CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD:

Similar documents
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 03/08/2017 ESTIMATE PAID: AWARD DATE: 03/28/2017 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 HIGHWAY: US 377 COUNTY: 01/04/2017 ESTIMATE PAID: AWARD DATE: 01/26/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: US 84 COUNTY: 04/04/2017 ESTIMATE PAID: AWARD DATE: 04/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 HIGHWAY: COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: US 82 COUNTY: 02/01/2018 ESTIMATE PAID: AWARD DATE: 02/22/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: US 82 COUNTY: 12/03/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD:

$ CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 234, PROJECT: RMC SH0020

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: SL 467 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/15 HIGHWAY: COUNTY: 12/08/2014 ESTIMATE PAID: AWARD DATE: 12/09/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: SH 103 COUNTY: 10/03/2017 ESTIMATE PAID: AWARD DATE: 10/26/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 04/11/2017 ESTIMATE PAID: AWARD DATE: 04/17/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 HIGHWAY: FM 1186 COUNTY: 12/01/2016 ESTIMATE PAID: AWARD DATE: 12/15/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

$0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 2, IH PROJECT: RMC

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 09/08/2016 ESTIMATE PAID: AWARD DATE: 09/29/2016 ESTIMATE PERIOD: 10/03/2017 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: COUNTY: 03/09/2016 ESTIMATE PAID: AWARD DATE: 03/10/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

RFB Addendum 3

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: COUNTY: 03/05/2015 ESTIMATE PAID: AWARD DATE: 03/26/2015 ESTIMATE PERIOD:

ADDENDUM ACKNOWLEDGMENT

OKLAHOMA TURNPIKE AUTHORITY

2015 Williamson County INVITATION FOR BID

OKLAHOMA TURNPIKE AUTHORITY

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

PART A ROADWAY - BASE BID

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location:

REPLACEMENT OF MERCER COUNTY BRIDGE

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

Engineer's Preliminary Estimate - 100% Submittal

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

BID TABULATION BID REQUEST NO

A DESIGN-BUILD PROJECT

ADDENDUM No. 1 January 29, Paving Program Village of Milford

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affec

BID TABULATION. Engineer's Estmated Opinion of Costs

Final Estimates Level 2

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS


New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

OKLAHOMA TURNPIKE AUTHORITY

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

THIS SECTION INTENTIONALLY LEFT BLANK

CANTON COMMUNITY REQUEST FOR BOARD ACTION

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch

Manistee County Road Commission Bid Forms and Requirements for Manistee County 2019 Local County-wide HMA Wedging and Chip Sealing for Various Roads

LOCAL AGENCY BILLING SUMMARY

ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Addendum 1 13 TH Street Streetscape. September 1, 2017

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.

Galveston County MUD No. 6 Page 1 Operating Fund September 10, 2018

Fort Worth s Experience with the Use of SBR Latex in Hot Mix

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

BERRIEN COUNTY ROAD COMMISSION PROPOSAL AND SPECIFICATION FOR EUCLID AVENUE RECONSTRUCT PROJECT NO BENTON TOWNSHIP


INVITATION TO BID. CONTRACT PERIOD: The contract shall cover the County s needs for the period of July 21, 2015 through July 20, 2015.

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Rock Chalk Park - Infrastructure Report. July 2013

EMERGENCY CONTRACT MANUAL

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

Transcription:

48,793.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 69 18.00 CONTRACT ID: 017701102 PROJECT: NH 2017(641) CONTRACT: 02173007 AWARD : $2,215,251.08 PROJECTED : $2,257,251.08 ADJ. PROJECTED : $2,306,044.60 CONTRACT: CONTRACTOR: MOORE BROTHERS CONSTRUCTION COMPANY HIGHWAY: US 59 DISTRICT NAME: Lufkin COUNTY: POLK AREA ENGINEER: Kevin Harbuck, P.E. AREA NUMBER: 052 ESTIMATE NUMBER: 0014 LETTING DATE: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD: 06/01/2018 to 06/29/2018 NOTICE TO PROCEED DATE: 03/16/2017 ESTIMATE TYPE: FINL WORK BEGIN DATE: 05/24/2017 % COMPLETE: 10 ACCEPTED DATE: 06/29/2018 % TIME USED: 94.52 PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $2,331,438.31 $2,324,123.70 PARTICIPATING NON-PARTICIPATING $2,331,438.31 $2,324,123.70 RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS PAID TO CONTRACTOR $2,331,438.31 $2,324,123.70 CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 6 CONTRACT TIME STATEMENT WORK BEGIN DATE: 05/24/2017 ASSESSED LIQ DAMAGES: 0 TIME CHARGES BEGIN: 05/08/2017 LIQ DAMAGE RATE: $785.00 DAYS: 55 LIQUIDATED DAMAGES: 0 C. O. ADJUSTED DAYS: 18 DAYS AT CURRENT DAYS: 73 PER DAY $785.00 DAYS CHARGED : 69 TOTAL: PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date or Charged Credited 06/01/2018 1 VEG ESTABLISHMENT 06/02/2018 1 SATURDAY 06/03/2018 1 SUNDAY 06/04/2018 1 VEG ESTABLISHMENT 06/05/2018 1 VEG ESTABLISHMENT 06/06/2018 1 VEG ESTABLISHMENT 06/07/2018 1 VEG ESTABLISHMENT 06/08/2018 1 VEG ESTABLISHMENT 06/09/2018 1 SATURDAY 06/10/2018 1 SUNDAY 06/11/2018 1 VEG ESTABLISHMENT 06/12/2018 1 VEG ESTABLISHMENT 06/13/2018 1 VEG ESTABLISHMENT 06/14/2018 1 VEG ESTABLISHMENT 06/15/2018 1 VEG ESTABLISHMENT 06/16/2018 1 SATURDAY 06/17/2018 1 SUNDAY 06/18/2018 1 VEG ESTABLISHMENT 06/19/2018 1 VEG ESTABLISHMENT 06/20/2018 1 VEG ESTABLISHMENT 06/21/2018 1 VEG ESTABLISHMENT 06/22/2018 1 VEG ESTABLISHMENT 06/23/2018 1 SATURDAY 06/24/2018 1 SUNDAY 06/25/2018 1 VEG ESTABLISHMENT 06/26/2018 1 VEG ESTABLISHMENT 06/27/2018 1 VEG ESTABLISHMENT 06/28/2018 1 VEG ESTABLISHMENT 06/29/2018 1 WORK COMPL & ACCEP Diary Adjustment Date or PERIOD SUMMARY Charged Credited 29 0 29 SATURDAY 4 SUNDAY 4 VEG ESTABLISHMENT 20 WORK COMPL & ACC 1

CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 6 WORK PERFORMED THIS PERIOD PROJECT NH 2017(641) CONTROL 017701102 CATEGORY 001 ROADWAY QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date 0075 03166401 000 AGGR (TY PE OR PL GR 4) CY 121.000-1.000 -$121.00 971.00 936.00 0090 03416062 000 D-GR HMA TY-D PG64-22(LEVEL-UP) TON 82.540-16.530 -$1,364.39 7,378.00 6,846.00 0120 05006001 000 MOBILIZATION LS 88,000 0.100 $8,80 1.00 1.00 TOTAL EARNINGS THIS ESTIMATE

CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 6 CONTRACT S PROJECT CATEGORY NH 2017(641) CONTROL 017701102 001 ROADWAY SUPP $ 0060 01346002 000 BACKFILL (TY B) STA 123.880 201.000 0 199.38 24,699.19 0065 01646021 000 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 0.390 26,702.000 0 23,754.56 9,264.28 0075 03166401 000 AGGR (TY PE OR PL GR 4) CY 121.000 971.000 0 936.00 113,256.00 0080 03166436 000 AH (AC-15P OR AC-10-2TR) GAL 3.080 37,416.000 0 33,80 104,104.00 0085 03406106 000 D-GR HMA(SQ) TY-D PG64-22 TON 300 23.000 0 60.08 18,024.00 0090 03416062 000 D-GR HMA TY-D PG64-22(LEVEL-UP) TON 82.540 7,378.000 0 6,846.00 565,068.84 0095 03426002 000 PFC (AHALT) PG76-22 TON 0.010 506.000 0 444.98 4.45 0100 03426006 000 PFC-C (AGGREGATE)(PG76 MIX) SAC-A TON 119.630 6,711.000 0 6,732.03 805,352.75 0105 03516008 000 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 66.510 2,968.000 0 4,150.11 276,023.82 0110 03546021 000 PLANE AH CONC PAV(0" TO 2") SY 1.780 87,759.000 0 87,742.12 156,180.97 0115 04386001 000 CLEANING AND SEALING EXISTING JOINTS LF 40 270 0 297.12 11,884.80 0116 04546008 HEADER TYPE EXPANSION JOINT CF 583.950 0 48.870 48.87 28,537.64 0117 04546009 JOINT SEALANT LF 36.560 0 336.120 336.12 12,288.55 0120 05006001 000 MOBILIZATION LS 88,000 1.000 0 1.00 88,00 0125 05026001 000 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2,380 4.000 0 4.00 9,52 0126 96086002 UNIQUE CHANGE ORDER 2 DOL 557.490 0 4.000 4.00 2,229.96 BARC'D SIGNS (INVOICE) 0140 05336001 000 RUMBLE STRIPS (SHOULDER) LF 0.170 40,054.000 0 32,886.47 5,590.70 0145 06626001 000 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 0.270 6,890 0 5,523.50 1,491.35 0150 06626004 000 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 0.280 31,104.000 0 23,365.00 6,542.20 0155 06626034 000 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 0.260 3,200 0 21,512.00 5,593.12 0160 06626109 000 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1.000 2,353.000 0 3,154.00 3,154.00 0165 06626112 000 WK ZN PAV MRK SHT TERM RMV (W)(4") LF 1.000 3,530 0 5,655.00 5,655.00 0170 06666035 000 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 0.940 3,200 0 2,054.00 1,930.76 0175 06666299 000 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 0.510 7,030 0 5,994.00 3,056.94 0180 06666302 000 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 0.460 27,664.000 0 23,57 10,842.20 0185 06666314 000 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 0.460 27,904.000 0 23,251.00 10,695.46 0190 06726010 000 REFL PAV MRKR TY II-C-R EA 3.850 459.000 0 367.00 1,412.95 0195 60016002 000 PORTABLE CHANGEABLE MESSAGE SIGN EA 3,500 2.000 0 2.00 7,00 0196 96086001 UNIQUE CHANGE ORDER 1 DOL 5,737.380 0 1.000 1.00 5,737.38 CLEAN BRIDGE ABUTMENTS & CAPS 0205 05856003 RIDE PAYMENT ADJUSTMENT ( 342) DOL 1.000 24,000 0 38,297.00 38,297.00 Category Subtotal $2,331,438.31 PROJECT NH 2017(641) CONTROL 017701102 CATEGORY 001 ROADWAY SUPP 0070 01686001 000 VEGETATIVE WATERING MG 5.000 267.000 0 0 0130 05066038 002 TEMP SEDMT CONT FENCE (INSTALL) LF 0.100 1,000 0 0 0135 05066039 002 TEMP SEDMT CONT FENCE (REMOVE) LF 0.100 1,000 0 0

CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 6 0200 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL 1.000 15,000 0 0 0225 96016001 MATERIAL ON HAND DOL 1.000 1,000 0 0 CATEGORY 002 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP 0210 96066055 FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 1.000 1,000 0 0 CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP 0215 96066056 FORCE ACCOUNT - SAFETY CONTINGENCY DOL 1.000 1,000 0 0 Category Subtotal TOTAL EARNINGS THIS CONTRACT $2,331,438.31

CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 6 CONSTRUCTION ESTIMATE COMBINED 01346002 000 BACKFILL (TY B) STA 123.880 201.00 199.380 24,699.19 01646021 000 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 0.390 26,702.00 23,754.560 9,264.28 03166401 000 AGGR (TY PE OR PL GR 4) CY 121.000 971.00 936.000 113,256.00 03166436 000 AH (AC-15P OR AC-10-2TR) GAL 3.080 37,416.00 33,800 104,104.00 03406106 000 D-GR HMA(SQ) TY-D PG64-22 TON 300 23.00 60.080 18,024.00 03416062 000 D-GR HMA TY-D PG64-22(LEVEL-UP) TON 82.540 7,378.00 6,846.000 565,068.84 03426002 000 PFC (AHALT) PG76-22 TON 0.010 506.00 444.980 4.45 03426006 000 PFC-C (AGGREGATE)(PG76 MIX) SAC-A TON 119.630 6,711.00 6,732.030 805,352.75 03516008 000 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 66.510 2,968.00 4,150.110 276,023.82 03546021 000 PLANE AH CONC PAV(0" TO 2") SY 1.780 87,759.00 87,742.120 156,180.97 04386001 000 CLEANING AND SEALING EXISTING JOINTS LF 40 27 297.120 11,884.80 04546008 HEADER TYPE EXPANSION JOINT CF 583.950 48.870 28,537.64 04546009 JOINT SEALANT LF 36.560 336.120 12,288.55 05006001 000 MOBILIZATION LS 88,000 1.00 1.000 88,00 05026001 000 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2,380 4.00 4.000 9,52 05336001 000 RUMBLE STRIPS (SHOULDER) LF 0.170 40,054.00 32,886.470 5,590.70 05856003 RIDE PAYMENT ADJUSTMENT ( 342) DOL 1.000 24,00 38,297.000 38,297.00 06626001 000 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 0.270 6,89 5,523.500 1,491.35 06626004 000 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 0.280 31,104.00 23,365.000 6,542.20 06626034 000 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 0.260 3,20 21,512.000 5,593.12 06626109 000 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1.000 2,353.00 3,154.000 3,154.00 06626112 000 WK ZN PAV MRK SHT TERM RMV (W)(4") LF 1.000 3,53 5,655.000 5,655.00 06666035 000 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 0.940 3,20 2,054.000 1,930.76 06666299 000 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 0.510 7,03 5,994.000 3,056.94 06666302 000 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 0.460 27,664.00 23,570 10,842.20 06666314 000 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 0.460 27,904.00 23,251.000 10,695.46 06726010 000 REFL PAV MRKR TY II-C-R EA 3.850 459.00 367.000 1,412.95 60016002 000 PORTABLE CHANGEABLE MESSAGE SIGN EA 3,500 2.00 2.000 7,00 96086001 UNIQUE CHANGE ORDER 1 DOL 5,737.380 1.000 5,737.38 CLEAN BRIDGE ABUTMENTS & CAPS 96086002 UNIQUE CHANGE ORDER 2 DOL 557.490 4.000 2,229.96 BARC'D SIGNS (INVOICE) TOTAL EARNINGS $2,331,438.31