Available online at ScienceDirect. Procedia Economics and Finance 34 ( 2015 )

Similar documents
Risk management as an element of processes continuity assurance

Available online at ScienceDirect. Procedia Economics and Finance 15 ( 2014 )

New Option Strategy and its Using for Investment Certificate Issuing

Available online at ScienceDirect. Procedia Economics and Finance 25 ( 2015 )

Available online at ScienceDirect. Procedia Economics and Finance 25 ( 2015 )

Model of financial controlling

RISKS IN PLM PLANNING

BASEL II AND ITS IMPLEMENTATION

ScienceDirect. Programme management for public budgeting and fiscal policy. Ganna Lytvynchenko a * 27 th IPMA World Congress

Determining of Provable Loss in Municipal Bus Transport and Its Influence on Public Budgets in Sparsely Populated Areas of the Czech Republic

A Method for the Evaluation of Project Management Efficiency in the Case of Industrial Projects Execution

Available online at ScienceDirect. Procedia Engineering 161 (2016 )

ScienceDirect. The Determinants of CDS Spreads: The Case of UK Companies

Possibility of Using Value Engineering in Highway Projects

ScienceDirect. A Study of Construction Claim Management Problems in Malaysia

Issues of financial literacy education

ScienceDirect. A Comparison of Several Bonus Malus Systems

Available online at ScienceDirect. Procedia Economics and Finance 39 ( 2016 )

Available online at ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12

ScienceDirect. Project Coordination Model

ScienceDirect. To the capital structure choice: Miller and Modigliani model

WORK BREAKDOWN STRUCTURE A TOOL FOR SOLVING DECISION MAKING PROBLEM IN PROJECT MANAGEMENT

MODELS OF APPLICATION ECONOMIC VALUE ADDED IN AUTOMOTIVE COMPANY

Available online at ScienceDirect. Procedia Economics and Finance 32 ( 2015 )

Uncertainty and the Transmission of Fiscal Policy

Available online at ScienceDirect. Procedia Economics and Finance 34 ( 2015 )

THE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT AT THE NATIONAL BANK OF SERBIA

Available online at ScienceDirect. Procedia Economics and Finance 32 ( 2015 ) Andreea Ro oiu a, *

Available online at ScienceDirect. Energy Procedia 69 (2015 )

machine design, Vol.7(2015) No.4, ISSN pp

INFORMATION SOURCES FOR FINANCIAL ANALYSE IN ORGANISATION

ESTIMATING TOOLS FOR INFRASTRUCTURE PROJECTS

Procedia - Social and Behavioral Sciences 156 ( 2014 )

Available online at ScienceDirect. Procedia Economics and Finance 6 ( 2013 )

Procedia Computer Science

Available online at ScienceDirect. Procedia Economics and Finance 25 ( 2015 ) 41 52

Procedia - Social and Behavioral Sciences 109 ( 2014 ) Policy-term financing of a business

Available online at ScienceDirect. Procedia Chemistry 14 (2015 )

ScienceDirect. Tax Analysis of Small Sawmilling Entrepreneurial Subjects

European Journal of Economic Studies, 2016, Vol.(17), Is. 3

ScienceDirect. Short Combo Strategy Using Barrier Options and its Application in Hedging

ScienceDirect. A model of green investments approach

Available online at ScienceDirect. Procedia Economics and Finance 34 ( 2015 )

Available online at ScienceDirect. Procedia Economics and Finance 15 ( 2014 ) Paula Nistor a, *

Braindumps.PRINCE2-Foundation.150.QA

ScienceDirect. Did the Czech and Slovak Banks Increase Their Capital Ratios by Decreasing Risk, Increasing Capital or Both?

Study on Principle of Product Defect Identification

Available online at ScienceDirect. Procedia Economics and Finance 24 ( 2015 )

Solvency Assessment and Management: Stress Testing Task Group Discussion Document 96 (v 3) General Stress Testing Guidance for Insurance Companies

Procedia - Social and Behavioral Sciences 210 ( 2015 ) Use of Public Debt Mezzanine Instruments in the Czech Republic

MODERN INNOVATIVE APPROACHES OF MEASURING BUSINESS PERFORMANCE

Backtesting value-at-risk: Case study on the Romanian capital market

PRINCE2-PRINCE2-Foundation.150q

ScienceDirect. Some Applications in Economy for Utility Functions Involving Risk Theory

NATIONAL BANK OF ROMANIA

Study on the Price Types of Construction Contracts for Construction Works

2nd Annual International Conference on Accounting and Finance (AF 2012) Current context of disclosure of corporate social responsibility in Sri Lanka

Available online at ScienceDirect. Procedia Economics and Finance 11 ( 2014 )

Available online at ScienceDirect. Energy Procedia 58 (2014 ) Renewable Energy Research Conference, RERC 2014

Procedia - Social and Behavioral Sciences 156 ( 2014 ) Ingars Erins a *, Laura Vitola b. Riga Technical University, Latvia

Feasibility Analysis Simulation Model for Managing Construction Risk Factors

Improvement and application of earned value analysis in coal project management

DRAFT GUIDANCE NOTE ON SAMPLING METHODS FOR AUDIT AUTHORITIES

Available online at ScienceDirect. Procedia Engineering 123 (2015 ) Creative Construction Conference 2015 (CCC2015)

THE USE OF THE LOGNORMAL DISTRIBUTION IN ANALYZING INCOMES

BUDGETING. After studying this unit you will be able to know: different approaches for the preparation of budgets; 10.

Available online at ScienceDirect. Transportation Research Procedia 14 (2016 )

PRINCE2 Sample Papers

Available online at ScienceDirect. Procedia Economics and Finance 10 ( 2014 )

Analysis of Insurance Undertakings Preparedness for Solvency II. October 2010

Procedia - Social and Behavioral Sciences 109 ( 2014 ) Yigit Bora Senyigit *, Yusuf Ag

Crowe, Dana, et al "EvaluatingProduct Risks" Design For Reliability Edited by Crowe, Dana et al Boca Raton: CRC Press LLC,2001

Jacek Prokop a, *, Ewa Baranowska-Prokop b

MULTISTAGE PORTFOLIO OPTIMIZATION AS A STOCHASTIC OPTIMAL CONTROL PROBLEM

Defining the Safety Integrity Level of Public Safety Monitoring System Based on the Optimized Three-dimension Risk Matrix

PROPOSALS OF CHANGES IN THE FINANCIAL STATEMENTS OF NON-PROFIT ORGANIZATIONS

MATHEMATICAL-STATISTICAL MODELS IN INSURANCE

Chapter 1. Research Methodology

Procedia - Social and Behavioral Sciences 213 ( 2015 ) th International Scientific Conference Economics and Management (ICEM-2015)

THE SOLUTION OF THE ALLOCATION PROBLEM USING DYNAMIC PROGRAMMING. Martin LAMPA, Andrea SAMOLEJOVÁ, Martin ČECH

DOES LOST TIME COST YOU MONEY AND CREATE HIGH RISK?

ADVANTAGES AND LIMITATIONS OF THE FINANCIAL RATIOS USED IN THE FINANCIAL DIAGNOSIS OF THE ENTERPRISE

University of Pardubice, Faculty of Economics and Administration

Module 4. College of Development Communication

Z-score Model on Financial Crisis Early-Warning of Listed Real Estate Companies in China: a Financial Engineering Perspective Wang Yi *

Monte Carlo analysis and its application within the valuation of technologies

Planning, Scheduling and Tracking Of Ongoing Bridge Construction Project Using Primavera Software and EVM Technique

A Risk Management Framework for Business Continuity in Agriculture

Available online at ScienceDirect. Procedia Economics and Finance 10 ( 2014 ) Banica (Ghintu) Ramona Mihaela a *

Reputation an Important Element for Automotive Industry Profit?

ScienceDirect. Statistical Analysis of the Indicators that have Influenced the Standard of Living in Romania During the Economic Crisis

ECONOMIC VALUATION OF MULTI-UNIT NUCLEAR PLANT PROGRAMS BASED ON REAL OPTIONS ANALYSIS. Abstract

1 Introduction to Cost and

Available online at ScienceDirect. Energy Procedia 65 (2015 )

Available online at ScienceDirect. Procedia Computer Science 61 (2015 ) 85 91

ScienceDirect. Economic Value Added as a measurement tool of financial performance

Feasibility study. Lecture 4. 7/15/2014 Dr. Joshua Onono

Transaction Based Business Process Modeling

Elaboration of strategic plans for territory development based on the implementation of investment and construction projects

GEOTHERMAL PROJECT MANAGEMENT

Transcription:

Available online at www.sciencedirect.com ScienceDirect Procedia Economics and Finance 34 ( 2015 ) 187 193 Business Economics and Management 2015 Conference, BEM2015 The Importance of Investment Audit for the Company Josef Drábek a *, Martina Merková b a Technical University in Zvolen, T.G.Masaryka 24, Zvolen 960 53, Slovak Republic b Technical University in Zvolen, T.G.Masaryka 24, Zvolen 960 53, Slovak Republic Abstract The aim of the paper is presentation of possible approach to realization of enterprise investment audit and also schematic quantification of possible effects in phase of investment utilization during planned economic lifetime of the project. The paper shows that conventional way of the investment process mostly prefers only issue of preparation and implementation phase. Utilization phase is underestimated. The monitoring of planned indicators and identification of deviations (particularly in revenues Cash Flow) are underrated. Identification of causes of variations as well as acceptance of addressed direct corrections can fill not only economic objectives of the project but also improve whole process of investment and financial decision making of the enterprise. Investment audit in the company is recommended to perform within methodology presented in the paper in particular phases of investment process. This methodology enables correct quantification of investment effects and declaration of the real contribution of investment to corporate performance increase. 2015 2016 The Authors. Published by by Elsevier B.V. B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer-review under responsibility of the Organizing Committee of BEM2015. Peer-review under responsibility of the Organizing Committee of BEM2015 Keywords: Investments; Projects' Audit; Effects of Investments; Investments' Controlling. 1. Introduction As it is known, ensuring the long-term development of each enterprise requires not only systematic recovery of existing technology, machinery and equipment, but also allocation of available financial resources in new production processes, which in terms of business cash flow will ensure to fulfil the investment objectives as well as the required appreciation of the capital invested. It is obvious that if every owner has to increase a value of available * Josef Drábek. Tel.: +421-45-5206110; fax: +421-45-5322051. E-mail address: josef.drabek@tuzvo.sk 2212-5671 2015 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer-review under responsibility of the Organizing Committee of BEM2015 doi:10.1016/s2212-5671(15)01618-4

188 Josef Drábek and Martina Merková / Procedia Economics and Finance 34 ( 2015 ) 187 193 capital in maximum possible level, he has to necessarily orient his attention in investment activities into three key areas: 1. Preparation, evaluation of good investment projects for the development of main production programs in company, fully ensuring the requirements of the market operators (Pre-investment phase). 2. Implementation of investment projects in accordance with an implementation plan of the company - ie, optimization of material, time, personnel, financial aspect of the project (Investment phase). 3. Effective utilization of the projects capacities in line with market requirements in the economic lifetime of the projects - the optimization of real revenues (cash flow) of projects, ensuring of return on capital invested (Phase of effective utilization). Each of these areas and issues is equally important for the overall success of investment, although some authors accentuate for example the key role of the first phase. When a business entity underestimates some of the areas, it cannot expect to achieve the required overall effect of investing. If we compare mentioned three areas in terms of companies attention, we find that the issue of monitoring or controlling of projects is paid minimum attention. Why this is so, we clarify in our contribution. The aim of the paper is to present methodology of investment audit in the company and to point to effects of investment audit for valuation of the real investment effectiveness. 2. Material and Methods In order to identify the importance and contribution of investment audit, it is necessary to analyse in detail the different stages of the investment process of the company, where it is possible not only to identify the causes of deviations but also implement targeted measures but also to choose an approach to measure benefits. According to knowledge of authors dealing with the issue of investment projects, the investment process can be characterized as follows. A. Pre-investment phase Pre-investment phase can be divided into three stages (Synek, 2011): Identification of investment opportunities. Pre-selection of projects. Evaluation of projects. Identification of investment opportunities - Opportunity study, the aim of the study is to prepare high-quality, as well as summary information about individual projects. From that information it must be understood that the investment is a benefit for the company for further development. Pre-selection of projects - Pre-feasibility study, is a processing of preliminary technical and economic study, which should correspond (Fotr, Soucek, 2005): consider all real possible variants of the project, assess whether the project should be analyzed in detail, particularly in terms of selected criteria and the requirements of potential investors, assess whether the project requires supporting and complementary studies for qualified investment and financial decision-making, assess whether the intention of the project is attractive enough for investors, assess whether the investment opportunity, the project can achieve the desired efficiency and return on invested capital, Evaluation of projects - feasibility study, the present study differs from the preliminary study particularly with deep processing as well as financial and time demands. Basic filling of technical and economic study is as follows (Drábek, Polách, 2008, Valach, 2006, Scholleová, 2009, Veber, 2009 and others): summary review of results justification and development of the project capacity of markets and production material inputs location and impact on the environment technological design and the production equipment organizational structure

Josef Drábek and Martina Merková / Procedia Economics and Finance 34 ( 2015 ) 187 193 189 workforce timetable for implementation and its budget financial and economic evaluation including the risk analysis of the project If the company succeeds in improving the efficiency of its processes, part of the avoided costs can be reflected in the launch of new investment so far not provided services and products (Sujová, Simanová, 2013). Based on practical experience, knowledge from projects implementation it can be concluded that the role of pre-investment phase is primarily to ensure precision and maximum completeness of the basic economic parameters of the project, which crucially affects the efficiency of investment. B. Investment (implementation) phase After completion of the decision-making process about the implementation of the project or the most suitable variant of the project, implementation phase occurs. Investment decisions (how much, to what, when, where and how to invest) belong among fundamental decisions, which greatly affect the future development of the company and its efficiency (Sujová, Hlaváčková, Šafařík, 2015). Implementation mainly includes the following activities: Creation of the necessary material, financial, personnel,... base, Updating of the technical and technological setting of the project Organisation of the process of selecting the most suitable suppliers of required assets in accordance with the requirements of investors, The acquisition of additional assets necessary for the success of all business processes, Selection and training of personnel for particular positions, Ensuring the trial operation and planned parameters of the project, Eliminate unexpected deviations and ensuring optimal capacity utilization of the project. In the implementation phase an attention of managers should be focused on two key factors that can positively as well as negatively affect the overall success of the project, namely: 1. In maximum possible extent to meet the schedule of implementation plan, especially in aspect of the material, time and finance. 2. Optimization of the structure of capital invested as well as the cost of capital, for financing the investments during project implementation. From the presented issues of the mentioned stage it is clear, that in the implementation phase is time a main factor, as well as compliance of the implementation schedule, which significantly affect the efficiency of the investment project. C. Operational phase - Phase of efficient use of investment Good organised pre-investment and investment phase reduces the likelihood of problems in the operational phase, i.e., in phase of efficient utilization of investment during the economic lifetime. The main task of managers is to full capacity of production in the maximum possible extent as a basis for the profitability of the project - cash flow. Exceeding of planned amount of cash flow for each year of lifetime positively affect not only the return on invested capital - meet the requirements of investors, as well as affects creation of additional financial resources for development of business activities in company. The role of investment controller in the operating phase is not only to monitor and evaluate ongoing processes, but also, based on investments monitoring and signals from the inner and outer environment of company, to prepare recommendations for corrections in plan or changes in the earlier stages of the investment process in the company. Practice or changes in the development of business environment show that deviations in project parameters are quite common, i.e. difference between planned and actual indicators required to take very quick, targeted measures for achieving mainly economic objectives of investing. Problems that may occur in the process of effective investments use, can have the nature of impact: Short-term - issues largely relate directly to the manufacturing process, where have been underestimated especially technical and technological parts of the project. Errors also occur frequently in underestimation of the working capital, which mostly affects the reduction of operational efficiency, with a direct impact on the overall effectiveness of the project. Long-term - problems relate to the overall investment strategy of the company. Mistakes may be hidden in false assumptions, ie, particularly in improper quantification of the basic economic parameters of the project. Failure

190 Josef Drábek and Martina Merková / Procedia Economics and Finance 34 ( 2015 ) 187 193 to achieve the parameters of the project is reflected in the expected investment revenues as well as appreciation rate on capital invested. Tools to solve these issues or facts of projected parameters is not only solving of impacts, but also early identification, removal or possible elimination of the causes in the process. Of course there should be subsequent post-invest audit, which should properly analyse all the causes of the problems in investment. Targeted quantifying of the causes and wrong decisions (technical, technological, financial and others), should prepare measures for each stage of the investment process, which should be specifically monitored in other projects. The essence of post-audit of investment project is to be properly realised exact analysis of the actual project results in all three phases; it was done the comparison of actual values with the planned indicators, as well as the identification of all the factors that caused the deviation from the achievement of the primary objectives. Post-investment audit becomes a key element of the controlling feedback and the results are reflected in the success of future investment projects that meet the golden rule of investing in company. Success of investment projects is dependent on a number of factors, which can be summarized into three categories: Preparation of investment projects - errors directly linked to the lack of information about the project - investment and neglected influence of key factors influencing the efficiency of investment. Implementation of investment projects - mistakes that have been made in the previous stage are reflected in the implementation process, but in case of deficiencies, it is possible to take certain corrective measures, but they may not fully eliminate these mistakes. In this phase is needed to monitor very closely the structure of capital expenditure, timetable as well as the amount and structure of funding sources. Efficient use of investment it is necessary to eliminate all possible risks, which occur in normal operation on a daily basis, involve the overall business risk arising from the market environment of given investment. It is desirable that the company had created variants of solutions the problems, which optimize the efficiency of investment, with tolerable acceptance of risk for investors. On the basis of presented knowledge and current situation in approach to realization of investment projects the methodology of investment audit was created. Investment audit within suggested methodology enable quantification of real effects of investment project. 3. Results and discussion The above analysed issue shows that the issue of management of investment process in company is complex, difficult and errors or ignorance of certain factors or laws are greatly signed not only to the effectiveness of individual projects, but also the achievement of the overall investment strategy and business in the company. It is therefore important to pay adequate attention to the issue post-investment audit, but especially its results to reflect in the improvement of the individual phases of the investment process in the company. Post-investment audit is not primarily intended to assess the degree of success or failure of the investment project, but to determine the primary causes that led to miss out the original objectives. It is therefore important to pay the same attention to analysis of the projects that in terms of value creation and business growth was more successful than planned. Tasks of investment audit are presented in Fig. 1 (Drábek, 2006).

Josef Drábek and Martina Merková / Procedia Economics and Finance 34 ( 2015 ) 187 193 191 5. Formulation of targeted measures for fulfilment of investment goals 1. Investment plan (fulfilment of investment strategy) INVESTMENT AUDIT 2. Structure of changes in the capital invested (plan fact) 4. Reflection of impact of changes in creation of sources for next 3. Changes of capital cost and the impact in realisation Fig. 1. Tasks of investment audit. (Drábek, 2006). Detection of the causes of these results can help to set other processes in investment controlling, so the company can focus precisely on these factors that support its success. In terms of overall management of the investment process, as well as the efficiency of investment it needs to be post-audit the part of the investment process of all projects. Post-audit is mostly applied for projects that are for the enterprise: Key projects, that in terms of scope, content and the amount of capital invested and links to other corporate projects affect its market value or the rate of appreciation of invested capital in the given period. The main element of assessment is the level of achieved equality (basic economic parameters) with reality. The focus of the evaluation is to analyze the information, time, financial and methodological base of the pre-investment phase and their impact on the actual operation of the investment. Risk projects, that are burdened with high overall business risk and which is difficult to quantify the impact of possible external changes in the effectiveness and efficiency of invested capital. The focus of the assessment is in the suitability of the applied methodology used in the phase of implementation and operational phase, or in the stage of the project termination. Properly processed post-audit of investment project identifies the deviation of the actual status of particular project parameters from the set assumptions, it finds the causes of deviations and creates a system of recommendations for future investment projects. Key recommendations based mainly on identifying the causes of all deviations from the expected estimate of the project's parameters, investments can touch: Quality of project preparation in the pre-investment phase, Receiving and processing of data - assumptions about key parameters, indicators of the project during the whole investment process, Selection of available information sources and their quality of processing, Suitability of the applied methodology of projects evaluation in line with the project objectives, Qualified managing the implementation process of the project (material, time, personnel, financial) and the adoption of appropriate solutions in the required time and space. If post-audit in the enterprise is seen not as an instrument of staff control, but as a tool to evaluate the success of the investment process - compliance with the fundamental principles of controlling management, it must be clearly declared its orientation to the future. This approach allows adequate involvement of employees in the company, so they will ensure qualified and the quality outputs of post-audit, with a direct impact on the further development of the quality of the overall investment process in the company. Of course, the result of this approach closely corresponds with the quality of the applied evaluation methodology, and thus with using of available information, indicators as well as the correct interpretation of the actual results of the particular projects.

192 Josef Drábek and Martina Merková / Procedia Economics and Finance 34 ( 2015 ) 187 193 The sequence of steps by implementation of investment audit is important due to quantification of possible, predicted and real benefits of investment project to a company. Quantification of contributions or effects is very difficult, it depends on ability to identify investment effects accurately or if the effects don t come from other technical and economic actions of the enterprise in that period. If, according the results of post-audit, are received targeted and specific recommendations and they are suitably applied in the process of investing in company, the benefits of this approach are clearly reflected in the rate of appreciation on capital invested (Fig. 2). 1. Effects of pre-realisation phase 5. Overall effects of investment audit EFECTS OF INVESTMENT AUDIT IN COMPANY 2. Effects of investment and financial decision-making 4. Effects of investment utilisation phase 3. Effects of implementation phase Fig. 2. Effects of investment audit in company. 4. Conclusion As results from the contested issue, quantification of the investment effects certainly is not easy and the effects are mostly quantified on the level of increased revenues, profit, cash flow, with a direct reflection to the projects evaluation manly by indicators net present value and internal rate of return. As documented in Fig. 2, the effects can be much larger, of course, provided a correct quantification of effects in the particular phases of investment process. Given the extent of the contribution it is not possible to quantify effects in example. The benefits need to be assessed for each project separately, of course, in the case of projects which follow each other, properly evaluate them as a whole. The specific attention should be paid to post-audit, and on its basis to assess the overall benefits of the project for the growth of the market value of the company. As we already stated, most companies evaluate projects by the traditional way, neglecting the importance of the audit and its impact on the overall efficiency of investment. Presented approach the quantification of the post-audit effects allows comprehensively evaluate the benefits of the project for the company as well as represents a real rate of appreciation of the capital invested. The contribution of authors to solving issue is the identification of possible effects of investment audit in particular phases of investment implementation during the predicted period of economic lifetime of investment project. Acknowledgements This paper was processed in the frame of the project No. 1/0286/16 under VEGA agency, Slovakia as the partial result of authors research. References Brealey, M. A., Myers, S. C. 2003. Principles of corporate finance. New York: McGraw Hill. Damodoran, A. 2012. Investment valuation, tools and techniques for determining the value of any asset. 3 rd ed. New Jersey: John Wiley&Sons Drábek J., Polách J. 2008. Real and Financial Investment of Companies/Reálne a finančné investovanie firiem (in Slovak). Zvolen: Technical University in Zvolen. 271 p.

Josef Drábek and Martina Merková / Procedia Economics and Finance 34 ( 2015 ) 187 193 193 Drábek, J. 2006. Investment controlling/investičný kontroling (in Slovak). 3 rd Ed. Zvolen: Technical University in Zvolen. 83 p. Fotr, J., Souček, I. 2005. Podnikatelský záměr a investiční rozhodování (in Czech). 1 st Ed. Praha: Grada. 356 p. Ross, S. A.,Westerfield, R. W., Jaffe, J. F. 2002. Corporate finance. 6 th Ed. McGraw-Hill Companies. Scholleová, H. 2009. Investment controlling/investiční controlling (in Czech). Praha: Grada. 285 p. Sujová, A., Hlaváčková, P., Šafařík, D. 2015. Analysis of Investment Effectiveness in the Wood Processing Industry of the Czech Republic. Procedia-Economics and Finance 26, 889-893. Sujová, A., Hlaváčková, P., Marcineková, K. 2015. Measuring the Impact of Foreign Trade on Performance Growth of the Woodprocessing Industry. Wood Research, 60(3): 491-502. Sujová, A., Simanová, Ľ. 2013. Meranie a riadenie výkonnosti interných procesov, in Meranie a riadenie výkonnosti podnikov. In: Rajnoha, R. et al. (Ed.). Zvolen: Technical University in Zvolen. p. 172-220. Synek, M. 2011. Manažerská ekonomika (in Czech). 5 th Ed. Praha: Grada. 471 p. Valach, J. 2006. Investiční rozhodování a dlouhodobé financování (in Czech). 2 nd Ed. Praha: Ekopress. 465 p. Veber, J. 2009. Management: základy, moderní manažerské přístupy, výkonnost a prosperita (in Czech). 2 nd Ed. Praha: Management Press. 734 p.