Second Disaster Risk Management Development Policy Loan with a CAT-DDO (P155656)

Similar documents
Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy. Implementation Status & Results Report Costa Rica Catastrophe Deferred Draw Down Option (CAT DDO) (P111926)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Public Disclosure Copy

TR Third Access to Finance for SMEs (SME III) (P130864)

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

Public Disclosure Copy

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Public Disclosure Copy

West Bengal PRI (P105990)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Disaster Risk Management Development Policy Loan with CAT DDO (P148861)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

The World Bank Integrated Disaster Risk Management and Resilience Program (P144539)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

The World Bank Public Expenditure and Fiscal Risk Management DPF-DDO (P154981)

Bangladesh Insurance Sector Development Project (P156823)

Public Disclosure Copy

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

Innovative Access to Finance (P147183)

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank Climate Change and Green Growth in Vietnam (P155824)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

The World Bank Strengthening Public Resource Management (P161586)

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

Public Disclosure Copy

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Pacific Islands Regional Oceanscape Program - Tuvalu (P151780)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Municipal Services Improvement (P096481)

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

Key Dates. Global Environmental Objectives. Components. Overall Ratings

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

The World Bank Research and Innovation in Science and Technology Project (P121842)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

State Owned Financial Institutions Reform Project (P156837)

Road Sector Development Project (P149322)

Public Disclosure Copy

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

West Bengal Institutional Strengthening of Gram Panchayats Program II (P159427)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

Public Disclosure Copy

Justice Sector Support Project (P104749)

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank CG Rep. Skills Development for Employability Project (P128628)

Second Science & Technology Project (P127308)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy

Public Disclosure Copy

The World Bank Pastoral Community Development Project III (P130276)

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Public Disclosure Copy

Public Disclosure Copy

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy. Name Previous Rating Current Rating

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank Revenue Administration Modernization Project (P130202)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

Transcription:

Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2016 Seq No: 4 ARCHIVED on 21-Sep-2017 ISR29426 Implementing Agencies: Department of Finance, Department of Finance Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:22-Dec-2015 Planned Mid Term Review Date:-- Original Closing Date:30-Sep-2018 Program Development Objectives Effectiveness Date:15-Apr-2016 Actual Mid-Term Review Date:-- Revised Closing Date:30-Sep-2018 Public Disclosure Authorized Public Disclosure Authorized Program Development Objective (from Program Document) The development objective of the proposed project is to enhance the technical and financial capacity of the Government of the Philippines to reduce disaster risk and manage the socio-economic and fiscal impacts of natural disasters. PHRPDODEL Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Implementation is progressing under the leadership of the Department of Finance. The DOF and the Technical Working Group are implementing planned activities, including: 1. Development of a Socio-economic Resilience Index by NEDA, using the Socio-economic Resilience methodology, starting with national and regional indices using data from the 2015 Family Income and Expenditure Survey. 2. Presentation by DPWH (to NEDA) of revisions to the National Building Code of the Philippines, in the form of a draft 'Philippine Building Act', integrating disaster risk reduction and climate adaptation. 3. Implementation of 72 Provincial Commodity Investment Plans (developed using the expanded Vulnerability and Suitability Assessment) under the Philippine Rural Development Program. 4. Development by the Housing and Urban Development Coordinating Council of a draft policy framework for post-disaster shelter assistance, to be adopted in the NEDA Disaster Recovery Framework. 5. Rollout of the Multi-hazard vulnerability assessment methodology for priority cultural heritage sites by the Department of Tourism, Tourism Infrastructure and Economic Zone Authority, and the Intramuros Administration. 9/21/2017 Page 1 of 8

6. Development of the implementation plan for the long-term Disaster Resilience Insurance Facility, based on experiences from the ongoing parametric insurance pilot. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Low Low Low Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Low Low Low Institutional Capacity for Implementation and Sustainability Moderate Moderate Moderate Fiduciary Moderate Moderate Moderate Environment and Social Moderate Moderate Moderate Stakeholders Low Low Low Other -- -- -- Overall Moderate Moderate Moderate Results Results Indicators A methodology for national-level risk-informed planning has been developed and applied by the National Economic and Development Authority in planning and public investment programming. (Text, Custom) Not developed Pilot version of the Methodology publicly launched Pilot version of the Methodology publicly launched and Socioeconomic Resilience indicator, baseline, and target for the Philippine Development Plan are under development Methodology developed and applied in planning and public investment programming The overall strategic framework of the Philippine Development Plan (PDP) puts forth the outcome Individuals and communities will be more resilient. The PDP states that building up resilience involves reducing exposure to hazards, mitigating the impact of the risks, and accelerating recovery if and when the risk materializes. The Socio-economic Resilience methodology is exactly in line with this paradigm in the PDP, and it was agreed that a Socio-economic Resilience Index will be developed using the model, starting with national and regional 9/21/2017 Page 2 of 8

indices using data from the 2015 Family Income and Expenditure Survey. Input data will then be progressively refined, and the baseline value for this PDP period will be updated upon the release of the 2018 Family Income and Expenditure Survey. It was also agreed that technical support would be provided to assist NEDA in developing a target value of the Socio-economic resilience index that would be achievable given the Targets already quantified in the individual chapters of the PDP. Disaster risk reduction measures are integrated in revisions to the National Building Code of the Philippines (NBCP) developed by the Department of Public Works and Highways. (Text, Custom) Not developed National and regional consultations on draft revisions completed Revisions integrating disaster risk reduction measures developed for the NBCP in the form of a draft 'Philippine Building Act' to be presented by the Department of Public Works and Highways to the National Economic and Development Authority Revisions integrating disaster risk reduction measures are developed for the NBCP The primary recommendation arising from 18 months of comprehensive, cross-sectoral, regional and national consultations is to move toward a new Philippine Building Act (PBA) to supersede the NBCP, the current provisions of which were found by DPWH to be severely underdeveloped when it comes to the safety of structures against natural hazards. Another major finding of the review and consultation process is that the 40-year old NBCP is restrictive because of the level of detail it prescribes, which could otherwise be integrated in the Implementing Rules and Regulations of the proposed new Act, or in various reference standards. Based on specific recommendations on the form and substance of the proposed PBA, the National Building Code Development Office presented a draft Philippine Building Act to the Secretary of Public Works (as the National Building Official) and the Management Committee of the Department of Public Works and Highways (August 23, 2017). DPWH will then present the proposal to NEDA, in advance of submission to the legislature for enactment into law, and fully meeting the target for this indicator. 9/21/2017 Page 3 of 8

PHINDIRITBL Provincial Commodity Investment Plans (PCIPs) developed using the expanded Vulnerability and Suitability Assessment (evsa) tool are approved by the Department of Agriculture under the Philippine Rural (Text, Custom) 47 PCIPs developed and approved 71 PCIPs developed and under implementation 80 PCIPs developed and approved; 72 under implementation 80 PCIPs developed and approved; 72 under implementation Date 09-Jul-2015 05-Apr-2017 19-Sep-2017 30-Sep-2018 As of August 2018, 80 Provincial Commodity Investment Plans have been approved and the final one (Biliran Province) is being developed (vis-à-vis the target of 80 by September 2018). Of the 80 provinces, 72 PCIPs are under implementation (approved sub-projects ongoing as specified in each Province s PCIP), fully meeting the target for this result indicator. Policy framework for post-disaster shelter assistance (through recovery and reconstruction phases) formulated by the member agencies of the Social Development Committee and endorsed to the Social Deve (Text, Custom) Not formulated Draft policy framework developed and under consultation Draft policy framework developed for incorporation in the National Economic and Development Authority's Disaster Recovery Framework Policy framework formulated and endorsed to Social Development Committee Technical Board Under the convening authority of the Housing and Urban Development Coordinating Council (HUDCC), a draft of the policy framework was developed from September through December 2016, and is being refined together with key shelter agencies and other stakeholders. The framework will be finalized for endorsement to the NEDA Social Development Committee - Technical Board. In parallel, the policy framework is being incorporated in the Disaster Rehabilitation and Recovery Framework that NEDA is currently finalizing. 9/21/2017 Page 4 of 8

PHINDIRITBL Multi-hazard vulnerability assessments of priority cultural heritage sites completed by the Department of Tourism and assessment methodology adopted in the Philippine Standards for Conservation. (Text, Custom) 2 sites assessed Vulnerability assessment completed for 18 sites Vulnerability assessment completed for 18 sites and assessment methodology adopted by the Intramuros Administration and the Tourism Infrastructure and Enterprise Zone Authority Vulnerability assessment completed for 5 priority cultural heritage sites and assessment methodology adopted in the Philippine Standards for Conservation The target has been achieved for the number of vulnerability assessments completed. As the Philippine Standards for Conservation are still under development, the Tourism Infrastructure and Enterprise Zone Authority, as well as the Intramuros Administration, have promulgated issuances adopting the multi-hazard vulnerability assessment methodology. The two agencies are currently rolling out the use of the methodology for the assessment of historical assets within their respective portfolios. Joint catastrophe risk insurance program for Local Government Units (LGUs) developed by the Department of Finance. (Text, Custom) Not developed Institutional structure for the Local Disaster Resilience Insurance Facility, product design, and premium co-financing mechanisms are being developed for 17 provinces Joint catastrophe risk insurance program piloted by DOF for 25 provinces and relevant national government agencies Long term program is developed with 10 LGUs participating Date 31-May-2015 05-Apr-2017 28-Jul-2017 30-Sep-2018 An allocation of PhP 1 billion was made, under the National Disaster Risk Reduction and Management Fund of the 2017 General Appropriations Act, for the insurance coverage of government facilities against natural calamities. In accordance with the provision, DOF and the Department of Budget and Management issued Joint Memorandum Circular No. 2017-1 on June 30, 2017, to provide guidelines on the implementation, monitoring, and reporting on the use of the allocation. On this basis, DOF piloted a joint catastrophe risk insurance program, with the placement of a parametric catastrophe risk transaction on 28 July 2017. Under the program, GSIS provides the government with an annual parametric insurance policy for catastrophe risk, with the World Bank acting as an intermediary between GSIS and a panel of international reinsurance companies. The program provides annual aggregate coverage of US$206 million against typhoons and earthquakes for national government assets, as well as typhoon coverage for 9/21/2017 Page 5 of 8

PHINDIRITBL 25 provinces. Long Term Program. DOF and relevant stakeholders reconfirmed that the pilot should not be a one-time transaction, and expressed the need for an institutionalized, sustainable mechanism, which could rely on a regular budget appropriation. A design for a long-term program is under development, drawing on consultations held over the past two years with national and local government officials, as well as extensive legal, institutional, and technical analysis. The proposed design will be presented by DOF to stakeholders across government to develop an action plan for implementation. Number of line agencies that have developed and piloted their Disaster Risk Financing and Insurance (DRFI) strategy. (Text, Custom) Not developed Scope of DRFI Strategy developed for 2 line agencies Consultations ongoing with the Department of Public Works and Highways and the Department of Education for the development of their respective DRFI strategies. Pilot completed through the joint catastrophe risk insurance program 2 agencies have developed and piloted their DRFI strategy The placement of the insurance coverage described under Result Indicator B1 represents a pilot implementation of the DRFI strategies of the beneficiary national government agencies, as specified in the DOF/DBM Joint Memorandum Circular No. 2017-1. Design of property catastrophe risk insurance pool for homeowners established by the Department of Finance and the Insurance Commission. (Text, Custom) Not established Design is under development Design is under review by the Department of Finance Design established DOF and the Insurance Commission are reviewing the design proposed by the Philippine Insurers and Reinsurers Association on the establishment of a Philippine Catastrophe Insurance Pool for homeowners and SMEs. It was agreed by DOF that the design of this facility should seek to support the implementation and enforcement of the proposed Philippine Building Act (Result Indicator A2) by providing 9/21/2017 Page 6 of 8

PHINDIRITBL incentives for compliance, e.g., through differentiation of premium rates. Program developed and commenced for post-disaster emergency income support by the Department of Budget and Management, Department of Social Welfare and Development, and the Department of Finance. (Text, Custom) Not developed Not developed Program operations manual under development Program developed and commenced Grant financing has been secured by the World Bank for assistance on the technical and operational aspects of establishing a scalability mechanism for emergency income support, as well as to establish the linkages to the national disaster risk financing and insurance strategy. Consultants have been engaged to work with DSWD on taking stock of previous experiences, documenting lessons learned, and developing a draft operations manual for future use of emergency cash transfers through existing safety net mechanisms. Catastrophe risk insurance database template updated and adopted by the Insurance Commission. (Text, Custom) Not updated Updated template developed and under industry consultations Updated template developed and undergoing final industry consultations Updated template adopted The Insurance Commission will issue a circular for the adoption of the catastrophe risk insurance database templates by September 2017. Overall 9/21/2017 Page 7 of 8

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P155656 IBRD-85760 Effective USD 500.00 500.00 0.00 2.50 497.50 1% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P155656 IBRD-85760 Effective 22-Dec-2015 20-Jan-2016 15-Apr-2016 30-Sep-2018 30-Sep-2018 Tranches Restructuring History There has been no restructuring to date. Related Operations There are no related projects. 9/21/2017 Page 8 of 8