FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Similar documents
FOR OFFICIAL USE ONLY

Document of The World Bank RESTRUCTURING PAPER

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A SECOND PROPOSED PROJECT RESTRUCTURING DAKAR DIAMNIADIO TOLL HIGHWAY PROJECT CREDIT 4579-SN BOARD APPROVAL DATE JUNE 2, 2009

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN WATER SUPPLY AND SANITATION PROJECT IBRD LOAN NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Indonesia: Infrastructure Financing Facility Company Project

The World Bank Third Secondary and Local Roads Project (P148048)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

The World Bank Kabeli-A Hydro Electric Project (P122406)

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8715-ID

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

FOR OFFICIAL USE ONLY

The Role of PT. Sarana Multi Infrastruktur in Infrastructure Development

FOR OFFICIAL USE ONLY

The World Bank NEITI Reporting Compliance (P162344)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank Indonesia Power Transmission Development Project (P117323)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Water and Sanitation in Tourist Areas (P054221)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

Indonesia: Indonesian Infrastructure Financing Facility Company Project

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

Public Disclosure Copy

Annex D. Completion and Learning Review Template Document of The World Bank FOR OFFICIAL USE ONLY

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EXPANDING ACCESS TO REDUCE HEALTH INEQUITIES PROJECT (APL III)

CONFERENCE REPORT BACKGROUND

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82060) ON A LOAN IN THE AMOUNT OF USD100 MILLION TO THE

FOR OFFICIAL USE ONLY

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Cambodia: Rural Credit and Savings Project

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Social Assistance System Strengthening Project (P123960)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

State Owned Financial Institutions Reform Project (P156837)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

InfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174)

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

FOR OFFICIAL USE ONLY

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT PAPER ON A PROPOSED ADDITIONAL LOAN AND RESTRUCTURING

THE WORLD BANK IBRD IDA WORLDBANKGROUP OFFICIAL DOCUMENTS

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

TR Third Access to Finance for SMEs (SME III) (P130864)

Public Disclosure Copy

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

Transcription:

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC OF INDONESIA XX OCTOBER 2013 FINANCIAL AND PRIVATE SECTOR DEVELOPMENT EAST ASIA PACIFIC REGION Report No: XXX This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

ABBREVIATIONS AND ACRONYMS ADB IFC IIFF MS PDO Asian Development Bank International Finance Corporation Infrastructure Financing Facility Moderately Satisfactory Project Development Objective Regional Vice President: Country Director: Sector Manager: Task Team Leader: Axel von Trotsenburg Rodrigo A. Chaves Hormoz Aghdaey Carlos Pinerua 2

Restructuring Data Sheet Restructuring Type: Level two Last modified on date : 10/08/2013 1. Basic Information Project ID & Name P092218: ID- Indo Infrastructure Finance Facility Country Task Team Leader Carlos Pinerua Sector Manager/Director Hormoz Aghdaey Country Director Rodrigo A. Chaves Original Board Approval Date 06/24/2009 Original Closing Date: 12/31/2013 Current Closing Date 12/31/2013 Proposed Closing Date [if applicable] 11/30/2015 EA Category F-Financial Intermediary Assessment Revised EA Category F-Financial Intermediary Assessment-Financial Intermediary Assessment EA Completion Date Revised EA Completion Date 2. Revised Financing Plan (US$m) Source Original Revised BORR 0.00 0.00 IBRD 100.00 100.00 Total 100.00 100.00 3. Borrower Organization Department Location Republic of Ministry of Finance 4. Implementing Agency Organization Department Location PT. Sarana Multi Infrastruktur (PERSERO) PT. Infrastructure Finance 3

5. Disbursement Estimates (US$m) Actual amount disbursed as of 10/08/2013 50.00 Fiscal Year Annual Cumulative 2012 0.00 50.00 Total 50.00 6. Policy Exceptions and Safeguard Policies Does the restructured project require any exceptions to Bank policies? N Does the restructured projects trigger any new safeguard policies? If yes, please select from the checklist below and update ISDS accordingly before submitting the package. N 7a. Project Development Objectives/Outcomes Original/Current Project Development Objectives/Outcomes The objective of the Project is to strengthen and further develop the institutional framework of the financial sector to facilitate financing of commercially viable infrastructure projects and thereby increase provision of private infrastructure in. Key performance indicators to judge PT. IIF's success include the following outcomes: (i) increase in the number of commercially viable infrastructure projects achieving financial closure through long-term debt financing, other financial products, and advisory services from the IIFF over the life of the project; (ii) Increase in the amount of private capital (including long-term debt and equity) available for infrastructure projects over the life of the project; (iii) Increased support to government s policy making in private provision of infrastructure through advisory services from IIFF; and (iv) Increase in privately financed infrastructure in. 7b. Revised Project Development Objectives/Outcomes [if applicable] 4

INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT P092218 LOAN 7731-ID Restructuring Paper 1. This memorandum is to request your concurrence with a Closing Date extension for the Infrastructure Financing Facility (IIF) Project (P092218) from December 31, 2013 to November 30, 2015. The extension will provide additional time to complete project activities and achieve the project s development objective (PDO). The Ministry of Finance requested this closing date extension in its letter to the World Bank dated September 27, 2013. 2. The objective of the project is to strengthen and further develop the institutional framework of the financial sector to facilitate the financing of commercially viable infrastructure projects and thereby increase provision of private infrastructure in. This US$100 million loan was approved on June 25, 2009 and became effective on April 25, 2011. The project has disbursed US$50 million to date, with US$38 million already going to sub-borrowers. 3. After a slow start, over the last year there has been significant progress in building IIF s operational capacity, including in managing safeguards requirements. To date, IIF has developed a portfolio of 10 sub-projects (valued at about Rps.2.8 trillion) in the areas of telecommunications, transport, power, and water, with 6 of those still pending approval from its Board of Commissioners. The project is currently rated Moderately Satisfactory (MS). Finally, the Borrower is in compliance with the project s audit requirement. 4. The proposed extension is necessary because, in hindsight, it may have been overly optimistic to expect IIF to become fully functional and have enough time to identify (and finance) bankable projects in just over 4 years. The extension would then allow IIF to fully disburse its project funds to sub-borrowers for existing investments and also finance additional infrastructure investments already in the pipeline. The team has reviewed IIF s action plan and is satisfied that the project would be fully implemented by the revised Closing Date. 5. The team has discussed with the Borrower a more extensive project restructuring, to include a possible restatement of the PDO, which was poorly drafted and, in its current form, difficult to align with the project s indicators. The Borrower is however more keen, at this point, on revisiting the application of the operations manual to subprojects first, which IIF feels is hampering their ability to finalize finance agreements with potential sub-borrowers on a timely basis. The related discussions with IIF and other lenders and shareholders (IFC, ADB, and KFW, in particular) are likely to be lengthy and difficult, and would then take place during the extension period. For this reason, a Closing Date extension is requested at this stage. 6. This will be the first extension of the project. 5