Engineer's Preliminary Estimate - 100% Submittal

Similar documents
ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

LETTING : CALL : 056 COUNTIES : MILLE LACS

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

REPLACEMENT OF MERCER COUNTY BRIDGE

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

PART A ROADWAY - BASE BID

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

OKLAHOMA TURNPIKE AUTHORITY

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

BID TABULATION BID REQUEST NO

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

TOTAL QUANTITY UNIT COST UNIT

SUBDIVISION IMPROVEMENTS AGREEMENT

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price


Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

BID TABULATION. Engineer's Estmated Opinion of Costs

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Opinion of Probable Cost

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

CONTRACT TIME DETERMINATION

Department of Public Works Engineering

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

A DESIGN-BUILD PROJECT

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

Rock Chalk Park - Infrastructure Report. July 2013

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

CITY OF TAMPA ADDENDUM 2. April 18, 2018

Market Street Gateway Improvements Phase 1

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Reviax Constracting Corp. DeSantis Construction

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

Exhibit 4 Page 1 of 8

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

ADDENDUM No. 1 January 29, Paving Program Village of Milford

CITY OF SAN MARCOS ENGINEERING DIVISION

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

CITY OF DEERFIELD BEACH Request for City Commission Agenda

2001 Average Bid Tabs

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

BRIDGE ALTERNATE STUDY No. 1

N E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS

Public Works Maintenance STORMWATER AND

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

APPENDICES APPENDICES

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

Active Construction RV Associates Scarsella JR Hayes

Addendum 1 Downtown North CRA Sidewalks


Addendum 1 13 TH Street Streetscape. September 1, 2017

A Financial Impact Assessment of LD 1725: Stream Crossings

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

CITY OF LAKE ELSINORE CALIFORNIA CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS FOR

New Jersey Department of Transportation DATE : 01/10/08 PAGE : TABULATION OF BIDS CALL ORDER : 167 CONTRACT ID : COUNTIES : CAPE MAY

Pavlick, Kenneth - DEN Date: :26:57-07'00'

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Transcription:

EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000 $ 7,000 4 074020 WATER POLLUTION CONTROL LS 1 $ 5,000 $ 5,000 5 074020C TEMPORARY DRAINAGE INLET PROTECTION EA 18 $ 250 $ 4,500 6 074029 TEMPORARY SILT FENCE M 1250 $ 12 $ 15,000 7 074032 TEMPORARY CONCRETE WASHOUT FACILITY EA 1 $ 3,000 $ 3,000 8 074033 TEMPORARY CONSTRUCTION ENTRANCE EA 2 $ 2,500 $ 5,000 9 074034 TEMPORARY COVER M2 3300 $ 3 $ 9,900 10 S 120090 CONSTRUCTION AREA SIGNS LS 1 $ 25,000 $ 25,000 11 S 120100 TRAFFIC CONTROL SYSTEM LS 1 $ 75,000 $ 75,000 12 S 120120 TYPE III BARRICADE EA 6 $ 140 $ 840 13 S 120149 TEMPORARY PAVEMENT MARKING (PAINT) M2 64 $ 40 $ 2,560 14 S 120159 TEMPORARY TRAFFIC STRIPE (PAINT) M 4850 $ 1 $ 3,395 15 S 120165 CHANNELIZER (SURFACE MOUNTED) EA 94 $ 28 $ 2,632 16 S 120300 TEMPORARY PAVEMENT MARKER EA 14 $ 4 $ 56 17 S 128650 PORTABLE CHANGEABLE MESSAGE SIGN EA 2 $ 20,000 $ 40,000 18 S 129000 TEMPORARY RAILING (TYPE K) M 1390 $ 30 $ 41,700 19 S 129100 TEMPORARY CRASH CUSHION MODULE EA 44 $ 220 $ 9,680 20 150206 ABANDON CULVERT M 48 $ 75 $ 3,600 21 150221 ABANDON INLET EA 1 $ 900 $ 900 22 150608 REMOVE CHAIN LINK FENCE M 250 $ 16 $ 4,000 23 150701 REMOVE YELLOW PAINTED TRAFFIC STRIPE M 600 $ 10 $ 6,000 24 150704 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE M 500 $ 10 $ 5,000 25 150711 REMOVE PAINTED TRAFFIC STRIPE M 620 $ 2 $ 1,240 26 150712 REMOVE PAINTED PAVEMENT MARKING M2 47 $ 24 $ 1,128 27 150714 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 905 $ 2 $ 1,810 28 150715 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 22 $ 24 $ 528 PAGE 1 OF 6

EA 284700 29 150722 REMOVE PAVEMENT MARKER EA 240 $ 2 $ 480 30 150742 REMOVE ROADSIDE SIGN EA 27 $ 95 $ 2,565 31 150771 REMOVE AC DIKE M 250 $ 8 $ 2,000 32 150805 REMOVE CULVERT M 63 $ 150 $ 9,450 33 150820 REMOVE INLET EA 2 $ 700 $ 1,400 34 151272 SALVAGE METAL BEAM GUARD RAILING M 56 $ 24 $ 1,344 35 151285 SALVAGE SIGN PANEL EA 3 $ 350 $ 1,050 36 152390 RELOCATE ROADSIDE SIGN EA 2 $ 250 $ 500 37 152432 ADJUST MANHOLE EA 4 $ 1,000 $ 4,000 38 152609 MODIFY INLET TO MANHOLE EA 2 $ 2,000 $ 4,000 39 153103 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 353 $ 7 $ 2,542 40 153210 REMOVE CONCRETE M3 165 $ 95 $ 15,675 41 153250A REMOVE MASONARY WALL LS 1 $ 2,400 $ 2,400 42 157560 BRIDGE REMOVAL (PORTION) LS 1 $ 10,000 $ 10,000 43 160101 CLEARING AND GRUBBING LS 1 $ 10,000 $ 10,000 44 160120 REMOVE TREE LS 1 $ 3,000 $ 3,000 45 170101 DEVELOP WATER SUPPLY LS 1 $ 15,000 $ 15,000 46 190101 ROADWAY EXCAVATION M3 8630 $ 12 $ 99,245 47 190105 ROADWAY EXCAVATION (TYPE Z-2) (AERIAL DEPOSITED LEAD) M3 1300 $ 250 $ 325,000 48 190110 LEAD COMPLIANCE PLAN LS 1 $ 5,000 $ 5,000 49 F 192003 STRUCTURE EXCAVATION (BRIDGE) M3 129 $ 85 $ 10,965 50 192037 STRUCTURE EXCAVATION (RETAINING WALL) M3 73 $ 75 $ 5,475 51 F 193003 STRUCTURE BACKFILL (BRIDGE) M3 97 $ 65 $ 6,305 52 193013 STRUCTURE BACKFILL (RETAINING WALL) M3 92 $ 55 $ 5,060 53 198001 IMPORTED BORROW M3 3380 $ 13 $ 42,250 54 198100 LIGHTWEIGHT FILL M3 4390 $ 46 $ 199,745 55 S 200002 ROADSIDE CLEARING LS 1 $ 10,000 $ 10,000 56 S 203001 EROSION CONTROL BLANKET M2 10810 $ 4 $ 43,240 PAGE 2 OF 6

EA 284700 57 S 203021 FIBER ROLLS M 1520 $ 11 $ 16,720 58 208731 200 mm CORREGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT M 37 $ 170 $ 6,290 59 250401 CLASS 4 AGGREGATE SUBBASE M3 1450 $ 23 $ 33,350 60 260301 CLASS 3 AGGREGATE BASE M3 1480 $ 42 $ 62,160 61 390155 ASPHALT CONCRETE (TYPE A) TONN 8840 $ 54 $ 477,360 62 394002 PLACE ASPHALT CONCRETE (MISCELLANEOUS AREA) M2 2275 $ 16 $ 36,400 63 394044 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 33 $ 30 $ 990 64 394048 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 380 $ 6 $ 2,280 65 S 490757 FURNISH PILING (CLASS 625C) M 528 $ 50 $ 26,400 66 S 490758 DRIVE PILE (CLASS 625C) EA 23 $ 1,100 $ 25,300 67 S 490759 FURNISH PILING (CLASS 400C) M 391 $ 50 $ 19,550 68 S 490760 DRIVE PILE (CLASS 400C) EA 19 $ 950 $ 18,050 69 F 510051 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 34 $ 650 $ 22,100 70 F 510053 STRUCTURAL CONCRETE, BRIDGE M3 117 $ 750 $ 87,750 71 F 510060 STRUCTURAL CONCRETE, RETAINING WALL M3 44 $ 500 $ 22,000 72 F 510502 MINOR CONCRETE (MINOR STRUCTURE) M3 31 $ 1,400 $ 43,400 73 510526 MINOR CONCRETE (BACKFILL) M3 102 $ 250 $ 25,500 74 511106 DRILL AND BOND DOWEL M 122 $ 36 $ 4,392 75 519120 JOINT SEAL (MR 15 MM) M 9 $ 110 $ 990 76 S-F 520102 BAR REINFORCING STEEL (BRIDGE) KG 23237 $ 2 $ 41,827 77 S-F 520103 BAR REINFORCING STEEL (RETAINING WALL) KG 2770 $ 2 $ 5,540 78 S 530100 SHOTCRETE M3 59 $ 750 $ 44,250 79 566011 ROADSIDE SIGN - ONE POST EA 10 $ 225 $ 2,250 80 566012 ROADSIDE SIGN - TWO POST EA 1 $ 600 $ 600 81 568001 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA 4 $ 150 $ 600 82 568016 INSTALL SIGN PANEL ON EXISTING FRAME M2 14 $ 130 $ 1,820 83 568017 INSTALL SIGN PANEL ON EXISTING POST EA 3 $ 600 $ 1,800 84 620909 450 mm ALTERNATIVE PIPE CULVERT M 544 $ 175 $ 95,200 85 620913 600 mm ALTERNATIVE PIPE CULVERT M 113 $ 200 $ 22,600 PAGE 3 OF 6

EA 284700 86 665830 300mm BITUMINOUS COATED SLOTTED CORREGATED STEEL PIPE (2.01mm) M 18 $ 300 $ 5,400 87 681594A WICK DRAIN (VERTICAL) M 100800 $ 2 $ 161,280 88 681595A WICK DRAIN (COLLECTOR DRAIN) M 4450 $ 2 $ 6,675 89 707133 900 mm PRECAST CONCRETE PIPE INLET M 5 $ 350 $ 1,750 90 719589 MINOR CONCRETE (BACKFILL) M3 102 $ 250 $ 25,500 91 731502 MINOR CONCRETE (MISC CONSTRUCTION) M3 53 $ 500 $ 26,500 92 731522 MINOR CONCRETE (COBBLESTONE PAVING) M2 490 $ 150 $ 73,500 93 S-F 750001 MISCELLANEOUS IRON AND STEEL KG 2055 $ 5 $ 10,275 94 S 800385 CHAIN LINK FENCE (TYPE CL-1.2) M 79 $ 40 $ 3,160 95 S 800391 CHAIN LINK FENCE (TYPE CL-1.8) M 74 $ 50 $ 3,700 96 S 800423 CHAIN LINK FENCE (TYPE CL-2.4) M 36 $ 65 $ 2,340 97 801340A PIPE BARRIER GATE (TYPE 1-COV) EA 1 $ 2,400 $ 2,400 98 802596 3.6m CHAIN LINK GATE (TYPE CL-1.8) EA 1 $ 1,600 $ 1,600 99 820107 DELINEATOR (CLASS 1) EA 14 $ 40 $ 560 100 820130 OBJECT MARKER EA 3 $ 60 $ 180 101 832003 METAL BEAM GUARD RAILING (WOOD POST) M 16 $ 65 $ 1,040 102 S-F 833020 CHAIN LINK RAILING M 33 $ 300 $ 9,900 103 839522A REMOVABLE BOLLARD EA 2 $ 1,000 $ 2,000 104 839523A BOLLARD EA 2 $ 500 $ 1,000 105 839565 TERMINAL SYSTEM (TYPE SRT) EA 1 $ 2,100 $ 2,100 106 839566 TERMINAL SYSTEM (TYPE CAT) EA 1 $ 4,600 $ 4,600 107 839567 TERMINAL SYSTEM (TYPE CAT) BACKUP EA 1 $ 800 $ 800 108 839701 CONCRETE BARRIER (TYPE 60) M 462 $ 100 $ 46,200 109 839704 CONCRETE BARRIER (TYPE 60D) M 35 $ 100 $ 3,500 110 F 839725 CONCRETE BARRIER (TYPE 736) M 70 $ 380 $ 26,600 111 S 840515 THERMOPLASTIC PAVEMENT MARKING M2 48 $ 33 $ 1,584 112 S 840561 100 mm THERMOPLASTIC TRAFFIC STRIPE M 1960 $ 1 $ 1,646 113 S 840563 200 mm THERMOPLASTIC TRAFFIC STRIPE M 330 $ 2 $ 548 PAGE 4 OF 6

EA 284700 114 S 840571 100 mm THERMOPLASTIC TRAFFIC STRIPE (BROKEN 5.18M - 2.14M) M 56 $ 1 $ 35 115 S 850101 PAVEMENT MARKER (NON-REFLECTIVE) EA 390 $ 2 $ 585 116 S 850111 PAVEMENT MARKER (RETROREFLECTIVE) EA 210 $ 5 $ 1,050 117 S 860201 SIGNAL AND LIGHTING (LOCATION 1) LS 1 $ 14,400 $ 14,400 118 S 860460 LIGHTING AND SIGN ILLUMINATION LS 1 $ 102,528 $ 102,528 119 S 861101 RAMP METERING SYSTEM (LOCATION 1) LS 1 $ 100,242 $ 100,242 120 999990 MOBILIZATION LS 1 $ 250,000 $ 250,000 SUBTOTAL $ 3,182,307 CONTINGENCY (5%) $ 159,115 TOTAL ITEMS $ 3,341,422 SUPPLEMENTAL WORK 121 066070 MAINTAIN TRAFFIC LS 1 $ 30,000 $ 30,000 122 066595 WATER POLLUTION CONTROL MAINTENANCE SHARING LS 1 $ 10,000 $ 10,000 123 066596 ADDITIONAL WATER POLLUTION CONTROL LS 1 $ 4,000 $ 4,000 124 066597 STORM WATER SAMPLING AND ANALYSIS LS 1 $ 15,000 $ 15,000 125 066830A ADDITIONAL DISPOSAL COSTS FOR REMOVAL OF YELLOW PAINT RESIDUE LS 1 $ 5,000 $ 5,000 126 069999A ADDITIONAL HAZARDOUS MATERIAL HANDLING LS 1 $ 20,000 $ 20,000 TOTAL SUPPLEMENTAL WORK $ 84,000 PAGE 5 OF 6

EA 284700 PRICE AMOUNT STATE FURNISHED MATERIALS 127 066061 CHP ENHANCED ENFORCEMENT (COZEEP) LS 1 $ 40,000 $ 40,000 128 066073 MARKER PANELS LS 1 $ 350 $ 350 129 066571 HARDWARE FOR MOUNTING SIGN PANELS LS 1 $ 2,000 $ 2,000 130 066572 SIGN PANELS LS 1 $ 12,800 $ 12,800 131 066803 PADLOCKS LS 1 $ 200 $ 200 132 066843 MODEL 170 CONTROLLER ASSEMBLY LS 1 $ 15,000 $ 15,000 133 066843A LED SIGNAL MODULES EA 14 $ 150 $ 2,100 134 066876 LOOP DETECTOR SENSOR S EA 17 $ 90 $ 1,530 135 066893 UTILITY SERVICE LS 1 $ 4,000 $ 4,000 TOTAL STATE FURNISHED MATERIALS $ 77,980 TOTAL CONSTRUCTION COST $ 3,503,000 PAGE 6 OF 6