Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Similar documents
TOTAL QUANTITY UNIT COST UNIT

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Reviax Constracting Corp. DeSantis Construction

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Engineer's Preliminary Estimate - 100% Submittal

OKLAHOMA TURNPIKE AUTHORITY

Rock Chalk Park - Infrastructure Report. July 2013

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

ADDENDUM No. 1 January 29, Paving Program Village of Milford

BID TABULATION PAGE 1 OF 6

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012


Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

SUBDIVISION IMPROVEMENTS AGREEMENT

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

LETTING : CALL : 056 COUNTIES : MILLE LACS

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

OKLAHOMA TURNPIKE AUTHORITY

BID TABULATION BID REQUEST NO

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

REPLACEMENT OF MERCER COUNTY BRIDGE

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)

PART A ROADWAY - BASE BID

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

OKLAHOMA TURNPIKE AUTHORITY

Opinion of Probable Cost

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

BID TABULATION PAGE 1 OF 8

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS


A DESIGN-BUILD PROJECT

CITY OF SAN MARCOS ENGINEERING DIVISION

The bid due date has been changed to 2:50 p.m. May 25, 2018.

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

Appendix B Example Project Designs and Engineers Opinion of Costs

Route Route Z Intersection Realignment

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

2001 Average Bid Tabs

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

RFB Addendum 3

PROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES

Utility Committee Meeting AGENDA. October 3, 2017

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-

CONTRACT TIME DETERMINATION

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

Addendum 1 Downtown North CRA Sidewalks

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

Storm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

The City of Owen Sound Asset Management Plan

MSCAA PROJECT NO

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

CITY OF SURREY (the Owner ) INVITATION TO TENDER (ITT)

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Drainage Improvements, Diversion #5

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

RIGHT-OF-WAY PERMIT APPLICATION

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

Department of Public Works Engineering

Public Works Maintenance STORMWATER AND

Transcription:

Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%) $ 350,000.00 TOTAL before HST $ 1,750,000.00 HST $ 227,500.00 TOTAL including HST $ 1,977,500.00

Date: January 2013 Page: 2 Roadworks (9+950-12+075) - Construction Phase V Full Depth Asphalt Removal and Grade Sq.m. 18623 $ 5.00 $ 93,115.00 Preparation Clearing and Grubbing ha. 0.40 $ 40,000.00 $ 16,000.00 Earth Fill cu.m. 42907 $ 15.00 $ 643,597.50 Tree Removal ea. 38 $ 350.00 $ 13,300.00 Pavement Markings - All Types m. 12295 $ 6.59 $ 81,024.05 Earth Excavation, Grading cu.m. 19700 $ 12.00 $ 236,400.00 HL 1 - Surface tonne 12035 $ 110.00 $ 1,323,903.90 HL 8 - Binder tonne 2316 $ 90.00 $ 208,423.22 Granular 'A' tonne 4537 $ 21.00 $ 95,271.12 Granular 'B', Type 1 Modified tonne 13094 $ 15.00 $ 196,410.00 Tack Coat Sq.m. 23700 $ 3.00 $ 71,100.00 Concrete Sidewalk Sq.m. 0 $ 61.00 $ - Concrete Curb and Gutter - All Types, m. 1455 $ 70.00 $ 101,850.00 including Curb Terminations Asphalt Multi Use Path m 1828.4 $ 200.00 $ 365,680.00 Culverts Removal - All length and sizes m. 268 $ 34.00 $ 9,112.00 Culverts - All sizes m. 293 $ 250.00 $ 73,250.00 Sod (Including Topsoil) Sq.m. 300 $ 6.00 $ 1,800.00 Seed and Mulch (Including Topsoil) Sq.m. 30000 $ 3.00 $ 90,000.00 Rip Rap (200-300 mm dia.) - Hand Sq.m. 250 $ 45.00 $ 11,250.00 Placed Erosion and Sediment Control L.S. 1 $ 25,000.00 $ 25,000.00 Traffic Control and Signing L.S. 1 $ 15,000.00 $ 15,000.00

Date: January 2013 Page: 3 Supply and Maintain Field Office L.S. 1 $ 10,000.00 $ 10,000.00 Mobilization and Demobilization L.S. 1 $ 5,000.00 $ 5,000.00 Subdrains - 150 mm dia. Perforated Plastic m. 1455 $ 22.00 $ 32,010.00 c/w Filter Sock 1200 mm dia. Concrete MH, CBMH ea. 0 $ 4,200.00 $ - 600 x 600 mm Precast Concrete (Single) CB ea. 13 $ 2,100.00 $ 27,300.00 600 x 1450 mm Precast Concrete (Double) CB ea. 1 $ 3,100.00 $ 3,100.00 Storm Sewers - All sizes m. 106 $ 280.00 $ 29,680.00 Hydro / Bell Pole Replacement ea. 11 $ 15,000.00 $ 165,000.00 C.P. Rail Multi-Use Trail Bridge (3 m wide) L.S. 1 $ 900,000.00 $ 900,000.00 Gages Creek Multi-use Trail Bridge (3 m wide) L.S. 1 $ 250,000.00 $ 250,000.00 SUBTOTAL $ 5,093,576.79 Engineering and Contingency (20%) $ 1,018,715.36 TOTAL (excludes HST) $ 6,112,292.14

Date: January 2013 Page: 4 Roadworks (12+075-13+100) - Construction Phase IV Full Depth Asphalt Removal and Grade Sq.m. 9305 $ 5.00 $ 46,525.00 Preparation Clearing and Grubbing ha. 0.25 $ 40,000.00 $ 10,000.00 Earth Fill cu.m. 2733 $ 15.00 $ 40,995.00 Tree Removal ea. 14 $ 350.00 $ 4,900.00 Pavement Markings - All Types m. 5395 $ 6.59 $ 35,553.05 Earth Excavation, Grading cu.m. 13530 $ 12.00 $ 162,360.00 HL 1 - Surface tonne 604 $ 110.00 $ 66,478.50 HL 8 - Binder tonne 1453 $ 90.00 $ 130,756.50 Granular 'A' tonne 2846 $ 21.00 $ 59,774.40 Granular 'B' Type 1 Modified tonne 7672 $ 15.00 $ 115,080.00 Tack Coat Sq.m. 12300 $ 3.00 $ 36,900.00 Concrete Sidewalk Sq.m. 0 $ 61.00 $ - Concrete Curb and Gutter - All Types, m. 755 $ 70.00 $ 52,850.00 including Curb Terminations Asphalt Multi Use Path m 1025 $ 200.00 $ 205,000.00 Culverts Removal - All lengths and sizes m. 233 $ 34.00 $ 7,922.00 Culverts - All sizes m. 286 $ 250.00 $ 71,500.00 Sod (Including Topsoil) Sq.m. 150 $ 6.00 $ 900.00 Seed and Mulch (Including Topsoil) Sq.m. 10000 $ 3.00 $ 30,000.00 Rip Rap (200-300 mm dia.) - Hand Sq.m. 150 $ 45.00 $ 6,750.00 Placed Erosion and Sediment Control L.S. 1 $ 25,000.00 $ 25,000.00 Traffic Control and Signing L.S. 1 $ 15,000.00 $ 15,000.00

Date: January 2013 Page: 5 Supply and Maintain Field Office L.S. 1 $ 10,000.00 $ 10,000.00 Mobilization and Demobilization L.S. 1 $ 5,000.00 $ 5,000.00 Subdrains - 150 mm dia. Perforated Plastic m. 755 $ 22.00 $ 16,610.00 c/w Filter Sock 1200 mm dia. Concrete MH, CBMH ea. 4 $ 4,200.00 $ 16,800.00 600 x 600 mm Precast Concrete (Single) CB ea. 1 $ 2,100.00 $ 2,100.00 600 x 1450 mm Precast Concrete (Double) CB ea. 0 $ 3,100.00 $ - Concrete Headwall and Grate ea. 1 $ 8,200.00 $ 8,200.00 Storm Sewers - All sizes m. 300 $ 180.00 $ 54,000.00 Hydro / Bell Pole Replacement ea. 16 $ 15,000.00 $ 240,000.00 Illumination at Roundabout L.S. 1 $ 90,000.00 $ 90,000.00 Landscaping/Streetscaping L.S. 1 $ 15,000.00 $ 15,000.00 SUBTOTAL $ 1,581,954.45 Engineering and Contingency (20%) $ 316,390.89 TOTAL (excludes HST) $ 1,898,345.34

Date: January 2013 Page: 6 Roadworks (13+100-14+550) - Construction Phase III Full Depth Asphalt Removal and Grade Sq.m. 11286 $ 5.00 $ 56,430.00 Preparation Clearing and Grubbing ha. 0.25 $ 40,000.00 $ 10,000.00 Earth Fill cu.m. 3930 $ 15.00 $ 58,950.00 Tree Removal ea. 66 $ 350.00 $ 23,100.00 Pavement Markings - All Types m. 8450 $ 6.59 $ 55,685.50 Earth Excavation, Grading cu.m. 16885 $ 12.00 $ 202,620.00 HL 1 - Surface tonne 900 $ 110.00 $ 99,016.50 HL 8 - Binder tonne 2163 $ 90.00 $ 194,701.50 Granular 'A' tonne 4238 $ 21.00 $ 89,006.40 Granular 'B' Type 1 Modified tonne 11902 $ 15.00 $ 178,530.00 Tack Coat Sq.m. 17400 $ 3.00 $ 52,200.00 Concrete Sidewalk Sq.m. 0 $ 61.00 $ - Concrete Curb and Gutter - All Types, m. 250 $ 70.00 $ 17,500.00 including Curb Terminations Asphalt Multi Use Path m 1450 $ 200.00 $ 290,000.00 Culverts Removal m. 287 $ 34.00 $ 9,758.00 Culverts m. 286 $ 250.00 $ 71,500.00 Sod Sq.m. 3625 $ 6.00 $ 21,750.00 Seed and Mulch Sq.m. 18850 $ 3.00 $ 56,550.00 Rip Rap (200-300 mm dia.) - Hand Sq.m. 150 $ 45.00 $ 6,750.00 Placed Erosion and Sediment Control L.S. 1 $ 25,000.00 $ 25,000.00 Traffic Control and Signing L.S. 1 $ 15,000.00 $ 15,000.00

Date: January 2013 Page: 7 Supply and Maintain Field Office L.S. 1 $ 10,000.00 $ 10,000.00 Mobilization and Demobilization L.S. 1 $ 5,000.00 $ 5,000.00 Subdrains - 150 mm dia. Perforated Plastic m. 250 $ 27.00 $ 6,750.00 c/w Filter Sock Hydro / Bell Pole Replacement ea. 8 $ 15,000.00 $ 120,000.00 SUBTOTAL $ 1,675,797.90 Engineering and Contingency (20%) $ 335,159.58 TOTAL (excludes HST) $ 2,010,957.48

Date: January 2013 Page: 8 Roadworks (14+550-15+400) - Construction Phase II-a Full Depth Asphalt Removal and Grade Sq.m. 11243 $ 5.00 $ 56,215.00 Preparation Clearing and Grubbing ha. 0.30 $ 40,000.00 $ 12,000.00 Earth Fill cu.m. 6733 $ 15.00 $ 100,995.00 Pavement Markings - All Types m. 3060 $ 6.59 $ 20,165.40 Earth Excavation, Grading cu.m. 7939 $ 12.00 $ 95,268.00 HL 1 - Surface tonne 400 $ 110.00 $ 44,038.50 HL 8 - Binder tonne 960 $ 90.00 $ 86,436.00 Granular 'A' tonne 1884 $ 21.00 $ 39,564.00 Granular 'B' Type 1 Roadway tonne 4016 $ 15.00 $ 60,240.00 Tack Coat Sq.m. 14280 $ 3.00 $ 42,840.00 Concrete Sidewalk Sq.m. 1200 $ 61.00 $ 73,200.00 Concrete Curb and Gutter - All Types, m. 1700 $ 70.00 $ 119,000.00 including Curb Terminations Culvert Removal - All sizes m. 50 $ 34.00 $ 1,689.80 Culverts - All sizes m. 42.6 $ 250.00 $ 10,650.00 Sod (Including Topsoil) Sq.m. $ 6.00 $ - Seed and Mulch (Including Topsoil) Sq.m. $ 3.00 $ - Rip Rap (200-300 mm dia.) - Hand Sq.m. 120 $ 45.00 $ 5,400.00 Placed Erosion and Sediment Control L.S. 1 $ 25,000.00 $ 25,000.00 Traffic Control and Signing L.S. 1 $ 15,000.00 $ 15,000.00 Supply and Maintain Field Office L.S. 1 $ 10,000.00 $ 10,000.00 Mobilization and Demobilization L.S. 1 $ 5,000.00 $ 5,000.00

Date: January 2013 Page: 9 Subdrains - 150 mm dia. Perforated Plastic m. 1700 $ 27.00 $ 45,900.00 c/w Filter Sock 1800 mm dia. Precast Concrete MH ea. 8 $ 7,200.00 $ 57,600.00 600 x 600 mm Precast Concrete (Single) CB ea. 31 $ 2,100.00 $ 65,100.00 600 x 1450 mm Precast Concrete (Double) CB ea. 2 $ 3,100.00 $ 6,200.00 Storm Sewers - 900 mm dia. m. 650 $ 420.00 $ 273,000.00 Storm Sewers - 200-300 mm dia. m. 160 $ 180.00 $ 28,800.00 Concrete Headwall and Grate ea 1 $ 8,200.00 $ 8,200.00 Hydro / Bell Pole Replacement ea. 1 $ 15,000.00 $ 15,000.00 Illumination L.S. 1 $ 91,000.00 $ 91,000.00 SUBTOTAL $ 1,413,501.70 Engineering and Contingency (25%) $ 353,375.43 TOTAL (excludes HST) $ 1,766,877.13

Date: January 2013 Page: 10 Roadworks (15+400-16+200) - Construction Phase II-b Pavement Markings - All Types m. 50 $ 6.59 $ 329.50 Earth Excavation, Grading cu.m. 378 $ 12.00 $ 4,536.00 Concrete Curb and Gutter - All Types, m. 225 $ 70.00 $ 15,750.00 including Curb Terminations Asphalt Multi Use Path m 375 $ 200.00 $ 75,000.00 Sod Sq.m. 200 $ 6.00 $ 1,200.00 Erosion and Sediment Control L.S. 1 $ 3,000.00 $ 3,000.00 Traffic Control and Signing L.S. 1 $ 2,500.00 $ 2,500.00 Subdrains - 150 mm dia. Perforated Plastic m. 225 $ 22.00 $ 4,950.00 c/w Filter Sock 600 x 600 mm Precast Concrete (Single) CB ea. 6 $ 2,100.00 $ 12,600.00 Storm Sewers - 200-300 mm dia. m. 80 $ 180.00 $ 14,400.00 SUBTOTAL $ 134,265.50 Engineering and Contingency (25%) $ 33,566.38 TOTAL (excludes HST) $ 167,831.88