1 Project Organizing in the construction industry Project financing: guidelines & best practices Padova, March 28th 2014 Palazzo del Bo Put simply: a PPP Project is considered bankable if lenders are willing to finance it, Head of Corporate Finance 1
2 Project financing 2
3 Some basic concepts In project finance, banks provide finance for a single project and take a large part of the risk of the success or failure of that project. The project may be or offices or shops, or any other venture involving construction or engineering a jails, schools and a hospital; a toll tunnel, bridge or highway; a sport infrastructure (stadium, pool, sporting arena, etc..); a cable network; a power station or pipeline; An asset serving an entity belonging to the pubilc sector 3
4 and a simplified structure A typical basic structure is as follows: A single purpose project company is formed to build and operate the project. The shares in the project company are owned by the project sponsors who enter into a shareholders or joint venture agreement governing their duties as shareholders. The host government grants the project company a concession or licence to operate the project. A construction company agrees to construct the project. A purchaser agrees to buy the project company s product and this produces the cash to repay the bank loan. 4
5 Project finance and PPP 5
6 Infrastructure financing PRIVATISATION PPP PUBLIC SECTOR PROPERTY Passage from public to private sector Long term concession to private sector Public property COST, RISK E RETURN Private ownership The majority of the costs, risks and returns are met by the private owner. The granting Authority pays for the use of the services Public company ownership QUALITY Standards established by private owners Granting Authority establishes standards Standards established by public company 6
7 Infrastructure financing MACROECONOMIC RELEVANCE Converting up-front fixed expenditures into a stream of future obligations MICROECONOMIC RELEVANCE Value for money Alleviating pressure on public company balances Improving efficiency in the public sector 7
8 PPP: what they are? Throughout the European Union and New Europe the decrease of available public resources and the restrictions imposed on the rate of increase of public deficits, have stimulated the search for alternative ways of financing infrastructural projects. Some examples: Public interest projects developed by public-private special purpose vehicles whose investments are made through the contribution of private expertise and private funds with part of equity funds provided by public shareholders ( Institutional PPPs ). Projects with an intrinsic capacity to generate profit through income. Public interest projects developed by private owned special purpose vehicles, through the awarding of DBFO concessions. The public sector is the grantor of the concession and sometime will provide subsidies in order to contribute to the funding of the project. The private sponsors will raise debt financing and will provide equity capital. Projects in which the private concessionary provides a service directly to the Public sector (eg. jails, schools, hospitals) in consideration of a revenue stream (availability fee) owed from the Public sector ( Contractual PPPs ). 8
9 PPP: main characteristics (1) MAIN CHARACTERISTICS OF PPPs Risk sharing between public and private sector Long term relationship between the parties Public service and ultimate regulatory responsibility remain in public sector USING PRIVATE SECTOR SKILLS FOR PUBLIC SECTOR SERVICES Contracts for services, not procurement of assets Output, not input, specifications Payments related to service delivery Whole life approach to design, build and operation CRITERIA FOR PPPs Economically viable for public sector Financially viable for the Private sector Appropriate risk and reward balance for public and private sector Public Sector: value for money FUNDAMENTAL MARKET CONDITIONS Public Sector political commitment/government partnership Reasonable project pipeline Focused, dedicated and experienced public sector team/ppp task force Clear legal and institutional environment Robust, transparent and competitive procurement Realistic risk sharing/sensible risk allocation 9
10 PPP: main characteristics (2) REASONABLE PROJECT PIPELINE Reasonable flow of affordable, viable and bankable projects Committed, structured and coordinated approach from public sector Pilots and pathfinders Prioritisation Political will at national level Ability to manage mix of grants vs. private sector grants Communication RISK ALLOCATION Standardised approach Bankable approach Value for Money Approach PROCUREMENT PROCESS Structured, transparent, non-discriminatory and consistent process Adequate planning and consent process Improved public sector understanding Public sector audit Adequate concession/public works/service legislation INSTITUTIONAL CAPABILITY Dedicated and resourced centre of excellence Sufficiently empowered decision-making bodies Use of experienced advisers Development of domestic private sector capacity (legal, financial, technical) Understanding the meaning of partnership 10
11 PPP: main characteristics (3) Distinguishing factors Active participation of the private sector in all phases of the infrastructure project through to the actual provision of the service (daily running); The involvement of the public sector is limited to its role as the principal buyer of this service and regulator of the quality of the services to be provided; Essentially private nature of the finance source (private bonds, equity, bank loans, etc ); Optimization of public sector costs (value for money) is considered throughout all project phases; Part of the risks are transferred to the private sector. 11
12 Identifying and structuring a successfull PPP GOVERNMENT SIDE ❶ Select suitable projects ❷ Manage for best value Define objectives structure project begin procurement PRIVATE SECTOR ❶ Optimise return on investments ❷ Manage project risk Establish feasibility; define bidding group; allocate resources Negotiate optimal risk transfer Define a value for money pricing mechanism and performance measurement Successful PFI/PPP Project Manage risks: construction, supply, operation, finance Define competitive bid; financing strategy; equity investment requirements Competitive and profitable bid 12
13 The role of the banks in infrastructure financing 13
14 Role of the banks (adviser, arranger, underwriter) Risks Allocation Project funding Adviser Lender COMMERCIAL CONTRACTS (construction, o&m, etc.) TERM SHEETS (Main Terms and Conditions) Underwriting FINANCING CONTRACTS (financial & security) Conditions precedent assessment Arranger Underwriter 14
15 Syndication and the credit process (for large transaction) Risk Management Internal RATING Syndication package Analysis of: (i) Information Memorandum (ii) Due Diligence reports (iii) Financial Plan (iv) Term sheets Risk Adjusted Return Over Capital Credit Committee Report Credit Committee approval Project Documentation Final commitment Analysis of: (i) Commercial Contracts (ii) Financial Documents Preliminary commitment 15
16 Major criteria for credit assessment: Risk apportionment and sustainable financial planning from a lender perspective 16
17 Sustainable financial planning DEFINING A BALANCED FINANCIAL STRUCTURE The financial structure of PFI/PPP is characterised by high ratios of debt to equity in the borrowing entity (special purpose vehicle or SPV) The willingness of investors to provide loans is a function of market conditions and the risk attached to the projects, as well as the level of government involvement Where the income stream to meet interest payment and repayment schedules comes from an availability/capacity charge which is paid by the Public Sector Client, long term investors and financiers wish to be assured that the availability/capacity charge provides a sufficient safety margin to ensure that the SPV can meet its financial obligations. For this reason the negotiation of cover ratios is important in providing a measure of security to loan providers Increasing competition, growing experience of PFI/PPP projects and the comfort provided by the Public Sector client have reduced the margins attached to the interest rates for such kind of initiatives..as well as (sometimes ) the level of financial ratios...but market trends suddenly changed upon the recent financial turmoil!!! 17
18 Risk analysis and allocation (the rating agencies 5 steps) ❶ ❷ Key risks Risk Allocation Identification Contracts & laws Insurance Guarantees ❸ Quantify the risks Experience rules Benchmarks Advisers Report No simple matrix A rather complicated balance of quantitative (leverage, base case, sensitivities) and qualitative (law, contracts, type of asset) ingredients ❹ ❺ Review the financing structure Long term cash flow projections Leverage / tenor Documentation covenants Base case Sensitivities Satisfactory financial ratio? NO YES 18
19 Risk analysis: how do we achieve an effective risk allocation? Due Diligence Risks Analysis Financing structure Legal Technical Risk Matrix Financial optimisation Insurance Bankability is, as it sounds, the acceptability or otherwise of a project s structure as the basis of a project financing.bankability is an art, not a science. (Graham D. Vinter) Risks Allocation 19 YES
20 Principles of risk allocation and risk management (1) RISK ALLOCATION AND VALUE FOR MONEY Risk should be borne by the party, which is best able to control them Complexity transaction costs Financing costs Optimal risk allocation Cost/time discipline Sharing risks is not a goal in itself but a way to achieve efficiency and quality as well as to create correct disciplines and incentives to achieve optimal outcome There are certain risks that are best managed by the Public Sector and to seek to transfer these risks would either not be viable or not offer value for money to the public sector (i.e. force majeure) (i.e. change in law/requirements change) (i.e risk of long term need for the service) RISK TRANSFER: REALITY & MITH Risk trasfer works up to a certain point! Innovation Completion Optimal lifecycle costs Risk has a price (value for money cheapest) Only certainty: outcome will differ from assumptions Scenario analysis should include multiple components (use multicriteria analysis ) Weight to common interest to see the asset built and operated 20
21 Principles of risk allocation and risk management (2) KEY FINANCIERS RISKS Construction Delay Price Performance Operation & Maintanance Cost Technical issues Legal and political Market (where applicable) Demand volume (traffic/users ) Toll, fare, evasion, delinquency Competition/diversion risk Other Insurance, Inflation, Interest rate, tax ISSUE OF CONCERN TO LENDERS IN CONCESSION FINANCING Award concessions fairly Clarify power of granting authorities Clarify tax and licencing regimes Provide lenders effective security Provide government undertakings to lenders Risk management devices Pass through and back to back agreements with contractors and subcontractors ring fencing (project company, segregated assets) insurance, hedging instruments indexation and provision for contingencies and contingency funding 21
22 Financing requirements and credit enhancement techniques: a lender perspective 22
23 Key issues for financiers in PFI/PPP projects MICRO Well defined projects; clarity on output specification Strong, experienced contractors Reliable completion undertakings Appropriate allocation of risk reflected in payment regime High quality predictable cash flows / low volatility Alternative service providers in the event of financiers step-in Protection from other adverse events, change in law, force majeure, insurance etc. MACRO Legal regime permitting taking of security and enforcement of contractual rights Political commitment to PFI/PPP and to specific projects Competition amongst constructions companies Availability of sercive providers Availability/capacity of long term debt market Availability of project equity Established exit route of equity Transparent procurement process 23
24 Requirements for financial viability: an outline External Internal Institutional Sound project foundamentals (economic rationale) Formalities / security effective at law / enforceability Possibility to create effective security Key Elements for a successful infrastructure financing Coherent legislative framework Rule of Law & role of the courts Coherence / consistency / coesion / stability Permits and consents One partnership, many interest! Reliability of the contractual framework Creditworthiness of the major project parties Political commitment (and grants ) 24
25 Risk allocation and sustainable financial planning CASH FLOWS STABILITY AND FINANCIERS REQUIREMENT Annual Debt Service Cover Ratio (ADSCR) Loan Life Cover Ratio (LLCR) Project Life Cover Ratio (PLCR) Debt/Equity Ratios Concession tail Sensitivities and stress tests Shape of repayment profile (sculpted, miniperm, balloon, bullet, cash sweep adjustment) Role of the Reserve Accounts (Debt Service Reserve Account; Maintanance Reserve Account ) 25
26 The contractual structure 26
27 Requirements for financing: an outline The importance of the contractual framework a) Consents, permits, authorisations b) Shareholders agreement and the sponsors contributions c) Concession agreement d) Construction contract e) Operation and maintenance agreement f) Supply contract/offtake agreement 27
28 Risk allocation and sustainable financial planning MITIGATION OF CONSTRUCTION RISK THROUGH DEDICATED DEVICES Turn key, lump sum, fixed price contract Experienced contractors Buffer in construction schedule Completion buffer Joint and several liability (single point of responsibility) Completion Guarantee Liability caps Liquidated damages for delay in completion Advance payment bonds; Retention Bonds; Performance Bonds Warranty periods Direct Agreement 28
29 The concession agreement: bankability and other selected issues 29
30 Requirements from a financier perspective: an outline THE CONCESSION AGREEMENT (1) The terms of the concession should be fixed for the life of the project; there should not be any unduly onerous terms imposed on the project company, e.g. a high level of liquidated damages if completion is not achieved by a fixed date if the project company is unable to pass-through all of those liquidated damages to its own contractor; the grantor of the concession should accept the change in law risk. So, for example, at the very least the concession period will be extended if the construction of the project is delayed because new regulations come into force requiring a re-working of the design or the retrofitting of new environmental protection equipment; the concession period should be extended by any period of force majeure; the concession should not terminate simply because the banks enforce their security; the arrangements for termination of the concession (when permitted) should not be expropriator and any compensation and compensation to which the project company is entitled should always be sufficient to repay the banks (even if the concession is being terminated for default by the project company) 30
31 Requirements from a financier perspective: an outline (2) THE CONCESSION AGREEMENT (2) on an enforcement, the banks should be able to freely transfer the concession to a third party; step-in rights provisions properly drafted and enforceable; financial balance clause; payment/indemnity provisions in case of contractual default by the public authority and revocation of the concession due to reasons of public interest ; payment/indemnity provisions in case of termination for breach of contract attributable to the concessionaire as an additional tool of credit enhancement, the terms of the concession must provide that any amount to be paid to the concessionaire in case of termination/revocation/withdrawal of the concession will have to be applied with priority to satisfy the claim of the lenders of the project. As an additional security for financial institutions, concession agreement must provide that revocation of the concession shall be ineffective until full payment of the indemnification 31
32 Lessons learnt: an international comparison 32
33 Need for clarity of requirements Costs of Procurement Dealing with the public Clear understanding Of service required Of the budgetary requirements Of the risk transferred Extended bid timetable Costs to public sector and private bidders Examples of failure of bids Political perception privatisation and managing borrowing Union opposition Profit in contract and refinancing Move towards Long Term Parterships Recent Policy Emphasis 33
Model Concession Agreement for Highways: An Overview
Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy
More informationOverview of the framework
Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by
More informationValue for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.
Value for Money Analysis: Choosing the Best Project Delivery Method Ken L. Smith, PE, CVS -HDR Engineering, Inc. 1 Overview What is a VfM analysis Why is it used Key VfM components and principles Life
More informationProject Finance. This course can be presented in-house for you on a date of your choosing. The Banking and Corporate Finance Training Specialist
Project Finance This course can be presented in-house for you on a date of your choosing The Banking and Corporate Finance Training Specialist Course Objectives Participants Will: Develop your understanding
More informationPublic Private Partnerships (PPPs) Projects
Development Process of Public Private Partnerships (PPPs) Projects By Dr Paul H K Ho 1 Disclaimer Funded by Commerce, Industry and Technology Bureau, The Government of the Hong Kong Special Administrative
More informationAn Introduction to PPP s
An Introduction to PPP s AAPA Facilities Engineering Seminar San Diego November 8 th, 2007 Presented by Manju Chandrasekhar Vice President Halcrow, Inc. Outline A Definition of PPP s Principles of PPP
More informationSumant Chak MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY. Asian Institute of Transport Development
MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY Sumant Chak Asian Institute of Transport Development Railway Staff College, Vadodara Course: BIMSTEC and MGC officers Course,
More informationOverview of the framework
Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.
More informationProject Finance An Overview
Project Finance An Overview KAMAL TAK ICAI, Navi Mumbai Chapter December 16, 2012 1 Project Finance An Overview What is Project Financing? How is it different? How are Projects developed? Various Project
More informationNigeria Infrastructure Building Conference 2014
Nigeria Infrastructure Building Conference 2014 May 2011 Project Finance as a viable option for financing Infrastructure Projects P R E P A R E D B Y: Helen Brume Divisional Head, Power, Infrastructure
More informationPublic Private Partnerships An overview from the legal perspective
Public Private Partnerships An overview from the legal perspective Ren Niemann Partner Allens is an independent partnership operating in alliance with Linklaters LLP. 1 What is a public private partnership?
More informationANNEX F THE FINANCIAL PROPOSAL
ANNEX F THE FINANCIAL PROPOSAL 1. THE FINANCIAL PROPOSAL Each Bidder is required to submit information detailing the Bidder s Business Plan, Letter(s) of Intent to provide finance, and a Detailed Financial
More informationDeveloping a PPP market: Getting the fundamentals right
Developing a PPP market: Getting the fundamentals right Essentials for private sector participation 17 March 2016 Why does private sector care about PPP projects? PPP projects offers stable cash flows
More informationIntro Public-Private Partnership (P3) Finance Course
Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP
More informationYanino Waste Processing Plant City of St. Petersburg
Yanino Waste Processing Plant City of St. Petersburg Project Briefing 26 October 2009 Page 1 Table of Contents Sections 1. Executive Summary. 3 2. Waste Processing Industry in St. Petersburg.....4 3. Project
More informationDelivering Public Private Partnerships in PNG
Port Moresby Chamber of Commerce-INA Public Private Partnership Seminar Pt Moresby, 22 nd February, 2012 1.4 Delivering Public Private Partnerships in PNG Michael Regan Professor of Infrastructure Institute
More informationIntroduction to Alternative Procurement Delivery
Introduction to Alternative Procurement Delivery for Florida Transportation Commission January 24, 2013 TABLE OF CONTENTS Alternative Project Delivery (APD) US Market Overview APD Funding and Financing
More informationOverview of the framework
Overview of the framework To meet the infrastructure deficit, the Twelfth Five Year Plan envisages a renewed thrust on investment in infrastructure, particularly in the power sector. The additional thermal
More informationWorkshop on PPP in Roads and Highways
Workshop on PPP in Roads and Highways Vickram Cuttaree, PPP-Coordinator, Europe & Central Asia Member of the Global Expert Team on PPP June 7, 2011 Agenda Rationale for PPP and International Experience
More informationPPP PUBLIC PRIVATE PARTNERSHIP
PPP PUBLIC PRIVATE PARTNERSHIP Definition by MOF 1. An arrangement between Government and Private party 2. To provide public assets and/or related services for public benefit 3. Private party makes investments
More informationDraft PPP Policy Outline
Note 7 May 2012 Draft PPP Policy Outline This note is the seventh in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership (PPP) programs.
More informationInternational Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships
International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships Budapest, Hungary March 7 8, 2007 The views expressed in this paper are those of the
More informationINFRASTRUCTURE FINANCE AND PPP
INFRASTRUCTURE FINANCE AND PPP INFRASTRUCTURE FINANCE AND PPP (Course Director: Meg Osius) Program Overview and Objectives In this three-day program participants will become familiar with the wide array
More informationWHAT IS PROJECT FINANCE? BANKING HANDY GUIDE
WHAT IS PROJECT FINANCE? BANKING HANDY GUIDE An introduction The project finance model is typically used for the purpose of financing the delivery of long-term infrastructure or natural resource projects,
More informationPPP Finance and Legal Issues. Edward Farquharson 25 July 2006
PPP Finance and Legal Issues Edward Farquharson 25 July 2006 Modes of Finance Sovereign Finance Public Sector Full Recourse Private Sector Non Recourse Corporate Finance Project Finance Agenda Role of
More informationURBAN TRANSPORT Funding and Financing solutions of the European Investment Bank
URBAN TRANSPORT Funding and Financing solutions of the European Investment Bank International Association of Public Transport Strategies for Public Transport in Cities Leipzig, 17-18 April 2008 Krzysztof
More informationWhat Are Availability-Based Projects?
Agenda What are Availability-Based Projects? Overview of Fitch s Analytical Approach Completion Risk Revenue Risk Operations and Life Cycle Risk Case Studies Agenda What are Availability-Based Projects?
More informationWorld Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program
World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects Workshop Program 3 June, 2015 Richard MacGeorge Successful preparation of bankable projects Getting Projects From Fairway
More informationNew Financing Trends Impact on Tunnelling Contracts
Martin Holfelder, Dipl.-Ing., Member of Management, Bilfinger Berger AG, Civil Tunnelling Arne Speer, Dipl.-Ing., Regional Director East, Bilfinger Berger BOT Europe GmbH Contents of PPP Projects Return
More informationManaging Risk in PPP Projects through Legal Documentation
Managing Risk in PPP Projects through Legal Documentation P R E P A R E D F O R P R E S E N T A T I O N A T T H E E X P E R T R O U N D T A B L E O N P R I V A T E - P U B L I C P A R T N E R S H I P S
More informationOverview of Financing Agreements for Project Finance
Overview of Financing s for Project Finance A Lender s Perspective 5 June 2014 Asian Development Bank 27th Training Program of Asian EXIM Banks Forum on Project Finance About Efic Australia s export credit
More informationP3 Fundamentals and Best Practices in Resource and Project Management
Achieving better value, timeliness and accountability through public-private partnerships P3 Fundamentals and Best Practices in Resource and Project Management Ottawa, Ontario November 26, 2015 Greg Smith
More informationThe Eurostat treatment of PPPs. Helsinki 11 December 2015
The Eurostat treatment of PPPs Helsinki 11 December 2015 Eurostat statistical rules: why is the subject important? EU limits for government deficit and debt: Maastricht criteria Key questions: who should
More informationCARE ADVISORY RESEARCH AND TRAINING LTD. Project Finance: Infrastructure and Manufacturing Sectors
CARE ADVISORY RESEARCH AND TRAINING LTD Project Finance: Infrastructure and Manufacturing Secrs COURSE DESCRIPTION: Project finance involves limited or non-recourse of a new project in which risks must
More informationTREASURY MANAGEMENT POLICY The Association s Treasury Management Policy will be operated by the following principles:
1.0 STATEMENT OF PRINCIPLES TREASURY MANAGEMENT POLICY 2017 The Association s Treasury Management Policy will be operated by the following principles: (i) (ii) (iii) The Association regards the successful
More informationGuidance Note System of Governance - Insurance Transition to Governance Requirements established under the Solvency II Directive
Guidance Note Transition to Governance Requirements established under the Solvency II Directive Issued : 31 December 2013 Table of Contents 1.Introduction... 4 2. Detailed Guidelines... 4 General governance
More informationIrish Loan Originating Funds - An Introduction
Irish Loan Originating Funds - An Introduction In 2015 the Central Bank of Ireland (Central Bank) introduced one of Europe's first tailored regulatory regimes for loan originating funds. This development
More informationDeveloping the Power Sector through Private Investment in Mongolia. Edgar Saravia Program Manager
Developing the Power Sector through Private Investment in Mongolia Edgar Saravia Program Manager October 2008 Setting the Context Government of Mongolia ( GoM ) wishes to introduce PSP in power generation
More informationIndia Infrastructure Debt Fund: A Concept Paper
India Infrastructure Debt Fund: A Concept Paper - Gajendra Haldea Creation of world-class infrastructure has been recognised as a key priority and a necessary condition for sustaining the growth momentum
More informationP3 CONTRACTS. Morteza Farajian, Ph.D. November 2016
P3 CONTRACTS Morteza Farajian, Ph.D. November 2016 What is a Public-Private Partnership (P3)? Overview of P3s Definition P3 Defined A P3 involves a partnership between the public and private sector to
More informationGeneral Project Finance Rating Methodology Project Finance
General Rating Methodology Contacts Carlos Terré Managing Director +49-30-27-891-242 c.terre@scoperatings.com General Rating Methodology Table of Contents 1 Areas of application... 3 2 Rating definitions...
More informationDelivering investor perspectives on what makes a project financially viable and attractive for them. Deconstructing facets of a financial proposal to
Delivering investor perspectives on what makes a project financially viable and attractive for them. Deconstructing facets of a financial proposal to ensure you are covering all bases appropriately. Delving
More informationGroup Exercise to Screen a PPP Project for Financial Feasibility
World Bank & Brazilian Ministry of Transport Workshop on the Toolkit for PPP in Roads and Highways Group Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz, Ph.D. World Bank Brasilia,
More informationMETHODOLOGY For Risk Assessment and Management of PPP Projects
METHODOLOGY For Risk Assessment and Management of PPP Projects December 26, 2013 The publication was produced for review by the United States Agency for International Development. It was prepared by Environmental
More informationParticular Primary Principles of Public Private Partnerships. Doug Sanders, P.Eng., LL.B. November 2, 2011
Particular Primary Principles of Public Private Partnerships Doug Sanders, P.Eng., LL.B. November 2, 2011 Introduction Highways, water and wastewater treatment facilities, buildings, all targets for PPP
More informationThe 2009 Outsourcing World Summit. Outsourcing and Private Public Partnerships
The 2009 Outsourcing World Summit Outsourcing and Private Public Partnerships Jean-François Poisson, VP/GM SNC-Lavalin ProFac Jfpoisson@snclavalinprofac.com 1 About JF Joined SNC - Lavalin ProFac/Nexacor
More informationEnterprise Risk Management process at Dragon Oil
Enterprise Risk Management Risk Management Process Dragon Oil s business is potentially exposed to different risks. However, some business risks can be accepted by the Group provided that acceptance of
More informationPublic-Private Partnership (PPP) Contracts
25 29 June 2018 London / United Kingdom Introduction A key motivation for governments considering public-private partnerships (PPPs) is the possibility of bringing in new sources of financing for funding
More informationThe financing of an infrastructure project (capital investment project)
Dr Ivan Vella, Founding Partner, Vella Advocates; Managing Director, Credence Corporate & Advisory Services (Malta) The financing of an infrastructure project (capital investment project) PRELIMINARY CONSIDERATIONS
More informationPrivatisation and Infrastructure Australian Federal Tax Framework (January 2017 Draft)
Privatisation and Infrastructure Australian Federal Tax Framework (January 2017 Draft) QUALIFICATION THIS DOCUMENT IS A DRAFT. IT IS INTENDED TO GENERATE FEEDBACK FROM STAKEHOLDERS ON THE ISSUES IT RAISES
More informationOverview of cogeneration project development
Overview of cogeneration project development 2004 Cogeneration Week in Thailand 23-25 March 2004 Miracle Grand Convention Hotel, Bangkok Romel M. Carlos Financial Advisor Project Development Process Commissioning
More informationMINISTRY OF FINANCE AND ECONOMIC AFFAIRS
MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS
More informationPlenary 2: Public-Private Partnerships. Monday, 12:00 to 13:00
Plenary 2: Public-Private Partnerships Monday, 12:00 to 13:00 Session agenda 1. What is PPP? 2. When are PPPs appropriate and where have they been used? 3. PPI in South Asia 4. Key terms 5. Summary and
More informationPublic Private Partnerships. Gautrain Rapid Rail Link. in St Petersburg. World Bank Institute. CEO: Gautrain Management Agency
Public Private Partnerships in St Petersburg Gautrain Rapid Rail Link World Bank Institute Jack van der Merwe (Pr.Eng) CEO: Gautrain Management Agency 07-08 December 2007 Why Gauteng... why Gautrain? The
More informationFINAL draft Regulatory Technical Standards
EBA/RTS/2016/02 13 June 2016 FINAL draft Regulatory Technical Standards on Assigning Risk Weights to Specialised Lending Exposures under Article 153(9) of Regulation (EU) No 575/2013 (Capital Requirements
More informationThe Benefits of P3s. Why do P3s work?
The Benefits of P3s Why do P3s work? P3s are a long-term performance-based approach for procuring public infrastructure where the private sector assumes a major share of the responsibility in terms of
More informationBest Practice Modelling for Project Finance
Best Practice Modelling for Project Finance Course overview This course is aimed at Project Finance professionals who would like to improve their Excel skills and expand their knowledge of Best Practice
More informationIntroduction to the Toolkit Financial Models
World Bank & Brazilian Ministry of Transport Workshop on the Toolkit for PPP in Roads and Highways Introduction to the Toolkit Financial Models Cesar Queiroz World Bank Brasilia, Brazil, June 8-9, 2010
More informationGlobal Project Finance Alert
Global Project Finance Alert March 20, 2018 Project Finance: Structuring for Success Mini-Summary This Practice Note considers the meaning of the term structure in a project finance transaction and identifies
More informationAdvanced Operational Risk Modelling
Advanced Operational Risk Modelling Building a model to deliver value to the business and meet regulatory requirements Risk. Reinsurance. Human Resources. The implementation of a robust and stable operational
More informationI-66 RFI Response Vinci Concessions USA 25 November 2013
General: 1. Please describe your firm, its experience in relation to public-private partnership projects, and its potential interest in relation to the Project (e.g., design/engineering firm, construction
More informationIPP TRANSACTION ADVISOR TERMS OF REFERENCE
IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction
More informationPolicy Note Nº 9. Development and Financing Public Investment through Public- Private Partnerships Center for Financial Stability.
Policy Note Nº 9 Development and Financing Public Investment through Public- Private Partnerships Center for Financial Stability December 2007 Executive Summary Argentina's economy has been growing over
More informationNPD Model Explanatory Note
NPD Model Explanatory Note March 2015 FOREWORD In recent years a number of public authorities in Scotland have procured privately financed infrastructure projects using the non-profit distributing or NPD
More informationINDEX annual management plan, terminology in credit agreement
INDEX Aboriginal rights Aboriginal title, establishment of, 316 claims, suggested clauses, 321-323 consultation, process for, 318-321 duty to consult and accommodate, 317-318 generally, 313-315 risk assessment,
More informationT o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP
Advantages of PPP A key advantage of having the private sector provide public services is that it allows public administrators to concentrate on planning, policy and regulation. The private sector, in
More informationPublic Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013
Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013 Agenda What is a Public-Private Partnership? P3 Lessons Learned Locality Concerns Pop Quiz: Is this a P3 Project????
More informationXII. Public Private Partnerships for Public Transport Investments
XII. Public Private Partnerships for Public Transport Investments Introduction to Public Transport Planning and Reform XII-1 What is PPP? Agreement between Public and Private sector entities Often (but
More informationInfrastructure: An emerging real asset class
Market & Investment Insights Infrastructure: An emerging real asset class LISA FERRARO, MANAGING DIRECTOR AND PORTFOLIO MANAGER, ENERGY AND INFRASTRUCTURE Article Highlights: Infrastructure including roads,
More informationi TELECOMMUNICATIONS (UNIVERSAL SERVICE FUND) REGULATIONS, 2008 ARRANGMENT OF REGULATIONS PART I PRELIMINARY PART II UNIVERSAL SERVICE FUND
i TELECOMMUNICATIONS (UNIVERSAL SERVICE FUND) REGULATIONS, 2008 ARRANGMENT OF REGULATIONS PART I PRELIMINARY REGULATION 1. Citation 2. Commencement 3. Interpretation 4. Purpose PART II UNIVERSAL SERVICE
More informationMs. Laurel Ross, Acting Commission Secretary and Director
Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationApplied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2
Applied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2 1 2 Recap of Day 1 Applying central concepts to structuring PPP projects S1: Project screening S2: Defining project
More informationLong Term Investment: Investment Regulation, Financial Instruments, Risk Mitigation and Risk Sharing Mechanisms
2017/FDM1/008 Session: 3 Long Term Investment: Investment Regulation, Financial Instruments, Risk Mitigation and Risk Sharing Mechanisms Purpose: Information Submitted by: Organisation for Economic Co-operation
More informationGuidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)
Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) PPP Cell Planning Department Government of Rajasthan Contents 1. The RIPDF and its Role 2 i. Background of the RIPDF ---------------------------
More informationPeople s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing
Consultant s Report Project Number: 49166-001 People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing Public Private Partnerships: Management
More informationSCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS
SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction
More informationProblems and Prospects of Public Private Partnership in Bangladesh
Problems and Prospects of Public Private Partnership in Bangladesh M. Fouzul Kabir Khan North South University Dhaka, 16 July 2012 What is PPP? PPP is a form of medium/long term contractual arrangement
More informationVentus 2 VCT plc. Strategy Note Executive Summary
1 Executive Summary This note summarises the outcome of a strategy review undertaken by the Board of Ventus 2 VCT plc (the Company ) over the past year during the period when the last of the Company s
More informationInvesting in Renewable Assets in Emerging Markets
Investing in Renewable Assets in Emerging Markets Jonathan Cohen Principal Associate 20 June 2017 Contents Eversheds Sutherland approach The global renewable energy market Development challenges and mitigating
More informationMethodology for Quantitative Procurement Options Analysis Discussion Paper. Partnerships British Columbia Updated April 2014
Methodology for Quantitative Procurement Options Analysis Discussion Paper Partnerships British Columbia Updated April 2014 Table of Contents Part 1: Overview... 1 1. Purpose... 1 1.1 Policy Context...
More informationPublic-Private Partnerships:
Public-Private Partnerships: Risks & Rewards S. Brian Samuel, PPP Coordinator, CDB High-Level PPP Workshop, Caribbean Growth Forum St. Lucia, 15 th June 2015 POSSIBILITIES REWARDS RISKS LESSONS OPPORTUNITIES
More informationTHE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 )
THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) VIRGINIA DEPARTMENT OF TRANSPORTATION ( VDOT ) VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION ( DRPT ) RESPONSE TO REQUEST FOR INFORMATION
More informationUSAID-Funded Nepal Hydropower Development Project (NHDP)
USAID-Funded Nepal Hydropower Development Project (NHDP) Hydropower Financing: Traditional Project Finance, EPC and EPC-F Name of Facilitator: Sreeram Pethi Designation: Senior Financial Advisor Date:
More informationAn Overview of P3s in Maryland
An Overview of P3s in Maryland Greater Baltimore Committee Transportation Summit May 19, 2015 1 Discussion Outline Public Private Partnerships (P3s) overview Maryland P3 Law Transportation P3 Process (Regulatory)
More informationGUIDELINE ON ENTERPRISE RISK MANAGEMENT
GUIDELINE ON ENTERPRISE RISK MANAGEMENT Insurance Authority Table of Contents Page 1. Introduction 1 2. Application 2 3. Overview of Enterprise Risk Management (ERM) Framework and 4 General Requirements
More informationPublic Private Partnerships
Public Private Partnerships A Presentation to the Association of Financial Professionals of Canada Edmonton Chapter March 20, 2013 Alternative Capital Financing Office Alberta Treasury Board and Finance
More informationPublic Private Partnerships
Public Private Partnerships Osgoode Certificate in Construction Law 19 November 2013 Timothy J. Murphy Chief Marketing Partner tim.murphy@mcmillan.ca Outline 1. Different P3 Models 2. Typical DBFM Transaction
More informationValue for Money Test in Korea
Global Roundtable on Value for Money Value for Money Test in Korea Hyeon PARK Executive Director Public and Private Infrastructure Investment Management Center (PIMAC), KDI hpark@kdi.re.kr/ +82-19-445-2511
More informationNigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria
dentons.com Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria Briefing Note: December 2016 Contacts Dominic Spacie Partner Dentons UKMEA LLP One Fleet
More informationPPP for infrastructure Financing Evolving Good Practices. By Peter Stein CEO Stein Brothers AB MENA OECD INVESTMENT PROGRAMME AMMAN
PPP for infrastructure Financing Evolving Good Practices By Peter Stein CEO Stein Brothers AB MENA OECD INVESTMENT PROGRAMME AMMAN 2007-09-05 PPP=Public-Private Partnerships No agreed definition. Characteristics:
More informationMergers& Acquisitions
Mergers& Acquisitions How We Can Assist You? Mergers & Acquisitions can add great value to the business, but ensuring that every step of the process right from valuation to negotiation and completion is
More informationCOMITÉ EUROPÉEN DES ASSURANCES
COMITÉ EUROPÉEN DES ASSURANCES SECRÉTARIAT GÉNÉRAL 3bis, rue de la Chaussée d'antin F 75009 Paris Tél. : +33 1 44 83 11 83 Fax : +33 1 47 70 03 75 www.cea.assur.org DÉLÉGATION À BRUXELLES Square de Meeûs,
More informationContingent liability management
Contingent liability management International Best Practice and Regional Application Central Europe & Baltic Countries PPP Workshop Riga Latvia May 11, 2009 Agenda Project finance and project risks Contingent
More informationWarranty and Indemnity Insurance
Warranty and Indemnity Insurance Mrs. Ariane Brohez Partner ariane.brohez@loyensloeff.com Warranty and Indemnity Insurance Mrs. Bénédicte Deboeck Counsel benedicte.deboeck@loyensloeff.com Mr. Wim Vande
More informationPublic Private Partnerships (PPPs) in North America The Advent of a Market
Public Private Partnerships (PPPs) in North America The Advent of a Market RBS North American Infrastructure Advisory and Finance optional client logo 24 June 2008 Sell-Side Driver: The PPP market, while
More informationGuidance on the Approval and Supervision of Special Purpose Vehicles under Solvency II
2018 Guidance on the Approval and Supervision of Special Purpose Vehicles under Solvency II 1 Contents 1 Introduction... 3 2. Guidance... 5 2.1 General expectations of the Central Bank in relation to SII
More informationNew Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program
Infrastructure Financing Tools New Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program By Richard Sherman The Seneca Group, LLC February 2018 T he ocean of U.S. public policy
More informationMBF1223 Financial Management Prepared by Dr Khairul Anuar
MBF1223 Financial Management Prepared by Dr Khairul Anuar L3 Project Financing www.mba638.wordpress.com Objectives To understand what project financing is and what steps are involved in securing and managing
More informationFROM BILLIONS TO TRILLIONS: TRANSFORMING DEVELOPMENT FINANCE POST-2015 FINANCING FOR DEVELOPMENT: MULTILATERAL DEVELOPMENT FINANCE
DEVELOPMENT COMMITTEE (Joint Ministerial Committee of the Boards of Governors of the Bank and the Fund on the Transfer of Real Resources to Developing Countries) DC2015-0002 April 2, 2015 FROM BILLIONS
More informationLEGAL ASPECTS OF PROJECT FINANCE. Anjan Neupane Partner/Advocate Neupane Law Associates IN NEPAL