Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00 Code Repair Connect Exit signs to emergency lighting $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 battery packs. Code Repair Install vacuum breakers on non freeze $ 1,000.00 $ - $ - $ - $ - $ 1,000.00 hose bibbs. Code Repair Upgrade emergency lighting $ 10,000.00 $ - $ - $ - $ - $ 10,000.00 Failure Replacement Replace CTS computer millwork $ 15,000.00 $ - $ - $ - $ - $ 15,000.00 Failure Replacement Replace damaged hollow metal doors. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00 Failure Replacement Replace Damaged Incandescent Fixtures $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Failure Replacement Replace exit door from library $ 1,500.00 $ - $ - $ - $ - $ 1,500.00 Failure Replacement Replace washroom vanities $ 5,000.00 $ - $ - $ - $ - $ 5,000.00 Failure Replacement Upgrade breaker and ground fault relay $ 10,000.00 $ - $ - $ - $ - $ 10,000.00 Failure Replacement Upgrade faulty PA speakers. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00 Hazardous Materials Abatement Replace wet building materials $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Hazardous Materials Abatement Replace wet building materials $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Hazardous Materials Abatement Replace wet building materials. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Lifecycle Replacement Paint selected rooms in 1979 phase $ - $ - $ - $ - $ 10,000.00 $ 10,000.00 Lifecycle Replacement Replace 1979 drinking fountains $ 2,000.00 $ - $ - $ - $ - $ 2,000.00 Lifecycle Replacement Replace carpet $ - $ 7,000.00 $ - $ - $ - $ 7,000.00 Lifecycle Replacement Replace vinyl tile $ 4,200.00 $ - $ - $ - $ - $ 4,200.00 Preventative Maintenance Relocate telephone switch and data $ 4,000.00 $ - $ - $ - $ - $ 4,000.00 patch panels. Preventative Maintenance Repair faulty bubblers in 2002 fountains. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00 Repair Mudjack concrete slab $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Repair Repair and re-finish gym floor. $ - $ - $ - $ - $ 20,000.00 $ 20,000.00 Repair Repair fan coil units. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00 Repair Repair water closets, loose at base. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Total of Maintenance Events $ 83,700.00 $ 7,000.00 $ - $ - $ 30,000.00 $ 120,700.00 Barrier Free Access Upgrade Handicap lavatory not accessible. $ - $ 2,000.00 $ - $ - $ - $ 2,000.00 Millwork cover does not allow wheelchair access. Indoor Air Quality Upgrade Install steam humidifier $ - $ 140,000.00 $ - $ - $ - $ 140,000.00 Operating Efficiency Upgrade Install filter section upstream of heating $ 5,000.00 $ - $ - $ - $ - $ 5,000.00 coil. Program Functional Upgrade Provide wall acoustic treatment $ 15,000.00 $ - $ - $ - $ - $ 15,000.00 Study Study air seals at portable link to school $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Total of Upgrading Events Building Events Total $ 23,000.00 $ 142,000.00 $ - $ - $ - $ 165,000.00 $ 106,700.00 $ 149,000.00 $ - $ - $ 30,000.00 $ 285,700.00 Page 1 of 10
Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Site Events Code Upgrade Add blast wall at transformer $ 5,000.00 $ - $ - $ - $ - $ 5,000.00 Lifecycle Replacement Re-pave east parking lot $ - $ 20,000.00 $ - $ - $ - $ 20,000.00 Lifecycle Replacement Replace curb and gutter in east parking $ - $ 6,000.00 $ - $ - $ - $ 6,000.00 lot Maintenance Improve site drainage $ 20,000.00 $ - $ - $ - $ - $ 20,000.00 Program Functional Upgrade Provide chain link fencing $ 3,500.00 $ - $ - $ - $ - $ 3,500.00 Repair Provide weatherproof covers for car plugs $ 500.00 $ - $ - $ - $ - $ 500.00 Repair Repair lawn areas $ 3,500.00 $ - $ - $ - $ - $ 3,500.00 Repair Replace exterior site lighting fixtures $ - $ 2,500.00 $ - $ - $ - $ 2,500.00 Site Events Total $ 32,500.00 $ 28,500.00 $ - $ - $ - $ 61,000.00 Fr. M. Beauregard Education - Community Centre Total $ 139,200.00 $ 177,500.00 $ - $ - $ 30,000.00 $ 346,700.00 Page 2 of 10
Father J. A. Turcotte O M I School B3424A Building Events Maintenance Events D2020.02.06 Domestic Water Heaters* Failure Replacement Install new domestic hot water heater. $ - $ 12,000.00 $ - $ - $ - $ 12,000.00 D3040.04.01 Fans: Exhaust* - 1969 Failure Replacement Install new washroom exhaust fans. $ 14,000.00 $ - $ - $ - $ - $ 14,000.00 C3020.08 Carpet Flooring* Failure Replacement Replace carpet. $ - $ - $ 20,000.00 $ - $ - $ 20,000.00 C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)* Classrooms E2010.02.05 Educational Facility Casework* classroom 139 Failure Replacement Replace ceiling tiles in classrooms. $ - $ - $ 50,000.00 $ - $ - $ 50,000.00 Failure Replacement Replace classroom 139 millwork. $ - $ - $ 10,000.00 $ - $ - $ 10,000.00 B2030.05 Other Exterior Doors* Failure Replacement Replace exterior utility doors. $ - $ - $ 8,000.00 $ - $ - $ 8,000.00 D2010.08 Drinking Fountains / Coolers* Failure Replacement Replace failed drinking fountains. $ 12,000.00 $ - $ - $ - $ - $ 12,000.00 D2010.03 Lavatories* - 1969 Failure Replacement Replace failed lavatories and counter top. $ 20,000.00 $ - $ - $ - $ - $ 20,000.00 B2030.01.02 Steel-Framed Storefronts* Failure Replacement Replace hollow metal storefront. $ - $ - $ 7,500.00 $ - $ - $ 7,500.00 C1020.02 Interior Entrance Doors Failure Replacement replace interior entrance doors. $ - $ - $ 4,000.00 $ - $ - $ 4,000.00 E2010.02.05 Educational Facility Casework* 4 classrooms B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)* B2020.01.01.02 Aluminum Windows (Glass & Frame)* E2010.02.05 Educational Facility Casework* CTS Failure Replacement Replace millwork in four classrooms. $ 32,000.00 $ - $ - $ - $ - $ 32,000.00 Failure Replacement Replace roofing $ - $ - $ 425,000.00 $ - $ - $ 425,000.00 Failure Replacement $ - $ - $ 46,000.00 $ - $ - $ 46,000.00 Repair Repair computer desks. $ 6,000.00 $ - $ - $ - $ - $ 6,000.00 E2010.02.99 Other Casework* vanities Repair Repair vanities. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00 Total of Maintenance Events $ 86,000.00 $ 12,000.00 $ 570,500.00 $ - $ - $ 668,500.00 Upgrading Events K4010.03 Barrier Free Interior Circulation Barrier Free Access Upgrade Replace door locksets with lever design. $ - $ - $ - $ 14,500.00 $ - $ 14,500.00 D2010.04 Sinks* Code Upgrade Connect existing sink drain lines to underground drain line. $ 12,000.00 $ - $ - $ - $ - $ 12,000.00 Alberta Infrastructure and Transportation Page 3 of 10
Father J. A. Turcotte O M I School B3424A D3050.03 Humidifiers* - 1995 Indoor Air Quality Upgrade Install gas fired humidifiers with steam grids. D2010.04 Sinks* Operating Efficiency Upgrade Repipe sink drain lines for positive drainage. $ - $ 160,000.00 $ - $ - $ - $ 160,000.00 $ 12,000.00 $ - $ - $ - $ - $ 12,000.00 D5020.01 Electrical Branch Wiring* Program Functional Upgrade Add receptacles to classrooms. $ 21,600.00 $ - $ - $ - $ - $ 21,600.00 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)* Program Functional Upgrade Provide additional panelboards to service electrical requirements of school. $ 11,000.00 $ - $ - $ - $ - $ 11,000.00 C3020.14 Other Floor Finishes* Gym Program Functional Upgrade Replace gym flooring. $ - $ - $ 100,000.00 $ - $ - $ 100,000.00 D2010.06 Bathtubs* - 1986 Program Functional Upgrade Upgrade special needs tub brass. $ 7,000.00 $ - $ - $ - $ - $ 7,000.00 Total of Upgrading Events $ 63,600.00 $ 160,000.00 $ 100,000.00 $ 14,500.00 $ - $ 338,100.00 Total of Building Events $ 149,600.00 $ 172,000.00 $ 670,500.00 $ 14,500.00 $ - $ 1,006,600.00 Site Events G2040.03 Athletic and Recreational Surfaces* G2020.02.02 Flexible Paving Parking Lots(Asphalt)* Failure Replacement Regrade and repave asphalt play areas. $ - $ 180,000.00 $ - $ - $ - $ 180,000.00 Failure Replacement Re-grade and overlay asphalt parking lot. $ - $ 97,500.00 $ - $ - $ - $ 97,500.00 Total of Site Events $ - $ 277,500.00 $ - $ - $ - $ 277,500.00 Alberta Infrastructure and Transportation Page 4 of 10
Good Shepherd Community School B3430A Building Events Maintenance Events D3050.05.06 Unit Heaters* Failure Replacement Install new unit heater. $ 18,000.00 $ - $ - $ - $ - $ 18,000.00 C3030.07 Interior Ceiling Painting* Failure Replacement Repaint ceiling surfaces. $ - $ - $ 1,800.00 $ - $ - $ 1,800.00 C3010.11 Interior Wall Painting* Failure Replacement Repaint wall surfaces. $ - $ - $ 45,000.00 $ - $ - $ 45,000.00 B3020.01 Skylights* Failure Replacement Replace acrylic skylight. $ 1,500.00 $ - $ - $ - $ - $ 1,500.00 C3020.08 Carpet Flooring* Failure Replacement Replace Carpet. $ - $ - $ 30,000.00 $ - $ - $ 30,000.00 D5030.03 Clock and Program Systems* Failure Replacement Replace class change clock. $ 3,500.00 $ - $ - $ - $ - $ 3,500.00 D2010.02 Urinals* - 1974 Failure Replacement Replace cracked urinals. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00 D3040.04.01 Fans: Exhaust* Failure Replacement Replace exhaust fans. $ 15,000.00 $ - $ - $ - $ - $ 15,000.00 B2030.05 Other Exterior Doors* Failure Replacement Replace exterior utility doors $ - $ - $ 6,000.00 $ - $ - $ 6,000.00 D5020.02.02.03 Interior Metal Halide Fixture* Failure Replacement Replace gym light fixtures. $ 24,000.00 $ - $ - $ - $ - $ 24,000.00 C1020.02.02 Steel-Framed Storefronts Failure Replacement Replace hollow metal storefront. $ - $ - $ 7,500.00 $ - $ - $ 7,500.00 B2030.01.02 Steel-Framed Storefronts* Failure Replacement Replace hollow metal storefronts. $ - $ - $ 17,500.00 $ - $ - $ 17,500.00 C1020.02 Interior Entrance Doors Failure Replacement Replace interior entrance doors. $ - $ - $ 3,000.00 $ - $ - $ 3,000.00 D5010.03 Main Electrical Switchboards (Main Distribution)* B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)* C3020.07.02 Resilient Sheet Flooring - boot shelf C1030.02 Fabricated Compartments(Toilets/Showers)* Failure Replacement Replace main distribution switchboard. $ 50,000.00 $ - $ - $ - $ - $ 50,000.00 Failure Replacement Replace roofing. $ - $ - $ 275,000.00 $ - $ - $ 275,000.00 Failure Replacement Replace sheet vinyl flooring. $ - $ - $ 2,000.00 $ - $ - $ 2,000.00 Failure Replacement Replace shower compartments. $ - $ - $ - $ 5,000.00 $ - $ 5,000.00 D2010.05 Showers* Failure Replacement Replace shower heads and on/off brass. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00 Failure Replacement Replace windows, doors, millwork and carpet. $ 53,000.00 $ - $ - $ - $ - $ 53,000.00 Alberta Infrastructure and Transportation Page 5 of 10
Good Shepherd Community School B3430A B2020.01.01.02 Aluminum Windows (Glass & Frame)* Failure Replacement Replace windows. $ - $ - $ 66,000.00 $ - $ - $ 66,000.00 D5020.02.02.02 Interior Florescent Fixtures* Failure Replacement Replaced cracked and yellowing fixture lens. $ 75,000.00 $ - $ - $ - $ - $ 75,000.00 Total of Maintenance Events $ 254,000.00 $ - $ 453,800.00 $ 5,000.00 $ - $ 712,800.00 Upgrading Events K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Provide power door operators. $ 6,000.00 $ - $ - $ - $ - $ 6,000.00 Buildings ADJACENT NORTHEAST GROUP K4010.03 Barrier Free Interior Circulation Buildings FAR NORTHEAST GROUP Barrier Free Access Upgrade Replace door locksets $ - $ - $ - $ 1,000.00 $ - $ 1,000.00 Barrier Free Access Upgrade Replace door locksets with barrier free design. $ - $ - $ - $ 13,500.00 $ - $ 13,500.00 Barrier Free Access Upgrade Replace door locksets. $ - $ - $ - $ 1,000.00 $ - $ 1,000.00 Barrier Free Access Upgrade Replace door locksets. $ 1,500.00 $ - $ - $ - $ - $ 1,500.00 C1020.03 Interior Fire Doors* Code Upgrade Add fire doors and frames. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Indoor Air Quality Upgrade Indoor air quality upgrade. $ - $ 100,000.00 $ - $ - $ - $ 100,000.00 D3040.04 Special Exhaust Systems Indoor Air Quality Upgrade Install laminator exhaust. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00 D3040.01.01 Air Handling Units: Air Distribution* - 1974 Indoor Air Quality Upgrade Install new gymnasium air system. $ - $ 180,000.00 $ - $ - $ - $ 180,000.00 Buildings ADJACENT NORTHEAST GROUP Buildings FAR NORTHEAST GROUP Indoor Air Quality Upgrade Mechanical Systems Replacement $ - $ 100,000.00 $ - $ - $ - $ 100,000.00 Indoor Air Quality Upgrade Mechanical Systems Replacement $ - $ 100,000.00 $ - $ - $ - $ 100,000.00 D3050.03 Humidifiers* Operating Efficiency Upgrade Install gas fired humidifiers with steam grid humidifiers. $ - $ 120,000.00 $ - $ - $ - $ 120,000.00 C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Add acoustic wall panels. $ 16,000.00 $ - $ - $ - $ - $ 16,000.00 D5020.01 Electrical Branch Wiring* Program Functional Upgrade Add receptacles to classrooms. $ 13,200.00 $ - $ - $ - $ - $ 13,200.00 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)* Program Functional Upgrade Provide additional panelboards to service electrical requirements of school. $ 5,500.00 $ - $ - $ - $ - $ 5,500.00 C3020.14 Other Floor Finishes - Gym Program Functional Upgrade Replace gym flooring. $ - $ - $ 85,000.00 $ - $ - $ 85,000.00 Alberta Infrastructure and Transportation Page 6 of 10
Good Shepherd Community School B3430A Total of Upgrading Events $ 53,200.00 $ 600,000.00 $ 85,000.00 $ 15,500.00 $ - $ 753,700.00 Total of Building Events $ 307,200.00 $ 600,000.00 $ 538,800.00 $ 20,500.00 $ - $ 1,466,500.00 Site Events G2050.04 Lawns and Grasses* Failure Replacement Re-seed lawn. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00 G2030.02.02 Asphalt Pedestrain Pavement* Repair Repair asphalt sidewalks $ 2,000.00 $ - $ - $ - $ - $ 2,000.00 Total of Site Events $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 Alberta Infrastructure and Transportation Page 7 of 10
St. Paul's Elementary School B3436A Building Events Maintenance Events D3050.05.06 Unit Heaters* Failure Replacement Install new unit heater. $ 18,000.00 $ - $ - $ - $ - $ 18,000.00 C3030.07 Interior Ceiling Painting* Failure Replacement Repaint ceiling surfaces. $ - $ - $ 1,800.00 $ - $ - $ 1,800.00 C3010.11 Interior Wall Painting* Failure Replacement Repaint wall surfaces. $ - $ - $ 45,000.00 $ - $ - $ 45,000.00 C3020.08 Carpet Flooring* Failure Replacement Replace Carpet. $ - $ - $ 32,000.00 $ - $ - $ 32,000.00 C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)* 1974 Failure Replacement Replace ceiling tiles in classrooms. $ - $ - $ 50,000.00 $ - $ - $ 50,000.00 D3040.04.01 Fans: Exhaust* Failure Replacement Replace exhaust fans. Install deficiency range hood. $ 16,000.00 $ - $ - $ - $ - $ 16,000.00 B2030.05 Other Exterior Doors* Failure Replacement Replace exterior utility doors. $ - $ - $ 6,000.00 $ - $ - $ 6,000.00 B2030.01.02 Steel-Framed Storefronts* Failure Replacement Replace hollow metal storefront. $ - $ - $ 7,500.00 $ - $ - $ 7,500.00 C1020.02 Interior Entrance Doors Failure Replacement replace interior entrance doors. $ - $ - $ 4,000.00 $ - $ - $ 4,000.00 D5010.03 Main Electrical Switchboards (Main Distribution)* E2010.02.05 Educational Facility Casework* Classroom 140 Failure Replacement Replace main distribution switchboard. $ 50,000.00 $ - $ - $ - $ - $ 50,000.00 Failure Replacement Replace millwork in classroom 140. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00 D5020.03.01.04 Exterior H.P. Sodium Fixtures* B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)* C1030.02 Fabricated Compartments(Toilets/Showers)* B2020.01.01.02 Aluminum Windows (Glass & Frame)* B2020.01.01.02 Aluminum Windows (Glass & Frame)* 1995 Buildings NORTHEAST GROUP Failure Replacement Replace pot lights at front entrance vestibule. $ 1,600.00 $ - $ - $ - $ - $ 1,600.00 Failure Replacement Replace roofing. $ - $ - $ 277,000.00 $ - $ - $ 277,000.00 Failure Replacement Replace toilet compartments. $ - $ - $ - $ 5,000.00 $ - $ 5,000.00 Failure Replacement Replace windows. $ - $ - $ 52,000.00 $ - $ - $ 52,000.00 Preventative Maintenance Add grilles to clerestory windows. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00 Repair Repair structural foundation $ 30,000.00 $ - $ - $ - $ - $ 30,000.00 Repair Repair structural foundations. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00 Total of Maintenance Events $ 164,600.00 $ - $ 475,300.00 $ 5,000.00 $ - $ 644,900.00 Upgrading Events Alberta Infrastructure and Transportation Page 8 of 10
St. Paul's Elementary School B3436A K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Provide power door operators. $ 6,000.00 $ - $ - $ - $ - $ 6,000.00 Buildings WEST GROUP Buildings NORTHEAST GROUP K4010.03 Barrier Free Interior Circulation Barrier Free Access Upgrade Replace door docksets. $ - $ - $ - $ 1,500.00 $ - $ 1,500.00 Barrier Free Access Upgrade Replace door locksets. $ - $ - $ - $ 1,500.00 $ - $ 1,500.00 Barrier Free Access Upgrade Replace door locksets. $ - $ - $ - $ 1,500.00 $ - $ 1,500.00 Barrier Free Access Upgrade Replace door locksets. $ - $ - $ - $ 13,500.00 $ - $ 13,500.00 C1020.03 Interior Fire Doors* Code Upgrade Add fire doors and frames. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 D5030.01 Detection and Fire Alarm* Code Upgrade Add smoke detectors in corridors. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00 K40 Current Code Issues Code Upgrade Provide door hold opens. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00 K40 Current Code Issues Code Upgrade Provide fire rated shutters. $ 12,000.00 $ - $ - $ - $ - $ 12,000.00 D3040.01.01 Air Handling Units: Air Distribution* - 1974 Buildings NORTHEAST GROUP Buildings WEST GROUP Indoor Air Quality Upgrade Install new gymnasium air system. $ - $ 180,000.00 $ - $ - $ - $ 180,000.00 Indoor Air Quality Upgrade Replace mechanical systems $ - $ 150,000.00 $ - $ - $ - $ 150,000.00 Indoor Air Quality Upgrade Replace mechanical systems. $ - $ 200,000.00 $ - $ - $ - $ 200,000.00 Indoor Air Quality Upgrade Replace mechanical systems. $ - $ 150,000.00 $ - $ - $ - $ 150,000.00 D3050.03 Humidifiers* Operating Efficiency Upgrade Install gas fired humidifiers with steam grid humidifiers. $ - $ 120,000.00 $ - $ - $ - $ 120,000.00 C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Add acoustic wall panels. $ - $ - $ 16,000.00 $ - $ - $ 16,000.00 D5020.01 Electrical Branch Wiring* Program Functional Upgrade Add receptacles to classrooms. $ 16,800.00 $ - $ - $ - $ - $ 16,800.00 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)* Program Functional Upgrade Provide additional panelboard to service electrical requirements of school. $ 5,500.00 $ - $ - $ - $ - $ 5,500.00 C3020.14 Other Floor Finishes* Program Functional Upgrade Replace gym flooring. $ - $ - $ 85,000.00 $ - $ - $ 85,000.00 Total of Upgrading Events $ 54,300.00 $ 800,000.00 $ 101,000.00 $ 18,000.00 $ - $ 973,300.00 Total of Building Events $ 218,900.00 $ 800,000.00 $ 576,300.00 $ 23,000.00 $ - $ 1,618,200.00 Site Events Alberta Infrastructure and Transportation Page 9 of 10
G2040.03 Athletic and Recreational Surfaces* G2030.04 Rigid Pedestrian Pavement (Concrete)* G2030.04 Rigid Pedestrian Pavement (Concrete)* G2020.02.02 Flexible Paving Parking Lots(Asphalt)* G2020.05 Parking Lot Curbs and Gutters* Fort McMurray Roman Catholic Separate School District No.32 St. Paul's Elementary School B3436A Failure Replacement Replace asphalt paving. $ - $ - $ 90,000.00 $ - $ - $ 90,000.00 Failure Replacement Replace concrete sidewalks. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00 Program Functional Upgrade Add sidewalk. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00 Repair Repair asphalt paving. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00 Repair Repair concrete curbs. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00 Total of Site Events $ 20,000.00 $ - $ 90,000.00 $ - $ - $ 110,000.00 Alberta Infrastructure and Transportation Page 10 of 10