FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Similar documents
CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

BID TABULATION BID REQUEST NO

Rock Chalk Park - Infrastructure Report. July 2013

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

TOTAL QUANTITY UNIT COST UNIT

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Addendum 1 13 TH Street Streetscape. September 1, 2017

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

OKLAHOMA TURNPIKE AUTHORITY

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

CITY OF DEERFIELD BEACH Request for City Commission Agenda

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

Department of Public Works Engineering

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Reviax Constracting Corp. DeSantis Construction

PART A ROADWAY - BASE BID

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

BID TABULATION PAGE 1 OF 8

ADDENDUM No. 1 January 29, Paving Program Village of Milford

CITY OF SAN MARCOS ENGINEERING DIVISION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

OKLAHOMA TURNPIKE AUTHORITY

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

NE WEST KINGSTON ROAD CULVERT REPLACEMENT


Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

LETTING : CALL : 056 COUNTIES : MILLE LACS

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

REPLACEMENT OF MERCER COUNTY BRIDGE

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

RFB Addendum 3

CITY OF TAMPA ADDENDUM 2. April 18, 2018

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

REQUEST FOR PROPOSALS ADA SIDEWALK RAMP REPLACEMENT 2019 Construction Season. SUBMITTAL DUE DATE: 2:00 p.m. on Tuesday, March 19, 2019

OKLAHOMA TURNPIKE AUTHORITY

MEETING NOTICE. City Council will be held at 5:30 p.m. in the City Council Chambers. located at 305 Third Avenue East.

A DESIGN-BUILD PROJECT

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

SUBDIVISION IMPROVEMENTS AGREEMENT

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

Addendum 1 Downtown North CRA Sidewalks

Market Street Gateway Improvements Phase 1

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

PROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL


ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

CONTRACT TIME DETERMINATION

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

**REVISED BID PRICE FORM** October 24, 2018

MSCAA PROJECT NO

2001 Average Bid Tabs

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER

BID TABULATION. Engineer's Estmated Opinion of Costs

PROPOSAL FOR IMPROVEMENTS TO OGDEN - HINCKLEY AIRPORT OGDEN, UTAH AIP PROJECT NO

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Electric Service Information Sheet Georgia Power Company

PUBLIC WORKS DEPARTMENT CURB, GUTTER, SIDEWALK REPAIR AND CURB- RAMP INSTALLATION, PHASE 2 PROJECT NO. PW1531

GENERAL AVIATION TERMINAL BUILDING

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

TIMBERLAKE COMMUNITY ASSOCIATION

Transcription:

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00 $25,000.00 4 SWPPP 1 LS $37,500.00 $37,500.00 5 Airfield Safety and Security 1 LS $25,000.00 $25,000.00 7 8 9 (Full Depth, ± 4 1/2") Remove Asphaltic Concrete Shoulder Pavement 3,000 LF $2.50 $7,500.00 25,000 SY $2.50 $2,500.00 12,000 SY $2.00 $24,000.00 4,700 SY $2.00 $9,400.00 10 Obliterate Pavement Marking 900 SF $4.00 $3,00.00 11 Unclassified Excavation 9,000 CY $12.00 $108,000.00 12 5,000 CY $45.00 $225,000.00 13 Subgrade Preparation (8 Inch Depth) 31,000 SY $2.00 $2,000.00 14 15 1 17 (FAA, inch Thickness) (FAA, 7 1/2 inch Thickness) (FAA 3/4", 3 Inch Thickness) 25,000 SY $12.00 $300,000.00 11,000 SY $13.00 $143,000.00 5,000 SY $22.00 $110,000.00 31,000 SY $15.00 $45,000.00 18 Permanent Pavement Markings (Yellow) 18,100 SF $1.00 $18,100.00 19 Permanent Pavement Markings (White) 0 SF $1.00 $0.00 20 Seeding 20,000 SY $0.50 $10,000.00 21 Drainage 1 LS $200,000.00 $200,000.00 $1,985,00.00 22 Electrical 5,000 LF $9.00 $480,000.00 $480,000.00 $2,45,00.00 C-1

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) $1,400.00 $3,082,000.00 $308,200.00 $154,100.00 $308,200.00 $3,852,500.00 9/8/2018 Dibble Engineering Page 2 C-2

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II) 1 Contractor Quality Control 1 LS $52,000.00 $52,000.00 2 Mobilization 1 LS $104,000.00 $104,000.00 3 Location of Underground Utilities 1 LS $2,000.00 $2,000.00 4 SWPPP 1 LS $39,000.00 $39,000.00 5 Airfield Safety and Security 1 LS $2,000.00 $2,000.00 7 8 9 (Full Depth, ± 4 1/2") Remove Asphaltic Concrete Shoulder Pavement 3,000 LF $2.50 $7,500.00 25,000 SY $2.50 $2,500.00 12,000 SY $2.00 $24,000.00 4,700 SY $2.00 $9,400.00 10 Obliterate Pavement Marking 900 SF $4.00 $3,00.00 11 Unclassified Excavation 9,000 CY $12.00 $108,000.00 12 5,000 CY $45.00 $225,000.00 13 Subgrade Preparation (8 Inch Depth) 31,000 SY $2.00 $2,000.00 14 14 15 1 17 (FAA, 1/2 inch Thickness) (FAA, inch Thickness) (FAA, 7 1/2 inch Thickness) (FAA 3/4", 3 Inch Thickness) 20,000 SY $12.00 $240,000.00 5,000 SY $12.00 $0,000.00 11,000 SY $15.00 $15,000.00 25,000 SY $22.00 $550,000.00 11,000 SY $15.00 $15,000.00 18 Permanent Pavement Markings (Yellow) 17,100 SF $1.00 $17,100.00 19 Permanent Pavement Markings (White) 0 SF $1.00 $0.00 20 Seeding 20,000 SY $0.50 $10,000.00 21 Drainage 1 LS $200,000.00 $200,000.00 $2,15,100.00 22 Electrical 5,000 LF $9.00 $480,000.00 $480,000.00 C-3

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II) $2,3,100.00 $59,025.00 $3,295,125.00 $329,512.50 $14,75.25 $329,512.50 $4,118,90.25 9/8/2018 Dibble Engineering Page 2 C-4

FALCON FIELD RW 22L HOLDING BAY 1 Contractor Quality Control 1 LS $9,000.00 $9,000.00 2 Mobilization 1 LS $18,000.00 $18,000.00 3 Location of Underground Utilities 1 LS $4,500.00 $4,500.00 4 SWPPP 1 LS $,750.00 $,750.00 5 Airfield Safety and Security 1 LS $4,500.00 $4,500.00 7 Remove Asphaltic Concrete Shoulder Pavement 450 LF $2.50 $7,500.00 800 SY $2.00 $1,00.00 8 Obliterate Pavement Marking 450 SF $4.00 $1,800.00 9 Unclassified Excavation 11,250 CY $12.00 $135,000.00 10 100 CY $45.00 $4,500.00 11 Subgrade Preparation (8 Inch Depth) 5,500 SY $2.00 $11,000.00 12 13 (FAA, inch Thickness) 5,500 SY $12.00 $,000.00 5,500 SY $22.00 $121,000.00 14 Permanent Pavement Markings (Yellow) 1,800 SF $1.00 $1,800.00 $392,950.00 15 Electrical 500 LF $9.00 $48,000.00 $48,000.00 $440,950.00 $110,237.50 $551,187.50 $55,118.75 $27,559.38 $55,118.75 $88,984.38 C-5

FALCON FIELD RW 22R & 4L HOLDING BAYS 1 Contractor Quality Control 1 LS $8,500.00 $8,500.00 2 Mobilization 1 LS $17,000.00 $17,000.00 3 Location of Underground Utilities 1 LS $4,250.00 $4,250.00 4 SWPPP 1 LS $,500.00 $,500.00 5 Airfield Safety and Security 1 LS $4,250.00 $4,250.00 7 Remove Asphaltic Concrete Shoulder Pavement 950 LF $2.50 $7,500.00 2,900 SY $2.00 $5,800.00 8 Obliterate Pavement Marking 00 SF $4.00 $2,400.00 9 Unclassified Excavation 550 CY $12.00 $,00.00 10 2,00 CY $45.00 $117,000.00 11 Subgrade Preparation (8 Inch Depth) 5,500 SY $2.00 $11,000.00 12 13 (FAA, inch Thickness) 5,500 SY $12.00 $,000.00 5,500 SY $22.00 $121,000.00 14 Permanent Pavement Markings (Yellow) 2,800 SF $1.00 $2,800.00 $380,00.00 15 Electrical 500 LF $9.00 $48,000.00 $48,000.00 $428,00.00 $107,150.00 $535,750.00 $53,575.00 $2,787.50 $53,575.00 $9,87.50 C-

FALCON FIELD TW 'D9' 1 Contractor Quality Control 1 LS $4,400.00 $4,400.00 2 Mobilization 1 LS $8,800.00 $8,800.00 3 Location of Underground Utilities 1 LS $2,200.00 $2,200.00 4 SWPPP 1 LS $3,300.00 $3,300.00 5 Airfield Safety and Security 1 LS $2,200.00 $2,200.00 7 8 (Full Depth, ± 4 1/2") Remove Asphaltic Concrete Shoulder Pavement 00 LF $2.50 $1,500.00 1,100 SY $2.50 $2,750.00 1,120 SY $2.00 $2,240.00 11 Obliterate Pavement Marking 350 SF $4.00 $1,400.00 12 Unclassified Excavation 0 CY $12.00 $0.00 13 2,000 CY $45.00 $90,000.00 14 Subgrade Preparation (8 Inch Depth) 2,220 SY $2.00 $4,440.00 15 1 17 18 (FAA, 1/2 inch Thickness) (FAA, 7 1/2 inch Thickness) (FAA 3/4", 3 Inch Thickness) 1,100 SY $12.00 $13,200.00 1,120 SY $15.00 $1,800.00 1,100 SY $22.00 $24,200.00 1,120 SY $15.00 $1,800.00 19 Permanent Pavement Markings (Yellow) 1,245 SF $1.00 $1,245.00 20 Seeding 1,345 SY $0.50 $72.50 $19,147.50 21 Electrical 250 LF $9.00 $24,000.00 $24,000.00 $220,147.50 $55,03.88 $275,184.38 $27,518.44 C-7

FALCON FIELD TW 'D9' $13,759.22 $27,518.44 $343,980.47 9/8/2018 Dibble Engineering Page 2 C-8

FALCON FIELD DUAL TAXILANE (EXH. 4M & 4N) 1 Contractor Quality Control 1 LS $54,000.00 $54,000.00 2 Mobilization 1 LS $108,000.00 $108,000.00 3 Location of Underground Utilities 1 LS $27,000.00 $27,000.00 4 SWPPP 1 LS $40,500.00 $40,500.00 5 Airfield Safety and Security 1 LS $27,000.00 $27,000.00 1,800 LF $2.50 $4,500.00 7 Sawcut Concrete Median 50 LF $5.00 $250.00 8 Sawcut Curb 1 LF $3.00 $48.00 9 13,000 SY $2.00 $2,000.00 10 Remove Concrete Sidewalk 4,00 SF $2.00 $9,200.00 11 Remove Concrete Curb 800 LF $.00 $4,800.00 12 Obliterate Pavement Marking 500 SF $4.00 $2,000.00 13 Remove Tree 8 EA $500.00 $4,000.00 14 Remove Security Fence 300 LF $2.00 $00.00 15 Remove Concrete Gutter 700 LF $50.00 $35,000.00 1 Remove Catch Basin 2 EA $1,500.00 $3,000.00 17 Unclassified Excavation 80,000 CY $12.00 $90,000.00 18 1,500 CY $45.00 $7,500.00 19 Subgrade Preparation (8 Inch Depth) 2,590 SY $2.00 $53,180.00 20 21 22 (FAA, 1/2 inch Thickness) (FAA, inch Thickness) 25,230 SY $13.00 $327,990.00 1,30 SY $12.00 $1,320.00 2,590 SY $22.00 $584,980.00 23 Single Curb 150 LF $13.00 $1,950.00 24 ' Security Fence with Wildlife Deterrent 2,100 LF $21.00 $44,100.00 25 Double Swing Gate 2 EA $2,000.00 $4,000.00 C-9

FALCON FIELD DUAL TAXILANE (EXH. 4M & 4N) 2 Permanent Pavement Markings (Yellow) 2,050 SF $1.00 $2,050.00 28 Drainage 1 LS $50,000.00 $50,000.00 29 Structural (Hangar Removal) 189,000 CY $0.77 $145,530.00 $2,03,498.00 30 Electrical 1,00 LF $9.00 $153,00.00 31 Remove Light Pole 2 EA $40.00 $920.00 $153,00.00 $2,757,098.00 $89,274.50 $3,44,372.50 $344,37.25 $172,318.3 $344,37.25 $4,307,95.3 9/8/2018 Dibble Engineering Page 2 C-10