Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990 ICCB Building Illinois Repair & Renovation - Renovate Classrooms $ 44,652.00 $ 44,652.00 $ 44,652.00 FY1991 & 1992 ICCB Building Illinois Repair & Renovation - Resurface South Parking Lot $ 104,500.00 $ 104,500.00 $ 104,500.00 New North Entrance to Campus FY1993 Agricultural Technology Building (John Deere) $ 216,700.96 $ 216,700.96 Replace Heat Piping $ 142,997.50 Exterior Moister Protection $ 84,260.00 Drainage Repairs (North Parking Lot) $ 317,199.41 ADA Modifications for Campus Accessibility $ 34,938.00 ICCB Grant - Resurface North East Parking Lot $ 92,000.00 $ 92,000.00 $ 92,000.00 Extension of South East Parking Lot $ 89,001.65 $ 89,001.65
Cost FY1994 Agricultural Technology Building $ 204,809.00 $ 204,809.00 (Pro-Tech Asbestos Survey Annex) $ 31,178.59 Exterior Door Modifications $ 105,387.61 Cooling Tower Repairs $ 94,212.31 HVAC Alterations in Field House $ 35,817.92 Security Lighting Upgrade $ 176,051.38 Hazerdous Bleacher Replacement $ 52,150.00 ICCB Grant - Complete Circle Roadway from North West Parking Lot to Ag Tech $ 65,916.00 $ 65,916.00 $ 65,916.00 FY1995 Asbestos Excapsulation $ 456,623.04 Electrical Code Corrections $ 35,666.45 Natural Gas Line Replacement and Parking Lot Resurfacing $ 65,022.56 ADA Signage $ 58,566.90 ICCB Grant - Renovate Board Room $ 27,224.00 $ 27,224.00 $ 27,224.00 FY1996 Kluthe Center for Higher Education & Technology $ 1,348,400.00 $ 1,129,646.50 $ 2,478,046.50 ADA Restroom Modifications, Campus Locks, sidewalk to AT Building $ 79,038.68 Reroof covered walkways & Field House repair Gym floor $ 485,042.02 Exterior Security Lighting $ 80,251.00 FY1997 ADA South East Restrooms $ 365,070.75 $ - $ 221,081.00 $ 221,081.00 ADA Signage Sidewalk Replacement $ 39,244.24
Cost Roof Replacement - North West Building $ 195,564.70 Theater Renovations (FY97 & FY98) $ 175,700.00 $ 175,700.00 $ 175,700.00 FY1998 ADA North East Restrooms $ 301,811.60 $ - $ 258,092.70 $ 258,092.70 Tuckpoint Classroom Bldgs. $ 35,597.60 Replace Absorption Chiller $ 267,321.20 Replace Sidewalks $ 33,982.10 Hanidcapped Accessible Study Areas (LRC) $ 46,836.60 South East Dental Lab - Tile Floor, Remodel President's Office & Bathroom and Carpet Administration Wing $ 38,150.00 $ 38,150.00 $ 2,417.08 $ 78,717.08 Recycling Center $ - $ 44,721.64 $ 44,721.64 FY1999 ADA North West Restrooms $ 355,500.00 $ - $ 367,719.20 $ 367,719.20 Tile Replacement/Drainage Improvements $ 61,650.07 Hazardous Area improvements Lower Library $ 38,963.20 Campus Security Access Road $ 247,992.86 Sidewalk Replacement $ 33,159.54 Security Office Access Road Lighting $ 31,329.20 Stage Backdrop Replacement $ 60,000.00 North East 102/104 Ventilation Proiject, Enclose & Carpet North East G.I.S. Lab. Misc. Painting & Repairs to Kitchen and Remodel Portions of Cafeteria $ 40,200.00 $ 40,200.00 $ 40,200.00 Workforce Development Center Renovations Project $ -
Cost Classroom Ventilation Modifications $ 19,712.10 FY2000 Exterior Door Replacement $ 193,892.10 Absorption Chiller Replacement $ 233,140.65 Hazardous Sidewlak Replacement $ 50,296.43 Exterior Masonry Restoration $ 105,584.10 Gas Line Replacement $ 50,342.40 Electrical Lighting Improvements $ 55,438.80 Safety Enclosure $ 91,138.50 Vo-Tech Building Roof Replacement $ 138,019.95 Theater ADA Renovations $ 72,000.00 Theater Renovations $ 39,951.00 $ 39,951.00 $ 140,300.00 $ 180,251.00 Underground Storage Tank Removal Lawn Irrigation Project Workforce Development Center Electrical Upgrade FY2001 $ - East Classroom Building $ 5,896,475.10 $ 5,896,475.10 $ 1,051,100.00 $ 6,947,575.10 Termite Treatment/Natural Gas Piping Replacement (NE) $ 85,982.60 LRC Indoor Air Quality $ 124,555.74 Lighting Upgrade in Classroom Buildings $ 100,928.88 Roof Replacement Admin/Student Services Bldg. $ 281,212.85 Asbestos Encapsulation - Field House $ 66,765.20 Theater Renovations $ 69,650.17 Water Reservior Renovations and Safety Fence $ 138,422.50 Water Line to Farm Building $ 46,698.60
Cost Exhaust/Ventilation System - Vo Tech $ 40,362.90 ICCB Grant - Renovate Field House $ 107,792.51 $ 107,792.51 $ 107,792.51 IDOT/Vo Tech Renovation, North West Classroom Door Project, North West Classroom & Office Carpeting, Misc. Hall & Ceiling Painting $ 48,823.00 $ 48,823.00 $ 39,861.00 $ 88,684.00 FY2002 Maintenance Facilities Buildings (Print & Farm) $ 1,193,315.84 $ 1,193,315.84 West Classroom Building, Phase I $ 2,974,343.99 $ 2,974,343.99 $ 1,828,927.74 $ 4,803,271.73 Student Services Building Planning $ - $ 66,000.00 $ 66,000.00 Gas Line Replacement & Termite Control in NW, SE & LRC $ 181,299.65 Energy Management System Replacement $ 73,418.10 Lighting Renovations $ 109,718.90 Roof Replacement - LRC $ 121,195.90 Drainage Improvements North Entrance & NE/NW Parking Lots $ 275,989.00 Sidewalk Replacement $ 73,976.99 Exhaust/Air Conditioning Systems Replacements QC/QA $ 60,876.70 Renovation of Tiered Seating Classrooms $ 129,200.00 $ 129,200.00 $ 129,200.00 Kluthe Center Carpet and Ceiling Tile $ 56,510.00 $ 56,510.00 $ 1,161.55 $ 57,671.55 ADA South East Classroom Building Toilet Renovations $ 85,885.80 FY2003 West Building, Phase II, Planning $ -
Cost Upgrade Library Power Sources $ 131,389.20 Lighting Upgrade $ 195,028.66 Sidewalk Repair & Installation $ 146,239.82 Boiler Replacement $ 457,755.80 Electrical Grounding Improvements $ 83,354.84 Carpet Tiered - Seating Classrooms & Commons Area, Partial Renovation of Graphics Department $ 53,335.00 $ 53,335.00 $ 53,335.00 FY2004 Drainage, Grading and Roadway Improvements $ 150,987.28 Roof Replacement - South East Building $ 83,692.83 Noise Level Improvements in HVAC Systems $ 100,170.84
Cost Door Replacement and Automomatic Door Openers $ 444,945.79 Office Area Renovations - Emergency Project NW Building $ 266,847.96 FY2005 Renovation of Northwast Building Offices $ 412,500.00 Restoration of Classroom Building Penthouse $ 64,013.65 Renovation of Student Center $ 43,500.00 FY2006 Southeast Electrical Renovations $ 368,286.90 Field House Accessibility and Infostructure Update $ 624,930.00 Ball Field Pedestrian Way $ 421,152.25 Roadway & Drainage $ 208,434.93 Dug Outs $ 52,920.00 $ 52,920.00 FY 2007 Field House Exterior Renovation $ 104,085.35 Pedestrian Way Improvements $ 146,521.91 Theater Stage Renovation $ 39,908.74 Parking Area Lighting $ 76,921.20 $ 18,240,999.46 FY 2008 Fire Equipment Improvement $ 44,708.12 Marshall Improvements $ 101,532.48 DCEO Student Center Renovation $ 509,593.24 Chiller Renovation $ 89,040.00 301 Richmond Ave East $ 1,537,000.00 FY 2009
GeoThermal Loop $ 439,984.97 Fitness Center Addition $ 2,200,684.47 Energy Savings Contract $ 3,874,059.00 Geothermal System - Vo Tech $ 445,531.00 FY 2010 West Building Generator $ 1,272,017.41 FY 2011 LRC Energy Savings Renovation $ 5,808,515.40 NW Safety/Accessibility $ 650,000.00 NW Healthy Environment $ 615,000.00 NW Energy Savings Renovation $ 3,495,573.16 Technology Building II $ 3,490,435.80 FY 2013 Cost Kluthe Automation System Upgrade $ 49,800.00 $ 49,800.00 $ 49,800.00 Geothermal Well Field $ 538,463.09 $ 538,463.09 $ 86,282.00 $ 280,000.00 $ 904,745.09 FY 2014 WEBB ESCO $ 2,247,786.30 $ 2,247,786.30 $ 4,095,096.52 $ 6,342,882.82 NE & NW Roof $ 698,933.00 $ 698,933.00 $ 698,933.00 Solar VoTech $ - $ 75,600.00 $ 59,779.17 $ 135,379.17 Recycling Center $ - $ 26,998.00 $ 26,998.00 ZEB $ - $ 397,197.00 $ 403,505.00 $ 800,702.00 FY 2015 West Building Photo Array #1 & #2 $ 120,249.18 $ 181,320.80 $ 301,569.98 FY 2016 Tuck Pointing $ 402,046.00 $ 402,046.00 $ 28,919.00 $ 430,965.00 Fire Pump $ 122,614.40 $ 122,614.40 $ 122,614.40 NE Safey & Accessibility $ 8,334,129.79 $ 8,334,129.79 $ 65,875.00 $ 8,400,004.79 North Wind Turbine $ 50,000.00 $ 50,000.00 $ 176,601.60 $ 487,845.00 $ 714,446.60 South Wind Turbine $ 50,000.00 $ 50,000.00 $ 176,601.60 $ 487,845.00 $ 714,446.60
Cost Solar Array VoTech Roof $ - $ 431,075.60 $ 419,928.40 $ 851,004.00 Library Sidewalks $ - $ 13,510.00 $ 13,510.00 GeoThermal Well Field #4 $ 919,552.60 $ 919,552.60 $ 498,842.00 $ 1,418,394.60 FY 2017 VoTech Energy Saving Renovation $ 649,944.55 $ 649,944.55 $ 1,706,289.16 $ - $ 2,356,233.71