Categorizing Losses. Using the Required FEMA Categories to Properly Handle Emergencies. Issue 3. By Jeff Shaw

Similar documents
Public Assistance. Supplemental financial assistance for debris removal, emergency protective measures, and permanent restoration of infrastructure

Mitigation Measures: Sound Investments in Disaster Recovery

This discussion provides information related to the damage assessment process and discusses the roles and impact of local and county government.

KANSAS CITY, MISSOURI EMERGENCY OPERATIONS PLAN. Annex D: Damage Assessment

Local Damage Assessment. Pocket Guide

Public Assistance: Local, State, Tribal and Non-Profit

Disaster Recovery Planning: Preparation is Key to Survival

EMERGENCY MANAGEMENT FOR PUBLIC WORKS

Hurricane SANDY DR-4086-NJ

Dade County Natural Hazard Mitigation Plan

Emergency Relief Program. Ammon Heier, FHWA ER Coordinator

MAINTENANCE DEPARTMENT

DISASTER MANAGEMENT AND ASSISTANCE

THIS PAGE LEFT BLANK INTENTIONALLY

DEBRIS, MONITORING, AND CONTRACTOR PROCUREMENT! MANAGE, REMOVE & DISPOSE

A SUMMARY OF EMERGENCY RELIEF PROCEDURES. For FEDERAL-AID HIGHWAYS

NORTH CAROLINA EMERGENCY MANAGEMENT

Hurricane Matthew. As of August 24, 2018, the County has received $76,596 in reimbursements from

Prepare + Prevent + Respond + Recover + Mitigate APPLICANT BRIEFING. Recovery_PPT_v7_2-15_4p 1

Matthew Cost Recovery Update #9

Emergency Management. Alden Graybill, Recovery / Mitigation Division Manager, OEM

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

East Hartford. Challenges

Josué M. Yambó Senior Transportation Engineer & ER Program Coordinator Federal Highway Administration (FHWA)

Hazard Mitigation Planning

RiskTopics. Guide to flood emergency response plans September 2017

Emergency Relief Program

Emergency Relief Program

Hurricane Recovery Resources for Health Centers Obtaining Federal Emergency Management Agency (FEMA) Funding for Damaged or Destroyed Facilities

King County Flood Control District 2015 Work Program

Section 406 Hazard Mitigation

Stormwater Management Utility Fee Reduction Credit Application

ENGINEERING AND CONSTRUCTION BULLETIN

Disaster Recovery Resources for Health Centers Obtaining Federal Emergency Management Agency (FEMA) Funding for Damaged or Destroyed Facilities

6.0 MONITORING AND CONTINGENCY PLANS

ASFPM RECOMMENDED TASK FORCE ACTIONS

Justification for Floodplain Regulatory Standards in Illinois

City of Santa Clarita Engineering Services Division Valencia Boulevard Santa Clarita, CA (661) Levee Certification

PEPIN COUNTY EMERGENCY SUPPORT FUNCTION (ESF) 14 LONG-TERM RECOVERY

BACKGROUND ANNUAL PROGRESS REPORT DEVELOPMENT ADOPTION OF THE H-GAC HAZARD MITIGATION PLAN/UPDATES MISSION STATEMENT

Preparing for Disaster

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

A Quick Guide: FEMA Reimbursement for Acute Care Hospitals

Joint Recommendations on Levee Policy. Association of State Floodplain Managers. National Association of Flood and Stormwater Management Agencies

Hazard Mitigation Grants. Technical Assistance Session Middlesex County, NJ December 7, 2011

Flood Solutions. Summer 2018

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

Chapter 10 Mitigation

Authors: Terry Zien, Brian Rast and the Silver Jackets Co presenters: Brian Rast, Dave Lupardus and Frank Dolan

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

33. Government financial support to local authorities

Phase 2. Debris and Ash Removal Operations by County and Program. Cal Recycle

Hurricanes Irma and Maria- Puerto Rico and the U.S. Virgin Islands

State Risk and Insurance Management Association A Workshop About FEMA, Insurance, and The Recovery Process

Introduction to Sequence of Delivery. Visual 2.0

Volusia County Floodplain Management Plan 2012

Flood Risk Outreach Tools for Georgia Communities. GAFM 10 th Annual Conference Presented By: Jarrett Mattli

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

STORMWATER MANAGEMENT FUND Department of Environmental Services

QUESTIONS & ANSWERS Wildfire and Flooding Frequently Asked Questions for First Nations Communities

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

Existing Strategies. Challenges

City of St. Augustine. Floodplain Management Higher Standards Information

Public Assistance Program

Repetitive Loss Area Revisit # 6 Walter Road Area Jefferson Parish

Presenters. Bracken Engineering. Structures Disasters Forensics

This survey is expected to take approximately 20 minutes and must be completed in one session.

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Hurricanes and Windstorm Coverage

STATE OF SOUTH CAROLINA

Frequently Asked Questions (FAQs)

COUNTY OF GREENVILLE PROPRIETARY FUNDS

10/23/2014. Presented by: Erike Young, MPPA, CSP, ARM-E. Public Sector Disaster Planning/Emergency Response

Mississippi Development Authority. Katrina Supplemental CDBG Funds. For. Affordable Housing Tax Credit Gap Funding

Things You Should Know About Flood Protection

2011 MT Floods Damages and Recovery Options

Right of Way Permits. Contact Information:

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters..

Solid Waste & Recycling

Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356

Village Glen HOA P.O. Box 1537, Arroyo Grande, CA. Reserve Study

USACE Levee Screening Tool Understanding the Classification

HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT...

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

Community Rating System. National Flood Insurance Program

Avon. Challenges. Estimated Damages from 100- Year Flood

Bone Bolango, Indonesia

The Provincial Disaster Assistance Program Regulations, 2011

This survey is expected to take approximately 20 minutes and must be completed in one session.

PUBLIC SURVEY FOR HAZARD MITIGATION PLANNING

UNIT 2: THE NATIONAL FLOOD INSURANCE PROGRAM

in coordination with Peoria County, Planning and Zoning Department

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF LISBON

Challenges. Estimated Damages from 100-Year Flood

By Paul O. Dudey, CPCU Contributing: Donald S. Malecki, CPCU

EMERGENCY RELIEF MANUAL (Federal-Aid Highways) November 2009

Hurricane Harvey s Fiscal Impact on State Agencies PRESENTED TO HOUSE APPROPRIATIONS COMMITTEE LEGISLATIVE BUDGET BOARD STAFF

Strategic Asset Management Policy

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

Transcription:

Issue 3 D I S A S T E R R E C O V E R Y T O D A Y Categorizing Losses E D I T O R S N O T E This issue of Disaster Recovery Today focuses on categorizing losses using the required FEMA categories. This step is the third in a nine-step process identified by Adjusters International to respond to a declared disaster. Following a disaster, categorizing losses must be accurately performed to avoid future conflicts with FEMA. This issue breaks down the categories and describes how each is to be used. Your comments, suggestions and requests for back issues are always welcome. Sheila E. Salvatore, Editor Using the Required FEMA Categories to Properly Handle Emergencies By Jeff Shaw In the previous issue of Disaster Recovery Today, the focus was on assessing and documenting losses caused by a disaster. If the event is of such magnitude that federal aid is declared, the losses will need to then be categorized by FEMA categories A through G. These categories are separated into two sections: Emergency Work (Categories A & B) and Permanent Work (Categories C through G). The primary difference between emergency and permanent work involves the reimbursement for an agency s employees (force account) for eligible disaster-related work. FEMA only reimburses for overtime under categories A & B 1, A D J U S T E R S I N T E R N A T I O N A L. C O M 1 This is for force account labor only. It does not affect contract costs. Additionally, in some instances such as when seasonal employees are used for disaster-related work, both straight and overtime may be reimbursable.

whereas the remaining categories are reimbursed for both straight time and overtime. The focus of this issue is to define 2 and discuss each FEMA category in an effort to provide a snapshot of how FEMA views an applicant s recovery. It is important to keep these categories in mind, as oftentimes it will take several weeks sometimes months before an event is declared as eligible and FEMA is actually on site. Category A Debris Removal Public Interest Determination by FEMA Eliminate immediate threats to life, public health and safety; or Eliminate immediate threats of significant damage to improved public or private property; or Ensure economic recovery of the affected community to the benefit of the community-at-large. Private Property Debris Removal Debris removal from private property is the responsibility of the individual property owner. When it is in the public interest for an eligible applicant to remove debris, the following criteria exist: On urban, suburban and rural property, including large lots. Clearance of living, recreational and working areas is eligible, except areas used for crops and livestock, or unused areas. No assistance will be provided to individuals or private organizations for removing debris from their own property except for eligible private non-profit applicants. Right of Entry Agreement must be obtained to indemnify the federal government against any claim arising from such removal. Debris removal is typically a very controversial issue when dealing with FEMA. There are always concerns over where the debris came from, whether it was weighed properly, whether the contractor was procured in accordance with guidelines, etc. Unfortunately, many decisions are made prior to FEMA s arrival, so it becomes imperative to document and photo-journal all activities. An applicant should attempt to do the following, until further direction is provided by the state and FEMA: Photograph areas of heavy debris that is to be removed and processed. Segregate activities on federal aid eligible roadways. Contract for debris removal on either a per ton or cubic yard basis. Attempt, where possible, to limit time and expense contracts to 70 hours. Use force account personnel or contractors to monitor the debris removal activities. Track force account hours and equipment by documenting who, what, where, why. Also describe equipment and for how long it was used. Gain a right of entry (hold harmless) agreement before removing debris from private property. Read and become familiar with FEMA s Debris Management Guide at www.fema.gov/ government/grant/pa/ demagde.shtm. It is not uncommon for FEMA to place debris teams in the field to monitor how an applicant and DISASTERRECOVERYT O D A Y. C O M 2 Definitions in blue are provided from FEMA s Applicant Handbook which can be found at www.fema.gov/government/grant/pa/apphandbk.shtm

their representatives (contractors) are dealing with debris. Often these teams will monitor and generate reports that are then submitted to the state and FEMA. It is imperative that an applicant receives copies of all such reports in case determinations made in the field are in error. In larger scale disasters, the state and FEMA may also utilize the expertise of the United States Army Corps of Engineers (USACE) for planning, monitoring and providing guidance. Category B - Emergency Protective Measures General Measures to save lives, to protect public health and safety, and to protect improved property, are eligible. In order to be eligible, emergency protective measures for property must eliminate or lessen immediate threats of significant damage to improved public or private property through measures that are cost-effective. FEMA may require a certification by local, state and/or federal officials that a threat exists, including identification and evaluation of the threat and recommendations of the Emergency Work necessary to cope with the threat. Items that fall into category B include: Search and rescue Emergency medical care Emergency mass care and shelter Security in the disaster area Provision of food, water, ice and other essential needs at central distribution points for use by the local citizens A D J U S T E R S I N T E R N A T I O N A L. C O M Many decisions are made prior to FEMA s arrival, so it becomes imperative to document and photo-journal all activities. Provision of temporary facilities for essential community services Activation of a state or local emergency operations center Demolition and removal of damaged public or private buildings and structures that pose an immediate threat to the safety of the general public Removal of health and safety hazards Emergency protective measures to protect lives or improve property Emergency measures to prevent further damage to the facility Restoration of access Emergency communications Emergency public transportation Building safety inspections When considering category B, it is important to not forget the activities performed in preparing for a disaster. In the event of a hurricane, where an agency may have three to five days notice, eligible costs would typically start with the activation of the Emergency Operations Center (EOC) and the evacuation itself. Additionally, costs incurred for boarding windows and sandbagging prior to an event would be eligible. Historically category B is controversial, since the terms immediate threat, cost effective and health and safety are somewhat subjective. Every agency views threats and responds to them differently, whereas FEMA Project Officers typically define threats as spelled out in their written policies. In both of the above categories of work, we encourage our clients to do what has to be done to get back to normal. This serves two purposes: it allows you to get back to day-to-day operations as quickly as possible; and it demonstrates to FEMA that you are not taking action solely because they are providing aid. Category C - Road Systems Repairs and Replacements The damage must be directly related to the disaster. It cannot be a pre-existing condition nor caused by an event after the official period of incidence. Repairs to structures (bridges, etc.) may be made when the estimated repair cost is less than the estimated replacement cost, unless the structure is damaged greater than 50%. If a structure is damaged to the extent that repairs exceed 50% of the replacement costs, funding may be provided to replace the structure. The applicant also may choose to make repairs, however, the funding provided will be limited to the cost of replacement. Road Repairs On gravel roads, the base need not be damaged to be eligible for major gravel replacement. Loss of gravel

must be evident. Potholes and rutted surfaces must be shown to be a result of the disaster event. Paving Loss of paved surface is eligible. Alligatored surface is generally a sign of normal deterioration and is not eligible, unless shown to be exclusively disaster-related. Standards Bridge and road standards that have been formally adopted and are in practice, or adopted and placed in effect prior to the date of the disaster declaration, are eligible. The standards must apply to work accomplished using all sources of funds, and not limited to work receiving state and/or federal aid. A copy of standards and council meeting minutes approving the standards should be maintained in the permanent applicant file. On-System Facilities Facilities funded by other federal agencies, such as the Federal Highway Administration (FHWA), are not eligible for permanent repair. Debris removal and emergency measures are eligible on federal aid roads except where the Emergency Relief (ER) Program of the FHWA is activated. For further particulars, see the Public Assistance Guide, FEMA 322. Scheduled Replacement Facilities are not eligible if scheduled for replacement within the next 12 months using federal funds. As stated above, permanent repairs are not eligible on FHWA funded roadways. That being said, an applicant may still do what is necessary to make the roadways safe and passable, however, the FHWA requires prior approval before permanent repairs. For the FHWA s ER Program to be activated, a state must have amassed extraordinary costs per the following: Although there is no nationwide definitive monetary break point between what is considered routine and extraordinary repair expenses the FHWA has determined that eligible ER repair activities in a state in the range of $700,000 (Federal share) or more are usually significant enough to justify approval of ER funds. 3 If the ER Program is activated, the applicant will need to segregate all activities, including emergency work, between federal aid and non-federal aid eligible roads. Since it may take several months for this program to be activated in a major event (hurricane, severe flooding, etc.), applicants should begin this segregation immediately. More information on the FHWA s ER Program can be found at www.fhwa.dot.gov Category D - Water Control Facilities Levees and Dams If the levee or dam meets the definition of a flood control work and thus falls within the authority of the U.S. Army Corps of Engineers (USACE) or Natural Resources Conservation Service (NRCS), it is not eligible for permanent restoration. Drainage Channels The USACE or NRCS may be involved in some flood channels; in these cases, local drainage channels are not eligible. Manmade channels must show evidence of routine maintenance and will be restored to pre-flood hydraulic capacity. Appropriate documentation, including construction and maintenance records for the man-made channels should be placed in the permanent applicant file. The documentation should include records DISASTERRECOVERYT O D A Y. C O M 3 Emergency Relief Manual (Federal Aid Highways) Interim Update, August 2003

demonstrating the pre-disaster condition of the channels. Natural Streams Debris removal from natural streams is not normally eligible for assistance. Only debris that causes a threat to lives, public health and safety, or damage to improved property from a 5-year flood event, is eligible. Work to protect improved property must have a favorable ratio of benefits to costs. Any work in natural streams must also be closely reviewed and monitored to minimize undesirable environmental effects. Seeding and Sodding Seeding, grass, and sod will be eligible only when necessary to stabilize slopes and minimize sediment runoff. Debris Disaster-caused debris in catch basins and channels is eligible for removal when the pre-existing condition can be established. FEMA is particularly interested in category D, as flooding is one of the costliest forms of disasters in the United States. Oftentimes, however, they will deny reimbursement for clearing and repairing those facilities that an applicant does not keep maintained. A good example of this would be a drainage ditch that is laden with storm debris. Applicants would like FEMA to provide funds to clear all of the debris out, however, if the ditch is not routinely maintained, much of the debris can be pre-event, and due to negligence. If the applicant can show that they normally keep the ditch clean through a normal maintenance schedule, then they typically find the debris eligible. A D J U S T E R S I N T E R N A T I O N A L. C O M When approaching category D work, as with damage to federalaid roadways, jurisdiction for repairs may reside with other agencies such as the US Army Corps of Engineers (USACE) or the Natural Resource Conservation Service (NRCS). More information on these agencies can be found at: USACE www.usace.army.mil NRCS http://policy.nrcs.usda.gov Category E - Buildings and Equipment Restoration Buildings are to be restored to pre-disaster design capacity in accordance with present codes and standards. Use and Occupancy The building must have been in active use prior to the disaster. If only part of the building was occupied at the time of the disaster, or if the building was being used for a less demanding function than its original purpose, then replacement will be made at the reduced size, or restoration will be limited to that required to resume the immediate pre-disaster use. Extensive Damage If repairs to a facility would cost 50% or more of the cost of replacing the facility to its predisaster design, then the facility is eligible for replacement. This is known as the 50% Rule, and is discussed in detail in the Public Assistance Guide, FEMA 322. Insurance Check on insurance presently in force. Insurance coverage pays first. Uninsured losses are eligible. If repair costs exceed $5,000, a general hazard insurance commitment will be required equal to the amount of eligible damages. Repair costs for flood damages occurring to buildings and/or contents within the 100- year flood zone will be reduced by the amount that would have been available from a standard NFIP flood policy whether or not the facility was actually insured. Equipment Office equipment and furniture should be replaced with used or surplus, if available. Repair if feasible.

Supplies Consumable supplies will be replaced to pre-disaster quantities. Vehicles Special equipment, such as twoway radios, is eligible. Blue book prices should be used and salvage taken. Check for comprehensive insurance. If repair costs exceed $5,000, an insurance commitment will be required equal to the amount of damages. Grounds Grounds around buildings may be included with building structure if it is to be handled as a single project, except trees and other plantings, which are not eligible. Cleaning For buildings with light damage, cleaning and painting is eligible. As discussed in a previous edition of Disaster Recovery Today, FEMA and applicants often disagree on building repairs, codes and standards, and equipment claims. The following should be kept in mind when dealing with category E losses: While it is appropriate for FEMA to replace a piece of equipment with like, kind and quality, including a used item, such an item may not be readily available, thus a new item may have to be purchased. FEMA uses the Cost Estimating Format (CEF) to determine repair costs for large projects. It is important for applicants to work with FEMA in determining the correct cost factors such as an extraordinary demand caused by the event and If an applicant is claiming an upgrade based on local codes or standards, they must be prepared to demonstrate that the standard existed prior to the event and that it is enforceable. the appropriate costs for materials, overhead and profit, etc. If an applicant is claiming an upgrade based on local codes or standards, they must be prepared to demonstrate that the standard existed prior to the event and that it is enforceable. Locate and duplicate original building drawings/ plans or major repair plans for submission to FEMA. Photographs before, during and after are extremely valuable. Category F Utilities Electrical Restore to pre-disaster design in the most economical manner. Extra pole structures are sometimes necessary to restore the function when erosion has destroyed stream banks and ground clearance has to be maintained over longer distances. Sewer Visual evidence of ground subsidence indicating infiltration into the pipe must be present. Limited TV inspection is eligible when damage is apparent. Use of TV inspection to search for problems is not eligible. Cleaning of disaster-related debris from sewer lines is eligible only when necessary to restore adequate functioning of the system in specific reaches when the pre-existing condition can be established. Revenues Loss of revenue is not eligible. Added costs or charges for providing regular utility services are not eligible. When dealing with utilities, an applicant generally has two sets of costs: what was done immediately to restore service (category B) and what was done as a permanent solution (category F). In some cases, however, the immediate fix is the permanent solution. Historically, if the activity is conducted very soon after the event, FEMA may conclude that it is an emergency measure. If an applicant is using their own staff for the work, then only overtime is eligible. It is imperative that applicants carefully articulate what was done and whether more work is required before a permanent solution is reached. DISASTERRECOVERYT O D A Y. C O M

Category G - Parks, Recreational, and Other Grass Grass, seeding and sod are eligible only when necessary to stabilize slopes and minimize sediment runoff. Trees Trees and other plantings are not eligible. Damage Estimates All structures and damage sites within a park may be included as a single project if repair or contract is being handled that way. They can be claimed separately, if desired. Beaches To be eligible, a beach must have been improved to a designed profile and regularly maintained prior to the disaster. Appropriate documentation should be placed in the permanent applicant file to show that the beaches were designed, constructed and routinely maintained. The documentation should include A D J U S T E R S I N T E R N A T I O N A L. C O M records showing when beach sand was last replaced and at what depths. Permanent restoration of the sand on natural beaches is not eligible. Historically, category G has been the catch-all category for permanent repair issues not addressed in the other categories. Repairs to such items as applicantowned ball fields, golf courses, playgrounds, etc., fall within category G. What often becomes confusing is when a park has a damaged facility within it such as public restrooms or picnic shelters. These damages can be addressed in either category E or G, depending on the decision of the Project Officer. The seven categories listed above were developed to implement the Public Assistance process. In theory, they correspond with existing departmental systems normally part of most applicants organization structure, e.g.: Category A - Solid Waste/ Public Works Category B - Public Safety/ Police/Fire Category C - DOT/Public Works Category D - Public Works Category E - Facilities/ Public Works/ Risk Management Category F - Utilities/ Public Works Category G - Parks and Recreation In most cases when an event occurs, an agency does what it has to do to achieve a safe environment, to continue government services and to restore normalcy as quickly as possible. As stated earlier, much of this is accomplished prior to FEMA s arrival. Knowledge of how FEMA categorizes costs is not only crucial to the emergency manager but all prospective members of the recovery team. In the next issue of Disaster Recovery Today, we will look at the guiding factors of eligibility and provide examples of how the wording and structure of a claim to FEMA is crucial to receiving funding.

Top Ten Natural Disasters Ranked by FEMA Relief Costs Event Year FEMA Funding Hurricane Katrina 2005 $7.2 billion* (AL, LA, MS) Northridge Earthquake 1994 $6.961 billion (CA) Hurricane Georges 1998 $2.251 billion (AL, FL, LA, MS, PR, VI) Hurricane Ivan 2004 $1.947 billion** (AL, FL, GA, LA, MS, NC, NJ, NY, PA, TN, WVA) Hurricane Andrew 1992 $1.813 billion (FL, LA) Hurricane Charley 2004 $1.559 billion** (FL, SC) Hurricane Frances 2004 $1.425 billion** (FL, GA, NC, NY, OH, PA, SC) Hurricane Jeanne 2004 $1.407 billion** (DE, FL, PR, VI, VA) Tropical Storm Allison 2001 $1.387 billion (FL, LA, MS, PA, TX) Hurricane Hugo 1989 $1.307 billion (NC, SC, PR, VI) Jeff Shaw Adjusters International *Amount obligated from the President s Disaster Relief Fund for FEMA s assistance programs, hazard mitigation grants, federal mission assignments, contractual services and administrative costs as of March 31, 2006. Figures do not include funding provided by other participating federal agencies, such as the disaster loan programs of the Small Business Administration and the Agriculture Department s Farm Service Agency. Note: Funding amounts are stated in nominal dollars, unadjusted for inflation. **Amount obligated from the President s Disaster Relief Fund for FEMA s assistance programs, hazard mitigation grants, federal mission assignments, contractual services and administrative costs as of May 31, 2005. Figures do not include funding provided by other participating federal agencies, such as the disaster loan programs of the Small Business Administration and the Agriculture Department s Farm Service Agency. Note: Funding amounts are stated in nominal dollars, unadjusted for inflation. CORPORATE OFFICE 126 Business Park Drive Utica, New York 13502 1-800-382-2468 Outside U.S. (315) 797-3035 FAX: (315) 272-2054 editor@disasterrecoverytoday.com PUBLISHER Ronald A. Cuccaro, SPPA EDITOR Sheila E. Salvatore WEB ADDRESSES www.adjustersinternational.com www.disasterrecoverytoday.com DISASTER RECOVERY TODAY is published as a public service by Adjusters International, Inc. It is provided for general information and is not intended to replace professional insurance, legal and/or financial advice for specific cases. DRC05-2R 4002 Copyright 2007 Adjusters International, Inc. Adjusters International and the AI logo DISASTERRECOVERYT O D A Y. C O M are registered trademarks of Adjusters International, Inc. All rights reserved. PRINTED ON RECYCLED PAPER