BID TABULATION BID REQUEST NO

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Rock Chalk Park - Infrastructure Report. July 2013

BID TABULATION PAGE 1 OF 8

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

TOTAL QUANTITY UNIT COST UNIT

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION PAGE 1 OF 6

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

LETTING : CALL : 056 COUNTIES : MILLE LACS

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

REPLACEMENT OF MERCER COUNTY BRIDGE

OKLAHOMA TURNPIKE AUTHORITY

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

OKLAHOMA TURNPIKE AUTHORITY

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

Department of Public Works Engineering

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

Reviax Constracting Corp. DeSantis Construction

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

ADDENDUM No. 1 January 29, Paving Program Village of Milford

SUBDIVISION IMPROVEMENTS AGREEMENT

Engineer's Preliminary Estimate - 100% Submittal

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Exhibit 4 Page 1 of 8

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $


SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

Addendum 1 13 TH Street Streetscape. September 1, 2017

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

PART A ROADWAY - BASE BID

Addendum 1 Downtown North CRA Sidewalks

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

CITY OF TAMPA ADDENDUM 2. April 18, 2018

PROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

Active Construction RV Associates Scarsella JR Hayes

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Opinion of Probable Cost

BID TABULATION. Engineer's Estmated Opinion of Costs

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-

CONTRACT TIME DETERMINATION

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

Market Street Gateway Improvements Phase 1

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

ARKANSAS PUBLIC SERVICE COMMISSION

Utility Committee Meeting AGENDA. October 3, 2017

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $

OKLAHOMA TURNPIKE AUTHORITY

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

2001 Average Bid Tabs

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

A DESIGN-BUILD PROJECT

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

The bid due date has been changed to 2:50 p.m. May 25, 2018.

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Transcription:

Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1 LS $ 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 2,586.48 $ 2,586.48 C-3 Chain Link Fence 640 Ft $ 18.00 $ 11,520.00 $ 17.80 $ 11,392.00 $ 18.37 $ 11,756.80 C-4 Chain Link Fence with Privacy Slats 355 Ft $ 20.00 $ 7,100.00 $ 31.45 $ 11,164.75 $ 32.48 $ 11,530.40 C-5 Clearing & Grubbing 1 LS $ 25,000.00 $ 25,000.00 $ 35,000.00 $ 35,000.00 $ 14,388.74 $ 14,388.74 C-6 Building Demolition 1 Each $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 647.30 $ 647.30 C-7 Remove Curb & Gutter 400 Ft $ 3.50 $ 1,400.00 $ 3.00 $ 1,200.00 $ 5.58 $ 2,232.00 C-8 Remove & Dispose Fire Hydrant 1 Each $ 500.00 $ 500.00 $ 262.50 $ 262.50 $ 130.12 $ 130.12 C-9 Remove Existing Waterline 610 Ft $ 5.00 $ 3,050.00 $ 15.93 $ 9,717.30 $ 4.34 $ 2,647.40 C-10 Cap Existing Waterline 1 Each $ 1,000.00 $ 1,000.00 $ 262.50 $ 262.50 $ 130.12 $ 130.12 C-11 Remove Light Pole & Concrete Base 1 Each $ 500.00 $ 500.00 $ 350.00 $ 350.00 $ 223.15 $ 223.15 C-12 Unclassified Excavation 30,559 CuYd $ 3.00 $ 91,677.00 $ 3.00 $ 91,677.00 $ 2.50 $ 76,397.50 C-13 Placing Topsoil (12") 2,330 CuYd $ 6.00 $ 13,980.00 $ 5.00 $ 11,650.00 $ 6.00 $ 13,980.00 C-14 Waste 21,741 CuYd $ 5.50 $ 119,575.50 $ 4.50 $ 97,834.50 $ 4.00 $ 86,964.00 C-15 Scarify and Recompact (8") 6,099 CuYd $ 8.00 $ 48,792.00 $ 2.50 $ 15,247.50 $ 2.50 $ 15,247.50 C-16 Type 2 Turf Reinforcement Mat 400 SqYd $ 5.00 $ 2,000.00 $ 5.94 $ 2,376.00 $ 6.13 $ 2,452.00 C-17 High Flow Silt Fence 2,487 Ft $ 3.00 $ 7,461.00 $ 2.10 $ 5,222.70 $ 2.17 $ 5,396.79 C-18 Concrete Washout Facility 1 Each $ 1,200.00 $ 1,200.00 $ 1,000.00 $ 1,000.00 $ 1,265.03 $ 1,265.03 C-19 Temporary Tracking Control 1 Each $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 2,360.54 $ 2,360.54 C-20 Pull Manhole Modifications 1 LS $ 1,200.00 $ 1,200.00 $ 5,000.00 $ 5,000.00 $ 2,060.27 $ 2,060.27 Page 1 of 9

C-21 Concrete Splash Pad 288 SqFt $ 5.50 $ 1,584.00 $ 15.75 $ 4,536.00 $ 5.69 $ 1,638.72 C-22 15" RCP Storm Sewer, Furnish 236 Ft $ 24.00 $ 5,664.00 $ 21.13 $ 4,986.68 $ 18.98 $ 4,479.28 C-23 15" RCP Storm Sewer, Install 236 Ft $ 16.00 $ 3,776.00 $ 19.80 $ 4,672.80 $ 16.27 $ 3,839.72 C-24 24" RCP Storm Sewer, Furnish 468 Ft $ 30.00 $ 14,040.00 $ 35.36 $ 16,548.48 $ 29.28 $ 13,703.04 C-25 24" RCP Storm Sewer, Install 468 Ft $ 17.00 $ 7,956.00 $ 21.38 $ 10,005.84 $ 16.27 $ 7,614.36 C-26 27" RCP Storm Sewer, Furnish 404 Ft $ 36.00 $ 14,544.00 $ 44.56 $ 18,002.24 $ 41.21 $ 16,648.84 C-27 27" RCP Storm Sewer, Install 404 FT $ 18.00 $ 7,272.00 $ 22.43 $ 9,061.72 $ 16.27 $ 6,573.08 C-28 2'x3' Type B - Drop Inlet 6 Each $ 1,800.00 $ 10,800.00 $ 1,791.67 $ 10,750.02 $ 2,331.36 $ 13,988.16 C-29 4.5'x10' Type S Drop Inlet 2 Each $ 4,000.00 $ 8,000.00 $ 3,921.75 $ 7,843.50 $ 3,253.06 $ 6,506.12 C-30 4" Draintile (PVC or Dual-Walled Polyethylene) 3,472 Ft $ 8.50 $ 29,512.00 $ 13.47 $ 46,767.84 $ 11.93 $ 41,420.96 C-31 6" Draintile (PVC or Dual-Walled Polyethylene) 304 Ft $ 9.50 $ 2,888.00 $ 15.22 $ 4,626.88 $ 17.35 $ 5,274.40 C-32 High Performance Geotextile Fabric 27,443 SqYd $ 3.00 $ 82,329.00 $ 2.50 $ 68,607.50 $ 1.96 $ 53,788.28 C-33 Base Course (15") 22,900 Ton $ 9.00 $ 206,100.00 $ 8.75 $ 200,375.00 $ 8.75 $ 200,375.00 C-34 Curb and Gutter, Rollover 1,398 Ft $ 11.00 $ 15,378.00 $ 10.24 $ 14,315.52 $ 9.16 $ 12,805.68 C-35 6" PCC Fillet Section 4.5 SqYd $ 60.00 $ 270.00 $ 68.25 $ 307.13 $ 58.01 $ 261.05 C-36 Concrete Valley Gutter 7,995 SqFt $ 5.00 $ 39,975.00 $ 3.94 $ 31,500.30 $ 4.45 $ 35,577.75 C-37 Asphalt Concrete, Class E,Type 1, Natural Agg. 2,150 Ton $ 72.00 $ 154,800.00 $ 78.12 $ 167,958.00 $ 70.00 $ 150,500.00 C-38 Asphalt Concrete, Class G,Type 2, 85% Quartzite 2,150 Ton $ 86.00 $ 184,900.00 $ 81.69 $ 175,633.50 $ 85.50 $ 183,825.00 C-39 SS-1h or CSS-1h Asphalt for Tack 5.7 Ton $ 1,200.00 $ 6,840.00 $ 813.75 $ 4,638.38 $ 800.00 $ 4,560.00 C-40 Pavement Marking Paint, White 85.0 Gal $ 110.00 $ 9,350.00 $ 105.00 $ 8,925.00 $ 97.61 $ 8,296.85 C-41 Soil Preparation, Seeding, Fertilizing & Mulching 735 CSF $ 8.00 $ 5,880.00 $ 5.78 $ 4,248.30 $ 5.96 $ 4,380.60 Subtotal: $ 1,212,313.50 $ 1,203,167.37 $ 1,046,708.62 Corrected Anomaly Page 2 of 9

Base Bid - Lighting for New Parking Lot Number Lighting / Electrical Items Quantity Unit E-1 Type PL2 Luminaires - Includes pole, base & grounding 18 Each $ 5,000.00 $ 90,000.00 $ 6,930.00 $ 124,740.00 $ 7,156.72 $ 128,820.96 E-2 Type PL Luminaire - Includes pole, base & grounding 1 Each $ 4,500.00 $ 4,500.00 $ 5,721.00 $ 5,721.00 $ 5,908.63 $ 5,908.63 E-3 E-4 E-5 E-6 E-7 E-8 Lighting Control Panels - Includes two lighting control panels, concrete pad, & secondary service from padmounted transformer 2"C - 4 #1/0 - Includes conduit, conductors, trenching, 2"C - 4 #2 - Includes conduit, conductors, trenching, 1-1/2"C - 4 #6 - Includes conduit, conductors, trenching, 1-1/2"C - 3 #6- Includes conduit, conductors, trenching, Reconnect Lighting Circuits to Existing Panel - Direct burial (Intramural Field) 1 LS $ 38,000.00 $ 38,000.00 $ 51,320.85 $ 51,320.85 $ 52,999.83 $ 52,999.83 1,800 Ft $ 21.00 $ 37,800.00 $ 17.97 $ 32,346.00 $ 18.55 $ 33,390.00 450 Ft $ 16.50 $ 7,425.00 $ 13.43 $ 6,043.50 $ 13.87 $ 6,241.50 720 Ft $ 14.70 $ 10,584.00 $ 8.46 $ 6,091.20 $ 8.73 $ 6,285.60 720 Ft $ 14.00 $ 10,080.00 $ 7.48 $ 5,385.60 $ 7.72 $ 5,558.40 1 LS $ 5,000.00 $ 5,000.00 $ 3,633.00 $ 3,633.00 $ 3,751.85 $ 3,751.85 E-9 Remove Existing Transformer at Intramural Field 1 LS $ 500.00 $ 500.00 $ 3,123.75 $ 3,123.75 $ 3,225.94 $ 3,225.94 E-10 E-11 E-12 E-13 E-14 Relocated Existing Lighting Control Panel at Intramural Field - Includes concrete pad and providing secondary service to panel Remove Existing Sectionalizing Switch - Includes splicing loop circuit conductors & storing as directed Extend Primary Circuit from 11th Street Sectionalizing Switch - Includes connecting to padmounted transformer Extend Primary Circuit from 8th Street Sectionalizing Switch - Includes reconnecting Caldwell Hall Transformer Pad - Includes relocating and installing concrete pad for padmounted transformer 1 LS $ 4,500.00 $ 4,500.00 $ 2,925.30 $ 2,925.30 $ 3,021.00 $ 3,021.00 1 LS $ 3,500.00 $ 3,500.00 $ 1,558.20 $ 1,558.20 $ 1,609.18 $ 1,609.18 1 LS $ 6,000.00 $ 6,000.00 $ 16,989.00 $ 16,989.00 $ 17,544.80 $ 17,544.80 1 LS $ 12,000.00 $ 12,000.00 $ 31,461.15 $ 31,461.15 $ 32,490.41 $ 32,490.41 1 LS $ 2,000.00 $ 2,000.00 $ 3,037.65 $ 3,037.65 $ 3,137.03 $ 3,137.03 Base Bid Total: Subtotal: $ 231,889.00 $ 294,376.20 $ 303,985.13 $ 1,444,202.50 $ 1,497,543.57 $ 1,350,693.75 Corrected Anomaly Page 3 of 9

Alternate #1 - Access Road to 11th Street Number Grading and Surfacing Items Quantity Unit 1.1 Mobilization 1 LS $ 8,000.00 $ 8,000.00 $ 9,400.00 $ 9,400.00 $ 1,354.43 $ 1,354.43 1.2 Traffic Control 1 LS $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 1,551.89 $ 1,551.89 1.3 Remove Concrete Sidewalk/Surfacing 436 SqFt $ 0.50 $ 218.00 $ 1.50 $ 654.00 $ 1.00 $ 436.00 1.4 Remove Curb & Gutter 75 Ft $ 3.50 $ 262.50 $ 3.00 $ 225.00 $ 4.50 $ 337.50 1.5 Adjust Manhole Casting 1 Each $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 1.6 Unclassified Excavation 545 CuYd $ 3.00 $ 1,635.00 $ 3.00 $ 1,635.00 $ 2.50 $ 1,362.50 1.7 Placing Topsoil 350 CuYd $ 6.00 $ 2,100.00 $ 5.00 $ 1,750.00 $ 6.00 $ 2,100.00 1.8 Waste 195 CuYd $ 6.00 $ 1,170.00 $ 4.50 $ 877.50 $ 4.50 $ 877.50 1.9 Scarify and Recompact (8") 353 CuYd $ 8.00 $ 2,824.00 $ 2.50 $ 882.50 $ 2.50 $ 882.50 1.10 High Flow Silt Fence 356 Ft $ 3.00 $ 1,068.00 $ 2.10 $ 747.60 $ 2.17 $ 772.52 1.11 6" Draintile (PVC or Dual-Walled Polyethylene) 482 Ft $ 9.00 $ 4,338.00 $ 15.22 $ 7,336.04 $ 17.35 $ 8,362.70 1.12 High Performance Geotextile Fabric 1,588 SqYd $ 3.00 $ 4,764.00 $ 2.50 $ 3,970.00 $ 1.92 $ 3,048.96 1.13 Base Course (15") 1,350 Ton $ 9.00 $ 12,150.00 $ 8.75 $ 11,812.50 $ 8.75 $ 11,812.50 1.14 Curb and Gutter (Standard 30" Wide) 836 Ft $ 10.00 $ 8,360.00 $ 10.24 $ 8,560.64 $ 9.16 $ 7,657.76 1.15 Sidewalk 250 SqFt $ 4.50 $ 1,125.00 $ 4.20 $ 1,050.00 $ 3.20 $ 800.00 1.16 Detectable Warning Panel 2 Each $ 350.00 $ 700.00 $ 262.50 $ 525.00 $ 200.61 $ 401.22 Page 4 of 9

1.17 6" PCC Fillet Section 69.0 SqYd $ 60.00 $ 4,140.00 $ 68.25 $ 4,709.25 $ 58.01 $ 4,002.69 1.18 Concrete Valley Gutter 150 SqFt $ 6.00 $ 900.00 $ 4.20 $ 630.00 $ 4.45 $ 667.50 1.19 Asphalt Concrete, Class E, Natural Agg. (2.5") 180 Ton $ 72.00 $ 12,960.00 $ 78.12 $ 14,061.60 $ 70.00 $ 12,600.00 1.20 Asphalt Concrete, Class G, 85% Quartzite (1.5") 120 Ton $ 86.00 $ 10,320.00 $ 81.69 $ 9,802.80 $ 86.00 $ 10,320.00 1.21 SS-1h or CSS-1h Asphalt for Tack 0.3 Ton $ 1,200.00 $ 360.00 $ 813.75 $ 244.13 $ 800.00 $ 240.00 1.22 Pavement Marking Paint, White 1.6 Gal $ 110.00 $ 176.00 $ 105.00 $ 168.00 $ 100.00 $ 160.00 1.23 Stop Sign 1 Each $ 350.00 $ 350.00 $ 550.00 $ 550.00 $ 200.00 $ 200.00 Subtotal: $ 79,420.50 $ 81,591.56 $ 70,448.17 Alternate #1 - Lighting for Access Road Number Lighting / Electrical Items Quantity Unit 1.24 Relocated Existing Pole & Fixtures 1 LS $ 900.00 $ 900.00 $ 1,118.25 $ 1,118.25 $ 1,154.83 $ 1,154.83 1.25 Type PL Luminaire - Includes pole, base & grounding 4 Each $ 4,500.00 $ 18,000.00 $ 5,721.00 $ 22,884.00 $ 5,908.63 $ 23,634.52 1.26 1.27 1-1/2"C - 3 #6- Includes conduit, conductors, trenching, 1-1/2"C - 4 #6- Includes conduit, conductors, trenching, 120 Ft $ 14.00 $ 1,680.00 $ 7.48 $ 897.60 $ 7.72 $ 926.40 400 Ft $ 14.70 $ 5,880.00 $ 8.46 $ 3,384.00 $ 8.73 $ 3,492.00 Alternate #1 Total Subtotal: $ 26,460.00 $ 28,283.85 $ 29,207.75 $ 105,880.50 $ 109,875.41 $ 99,655.92 Page 5 of 9

Alternate #2 - Extend North Parking Lot, Connect North Parking Lot to New Parking Lot & Flush Seals Number Grading and Surfacing Items Quantity Unit 2.1 Mobilization 1 LS $ 15,000.00 $ 15,000.00 $ 22,000.00 $ 22,000.00 $ 1,354.43 $ 1,354.43 2.2 Traffic Control 1 LS $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2.3 Remove Asphalt Surfacing 152 SqYd $ 1.50 $ 228.00 $ 5.00 $ 760.00 $ 4.00 $ 608.00 2.4 Remove Concrete Sidewalk/Surfacing 4,381 SqFt $ 0.50 $ 2,190.50 $ 1.50 $ 6,571.50 $ 0.50 $ 2,190.50 2.5 Remove Curb & Gutter 1,037 Ft $ 3.50 $ 3,629.50 $ 3.00 $ 3,111.00 $ 3.00 $ 3,111.00 2.6 Unclassified Excavation 3,297 CuYd $ 3.00 $ 9,891.00 $ 3.00 $ 9,891.00 $ 2.50 $ 8,242.50 2.7 Placing Topsoil 467 CuYd $ 6.00 $ 2,802.00 $ 5.00 $ 2,335.00 $ 6.00 $ 2,802.00 2.8 Waste 2,765 CuYd $ 6.00 $ 16,590.00 $ 4.50 $ 12,442.50 $ 4.00 $ 11,060.00 2.9 Scarify and Recompact (8") 1,359 CuYd $ 8.00 $ 10,872.00 $ 2.50 $ 3,397.50 $ 2.50 $ 3,397.50 2.10 High Flow Silt Fence 550 Ft $ 3.00 $ 1,650.00 $ 2.10 $ 1,155.00 $ 2.17 $ 1,193.50 2.11 4" Draintile (PVC or Dual-Walled Polyethylene) 988 Ft $ 8.50 $ 8,398.00 $ 13.47 $ 13,308.36 $ 11.93 $ 11,786.84 2.12 6" Draintile (PVC or Dual-Walled Polyethylene) 507 Ft $ 9.50 $ 4,816.50 $ 15.22 $ 7,716.54 $ 17.35 $ 8,796.45 2.13 High Performance Geotextile Fabric 6,114 SqYd $ 3.00 $ 18,342.00 $ 2.50 $ 15,285.00 $ 1.92 $ 11,738.88 2.14 Base Course (15") 5,100 Ton $ 9.00 $ 45,900.00 $ 8.75 $ 44,625.00 $ 8.75 $ 44,625.00 2.15 Curb and Gutter, Rollover 550 Ft $ 11.00 $ 6,050.00 $ 10.24 $ 5,632.00 $ 9.16 $ 5,038.00 2.16 6" PCC Fillet Section 50.0 SqYd $ 60.00 $ 3,000.00 $ 68.25 $ 3,412.50 $ 58.01 $ 2,900.50 2.17 Concrete Valley Gutter 250 SqFt $ 6.00 $ 1,500.00 $ 4.20 $ 1,050.00 $ 4.45 $ 1,112.50 Page 6 of 9

2.18 Asphalt Concrete, Class E, Natural Agg. 540 Ton $ 72.00 $ 38,880.00 $ 78.12 $ 42,184.80 $ 70.00 $ 37,800.00 2.19 Asphalt Concrete, Class G, 85% Quartzite 540 Ton $ 86.00 $ 46,440.00 $ 81.69 $ 44,112.60 $ 86.00 $ 46,440.00 2.20 SS-1h or CSS-1h Asphalt for Tack 1.4 Ton $ 1,200.00 $ 1,680.00 $ 813.75 $ 1,139.25 $ 800.00 $ 1,120.00 2.21 SS-1h or CSS-1h Asphalt for Flush 12.4 Ton $ 1,200.00 $ 14,880.00 $ 2,520.00 $ 31,248.00 $ 800.00 $ 9,920.00 2.22 Sand for Flush Seal 230 Ton $ 35.00 $ 8,050.00 $ 32.55 $ 7,486.50 $ 40.00 $ 9,200.00 2.23 Sweeping Asphalt Parking Lot 1 LS $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 2.24 Pavement Marking Paint, White 85.0 Gal $ 110.00 $ 9,350.00 $ 105.00 $ 8,925.00 $ 100.00 $ 8,500.00 Alternate #2 - Lighting to Extend North Parking Lot Number Lighting / Electrical Items Quantity Unit Subtotal: $ 273,139.50 $ 291,789.05 $ 235,937.60 Corrected Anomaly 2.25 Type PL Luminaires - Includes pole, base & grounding 5 Each $ 5,000.00 $ 25,000.00 $ 5,721.00 $ 28,605.00 $ 5,908.63 $ 29,543.15 2.26 2.27 1-1/2"C - 3 #6- Includes conduit, conductors, trenching, 1-1/2"C - 4 #6- Includes conduit, conductors, trenching, 140 Ft $ 14.00 $ 1,960.00 $ 7.48 $ 1,047.20 $ 7.72 $ 1,080.80 480 Ft $ 14.70 $ 7,056.00 $ 8.46 $ 4,060.80 $ 8.73 $ 4,190.40 Alternate #2 Total: Subtotal: $ 34,016.00 00 $ 33,713.00 $ 34,814.35 35 $ 307,155.50 $ 325,502.05 $ 270,751.95 Corrected Anomaly Page 7 of 9

Alternate #3 - Connect Existing Parking Lots Number Grading and Surfacing Items Quantity Unit 3.1 Mobilization 1 LS $ 12,000.00 $ 12,000.00 $ 20,000.00 $ 20,000.00 $ 1,354.42 $ 1,354.42 3.2 Traffic Control 1 LS $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 3.3 Remove Street Surfacing, Asphalt 137 SqYd $ 3.00 $ 411.00 $ 5.00 $ 685.00 $ 4.00 $ 548.00 3.4 Remove Concrete Sidewalk/Surfacing 4,223 SqFt $ 0.50 $ 2,111.50 $ 1.50 $ 6,334.50 $ 0.50 $ 2,111.50 3.5 Remove Curb & Gutter 1,142 Ft $ 3.50 $ 3,997.00 $ 3.00 $ 3,426.00 $ 3.00 $ 3,426.00 3.6 Remove SDSU Permit Parking Sign 2 Each $ 500.00 $ 1,000.00 $ 50.00 $ 100.00 $ 230.00 $ 460.00 3.7 Unclassified Excavation 1,627 CuYd $ 3.00 $ 4,881.00 $ 3.00 $ 4,881.00 $ 2.50 $ 4,067.50 3.8 Waste 1,494 CuYd $ 4.00 $ 5,976.00 $ 4.50 $ 6,723.00 $ 4.00 $ 5,976.00 3.9 Scarify and Recompact (8") 766 CuYd $ 8.00 $ 6,128.00 $ 2.50 $ 1,915.00 $ 2.50 $ 1,915.00 3.10 4" Draintile (PVC or Dual-Walled Polyethylene) 956 Ft $ 9.00 $ 8,604.00 $ 13.47 $ 12,877.32 $ 11.93 $ 11,405.08 3.11 High Performance Geotextile Fabric 3,445 SqYd $ 3.00 $ 10,335.00 $ 2.50 $ 8,612.50 $ 2.17 $ 7,475.65 3.12 Base Course (15") 2,900 Ton $ 9.00 $ 26,100.00 $ 8.75 $ 25,375.00 $ 8.50 $ 24,650.00 3.13 Curb and Gutter (Standard 30" Wide) 203 Ft $ 11.00 $ 2,233.00 $ 10.24 $ 2,078.72 $ 9.16 $ 1,859.48 3.14 Concrete Valley Gutter 2,585 SqFt $ 6.00 $ 15,510.00 $ 3.94 $ 10,184.90 $ 4.45 $ 11,503.25 3.15 Asphalt Concrete, Class E, Natural Agg. 320 Ton $ 72.00 $ 23,040.00 $ 78.12 $ 24,998.40 $ 70.00 $ 22,400.00 3.16 Asphalt Concrete, Class G, 85% Quartzite 320 Ton $ 86.00 $ 27,520.00 $ 81.69 $ 26,140.80 $ 86.00 $ 27,520.00 3.17 SS-1h or CSS-1h Asphalt for Tack 0.8 Ton $ 1,200.00 $ 960.00 $ 813.75 $ 651.00 $ 800.00 $ 640.00 3.18 Pavement Marking Paint, White 12.0 Gal $ 110.00 $ 1,320.00 $ 105.00 $ 1,260.00 $ 100.00 $ 1,200.00 Alternate #3 Total: $ 152,626.50 $ 157,743.14 $ 130,011.88 Page 8 of 9