CITY OF SAN MARCOS ENGINEERING DIVISION

Similar documents
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

SUBDIVISION IMPROVEMENTS AGREEMENT

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

TOTAL QUANTITY UNIT COST UNIT

APPROVED 9 LOT TENTATIVE TRACT MAP - NEAR FINAL MAP

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

PROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project

Rock Chalk Park - Infrastructure Report. July 2013

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Route Route Z Intersection Realignment

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

Department of Public Works Engineering

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

SAN RAFAEL CITY COUNCIL AGENDA REPORT

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

City of Arcata Engineering Department Encroachment Permit Application

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

BID TABULATION PAGE 1 OF 6

CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015

BID TABULATION BID REQUEST NO

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

Appendix B Example Project Designs and Engineers Opinion of Costs

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Engineer's Preliminary Estimate - 100% Submittal

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Solicitation/Proposal/Award (Construction) PROPOSAL

Reviax Constracting Corp. DeSantis Construction

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

OKLAHOMA TURNPIKE AUTHORITY

A DESIGN-BUILD PROJECT

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

Fees/Privatization/Sponsorship Opportunities


JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

Capital Cost Estimation Methodology

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS


FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

Appendix E: Revenues and Cost Estimates

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

APPENDIX A-3: Cost Engineering

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

City of La Verne Cost Allocation Study

Addendum 1 Downtown North CRA Sidewalks

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

Specifications, Forms of Contract, and Proposal Forms for a Service Contract for Various Types of Concrete Work

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009

SECTION 110A FEE TABLES

OKLAHOMA TURNPIKE AUTHORITY

Public Works Maintenance STORMWATER AND

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

CONTRACT TIME DETERMINATION

BID TABULATION PAGE 1 OF 8

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

City of Palmer Action Memorandum No

ADDENDUM No. 1 January 29, Paving Program Village of Milford

PUBLIC WORKS DEPARTMENT CURB, GUTTER, SIDEWALK REPAIR AND CURB- RAMP INSTALLATION, PHASE 2 PROJECT NO. PW1531

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

PART A ROADWAY - BASE BID

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

CITY OF SAN JACINTO Capital Improvement Program Project Details

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Lakewood Ranch CDD 6

RFB Addendum 3

Right of Way Permits. Contact Information:

Transcription:

AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN REVIEW & PERMIT/INSPECTION A. GRADING PLAN REVIEW FEE 1. The Grading Plan Review Fee is based on TWO parts. PART 1: EARTHWORK PART 2: ON-SITE IMPROVEMENTS Retaining walls Drainage pipes and structures Erosion control [e.g. sandbagging, landscaping* and hydroseeding] *Landscaping and hydroseeding for erosion control purposes only. There is a separate review and inspection fee assessed by the City's Planning Division for aesthetic landscaping. See Subsection A.6. for a sample calculation of the Grading Plan Review Fee. 2. The unit prices of the Engineer s Cost Estimate shall be based on the City's UNIT PRICES FOR BOND 3. The Engineer's Cost Estimate shall include a 15% contingency. 4. The subtotal of PART 1 (EARTHWORK) of the GRADING PLAN REVIEW FEE shall be based on the following schedule: (Note: fee shall be based upon whichever is greater, excavation or fill): AMOUNT OF GRADING FEE 100 Cubic Yards or Less... $ 250.00 101-1,000 Cu. Yds... $ 350.00+ $40 per 100 CY 1,001-10,000 Cu. Yds... $ 750.00+ $100 per 1,000 CY 10,001-100,000 Cu. Yds.... $2,000.00 + $70 per 10,000 CY 100,001 Cu. Yds or more.... $3,500.00 + $40 per 10,000 CY 5. The subtotal of PART 2 (ON-SITE IMPROVEMENTS) (i.e. retaining walls, drainage pipes and structures, and erosion control) of the GRADING PLAN REVIEW FEE shall be based on the following schedule: Cost of On-Site Improvement Fee $0 to $ 19,999 $ 200 + 4.00% ($0 to $ 19,999) $ 20,000 to $ 49,999 $ 1,000 + 2.50% (cost less $ 19,999) $ 50,000 to $ 99,999 $ 1,750 + 2.00% (cost less $ 49,999) $100,000 to $ 249,999 $ 2,750 + 1.75% (cost less $ 99,999) $250,000 to $ 499,999 $ 5,375 + 1.50% (cost less $ 249,999) $500,000 to $ 1,000,000 $ 9,125 + 1.50% (cost less $ 499,999) Over $ 1,000,000 $ 16,625 + 1.50% (cost less $ 1,000,000)

Page 2 of 5 6. Sample calculation of Grading Plan Review Fee using the Engineer s Cost Estimate (grading plan items only): PART 1 (EARTHWORK SUBTOTAL): a. Grading... 80,000 C.Y.... ** USING SCHEDULE A.4., PART 1 (EARTHWORK) SUBTOTAL OF THE GRADING PLAN REVIEW FEE IS: [1st. 10,000 C.Y. @ $2000.00] + {[(80,000-10,000) X $70/10,000} =$2,490.00 PART 2 (ON-SITE IMPROVEMENT ITEMS SUBTOTAL): b. Masonry Retaining Wall Type C-1 1,220 S.F....@ $29.65/S.F. $36,173 c. 24" R.C.P. Storm Drain Pipe 312 L.F...@ $110/L.F. $34,320 d. 10' Type 'B' Curb Inlet 2 EA....@ $5,000/EA. $ 10,000 e. Hydroseeding 10,000 S.F....@ $.13/S.F. $ 1,300 f. Sandbags 30 EA....@ $3.00/EA. $ 90 15% Contingency... $12,283 Total... $96,166 USING SCHEDULE A.5., PART 2 (ON-SITE IMPROVEMENTS) SUBTOTAL OF THE GRADING PLAN REVIEW FEE IS: $1,750 + [0.0200 X ($96,166 - $49,999)] = $2,673.34 THE TOTAL GRADING PLAN REVIEW FEE IS $5,163.34 ($2,490.00 + $2,673.34). 7. The Grading Plan Review Fee applies to three (3) plan checks. New grading plan review fees will be required if more than three plan checks are necessary. The fee for the fourth (4 th ) and subsequent plan check(s) will be 33% of the total fee calculated at the time of submittal. 8. Other fees: B. IMPROVEMENT PLAN REVIEW FEE 1. The Improvement Plan Review Fee is based on the Engineer s Cost Estimate of all the improvements.* See Subsection B.5. for a sample calculation of the Improvement Plan Review Fee. 2. The unit prices of the Engineer's Cost Estimate shall be based on the City's UNIT PRICES FOR BOND 3. The Engineer's Cost Estimate total shall include a 15% contingency. 4. The Improvement Plan Review Fee shall be based on the following schedule (include a 15% contingency in the cost of improvements estimate): Cost of Improvements Fee $0 to $ 19,999 $ 200 + 4.00% ($0 to $ 19,999) $ 20,000 to $ 49,999 $ 1,000 + 2.50% (cost less $ 19,999) $ 50,000 to $ 99,999 $ 1,750 + 2.00% (cost less $ 49,999) $100,000 to $ 249,999 $ 2,750 + 1.75% (cost less $ 99,999) $250,000 to $ 499,999 $ 5,375 + 1.50% (cost less $ 249,999) $500,000 to $ 1,000,000 $ 9,125 + 1.50% (cost less $ 499,999) Over $ 1,000,000 $ 16,625 + 1.50% (cost less $ 1,000,000)

Page 3 of 5 5. Sample calculation of Improvement Plan Review Fee using the Engineer s Cost Estimate: a. Roadway Excavation 7,320 C.Y. @ $ 28/C.Y. =$ 204,960 b. Remove Curb & Gutter 150 L.F. @ $ 3.00/L.F. =$ 450 c. 5" A.C. Pavement on 6 CI.2 Base 8,000 S.F. @ $ 3.73 S.F. =$ 29,840 d. 6" Type G Curb & Gutter 200 L.F. @ $ 22.00/L.F. =$ 4,400 e. 4" P.C.C. Sidewalk 1,000 S.F. @ $ 5.00/S.F. =$ 5,000 f. Pedestrian Ramp 2 EA. @ $ 1,500/EA. =$ 3,000 g. LPSV Street Light, 90 Watt 1 EA. @ $ 4,300/EA. =$ 4,300 h. Overhead Utility Undergrounding 300 L.F. @ $ 400/L.F. =$ 120,000 15% Contingency =$ 55,793 TOTAL:... $427,743 USING SCHEDULE B.4., IMPROVEMENT PLAN REVIEW FEE IS: $5,375 + [0.0150 X ($427,743 - $249,999)] = $8,014.16 THE IMPROVEMENT PLAN REVIEW FEE IS $8,014.16 6. The Improvement Plan Review Fee applies to three (3) plan checks. New review fees will be required if more than three plan checks are necessary. The fee for the fourth (4 th ) and subsequent plan check(s) will be 33% of the total plan review fee calculated at the time of submittal. 7. Other fees: Additional improvement plan review required by changes, additions or revisions to approved plans (minimum charge is 1/2 hour)...... $97.80/hr. C. GRADING PERMIT (INSPECTION) FEE 1. The Grading Permit Fee is based on TWO parts: PART 1: EARTHWORK PART 2: ON-SITE IMPROVEMENTS Retaining Walls Drainage pipes and structures Erosion control [e.g. sandbagging, landscaping* and hydroseeding] * Landscaping and hydroseeding for erosion control purposes only. There is a separate review and inspection fee assessed by the City's Planning Division for aesthetic landscaping. See Subsection C.6. for a sample calculation of the Grading Permit Fee. 2. The unit prices of the Engineer s Cost Estimate shall be based on the City's UNIT PRICES FOR BOND 3. The Engineer's Cost Estimate shall include a 15% contingency. 4. The subtotal of PART 1 (EARTHWORK) of the Grading Permit Fee shall be based on the following schedule: (Note: fee shall be based upon whichever is greater, excavation or fill): AMOUNT OF GRADING FEE 100 Cubic Yards or Less $ 150.00 101-1,000 Cu. Yds: $ 100.00 + $30 per 100 CY 1,001-10,000 Cu. Yds: $ 370.00 + $25 per 1,000 CY 10,001-100,000 Cu. Yds.: $ 604.00 + $25 per 10,000 CY 100,001 Cu. Yds. or more: $1,684.00 + $20 per 10,000 CY

Page 4 of 5 5. The subtotal of PART 2 (ON-SITE IMPROVEMENTS) (retaining walls, drainage pipes and structures, and erosion control)] of the Grading Permit Fee shall be two and one-half percent (2.50%) of the Engineer's Cost Estimate of the on-site improvements. 6. Sample calculation of Grading Permit Fee using the Engineer s Cost Estimate (grading plan items only): PART 1 (EARTHWORK SUBTOTAL): a. Grading...80,000 C.Y USING SCHEDULE C.4., PART 1 (EARTHWORK) SUBTOTAL OF THE GRADING PERMIT FEE IS: [1st. 10,000 C.Y. @ $604.00] + {[(80,000-10,000)/$25/$10,00} = $779.00 PART 2 (ON-SITE IMPROVEMENT ITEMS SUBTOTAL): b. Masonry Retaining Wall Type C-1 1,220 S.F....@ $ 29.65/S.F. $ 36,173 c. 24" R.C.P. Storm Drain Pipe 312 L.F....@ $ 110/L.F. $ 34,320 d. 10' Type 'B' Curb Inlet 2 EA....@ $ 5,000/EA. $ 10,000 e. Hydroseeding 10,000 S.F....@ $.130/S.F $ 1,300 f. Sandbags 30 EA....@ $ 3.00/EA. $ 90 15% Contingency of On-Site Improvement Items B. - F.... $ 12,283 On-Site Improvement Item B - F. (Part 2) SUBTOTAL:... $ 81,833 GRAND TOTAL:... $ 94,116 AS STATED IN C.5., PART 2 (ON-SITE IMPROVEMENTS) SUBTOTAL OF THE GRADING PERMIT FEE IS: $[0.0250 x ($96,166)] = $2,404.15 THE TOTAL GRADING PERMIT FEE IS $3,183.15 ($779.00 + $2,404.15). 7. Other fees: D. IMPROVEMENT (INSPECTION) FEE 1. The Improvement Inspection Fee is based on the Engineer's Cost Estimate of all improvements. 2. The unit prices of the Engineer s Cost Estimate shall be based on the City's UNIT PRICES FOR BOND 3. The Engineer s Cost Estimate total shall include a 15% contingency. 4. The Improvement Inspection Fee shall be two and one-half percent (2.50%) of the Engineer's Cost Estimate of improvements. 5. Sample calculation of Improvement Inspection Fee using the Engineer s Cost Estimate: a. Roadway Excavation... 7,320 C.Y.. @ $28/C.Y. $ 204,964 b. Remove Curb & Gutter... 150 L.F... @ $3.00/L.F $ 450 c. 5" A.C. Pavement on 6 CI.2 Base... 8,000 S.F... @ $3.73/S.F. $ 29,840 d. 6" Type G Curb & Gutter... 200 L.F... @ $22.00/L.F. $ 4,400 e. 4" P.C.C. Sidewalk... 1,000 S.F... @ $5.00/S.F. $ 5,000 f. Pedestrian Ramp... 2 EA... @ $1,500/EA. $ 3,000 g. LPSV Street Light, 90 Watt... 1 EA... @ $4,300/EA. $ 4,300 f. Overhead Utility Undergrounding... 300 L.F... @ $400/L.F. $ 120,000 15% Contingency... $ 55,688

Page 5 of 5 GRAND TOTAL:... $ 427,748 USING SCHEDULE D.4., IMPROVEMENT INSPECTION FEE IS: $[0.0250 X ($427,748)] = $10,693.70 THE IMPROVEMENT INSPECTION FEE IS $10,693.70 6. Other fees: U:\DEVELOPMENT SERVICES USERS\ENGINEERING\ENGINEERING\HANDOUTS\FEE SCHEDULE FOR GRADING & IMPROVEMENT.DOC REVISED 11/21/06