPA is in naira, the local currency of Nigeria, which, at the time of signing, was seeing a sharp decline in value against the U.S. dollar, due in part to the then-prevailing low oil price. This led the Government of Nigeria to implement foreign exchange controls to shore up the naira s value. The lenders to the project were able to secure assurances from the Central Bank of Nigeria (CBN) and a series of special dispensations; however, the effectiveness of these depended upon the continued support of the CBN The potential for failure to supply gas to the project rests with NBET such that NBET is obliged to continue to pay capacity payments under the PPA in the event of a gas supply failure that is not caused by the project company. Any prolonged failure to supply gas ultimately allows the parties to terminate the PPA, which triggers a payment obligation to the project company from the Ministry of Finance of Nigeria. (B) Put and Call Option Agreement The essence of the PCOA is to ensure that the Government of Nigeria stands behind the obligations of NBET in the event of an early termination of the PPA. The PCOA allows the project company to put the power plant or the equity interest in it to the Government of Nigeria in almost all instances where the PPA is terminated early. In such circumstances, the Government of Nigeria is obliged to pay a purchase price that, at the very minimum, is enough to cover outstanding debt. Traditionally, this type of early termination payment obligation has been covered in IPPs by a government guarantee or government support agreement. Therefore, the PCOA represents a new structural innovation for dealing with this risk and is now being used on other projects across the EMEA region. 6

(C) Innovative Credit Enhancement Techniques In addition to the innovative PCOA used to backstop NBET s obligations under the PPA, the gas sales and purchase agreement (GSPA) also involved an innovative structure used to credit-enhance the project company in respect of its payment obligations under the GSPA. The GSPA required that the payment obligations of the project company be backed by a letter of credit (L/C) issued by a bank with a required minimum credit rating. The traditional means of structuring to achieve this is for the sponsors and their respective parent companies to procure the L/C without the L/C provider having any recourse to the project company or its assets. However, in the Azura Edo IPP, the L/C was provided by one of the senior lenders as part of the overall financing package. This required some rethinking of the architecture for project accounts. For example, the project company is required to fund collateral accounts to effectively collateralize the L/C in the event of it being called and to fund L/C collateral reserve accounts to backstop such obligation. This approach represents new thinking to deal with a commonly encountered problem. (iii) Other potential structuring innovations for a project finance transaction There are many other innovative approaches to structuring a project that are beyond the scope of this Practice Note. However, that does not mean that they are less important to the wider project finance community or any less innovative. When looking at innovative structuring techniques, consideration may be given to: structures used by project lenders to plug a local currency shortfall and to extend local currency tenors offered by local commercial lenders the IFC s Scaling Solar Programme in Zambia the IFC s approach to financing its Round One solar projects in Jordan the treatment of contingent reserves in natural resource reserve-based financing transactions cash sweeps, margin ratchets, and the tightening or loosening of project covenants in response to specific in-country events or project-related actions occurring or not occurring some of the structures used to finance renewable energy YieldCos the growing recognition of green finance as a suite of financing products in their own right and how these may develop to impact project finance structures in the future. One thing is for certain: project finance transactions will continue to face risks and challenges, and project structuring techniques will continue to adapt in innovative ways to meet those risks and challenges. 7

Contact Information If you have any questions regarding this alert, please contact: Julian Nichol julian.nichol@akingump.com +44 (0) 20 7012 9828 London Office 1 Source, World Bank Guarantees for Private Projects, Kenneth Hansen and Anthony Molle, April 12, 2016, with the author s own adaptations. 8