Possibility of Using Value Engineering in Highway Projects

Similar documents
Managing Project Risk DHY

Life Cycle Cost Optimization Within Decision Making on Alternative Designs Shiven Jiten Sompura 1, Aakash Goyal 1 and Hakob Avetisyan, Ph.D.

Establishment of Risk Evaluation Index System for Third Party Payment in Internet Finance

Integrated Earned Value Management and Risk Management Approach in Construction Projects

LIFE CYCLE ASSET MANAGEMENT. Project Management Overview. Good Practice Guide GPG-FM-001. March 1996

Policy rationale & Value Engineering

SOA STRATEGIC PLAN EXPOSURE DRAFT

A Study on Risk Analysis in Construction Project

Available online at ScienceDirect. Procedia Economics and Finance 34 ( 2015 )

PROJECT COST ESTIMATING,

Project Theft Management,

MODERN INNOVATIVE APPROACHES OF MEASURING BUSINESS PERFORMANCE

Evaluation of Construction Risks Impact on Construction Project Manager s

Analysis of Estimate at Completion of a Project's duration to improve Earned Value Management System 1 N.Vignesh

Risk Assessment in Construction of Highway Project

The 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION

PMI - Dallas Chapter. Sample Questions. March 22, 2002

Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS

Available online at ScienceDirect. Procedia Engineering 123 (2015 ) Creative Construction Conference 2015 (CCC2015)

Review of the Federal Transit Administration s Transit Economic Requirements Model. Contents

Study of Cost Control Techniques Used in Construction Industry and Their Impact to Minimize Cost Overrun

A Study of the Efficiency of Polish Foundries Using Data Envelopment Analysis

Chapter 8: Lifecycle Planning

INTRODUCTION TO FINANCIAL MANAGEMENT

A STUDY ON FINANCIAL ANALYSIS WITH REFERENCE TO NDMPMACU LTD., NELLORE, A.P.

Kamal Golabi Woodward-Clyde Consultants San Francisco

Department of Defense INSTRUCTION

Integrated Management System For Construction Projects

Legislative Environment Regulating Charity Activities in Georgia

March The Risks and Rewards of Value Engineering: Brought to you by: Inside this Issue: Risks and Rewards of Value Engineering.

Part II 2011 Syllabus:

BCE Guidance. Advanced Wastewater Treatment Plant. Version 1.0

Time and Cost Optimization Techniques in Construction Project Management

Mechanism and Methods of Enterprise Financing System Flexibility

Equitable Financial Evaluation Method for Public-Private Partnership Projects *

Available online at ScienceDirect. Procedia Economics and Finance 32 ( 2015 )

RISK MANAGEMENT IN CONSTRUCTION PROJECTS AND ANALYSIS

machine design, Vol.7(2015) No.4, ISSN pp

Keep Wisconsin Moving Smart Investments Measurable Results

Peer to Peer Lending Supervision Analysis base on Evolutionary Game Theory

Appendix A Decision Support Analysis

ScienceDirect. A Study of Construction Claim Management Problems in Malaysia

The Influences of Value-Based Management on Dividend Policy

Research on Optimization Direction of Industrial Investment Structure in Inner Mongolia, the West of China

Mn/DOT Scoping Process Narrative

A Risk Management Framework for Business Continuity in Agriculture

Impact of New Highway Bill on Cement Consumption

Interpretive Structural Modeling of Interactive Risks

APPLICATION OF FORMAL SAFETY ASSESSMENT IN THE LEGAL ACTIVITY OF INTERNATIONAL MARITIME

Improvement and application of earned value analysis in coal project management

Department of Defense INSTRUCTION

CONSTRUCTION ENGINEERING & TECHNOLOGY: EMV APPROACH AS AN EFFECTIVE TOOL

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

A Study on Factors Affecting Investment Decision Making in the Context of Portfolio Management

RISK MANAGEMENT POLICY

What is Risk Management? Phil Barnes Assistant Director Office of Policy Analysis, Research, & Innovation (PARI)

A Method for the Evaluation of Project Management Efficiency in the Case of Industrial Projects Execution

MANAGEMENT OF ACCELERATION TIME BY USING TIME COST TRADE OFF METHOD ON CONSTRUCTION PROJECT OF INTEGRATED OFFICE OF SAMARINDA

Available online at ScienceDirect. Procedia Engineering 161 (2016 )

Use of Internal Models for Determining Required Capital for Segregated Fund Risks (LICAT)

Total revenue calculation in a two-team league with equal-proportion gate revenue sharing

THE IMPACT OF EUROPEAN PROJECTS ON THE DEVELOPMENT OF THE NORTHWEST REGION OF ROMANIA. Ioana MUREŞAN 1 Răzvan NISTOR 2 Liviu ILIEŞ 3

INTERNAL CAPITAL ADEQUACY ASSESSMENT PROCESS GUIDELINE. Nepal Rastra Bank Bank Supervision Department. August 2012 (updated July 2013)

Project Management and Resource Constrained Scheduling Using An Integer Programming Approach

THE IMPACT OF OPERATIONAL RISK IN CAPITAL ADEQUACY RATIO IN ALBANIA

CMGC Interim Pricing (OPCC) Milestone Process

Considerations on the methodology for identifying and prioritizing public investment projects in Romania

King Fahd University of Petroleum and Minerals College of Environmental Design CEM 520: Construction Contracting

Policy modeling: Definition, classification and evaluation

To P3 or Not to P3 By JohN Gross

Expediting a Project, an Optimized Strategy Approach to Milestones Delay Management (MDM)

THE USE OF THE LOGNORMAL DISTRIBUTION IN ANALYZING INCOMES

European Journal of Economic Studies, 2016, Vol.(17), Is. 3

PREMnotes. Economic Policy. The World Bank

Working Paper #1. Optimizing New York s Reforming the Energy Vision

Risk management as an element of processes continuity assurance

Comparison of Different Methods of Credit Risk Management of the Commercial Bank to Accelerate Lending Activities for SME Segment

Fall 2015 Volume 5/ Issue 1. By David A. Ericksen. In this Issue: Page 1

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E.

NCDOT Public Private Partnerships P3 s Financing

Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University

Risk Management: Assessing and Controlling Risk

ก ก Tools and Techniques for Enterprise Risk Management (ERM)

BUDGET AS AN INSTRUMENT OF FINANCIAL CONTROL IN BUSINESS ORGANISATIONS: A CASE STUDY OF BETA GLASS PLC, UGHELLI, DELTA STATE, NIGERIA

12 GeV CEBAF Upgrade. Risk Management Plan

A Decade of Construction Inspections. Quality Built, LLC November 2011

Technical analysis of selected chart patterns and the impact of macroeconomic indicators in the decision-making process on the foreign exchange market

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University

Chapter 12: Programming/Resource Allocation

Analysis of Past NBI Ratings for Predicting Future Bridge System Preservation Needs

Measures for Cost Escalation in Bridge

ESTIMATING TOOLS FOR INFRASTRUCTURE PROJECTS

Learning Objectives. Learning Objectives 17/03/2016. Chapter 7 Establishing Objectives and Budgeting for the Promotional Program

Tangible Assets Threats and Hazards: Risk Assessment and Management in the Port Domain

Comparison Analysis in Evaluation Procedures and Evaluation Methods of Civil Buildings

Diana Andreea Traistaru, Ph. D. University of Craiova Faculty of Economics and Business Administration Craiova, Romania ABSTRACT

Using Online Simulation Technique for Revenue-Based Value for Money Assessment Model in PPP Project

INTER-ORGANIZATIONAL COOPERATIVE INNOVATION OF PROJECT-BASED SUPPLY CHAINS UNDER CONSIDERATION OF MONITORING SIGNALS

GEOTHERMAL PROJECT MANAGEMENT

Transcription:

Creative Construction Conference 2016 Possibility of Using Value Engineering in Highway Projects Renata Schneiderova Heralova Czech Technical University in Prague, Faculty of Civil Engineering, Thakurova 7, 166 29 Prague, Czech Republic Abstract The paper deals with the possibility of using value engineering in highway projects. The reasons for criticizing highway projects are usually three. Firstly, they do not achieve expected project goals, secondly, project delivery is not within a reasonable amount of time, and finally, costs are not in line with their budget limits. The author believes that value engineering methodology can help to find ways to improve solutions to these problems by balancing cost, schedule, and scope through the generation of innovative alternatives. It was found that a project can significantly save on costs and improve performance of project functioning by using the appropriate value engineering process at the right time. The paper summarizes the benefits and effectiveness of the value engineering methodology along with recommendations. Keywords: cost, highway construction, public projects, value engineering (VE) 1. Introduction Programs in the public works sector such as highway construction are being criticized for delivering projects that fail to hit the following targets: Expected project objectives Delivery within a reasonable amount of time Costs no more than their budgeted amounts In order to avoid this, care must be taken to achieve a reasonable number of highway projects that meet the expected project goals, are completed in time, and do not exceed the planned costs. Performance-based value engineering, modified for public works applications, can help achieve this. There is the need for a project management tool that efficiently identifies and balances project scope with the schedule and costs. Furthermore, project managers need to identify and analyze a large quantity of project alternatives with an appreciable variation in scope, schedule and cost. Escalating construction and maintenance costs, combined with reduced revenues, have led to an increased interest in value engineering by government transportation agencies [1]. All national agencies in Asia have national regulations mandating that certain projects have be value analyzed. In the USA, the Value Engineering Final Rule requires value engineering analyses of projects on the National Highway System (NHS) which receive Federal assistance reaching an estimated total cost of $50,000,000 or more, also bridge projects on the NHS receiving Federal assistance reaching an estimated total cost of $40,000,000 or more, and it provides for VE analysis guidance on projects [2]. There are no similar regulations in the Czech Republic. Value Engineering helps a project to meet the customer s need for cost efficiency within a short timeframe. It is important to realize that VE tools focused on the construction sector, particularly public works construction projects, should have greater emphasis on project scope, as this aspect of public works is usually the challenging aspect of project development. VE study looks for ways to improve solutions to a problem. It is a function-oriented, systematic, team approach, used to analyze and improve value in a product, facility design, system, or service. It offers a powerful methodology for solving problems and reducing costs while improving performance and quality. Value engineering studies can provide measured balance in cost, schedule, and scope by generating multiple 360

innovative alternatives. This requires a motivated team of professionals in cooperation with project stakeholders stimulated and guided by such an appropriate process. The main goals of this paper are to suggest a performance measurement based on the VE method for public projects and to summarize the benefits of the proposed methodology. 2. Literature review Value Engineering is a conscious and explicit set of disciplined procedures designed to seek out optimum value for both an initial and long-term investment. First utilized in manufacturing industry during World War II, it has been widely used in the construction industry for many years. The Society of American Value Engineers (SAVE) was formed in 1959 as a professional society dedicated to the advancement of VE through a better understanding of the principles, methods, and concepts involved. The Society of American Value Engineers defines VE as the systematic application of recognized techniques that identifies the function of the product or service, establishes a monetary value for that function, and provides the necessary function reliably at the lowest possible cost. Therefore, the purpose of a systematic VE approach is well demonstrated when the user is able to define and segregate the necessary functions from the unnecessary functions and thereby develop alternative means of accomplishing the necessary functions at a lower total cost [3]. VE in the construction industry is mainly an organized effort to challenge the design and construction plans of projects to provide the required facility at the lowest overall cost consistent with requirements for performance, reliability, and maintainability [4]. Research [5] emphasizes the VE Job Plan as an organized and systematic approach tool and is the key to success in VE studies. The job plan is the road map for defining the required task in determining the most economical combination of functions to complete the task. It is through the job plan that the study identifies the key areas of unnecessary costs and seeks new and creative ways of performing the same function. Other research [6] defines VE by what is true and what is not true about the VE concept. They state that VE is a systematic and multi-disciplined management technique. On the other hand, it is not a design reviewing, cost lowering, or quality control process. The Function Analysis System Technique (FAST) diagram is a powerful tool that helps to organize the random listing of functions by answering the questions: How? Why? What does it do? What must it do? This helps the VE team to develop many verb-noun functions structure and their interrelationships. Also, FAST diagrams aid in the identification of basic function and scope [7]. However, little research has indicated the importance of a performance measurement-based VE methodology for public construction projects. One study [1] demonstrates how a performance-based value engineering methodology helps save time and money and increases that functional performance. The objective of this study was to upgrade and expand existing facilities and systems on an express highway linking Seoul to Pusan. The VE study generated several innovative alternatives capable of saving up to 50% of project costs and also increasing performance and value from the baseline project plan. The design stage is the key stage of investment control in highway engineering. The advantages and disadvantages of design scheme quality directly influence the whole effect of project investment and application. Another study [8] verifies the reliability of applying value engineering in optimizing a design scheme of highway engineering using an actual engineering example. How to apply the theories and methods of value engineering in construction project is shown in [9]. In the construction of the road during the design process, the construction costs were reduced and the construction period was shortened by using value engineering methods. This paper analyzes loss of control in a highway investment at the design stage and puts forward some methods to control the cost of a highway for consideration in a Design Department, such as promoting quota-designs, optimizing a design project, enhancing design management and so on. According to the Federal Aid Highway Program (USA) [2], value engineering is defined as the systematic process of review and analysis of a project, during the concept and design phases, by a multidisciplinary team of people not involved in the project, and that is conducted to put forward recommendations for providing a) the needed functions safely, reliably, efficiently, and at the lowest overall cost; b) improving the value and quality of the project; and c) reducing the time to complete the project. The successful application of the VE process can contribute measurable benefits to the quality of surface transportation improvement projects and to the effective delivery of the overall Federal Aid Highway Program. The Value Engineering Final Rule was published in 2014, and this Final Rule removes the VE analysis requirement for projects delivered using the design/build method of construction, provides VE analysis guidance for projects delivered using the construction manager/general contractor (CM/GC) method of project delivery, and increases the project thresholds for required VE analyses to: Projects on the National Highway System (NHS) receiving Federal assistance with an estimated total cost of $50,000,000 or more Bridge projects on the NHS receiving Federal assistance with an estimated total cost of $40,000,000 or more. 361

Their web site describes the FHWA's VE program, discusses many subjects crucial to the administration of a successful VE program, and attests to the program's benefits through the compilation of annual accomplishment reports and descriptions of successful practices and VE analyses. The FHWA's VE program applies to the Federal Aid Program under which the funds authorized for Federal aid highway acts are distributed to States for projects developed and administered by State Departments of Transportation (DOT). The FHWA annually collects information on VE accomplishments within the Federal Aid and Federal Lands Highway Programs. The following Table 1 summarizes recent savings realized by conducting VE. Table 1. Summary of past VE savings Year 2014 2013 2012 2011 2010 Number of VE Studies 215 281 352 378 402 Cost to Conduct VE Studies and Program Administration Estimated Construction Cost of Projects Studied Percent of Project Cost Saved $8.7 M $9.8 M $12.0 M $12.5 M $13.6 M $20.9 B $23.0 B $30.3 B $32.3 B $34.2 B 8.32% 5.01% 3.78% 3.12% 5.79% Return on Investment 200:1 118:1 96:1 80:1 146:1 3. Value engineering in construction projects Value Engineering is not a design/peer review or a cost-cutting exercise. Value engineering is a creative, organized effort, which analyzes the requirements of a project for the purpose of achieving the essential functions at the lowest life cycle cost (LCC). Through a group investigation, using experienced, multi-disciplinary teams, value and economy are improved through the study of alternative design concepts, materials, and methods without compromising the functional and value objectives of the client. VE can be applied at any point in a project, even in construction. However, typically the earlier it is applied the higher the return on the time and effort invested see Fig. 1 [4]. The three main stages of a project and a VE application are described below. Fig. 1. Potential savings from value engineering application. Planning At the planning stage of development, there are additional benefits to be derived from a Value Engineering Workshop. An independent team can review the program, perform a functional analysis of the project, obtain the owners and users definition of value, define the key criteria and objectives for the project, verify the proposed program, review master plan utility options, offer alternative solutions, and verify the budget. 362

Design Design is the stage that most VE participants usually become involved, the point at least when the design has made it to the schematic stage. The primary tool available to the VE team is the Workshop. The Workshop is an opportunity to bring the design team and client together to review the proposed design solutions, the cost estimate, and the intended implementation schedule and approach, with a view to implementing the best value for the money. The definition of what is good value on any particular project will change from client to client and project to project. The five-step VE Job Plan is followed, as prescribed by SAVE International: Information Phase (understanding the background, analysis of the key functional issues the cost and impacts associated with function) Creative Phase (ways to provide the necessary function at a lesser LCC - improved value for client) Analysis Phase (criteria definition for evaluation, ideas analysis, weighted evaluation) Development Phase (ideas are expanded into workable solutions design change, evaluation of advantages and disadvantages, cost comparison, LCC calculation, comparison to original design) Presentation Phase (recommendations, key cost impacts). Construction During construction value engineering is still possible. Contractors can be provided with monetary incentives to propose solutions that offer enhanced value to the owner, and a share in the financial benefits realized. Clearly the owner must consider contractor-generated proposals very carefully, from both a life-cycle perspective [10], and a liability perspective. The team must be brought in to the decision-making process to agree to the proposed change in order not having any negative impact on the overall design and project function. Value Engineering is not only beneficial, but essential because: The functionality of the project is often improved as well as producing impressive savings, both on initial and Life Cycle Cost A "second look" at the design produced by engineers gives the assurance that all reasonable alternatives have been explored Cost estimates and scope statements are checked thoroughly assuring that nothing has been omitted or underestimated It assures that best value will be obtained over the life of the project 4. Performance measurement- based value engineering One of the problems with studies on public highway projects is the tendency for them to become a costcutting tool instead of a value-enhancing tool [11], [12]. Since costs are reported only at the conclusion of each study, there is no mechanism for weighting the value of the project costs that were cut against the project scope and project delivery components that accompanied these costs. Using value engineering and the performance measurement application in VE can help to optimize a project plan by minimizing cost and maximizing function performance. Project stakeholders quantify what and how well the project delivers project scope, schedule, and costs by measuring the impact and rating the effectiveness of the alternatives along with the performance measurement criteria. The reasons why we need to measure project performance for public works can be given. It brings transparency to all project issues for the project stakeholders, it handles conflicting project criteria, it addresses technical issues using quantitative or qualitative parameters, and it improves the probability of delivering a project that serves the community with optimal project value. Below, the formula shows the relationships between value, performance and life cycle cost. 363

P LCC i Vi (1) i Where: V i Value of improved alternative i P i Performance of improved alternative i LCC i Life cycle cost of improved alternative i In the VE process, project stakeholders identify the performance criteria, establish their relative weights, and then rate the current project. The VE team establishes the performance of the new alternatives as compared to the current project s performance, and project stakeholders verify the performance ratings for the VE alternatives. Determining the project performance criteria is an important process for measuring the project functions. Qualitative and quantitative parameters should be used to increase the objectivity of the application. Proposed criteria for highway construction are quality and safety, constructability, public-friendliness, environmentalfriendliness, socioeconomic factors, operational efficiency and maintainability, and project management considerations. After the project performance criteria and relative importance (weightings) are determined, stakeholders define the performance criteria parameters by identifying the units of measurement for each of the performance criteria and by establishing a range of acceptable values for these criteria. The selected sets of alternatives are compared against the original design concepts. The total performance rating is divided by the total project life cycle cost to produce a value index (1), and the difference between the value indices of the original design and the alternatives is expressed as a Value Improvement. 5. Conclusion and Recommendation The quality and cost of highways and other projects in the public works sector can benefit by the application of value engineering methodologies. Specifically, the VE methodology provides for analyzing the project objectives and attributes, which, in turn, focuses the development of alternatives in the value study. Government agencies that apply value engineering to their construction programs can achieve the following benefits: resolve technical problems on complex projects, gain additional technical expertise, give emphasis to efficient use of resources, improve project performance and achieve cost savings. Project performance measurements quantify the quality of project objectives and the timeframe in which they are delivered, which in turn allows the project value to be determined. Through VE program use in the public sector, significant improvement in project performance and cost savings has been experienced. Improving the relationship between the project performance and project life cycle costs has been a major benefit to public project managers. These savings have been extended into other public projects, a real value for the taxpayer. Most importantly, using VE could accelerate construction because it creates a consensus-building foundation. VE studies carried out in the public sector have allowed for the development of consensus on what the project scope, budget, and delivery should be. This consensus has been formed with project stakeholders, such as local governments, transportation and regulatory agencies and the communities involved or affected. Acknowledgements This work was supported by the Grant Agency of the Czech Technical University in Prague, Grant No. SGS15/132/OHK1/2T/11 and grant No. SGS16/026/OHK1/1T/11. References [1] Lee M.J., Lim, J.K., Hunter, G. Performance-Based Value Engineering Application to Public Highway Construction, KSCE Journal of Civil Engineering (2010) 14(3) 261-271 [2] http://www.fhwa.dot.gov/ve/ (10.3.2016) [3] Miles, L. D. Techniques of value analysis and engineering, 2 nd Ed., 1972. McGraw-Hill, New York, USA. [4] Dell'lsolla, A. J. (1998). Value engineering: Practical Applications...for Design, Construction, Maintenance and Operation, 1997, R.S.Means, Kingston, USA. [5] Assaf, S., Jannadi, O. A., and Al-Tamimi, A. Computerized system for application of value engineering methodology.asce Journal of Computing in Civil Engineering, 2000. Vol. 14, No. 3, pp. 206-214. [6] Zimmerman, L. W. and Hart, G. C. Value engineering, a practical approach for owners, designers and contractors. 1982. Van Nostrand Reinhold, New York, USA. [7] Parker, D. E. Value engineering theory,1985. Lawrence D. Miles Value Foundation, Washington, D.C. pp. 62-64. 364

[8] Feng, H., Ding, X. Application of Value Engineering in Optimizing Design Scheme of Highway Engineering, J.Applied Mechanics and Materials (2011) 71 436-439. [9] Wang, Y.The Control of the Highway Design Stage Based on Value Engineering, International Conference on Engineering and Business Management, China, 2010, 1-8 1615-1618. [10] Schneiderová Heralová, R.: Life Cycle Cost optimization within decision making on alternative designs of public buildings. Procedia Engineering. 2014, vol. 2014, no. 85, p. 454-463. [11] Schneiderová Heralová, R.: Highway Projects: Prices in Public Bids. Procedia Engineering. 2015, vol. 2015, no. 123, p. 496-503. [12] Hromada, E. Construction of Traffic Infrastructures: Causes of Low Effectiveness. Procedia Engineering. 85 (2014) pp. 251-259. 365