The World Bank KI: Telecommunications and ICT Development Project (P126324)

Similar documents
Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Innovative Access to Finance (P147183)

ICT Sector Support in Somalia Phase II (P152358)

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

The World Bank Pacific Islands Regional Oceanscape Program - Tuvalu (P151780)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Public Disclosure Copy

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Public Disclosure Copy

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

TR Third Access to Finance for SMEs (SME III) (P130864)

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy

The World Bank Ghana - PPP Project (P125595)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

West Bengal PRI (P105990)

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Bangladesh Insurance Sector Development Project (P156823)

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

The World Bank Municipal Services Improvement (P096481)

Public Disclosure Copy

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

Road Sector Development Project (P149322)

Public Disclosure Copy

The World Bank Revenue Administration Modernization Project (P130202)

The World Bank Mauritania Public Sector Governance Project (P146804)

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

Public Disclosure Copy. Implementation Status & Results Report Transparency and Accountability in Mongolian Education (TAME) (P150842)

The World Bank MW: Mining Governance and Growth Support Project (P120825)

Key Dates. Global Development Objectives. Components. Overall Ratings

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

The World Bank Cape Verde - Transport Sector Reform Project (P126516)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Uganda Reproductive, Maternal and Child Health Services Improvement Project (P155186)

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

Second Science & Technology Project (P127308)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Research and Innovation in Science and Technology Project (P121842)

Saint Lucia Health System Strengthening Project (P166783)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Mozambique Public Financial Management for Results Program (P124615)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Pastoral Community Development Project III (P130276)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Development of a National Statistical System for Tanzania (P107722)

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

Transcription:

Public Disclosure Authorized EAST ASIA AND PACIFIC Kiribati Transport & ICT Global Practice IBRD/IDA Technical Assistance Loan FY 2013 Seq No: 6 ARCHIVED on 27-Aug-2015 ISR20341 Implementing Agencies: Communications Commission of Kiribati, Ministry of Communication, Transport, & Tourism Development Public Disclosure Authorized Key Dates Key Project Dates Board Approval date:26-jul-2012 Planned Mid Term Review Date:-- Original Closing Date:30-Jun-2017 Project Development Objectives Effectiveness Date:09-Nov-2012 Actual Mid-Term Review Date:-- Revised Closing Date:30-Jun-2017 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The proposed Project development objective is: to strengthen the legal, regulatory and institutional environment, enabling transition to a marketdriven telecommunications sector and facilitating improved connectivity for the Outer Islands. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name ICT Policy and Legal Support:(Cost $1.20 M) Public Disclosure Authorized ICT Regulatory Support:(Cost $1.20 M) Outer Islands Connectivity:(Cost $2.00 M) Project Management:(Cost $0.60 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate 8/27/2015 Page 1 of 10

Implementation Status and Key Decisions 1. Overall implementation progress is satisfactory and key elements of the sector reform and institutional development program have been completed while others are underway. As of July 9, 2015, 67 percent of IDA Grant proceeds, and 35 percent of Australian and New Zealand Grant funds (channeled through the Pacific Region Infrastructure Facility (PRIF) trust fund) are disbursed. 2. The sale of most of the assets of Telekom Services Kiribati Ltd (TSKL), was agreed on 31 March 2015 and completed 26 May 2015. ATH (Fiji) was the successful purchaser and ATH Kiribati Ltd (ATHKL) has been formed to be the operator of those assets that were transferred. ATHKL did not acquire TSKL s assets on the Outer Islands, (which comprise all islands other than South Tarawa, Betio and Kiritimati) however ATHKL is to have the right to use these assets subject to maintaining them. 3. Work is ongoing to define a mechanism for supporting outer islands connectivity. The MCTTD and CCK have committed to working together and consulting closely, consistent with the respective roles prescribed for each under the Communications Act. 4. Key issues over the next 6 to 12 months include: (a) drafting the wholesale access regime (including interconnection rules) for the smooth entry into the market of possible new entrant(s); (c) licensing of a new mobile operator; and (iv) the developing and implementing a strategy to support services on Outer Islands. In this regard it will be important for the MCTTD and the CCK to consult closely on all policy and regulatory matters relevant to the introduction of private sector operators (ATH, the buyer of TSKL assets and any new mobile operator) and the mechanism for the supply of services on Outer Islands. 8/27/2015 Page 2 of 10

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Low Low Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Moderate Moderate Environment and Social -- Low Low Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Moderate Moderate Results Project Development Objective Indicators PHINDPDOTBL Improved ICT policymaking capacity (Text, Custom) Basic ICT policy in place. ICT Policy Analyst New initiatives pending Policy capacity 8/27/2015 Page 3 of 10

Limited ICT policy capacity at MCTTD. process rstarted and readvertised with egov position. Applications await review. Policy Analyst action. in MCTTD, reflecting training Policy Specialist adviser recruited and completed engagement. Policy Analyst appointed Dec 2014. PHINDPDOTBL Legal and regulatory framework more effective at delivering sector performance (Text, Custom) Telecommunications Act 2004 and associated instruments in need of revision. Law as previous Type approval and licensing rules now finalised and approved. Operator and Radcomms Licensing, Type Approval, Spectrum Plan, UA Scheme Rules, Numbering. UA Plan devised and amended 2015/08. Progress under a PPP planned and ToR prepared for 2015 execution. Regulations enforced and updated Current CCK regulatory program completed. Future work includes Consumer Protection and Compliance and Monitoring. UA Committee operational, a UA Plan based on PPP and implementation arrangements in development. PHINDPDOTBL Increase penetration of mobile telephones and Internet, including number of direct beneficiaries (% of population, of which 53% female) (Percentage, Custom) 12.00 14.00 14.00 40.00 Following commissioning of 3G network, Subscriber numbers were re-assessed and number reduced due to faulty methodology. Mid 2015 3G customers nears 10K, no 2G stats but on 3G network Internet now exceed voice revenues. 3G revenue exceeds 2G revenues in best past year. ATHKL has limited sales of 3G SIM cards, halting subscriber growth. 8/27/2015 Page 4 of 10

PHINDPDOTBL Increase in penetration of mobile telephones and Internet in Outer Islands (Percentage, Custom) 5.00 10.00 12.00 30.00 O/I phones are 2G. Customer numbers are estimates only as O/I phones are not separately identifiable Overall Intermediate Results Indicators Component 1: Policy-making capacity established and working (Text, Custom) Basic ICT policy in place. Limited ICT policy capacity ICT Policy Analyst appointment did not proceed. Now readvertised and applications await assessment. All 3 senior admin staff replaced or about to be. ICT Director on extended sick leave. ATH (Fiji) successful bidder 31 March 2015. Policy-making capacity established and working Date 12-Jun-2012 19-Jan-2015 13-Aug-2015 12-Jul-2015 Sale of TSKL Tarawa and Kiritimati assets completed 26 May 2015. ATHKL established to operate assets. ATHKL to rebuild network by Dec 2015. 8/27/2015 Page 5 of 10

Component 1: Preferred option for reforming TSKL adopted by Government (Text, Custom) None Sale of TSKL proceeding to plan. Sale of TSKL proceeding to plan. Preferred option for reforming TSKL adopted by Government Date 12-Jun-2012 19-Jan-2015 26-May-2015 12-Aug-2014 Component 2: Licensing regime in place (Text, Custom) Licensing regime not developed Licensing policy and license fees approved by CCK in February 2014. Licensing Rules ready for second mobile operator and others Licensing regime in place Date 12-Jun-2012 19-Jan-2015 13-Aug-2015 12-Jul-2015 Licensing regime in place. Component 2: Spectrum management plan adopted (Text, Custom) None. Plan completed, and implementation ongoing. Spectrum management system to be set up. CCK has bought Monitoring tools and awaits skills development. Spectrum management plan adopted Date 12-Jun-2012 19-Jan-2015 13-Aug-2015 12-Jul-2015 Regime defined. Spectrum allocation and Management system (e.g. SMS4DC) yet to be developed. Staff are trained on how to allocate spectrum and requests for spectrum from service providers are being met. Spectrum monitoring skills still required. 8/27/2015 Page 6 of 10

Component 2: Numbering plan adopted (Text, Custom) None. Numbering specialist engaged; plan preparation ongoing. ATHKL to consider fixed network change to 8 digits. Numbering plan adopted Date 12-Jun-2012 19-Jan-2015 13-Aug-2015 01-Jan-2016 Fixed service migration to eight digit plan pending ATHKL fixed switch replacement Component 2: Interconnection regime adopted (Text, Custom) None -- Draft Interconnection guide available per new entrant analysis. Interconnection regime adopted Date 12-Jun-2012 19-Jan-2015 13-Aug-2015 01-Jan-2016 Interconnection requirement pending new entrant being licensed and interconnection sought Component 2: Dispute and mediation procedures in place (Text, Custom) None To be included in CCK workplan. Pending next phase of regulatory instruments. May be developed via retained specialist firm. Dispute and mediation procedures in place Date 12-Jun-2012 19-Jan-2015 13-Aug-2015 01-Jan-2016 The law provides for disputes between licensees regarding interconnection and access, and also provides for persons affected by CCK decisions to apply for reconsideration or to apply to a Court for relief. 8/27/2015 Page 7 of 10

Component 2: Award of other telecommunications licenses (Number, Custom) 0.00 0.00 11.00 1.00 3 Individual, and 8 class licenses issued. Component 2: Internet broadband (minimum 256Kbps) subscribers (% of population) (Percentage, Custom) -- 2.93 9.00 20.00 Fixed BB 1.5% Mob BB 9% Residential plan of 128Kpbs for $30/month available 256kbps plan @$70/month used mostly by business. Significant broadband experience via 3G mobile Component 2: Number of direct beneficiaries (including % female) (Number, Custom) -- 30.00 17000.00 -- Date -- 19-Jan-2015 13-Aug-2015 -- Total subscribers of fixed, mobile and internet services. 2015 data pending ATH consolidation. Note--previous entry incorrect; should have been 14,000. 8/27/2015 Page 8 of 10

Component 3: Mobile penetration in Outer Islands (% population) (Percentage, Custom) 1.00 10.00 12.00 40.00 Percentage of Outer Islands population of 40,000. Estimate only as Outer islands phones not separately identified but post ATHKL consolidation may be possible. Component 3: Internet penetration in Outer Islands (% population) (Percentage, Custom) -- 1.00 1.00 20.00 Date 12-Jun-2012 08-Dec-2013 13-Aug-2015 12-Jul-2017 Outer Is access to Internet is through telecentres. Individual services pending WiFi / 3G rollout Overall Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P126324 IDA-H7800 Effective USD 1.00 1.00 0.00 0.72 0.32 72% P126324 TF-11213 Effective USD 4.10 4.10 0.00 1.45 2.65 35% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P126324 IDA-H7800 Effective 26-Jul-2012 26-Sep-2012 09-Nov-2012 30-Jun-2017 30-Jun-2017 P126324 TF-11213 Effective 20-Jan-2012 13-Feb-2012 13-Mar-2012 01-Dec-2015 30-Jun-2017 8/27/2015 Page 9 of 10

Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 8/27/2015 Page 10 of 10