FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:

Similar documents
FINANCIAL ANALYSIS OF TRANCHE 1

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS. A. Background

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS A. Introduction

INO: Java-Bali 500-Kilovolt Power Transmission Crossing

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS

ECONOMIC AND FINANCIAL ANALYSIS

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Methodology and Assumptions

RECONSTRUCTION AND DEVELOPMENT

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

FINANCIAL ANALYSIS. 1. Introduction and Methodology

FINANCIAL ANALYSIS. A. Introduction

ECONOMIC AND FINANCIAL ANALYSIS

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Trung Son Hydropower Project. Financial Analysis

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited

PROGRAM SOUNDNESS ASSESSMENT

(Java-Bali Power Sector Restructuring and Strengthening Project) between REPUBLIC OF INDONESIA. and

BLACKGOLD NATURAL RESOURCES LIMITED (Company Registration Number: C) (Incorporated in the Republic of Singapore)

ECONOMIC AND FINANCIAL ANALYSIS

FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.

ECONOMIC ANALYSIS. Table 1: Economic costs by project component

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

FINANCIAL ANALYSIS. A. Introduction

ASEAN Infrastructure Fund: Progress Update

ECONOMIC AND FINANCIAL ANALYSIS

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

KEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS. Project Economic Evaluation Division Economics and Development Resource Center

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project

1. Introduction. 2. Background. Agenda Item 10.3-Micro Eco Reform-Att A-Ann 3 INDONESIA - ANNEX 3

Tajikistan: Power Rehabilitation Project

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

Planning & Economic Analysis I

Your reference/letter of Our reference/name Tel. extension/ Fax extension Date/Document Page

PT Paiton Energy A Case Study in Renegotiation

FINANCIAL ANALYSIS. A. Financial Analysis

ASIAN DEVELOPMENT BANK

COUNTRY ECONOMIC INDICATORS. Table 1: Country Economic Indicators for Cambodia,

New Development Bank. Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects

ASIAN DEVELOPMENT BANK

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

ECONOMIC AND FINANCIAL ANALYSIS

Loan Agreement. Public Disclosure Authorized CONFORNED COPY LOAN NUMBER 2214 IND. Public Disclosure Authorized. (Twelfth Power Project)

ECONOMIC ANALYSIS. A. Introduction

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Perusahaan Gas Negara (PGAS IJ)

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

LEGAL ALERT. July general. banking

Infrastructure Financing Challenges in Southeast Asia

Guidelines for the Financial Governance and Management of Investment Projects Financed by the Asian Development Bank

ECONOMIC AND FINANCIAL ANALYSIS

AFRICAN DEVELOPMENT BANK GROUP

IOSCO GEM COMMITTEE CONFERENCE LONG-TERM FINANCING THROUGH CAPITAL MARKETS

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2)

Completion Report. Project Number: Loan Number: 1397 April Indonesia: Power Development and Efficiency Enhancement Project

Cambodia: Second Power Transmission and Distribution Project

SUPPORTING INFRASTRUCTURE DEVELOPMENT IN ASEAN ECONOMIES: THE ACCESS TO RISK MITIGATION INSTRUMENTS. Knut Gummert, OECD Southeast Asia Division

Optimal Capital Structure Analysis for Energy Companies Listed in Indonesia Stock Exchange

CONFERENCE REPORT BACKGROUND

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE

Completion Report. Project Number: Loan Number: 1978 September Indonesia: Small and Medium Enterprise Export Development Project

Clean Technology Fund Loan Agreement

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive

RCI as Driver of Inclusive Growth

B.V. ) 8.00% 2019, 2019 ); U.S.$1,250,000,000

Technical Assistance Cluster for Sustainable Infrastructure Assistance Program Subproject

Financing for Sustainable Urbanization

American Municipal Power, Inc.; Ohio Municipal Electric Generation Agency Joint Ventures: 1, 2, 4, 5, and 6; Municipal Energy Services Agency

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TANJUNG LESUNG Paradise on The West Coast of Java

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

PROJECT PREPARATION TECHNICAL ASSISTANCE

Marin Clean Energy 2016 Open Season Procurement Process Procedural Overview & Instructions

Green Bond Second Opinion

Power Distribution Development Program Region. East Asia & Pacific Country. Energy & Extractives Lending Instrument. Program-for-Results Program ID

Cost-Benefit Analysis CRIDF Guidance & Template

Eskom 2018/19 Revenue Application

renewables Made in Germany Initiative

By Director of Various New and Renewable Energy T

MYPD3 Application January 2013

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project

Asian Bond Market Initiative to support Infrastructure Development in the Region

Available In all territory served by the Company in the State of Wyoming.

Session 3.2 Estimation of Project Costs. Introductory Course on Economic Analysis of Investment Projects 1 July 2009

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT TO THE

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

Which WACC when? A cost of capital puzzle

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

MIXED LIFE CYCLE-COST BENEFIT WEB BASED-DECISION TOOL FOR LIGHTING LOAD RETROFITTING AND MANAGEMENT

CONSULTATION PAPER THE DISCOUNT RATE METHODOLOGY FOR LICENSED ELECTRICITY DISTRIBUTORS PUBLISHED ON 19 SEPTEMBER 2017

Transcription:

Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development Bank (ADB) guidelines. 1 The purpose was to determine the financial sustainability of the proposed investments for the transmission of 1,500 megawatts of power from Java to Bali to be executed by the State Electricity Company (PLN). 2 The analysis was performed using cash flow analysis by projecting future revenue and cost streams from the project based on certain assumptions. Since this is a new project, all cash flows are incremental. The future stream of net incremental cash flow is discounted to its present value, and the financial internal rate of return (FIRR) and financial net present value (FNPV) are calculated on an after-tax basis in real terms. The weighted average cost of capital (WACC) is determined based on the source and cost of financing, which is then used as a benchmark to compare with the FIRR. The project is considered financially viable if the FIRR exceeds the project s cost of funds as measured by the WACC. Sensitivity analysis was conducted to establish the robustness of the project FIRR to changes in various parameters. 2. Framework for Financial Analysis. The framework for the financial analysis consists of the project investment the project investment and operating plans. The project cost estimates include information from the technical analysis of expected annual capital expenditures during implementation, including civil works, equipment, environmental and social impact mitigation costs, project management and consultancies, training, and physical contingencies. The project operating plan provides projections of expected revenues and operating costs throughout implementation. The financing plan identifies sources of debt and equity financing of the project, including the amount of equity contribution from the government and/or PLN. 3. Assumptions. The following assumptions were used in carrying out the financial analysis: (i) (ii) Exchange rate and inflation. An average exchange rate of Rp11,200 per US dollar has been assumed for the base year 2013. For the later years, the exchange rate has been calculated on the basis of purchasing power parity (PPP), which assumes that the annual change in exchange rate is proportional to the ratio of the local and foreign inflation indexes. Capital costs. The total base capital cost of the project (excluding price contingencies and financing charges during implementation) is estimated at $360.3 million, inclusive of physical contingencies of $32.8 million. The financing plan comprises the following: ADB ordinary capital resources ($209.2 million), ASEAN Infrastructure Fund ($23.3 million), and the Government of Indonesia ($127.7 million). (iii) Implementation period. Construction of the project will commence in April 2014 and will be completed in March 2018. (iv) Economic useful life. The operating life of the project is assumed to be 25 years, and revenues from the sale of energy are estimated to flow from April 2018 to March 2043. 1 ADB. 2005. Financial Management and Analysis of Projects. Manila. 2 PT (Persero) Perusahaan Listrik Negara.

2 (v) Tax. The corporate income tax rate for Indonesia of 25% is assumed to apply throughout the life of the project. 4. Incremental Costs. The incremental fixed operating cost of the transmission interconnection was assumed to be 1.5% of the capital costs and is a typical rate for evaluating power transmission investments. The incremental variable cost was based on the levelized cost of electricity of a coal fired power plant, given that most of the energy transfer from the Paiton end of the connection in Java will be from base load coal-fired electricity. The levelized cost of coal-fired electricity is assumed to be $103/megawatt-hour 3 in 2013 prices or Rp1,153/kilowatthour, excluding transmission operating costs, which are separately calculated. The asset is depreciated over 25 years on a straight-line basis for the purpose of tax calculations. 5. Benefits. The incremental revenue assumes that PLN will continue to obtain a government subsidy based on total revenue (tariff and subsidy) set at an assumed 5% margin over the total operating costs (including taxes, interest cost, and depreciation). 4 This has been the approximate basis of subsidy used by the government in the past and is assumed to continue. The financial benefits to PLN will accrue from the incremental sales of 2,089 gigawatthours in 2018, increasing to a maximum of 10,512 gigawatt-hours/year from 2029 onwards when the transmission connection will be operating at full capacity. This is the incremental volume of electricity that was assumed to go into the system and was taken into account in the financial analysis. 6. It should be noted that a conservative basis was used in the financial analysis. A significant economic benefit from this project is based on savings achieved by replacing existing 526 megawatts of diesel electricity in Bali with electricity transmitted from coal-fired power plants in Java. However, while it is an economic benefit, this does not translate to financial benefits for PLN since the tariff subsidy mechanism is such that the subsidy will be accordingly reduced, thus negating the financial benefits to PLN from the diesel savings. In the financial analysis, it was conservatively assumed that the subsidy mechanism will continue to be in place throughout the term of the project. While this benefit from diesel savings has been evaluated as part of the financial sensitivity analysis (paragraph 11), it has not been included as a financial benefit to PLN in the base case. 7. Weighted Average Cost of Capital. The WACC is calculated as the weighted average cost of equity and debt used to fund the project. The cost of equity is calculated on the basis of the capital asset pricing model, which provides a methodology for estimating the required equity return as a function of the relative risk of the investment. According to the capital asset pricing model, the cost of equity is the rate of return on a risk-free investment such as government bonds, plus a risk premium appropriate for the project. Therefore, the cost of equity for a higher risk project is higher than that having a lower level of risk. The bases and assumptions and calculation of PLN s cost of equity are in Table 1. 3 United States Energy Information Administration. 2011. Annual Energy Outlook 2011. Washington, DC. 4 According to the 2012 PLN annual report, the Government of Indonesia has provided an electricity subsidy to its customers through PLN. The procedure for the calculation and payment of this electricity subsidy for budget years 2012 and 2011 is based on the Regulation of Minister of Finance of the Republic of Indonesia No. 111/PMK.02/2007 dated 14 September 2007, which has been amended by Regulation No. 162/PMK.02/2007 dated 17 December 2007. The electricity subsidy is computed as the negative difference between the average sales prices (Rp/kilowatt-hour) of each tariff category less the cost of electricity supplies on the voltage for each tariff category multiplied by the electricity sales volume (kilowatt-hours) of each tariff category. The subsidy also includes a margin. For example, based on the Approval Letter of Budget Performance List, the electricity subsidy for budget year 2012 amounted to Rp90,076,230 million, which includes a 7% margin above the costs of supplied electricity.

3 Table 1: Perusahaan Listrik Negara (PLN) Cost of Equity a Item Cost of Equity Risk Free b 5.40% Market Expected Rate of Return c 8.80% Market Risk Premium 3.40% Beta d 0.84 Cost of Equity 8.30% a The cost of equity has been calculated on the basis of the capital asset pricing model. b The yield on 10-year Government of Indonesia bonds has been used as risk-free rate. The current yield on 10-year government bonds is 5.44%. c The country risk premium for Indonesia has been used as the market expected rate of return as PLN is a wholly owned government company. (Source: Aswath Damodaran, January 2013). d As PLN is not a listed company, the beta for electricity utility companies in the US has been used as proxy for the beta of PLN. The asset beta (unlevered beta) for 56 electricity utilities companies in the US is around 0.47. The equity beta of PLN has been computed to be 0.84 considering the debt equity ratio of 1.06 and corporate tax rate of 25% in Indonesia. Source: Asian Development Bank. 8. The nominal cost of debt is taken as 20-year fixed London interbank offered rate swap rate with lenders spread and maturity premium, if applicable, and government on-lending margin. A tax rate of 25% is assumed. The inflation rate used to adjust the nominal values to real values is based on the long-term price escalation factors used by ADB. Given the estimated costs of equity and debt and the relative proportions of equity and debt in the project capital structure, the WACC is calculated at 2.49% (Table 2). Table 2: Weighted Average Cost of Capital Equity Total ADB AIF PLN Total A Amount ($ million) 209.2 Loan 23.3 127.7 360.3 B Proportion of Financing 58.07% 6.48% 35.45% 100.00% C Nominal Cost 4.50% 6.00% 8.26% D Tax Rate 25.00% 25.00% 0.00% E Nominal Cost Adjusted by Tax, C x (1-D) 3.37% 4.50% 8.26% F Inflation Rate 1.80% 1.80% 4.10% G Real Cost Adjusted by Tax, (1+E) (1+F)-1 1.54% 2.65% 4.00% H Cost of Type of Capital (B x F) 0.90% 0.17% 1.42% 2.49% WACC (%) 2.49% Loans ADB = Asian Development Bank, AIF = ASEAN Infrastructure Fund, ASEAN = Association of Southeast Asian Nations, PLN = Perusahaan Listrik Negara, WACC = weighted average cost of capital. Sources: ADB and PLN estimates. 9. Cost Benefit Analysis. Incremental costs and benefits in constant June 2013 prices were estimated over the life of the project and used as the basis of calculating the project s FIRR. The project cost and project net cash flows were based on constant June 2013 prices for the evaluation period (2014 2042). The project costs comprise all incremental capital expenditures, excluding financial charges during implementation and price contingencies. The operating expenditures are incremental expenses, excluding depreciation, interest expense, and price contingencies. After tax cash flows were used in the evaluation assuming a corporate tax rate of 25%.

4 10. The post-tax FNPV of the projected incremental cash flows discounted at WACC of 2.49% is Rp6,736 billion. The 10.5% post-tax real FIRR of the project is higher than the WACC of 2.49%, confirming that the project is financially viable. The results of the financial analysis are in Table 3. Table 3: Financial Evaluation Table (Rp billion) Year Capital Cost Revenue Cash Tax Net Cash 1 Costs 417 of Flow (417) Flow (417) 2 1,282 (1,282) (1,282) 3 1,311 (1,311) (1,311) 4 894 (894) (894) 5 457 2,455 2,822 (89) 48 (138) 6 2,803 3,193 390 54 336 7 3,528 3,966 438 66 372 8 4,259 4,746 487 78 409 9 5,049 5,588 539 91 448 10 5,902 6,498 596 105 491 11 6,823 7,480 658 121 537 12 7,818 8,542 724 137 587 13 8,892 9,688 796 155 640 14 10,052 10,926 873 175 699 15 11,306 12,263 957 196 762 16 12,167 13,182 1,015 210 805 17 12,167 13,181 1,014 210 804 18 12,167 13,180 1,013 210 803 19 12,167 13,179 1,012 209 802 20 12,167 13,178 1,011 209 802 21 12,167 13,178 1,011 209 802 22 12,167 13,178 1,011 209 802 23 12,167 13,178 1,011 209 802 24 12,167 13,178 1,011 209 802 25 12,167 13,178 1,011 209 802 26 12,167 13,178 1,011 209 802 27 12,167 13,178 1,011 209 802 28 12,167 13,178 1,011 209 802 29 12,167 13,178 1,011 209 802 FNPV = 6,736 WACC 2.49% FIRR = 10.5% FIRR = financial internal rate of return, FNPV = financial net present value, WACC = weighted average cost of capital. ( ) = negative. Sources: Asian Development Bank and Perusahaan Listrik Negara estimates. 11. Sensitivity Analysis. A sensitivity analysis was conducted to ascertain the impact of changes in project variables on base case FNPV and FIRR, including (i) increase in capital costs, (ii) delay in implementation of project, (iii) increase in operating costs, (iv) decrease in sales, and (v) diesel savings included as part of financial benefits. The results indicate that FIRR greater than the WACC is achieved under most scenarios (Table 4). The project is not very sensitive to increase in capital costs and delay in implementation but is highly sensitive to power sales decline and operating cost increase. If diesel savings are included as part of financial benefits (i.e., assuming the tariff subsidy mechanism does not apply), the FIRR of the project

5 increases to 36.9% from 10.5% in the base case, and the FNPV rises to Rp35,245 billion from the base case FNPV of Rp6,736 billion. This indicates the significant value (FNPV of Rp29 trillion) that is foregone by PLN as a result of the government subsidy mechanism and not operating as a commercial enterprise. Table 4: Financial Internal Rate of Return and Financial Net Present Value Base Case and Sensitivity Analysis Variables Change FIRR FNPV FIRR SI a SV b (%) FNPV SI a SV b (%) 1 Base case 10.5% 6,736 Capital cost 10% 9.6% 1.13 89 6,330 0.60 165.94 2 overrun 3 2-year delay in benefits 10.2% FIRR lower by 0.3% 5,940 FNPV lower by 11.8% Power sales (5%) 3.5% (5.77) 583 (18.27) (5.47) 4 decline (17.43) Operating Cost 5% 4.3% 15.41 6.53 1,086 16.78 5.96 5 Increase FIRR = financial internal rate of return, FNPV = financial net present value, SI = sensitivity indicator, SV = switching value. ( ) = negative. a The ratio of the percent change in the FIRR to the percent change in a variable. b The percent change required in a variable for the FIRR to become zero. Sources: Asian Development Bank and Perusahaan Listrik Negara estimates.