Exhibit 4 Page 1 of 8

Similar documents
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

LETTING : CALL : 056 COUNTIES : MILLE LACS

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

OKLAHOMA TURNPIKE AUTHORITY

TOTAL QUANTITY UNIT COST UNIT

BID TABULATION BID REQUEST NO

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

OKLAHOMA TURNPIKE AUTHORITY

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Addendum 1 13 TH Street Streetscape. September 1, 2017

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

Route Route Z Intersection Realignment

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

PART A ROADWAY - BASE BID

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Addendum 1 Downtown North CRA Sidewalks

CONTRACT TIME DETERMINATION

BID TABULATION. Engineer's Estmated Opinion of Costs

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

CITY OF DEERFIELD BEACH Request for City Commission Agenda

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Rock Chalk Park - Infrastructure Report. July 2013

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Engineer's Preliminary Estimate - 100% Submittal

CANTON COMMUNITY REQUEST FOR BOARD ACTION

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY EXECUTIVE BRIEF

Department of Public Works Engineering

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

Public Works Maintenance STORMWATER AND

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

ADDENDUM No. 1 January 29, Paving Program Village of Milford

OKLAHOMA TURNPIKE AUTHORITY

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

Right-of-Way Construction Permit Application

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

Chapter 6: Financial Resources

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

CITY OF TAMPA ADDENDUM 2. April 18, 2018

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Appendix B Example Project Designs and Engineers Opinion of Costs

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

BID TABULATION PAGE 1 OF 6

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS

SUBDIVISION IMPROVEMENTS AGREEMENT

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Electric Service Information Sheet Georgia Power Company

Appendix E: Revenues and Cost Estimates

GENERAL PROVISIONS I. WORK REQUIREMENTS

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

City of Newnan, Georgia

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board.

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

TRANSPORTATION CAPITAL PROGRAM

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

Reviax Constracting Corp. DeSantis Construction

RFB Addendum 3

ARKANSAS PUBLIC SERVICE COMMISSION

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

PROPOSAL FOR IMPROVEMENTS TO OGDEN - HINCKLEY AIRPORT OGDEN, UTAH AIP PROJECT NO

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

OPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS

ADOPTED BY SIV BOARD

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

REPLACEMENT OF MERCER COUNTY BRIDGE

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION


Market Street Gateway Improvements Phase 1

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

In this chapter, we will talk about the criteria and procedures for these other types of measurement and payment.

Active Construction RV Associates Scarsella JR Hayes

Transcription:

Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations: 0 HCED/Engineer's Cost Estimate General Asphalt Co Inc Weekley Asphalt Paving Inc. JVA Engineering Contractor Inc. Community Asphalt Corp % Difference Comparison Recommended Bid vs. Engineer's Estimate 1 (B/A) Group # Group Description Total Price Price Price Price Price 1 General Construction Operations $ 715,827.28 $ 617,473.97 $ 528,557.20 $ 909,472.00 $ 1,419,405.71 16% 2 Roadway $ 2,581,532.20 $ 2,320,800.90 $ 2,609,961.57 $ 2,762,148.80 $ 3,101,719.01 11% 3 Signing and Pavement Marking $ 201,266.22 $ 185,309.70 $ 206,297.35 $ 213,267.20 $ 202,462.93 9% 4 Signalization $ 137,454.80 $ 138,376.00 $ 124,209.40 $ 137,746.00 $ 149,034.28 1% 5 Landscaping $ 330,624.56 $ 452,034.00 $ 343,580.80 $ 368,570.00 $ 388,416.12 27% 6 Payment and Performance Bond $ 30,000.00 $ 20,000.00 $ 45,000.00 $ 61,500.00 $ 37,164.03 50% 7 Insurance $ 8,500.00 $ 5,000.00 $ 3,000.00 $ 15,000.00 $ 10,984.77 70% Total* $ 4,005,205.06 $ 3,738,994.57 $ 3,860,606.32 $ 4,467,704.00 $ 5,309,186.85 7% Note: The lowest bid received was compared against the engineer's cost estimate that uses the overall area costs based on historical industry prices for similar items of work being performed. Fluctuations in costs between the average costs and the bid costs may be present due to availability of materials and labor forces, market demand, economic activity, and overall bidding preferences of the contractor. * Bid Totals listed above do not include the $25,000 bid allowance for permit fees.

Page 2 of 8 Lot: General Construction Operations C2113975C1 01 01 FDOT PAY 0101 1 Mobilization 1 lump sum $ 290,848.56 $ 290,848.56 $ 100,000.00 $ 100,000.00 $ 90,495.00 $ 90,495.00 $ 390,000.00 $ 390,000.00 $ 486,447.66 $ 486,447.66 C2113975C1 01 02 FDOT PAY 0102 1 Maintenance of Traffic 1 lump sum $ 330,393.24 $ 330,393.24 $ 446,000.00 $ 446,000.00 $ 395,000.00 $ 395,000.00 $ 410,000.00 $ 410,000.00 $ 832,671.23 $ 832,671.23 C2113975C1 01 03 FDOT PAY 0104 10 3 SEDIMENT BARRIER 13236.3 linear foot $ 2.35 $ 31,131.78 $ 1.71 $ 22,634.07 $ 1.00 $ 13,236.30 $ 2.00 $ 26,472.60 $ 1.63 $ 21,575.17 C2113975C1 01 04 FDOT PAY 0104 18 INLET PROTECTION SYSTEM 5 each $ 224.00 $ 1,120.00 $ 90.00 $ 450.00 $ 110.00 $ 550.00 $ 150.00 $ 750.00 $ 1,871.96 $ 9,359.80 C2113975C1 01 05 FDOT PAY 0107 1 LITTER REMOVAL 165.62 acre $ 31.10 $ 5,151.18 $ 1.00 $ 165.62 $ 1.00 $ 165.62 $ 70.00 $ 11,593.40 $ 56.25 $ 9,316.13 C2113975C1 01 06 FDOT PAY 0107 2 MOWING 74.28 acre $ 43.81 $ 3,254.53 $ 1.00 $ 74.28 $ 1.00 $ 74.28 $ 200.00 $ 14,856.00 $ 168.75 $ 12,534.75 C2113975C1 01 07 FDOT PAY 0108 1 INSPECTION & SETTLEMENT MONITORING 1 lump sum $ 6,720.00 $ 6,720.00 $ 9,200.00 $ 9,200.00 $ 11,500.00 $ 11,500.00 $ 15,000.00 $ 15,000.00 $ 2,812.43 $ 2,812.43 C2113975C1 01 08 FDOT PAY 0109 71 13 FIELD OFFICE 900 SQUARE FEET 270 day $ 162.40 $ 43,848.00 $ 135.00 $ 36,450.00 $ 56.80 $ 15,336.00 $ 120.00 $ 32,400.00 $ 157.18 $ 42,438.60 1 lump sum $ 3,360.00 $ 3,360.00 $ 2,500.00 $ 2,500.00 $ 2,200.00 $ 2,200.00 $ 8,400.00 $ 8,400.00 $ 2,249.95 $ 2,249.95 C2113975C1 01 09 FDOT PAY Audio Visual Pre Construction and Post Construction Records Total $715,827.28 $617,473.97 $528,557.20 $909,472.00 $1,419,405.71

Page 3 of 8 Lot: Roadway C2113975C1 02 01 FDOT PAY 0110 1 1 CLEARING & GRUBBING 10.72 acre $ 16,800.00 $ 180,096.00 $ 10,835.00 $ 116,151.20 $ 26,437.50 $ 283,410.00 $ 19,000.00 $ 203,680.00 $ 14,955.37 $ 160,321.57 C2113975C1 02 02 FDOT PAY 0120 1 REGULAR EXCAVATION 7230 cubic yard $ 8.49 $ 61,379.81 $ 5.50 $ 39,765.00 $ 18.37 $ 132,815.10 $ 12.00 $ 86,760.00 $ 13.79 $ 99,701.70 C2113975C1 02 03 FDOT PAY 0120 6 EMBANKMENT 727 cubic yard $ 15.02 $ 10,918.96 $ 4.40 $ 3,198.80 $ 12.90 $ 9,378.30 $ 33.00 $ 23,991.00 $ 22.10 $ 16,066.70 C2113975C1 02 04 FDOT PAY 0160 4 TYPE B STABILIZATION 9297 square yard $ 5.60 $ 52,063.20 $ 3.80 $ 35,328.60 $ 3.45 $ 32,074.65 $ 3.50 $ 32,539.50 $ 6.22 $ 57,827.34 C2113975C1 02 05 FDOT PAY 0285 709 OPTIONAL BASE BASE GROUP 09 (B 12.5 ONLY) 8819 square yard $ 36.96 $ 325,950.24 $ 41.00 $ 361,579.00 $ 37.04 $ 326,655.76 $ 42.00 $ 370,398.00 $ 106.95 $ 943,192.05 C2113975C1 02 06 FDOT PAY 0286 2 TURNOUT CONSTRUCTION ASPHALT 714 ton $ 201.13 $ 143,606.53 $ 150.00 $ 107,100.00 $ 170.27 $ 121,572.78 $ 136.00 $ 97,104.00 $ 136.94 $ 97,775.16 C2113975C1 02 07 FDOT PAY 0327 70 1 MILLING EXIST ASPH PAVT 1 inch AVG DEPTH 31442 square yard $ 2.95 $ 92,615.56 $ 2.00 $ 62,884.00 $ 2.25 $ 70,744.50 $ 2.40 $ 75,460.80 $ 2.54 $ 79,862.68 C2113975C1 02 08 FDOT PAY 0334 1 13 SUPERPAVE ASPHALTIC CONC TRAFFIC C 8322 ton $ 101.74 $ 846,686.94 $ 95.00 $ 790,590.00 $ 109.60 $ 912,091.20 $ 115.00 $ 957,030.00 $ 98.81 $ 822,296.82 C2113975C1 02 09 FDOT PAY 0337 7 73 ASPHALT CONCRETE FRICTION COURSETRAFFIC C FC 9.5 PG 76 to 2986 ton $ 136.44 $ 407,405.06 $ 120.00 $ 358,320.00 $ 125.83 $ 375,728.38 $ 136.00 $ 406,096.00 $ 134.71 $ 402,244.06 C2113975C1 02 10 FDOT PAY 0425 5 MANHOLE ADJUST 1 each $ 688.89 $ 688.89 $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 1,100.00 $ 1,100.00 $ 562.49 $ 562.49 C2113975C1 02 11 FDOT PAY 0425 1525 INLETS DT BOT TYPE C PARTIAL 1 each $ 6,504.66 $ 6,504.66 $ 5,500.00 $ 5,500.00 $ 1,600.00 $ 1,600.00 $ 2,800.00 $ 2,800.00 $ 4,049.91 $ 4,049.91 C2113975C1 02 12 FDOT PAY 0425 2 63 MANHOLES P to 8 PARTIAL 1 each $ 4,052.16 $ 4,052.16 $ 5,500.00 $ 5,500.00 $ 2,900.00 $ 2,900.00 $ 5,100.00 $ 5,100.00 $ 6,187.36 $ 6,187.36 C2113975C1 02 13 FDOT PAY 0430 94 1 DESILTING PIPE 0 to 24 inch 338 linear foot $ 10.68 $ 3,611.46 $ 6.60 $ 2,230.80 $ 8.25 $ 2,788.50 $ 20.00 $ 6,760.00 $ 11.25 $ 3,802.50 C2113975C1 02 14 FDOT PAY 0430 174 112 PIPE CULVERT OPTIONAL MATERIAL ROUND 12 inch SD 45 linear foot $ 137.87 $ 6,204.24 $ 100.00 $ 4,500.00 $ 70.00 $ 3,150.00 $ 110.00 $ 4,950.00 $ 168.75 $ 7,593.75 C2113975C1 02 15 FDOT PAY 0520 1 10 CONCRETE CURB & GUTTER TYPE F 1303 linear foot $ 31.36 $ 40,862.08 $ 28.00 $ 36,484.00 $ 23.20 $ 30,229.60 $ 34.00 $ 44,302.00 $ 42.56 $ 55,455.68 C2113975C1 02 16 FDOT PAY 0522 2 CONCRETE SIDEWALK AND DRIVEWAYS 6 inch THICK 4241 square yard $ 52.34 $ 221,963.76 $ 60.50 $ 256,580.50 $ 42.35 $ 179,606.35 $ 41.50 $ 176,001.50 $ 42.84 $ 181,684.44 C2113975C1 02 17 FDOT PAY 0522 4 BUS SHELTER PAD REINFORCED CONCRETE 22 square yard $ 112.00 $ 2,464.00 $ 66.00 $ 1,452.00 $ 166.00 $ 3,652.00 $ 135.00 $ 2,970.00 $ 436.02 $ 9,592.44 C2113975C1 02 18 FDOT PAY 0527 2 DETECTABLE WARNINGS 961 square foot $ 35.84 $ 34,442.24 $ 31.00 $ 29,791.00 $ 25.00 $ 24,025.00 $ 29.00 $ 27,869.00 $ 47.25 $ 45,407.25 C2113975C1 02 19 FDOT PAY 0536 73 GUARDRAIL REMOVAL 93 linear foot $ 3.70 $ 343.73 $ 22.00 $ 2,046.00 $ 5.00 $ 465.00 $ 4.00 $ 372.00 $ 16.87 $ 1,568.91 C2113975C1 02 20 FDOT PAY 0570 1 2 PERFORMANCE TURF SOD PASPALUM NOTATUM BAHIA GRASS 33235 square yard $ 4.09 $ 135,864.68 $ 3.00 $ 99,705.00 $ 2.87 $ 95,384.45 $ 7.00 $ 232,645.00 $ 3.08 $ 102,363.80 C2113975C1 02 21 FDOT PAY 0751 35 BUS SHELTER RELOCATE 1 each $ 2,240.00 $ 2,240.00 $ 1,320.00 $ 1,320.00 $ 900.00 $ 900.00 $ 3,500.00 $ 3,500.00 $ 787.48 $ 787.48 C2113975C1 02 22 FDOT PAY 0751 36 BICYCLE RACK RELOCATE 1 each $ 896.00 $ 896.00 $ 110.00 $ 110.00 $ 120.00 $ 120.00 $ 360.00 $ 360.00 $ 2,249.95 $ 2,249.95 1 each $ 672.00 $ 672.00 $ 165.00 $ 165.00 $ 120.00 $ 120.00 $ 360.00 $ 360.00 $ 1,124.97 $ 1,124.97 C2113975C1 02 23 FDOT PAY 0751 37 TRASH RECEPTACLE RELOCATE Total $2,581,532.20 $2,320,800.90 $2,609,961.57 $2,762,148.80 $3,101,719.01

Page 4 of 8 Lot: Signing and Pavement Marking C2113975C1 03 01 FDOT PAY 0523 1 3 PATTERNED PAVEMENT GREEN BIKE LANE 813.7 square yard $ 95.01 $ 77,309.31 $ 100.00 $ 81,370.00 $ 89.50 $ 72,826.15 $ 96.00 $ 78,115.20 $ 101.25 $ 82,387.13 C2113975C1 03 02 FDOT PAY 0630 2 11 CONDUIT FURNISH & INSTALL OPEN TRENCH 20 linear foot $ 11.20 $ 224.00 $ 25.00 $ 500.00 $ 22.50 $ 450.00 $ 12.00 $ 240.00 $ 13.50 $ 270.00 C2113975C1 03 03 FDOT PAY 0635 2 40 PULL & SPLICE BOX RELOCATE 2 each $ 787.11 $ 1,574.23 $ 655.00 $ 1,310.00 $ 595.10 $ 1,190.20 $ 1,760.00 $ 3,520.00 $ 1,754.96 $ 3,509.92 C2113975C1 03 04 FDOT PAY 0646 1 40 ALUMINUM SIGNALS POLE RELOCATE 2 each $ 658.76 $ 1,317.52 $ 1,400.00 $ 2,800.00 $ 1,184.60 $ 2,369.20 $ 685.00 $ 1,370.00 $ 770.61 $ 1,541.22 C2113975C1 03 05 FDOT PAY 0700 1 11 SINGLE POST SIGN (F&I) LESS THAN 12 SF 37 assembly $ 470.40 $ 17,404.80 $ 360.00 $ 13,320.00 $ 695.00 $ 25,715.00 $ 695.00 $ 25,715.00 $ 444.36 $ 16,441.32 C2113975C1 03 06 FDOT PAY 0700 1 12 SINGLE POST SIGN (F&I) 12 to 20 SF 15 assembly $ 1,290.18 $ 19,352.76 $ 1,155.00 $ 17,325.00 $ 995.00 $ 14,925.00 $ 995.00 $ 14,925.00 $ 618.74 $ 9,281.10 C2113975C1 03 07 FDOT PAY 0700 1 50 SINGLE POST SIGN RELOCATE 23 assembly $ 168.00 $ 3,864.00 $ 315.00 $ 7,245.00 $ 395.00 $ 9,085.00 $ 395.00 $ 9,085.00 $ 140.62 $ 3,234.26 C2113975C1 03 08 FDOT PAY 0700 1 60 SINGLE POST SIGN REMOVE 36 assembly $ 25.76 $ 927.36 $ 17.00 $ 612.00 $ 50.00 $ 1,800.00 $ 50.00 $ 1,800.00 $ 84.37 $ 3,037.32 C2113975C1 03 09 FDOT PAY 0706 3 RETRO REFLECTIVE PAVEMENT MARKER 587 each $ 4.70 $ 2,761.25 $ 3.30 $ 1,937.10 $ 3.50 $ 2,054.50 $ 4.00 $ 2,348.00 $ 3.49 $ 2,048.63 C2113975C1 03 10 FDOT PAY 0710 90 PAINTED PAVEMENT MARKINGS FINAL SURFACE 1 lump sum $ 22,154.95 $ 22,154.95 $ 10,200.00 $ 10,200.00 $ 15,640.50 $ 15,640.50 $ 15,640.00 $ 15,640.00 $ 14,045.43 $ 14,045.43 C2113975C1 03 11 FDOT PAY 0711 11 123 THERMOPLASTIC STD. WHITE SOLID 12 inch 606 linear foot $ 2.69 $ 1,628.93 $ 2.20 $ 1,333.20 $ 1.30 $ 787.80 $ 1.50 $ 909.00 $ 1.43 $ 866.58 C2113975C1 03 12 FDOT PAY 0711 11 124 THERMOPLASTIC STD. WHITE SOLID 18 inch 110 linear foot $ 3.53 $ 388.08 $ 2.75 $ 302.50 $ 2.00 $ 220.00 $ 2.00 $ 220.00 $ 2.31 $ 254.10 C2113975C1 03 13 FDOT PAY 0711 11 125 THERMOPLASTIC STD. WHITE SOLID 24 inch 661 linear foot $ 4.82 $ 3,183.38 $ 3.50 $ 2,313.50 $ 3.00 $ 1,983.00 $ 3.00 $ 1,983.00 $ 3.15 $ 2,082.15 C2113975C1 03 14 FDOT PAY 0711 11 141 THERMOPLASTIC STD. WHITE 2 to 4 DOTTED GUIDELINE/ 6 to 1 0.98 gross mile $ 2,800.00 $ 2,744.00 $ 1,485.00 $ 1,455.30 $ 1,400.00 $ 1,372.00 $ 1,500.00 $ 1,470.00 $ 1,018.10 $ 997.74 C2113975C1 03 15 FDOT PAY 0711 11 160 THERMOPLASTIC STD. WHITE MESSAGE 3 each $ 168.00 $ 504.00 $ 110.00 $ 330.00 $ 120.00 $ 360.00 $ 120.00 $ 360.00 $ 129.37 $ 388.11 C2113975C1 03 16 FDOT PAY 0711 11 170 THERMOPLASTIC STD. WHITE ARROW 43 each $ 100.80 $ 4,334.40 $ 55.00 $ 2,365.00 $ 80.00 $ 3,440.00 $ 80.00 $ 3,440.00 $ 84.37 $ 3,627.91 C2113975C1 03 17 FDOT PAY 0711 11 224 THERMOPLASTIC STD. YELLOW SOLID 18 inch 491 linear foot $ 3.36 $ 1,649.76 $ 2.75 $ 1,350.25 $ 2.00 $ 982.00 $ 2.00 $ 982.00 $ 2.31 $ 1,134.21 C2113975C1 03 18 FDOT PAY 0711 11 241 THERMOPLASTIC STD. YELLOW 2 to 4 DOTTED/GUIDELINE/6 to 1 0.07 gross mile $ 2,800.00 $ 196.00 $ 1,485.00 $ 103.95 $ 1,500.00 $ 105.00 $ 1,500.00 $ 105.00 $ 1,018.10 $ 71.27 C2113975C1 03 19 FDOT PAY 0711 14 160 PREFORMED TAPE BIKE MESSAGE 21 each $ 255.91 $ 5,374.08 $ 230.00 $ 4,830.00 $ 860.00 $ 18,060.00 $ 860.00 $ 18,060.00 $ 731.23 $ 15,355.83 C2113975C1 03 20 FDOT PAY 0711 14 170 PREFORMED TAPE BIKE ARROW 21 each $ 151.28 $ 3,176.85 $ 100.00 $ 2,100.00 $ 370.00 $ 7,770.00 $ 370.00 $ 7,770.00 $ 731.23 $ 15,355.83 C2113975C1 03 21 FDOT PAY 0711 16 101 THERMOPLASTIC STD. OTHER SURFACES WHITE SOLID 6 inch 4.01 gross mile $ 4,378.35 $ 17,557.18 $ 4,510.00 $ 18,085.10 $ 3,500.00 $ 14,035.00 $ 3,500.00 $ 14,035.00 $ 3,723.66 $ 14,931.88 C2113975C1 03 22 FDOT PAY 0711 16 102 THERMOPLASTIC STD. OTHER SURFACES WHITE SOLID 8 inch 0.05 gross mile $ 5,534.12 $ 276.71 $ 5,610.00 $ 280.50 $ 4,600.00 $ 230.00 $ 4,600.00 $ 230.00 $ 4,944.26 $ 247.21 C2113975C1 03 23 FDOT PAY 0711 16 201 THERMOPLASTIC STD. OTHER SURFACES YELLOW SOLID 6 inch 2.99 gross mile $ 4,318.41 $ 12,912.04 $ 4,510.00 $ 13,484.90 $ 3,500.00 $ 10,465.00 $ 3,500.00 $ 10,465.00 $ 3,723.66 $ 11,133.74 0.24 gross mile $ 1,877.69 $ 450.65 $ 1,485.00 $ 356.40 $ 1,800.00 $ 432.00 $ 2,000.00 $ 480.00 $ 916.85 $ 220.04 C2113975C1 03 24 FDOT PAY 0711 16 231 THERMOPLASTIC STD. OTHER SURFACES YELLOW SKIP 6 inch Total $201,266.22 $185,309.70 $206,297.35 $213,267.20 $202,462.93

Page 5 of 8 Lot: Signalization C2113975C1 04 01 FDOT PAY 0630 2 11 CONDUIT (F& I) OPEN TRENCH 60 linear foot $ 8.96 $ 537.60 $ 33.00 $ 1,980.00 $ 30.00 $ 1,800.00 $ 10.00 $ 600.00 $ 9.56 $ 573.60 C2113975C1 04 02 FDOT PAY 0630 2 12 CONDUIT (F& I) DIRECTIONAL BORE 242 linear foot $ 22.40 $ 5,420.80 $ 33.00 $ 7,986.00 $ 30.00 $ 7,260.00 $ 18.00 $ 4,356.00 $ 20.25 $ 4,900.50 C2113975C1 04 03 FDOT PAY 0632 7 1 SIGNAL CABLE NEW OR RECONSTRUCTED INTERSECTION FURNISH & INS 1 per intersection $ 5,600.00 $ 5,600.00 $ 6,350.00 $ 6,350.00 $ 5,773.10 $ 5,773.10 $ 3,980.00 $ 3,980.00 $ 4,477.40 $ 4,477.40 C2113975C1 04 04 FDOT PAY 0635 2 11 PULL & SPLICE BOX (F&I) 13 inch x 24 inch 23 each $ 560.00 $ 12,880.00 $ 620.00 $ 14,260.00 $ 563.30 $ 12,955.90 $ 760.00 $ 17,480.00 $ 629.99 $ 14,489.77 C2113975C1 04 05 FDOT PAY 0635 2 12 PULL & SPLICE BOX (F&I) 24 inch X 36 inch 1 each $ 1,400.00 $ 1,400.00 $ 1,200.00 $ 1,200.00 $ 1,016.00 $ 1,016.00 $ 1,800.00 $ 1,800.00 $ 1,799.96 $ 1,799.96 C2113975C1 04 06 FDOT PAY 0639 1 123 ELECTRICAL POWER SRV(F&I) UGPURNOT REQ 1 assembly $ 2,800.00 $ 2,800.00 $ 1,400.00 $ 1,400.00 $ 1,176.20 $ 1,176.20 $ 1,200.00 $ 1,200.00 $ 1,349.97 $ 1,349.97 C2113975C1 04 07 FDOT PAY 0639 2 1 ELECTRICAL SERVICE WIRE (F&I) 320 linear foot $ 2.80 $ 896.00 $ 3.00 $ 960.00 $ 1.90 $ 608.00 $ 5.00 $ 1,600.00 $ 5.06 $ 1,619.20 C2113975C1 04 08 FDOT PAY 0639 1 610 ELECTRICAL POWER SERVICE REMOVE OVERHEAD 1 assembly $ 336.00 $ 336.00 $ 210.00 $ 210.00 $ 188.90 $ 188.90 $ 400.00 $ 400.00 $ 449.99 $ 449.99 C2113975C1 04 09 FDOT PAY 0643 600 STRAIN POLE WOOD REMOVE 2 each $ 560.00 $ 1,120.00 $ 415.00 $ 830.00 $ 377.70 $ 755.40 $ 1,850.00 $ 3,700.00 $ 2,081.20 $ 4,162.40 C2113975C1 04 10 FDOT PAY 0646 1 11 ALUMINUM SIGNALS POLE PEDESTAL 2 each $ 1,120.00 $ 2,240.00 $ 1,700.00 $ 3,400.00 $ 1,510.10 $ 3,020.20 $ 980.00 $ 1,960.00 $ 1,102.47 $ 2,204.94 C2113975C1 04 11 FDOT PAY 0649 31 108 M/ARMF&I WS 150SING ARMWITH LUM 60 1 each $ 44,800.00 $ 44,800.00 $ 50,000.00 $ 50,000.00 $ 44,687.90 $ 44,687.90 $ 44,890.00 $ 44,890.00 $ 50,500.07 $ 50,500.07 C2113975C1 04 12 FDOT PAY 0650 1 14 TRAFFIC SIGNAL(F&I) ALUMINUM 3 S 1 W 4 assembly $ 1,120.00 $ 4,480.00 $ 880.00 $ 3,520.00 $ 801.00 $ 3,204.00 $ 950.00 $ 3,800.00 $ 1,068.73 $ 4,274.92 C2113975C1 04 13 FDOT PAY 0650 1 70 TRAFFIC SIGNAL RELOCATE INCLUDES REMOVAL AND REINSTALLATION 4 assembly $ 515.20 $ 2,060.80 $ 400.00 $ 1,600.00 $ 364.20 $ 1,456.80 $ 580.00 $ 2,320.00 $ 652.48 $ 2,609.92 C2113975C1 04 14 FDOT PAY 0653 1 11 PEDESTRIAN SIGNAL (F&I) LED COUNT 1 WAY 2 assembly $ 952.00 $ 1,904.00 $ 550.00 $ 1,100.00 $ 501.30 $ 1,002.60 $ 640.00 $ 1,280.00 $ 719.98 $ 1,439.96 C2113975C1 04 15 FDOT PAY 0665 1 12 PEDESTRIAN DETECTOR (F&I) ACCESSIBLE 2 each $ 1,680.00 $ 3,360.00 $ 2,400.00 $ 4,800.00 $ 2,198.60 $ 4,397.20 $ 580.00 $ 1,160.00 $ 652.48 $ 1,304.96 C2113975C1 04 16 FDOT PAY 0670 5 140 TRAFFIC CONTROLLER ASSEMBLY (F&I) MODEL 2070 1 assembly $ 31,981.60 $ 31,981.60 $ 33,300.00 $ 33,300.00 $ 30,270.70 $ 30,270.70 $ 31,800.00 $ 31,800.00 $ 35,774.16 $ 35,774.16 C2113975C1 04 17 FDOT PAY 0670 5 600 TRAFFIC CONTROLLER ASSEMBLY REMOVE CONTROLLER WITH CABINET 1 assembly $ 392.00 $ 392.00 $ 415.00 $ 415.00 $ 377.70 $ 377.70 $ 300.00 $ 300.00 $ 337.49 $ 337.49 C2113975C1 04 18 FDOT PAY 0684 1 5 MANAGED FIELD ETHERNET SWITCH ADJUST / MODIFY 1 each $ 308.00 $ 308.00 $ 110.00 $ 110.00 $ 94.40 $ 94.40 $ 850.00 $ 850.00 $ 956.23 $ 956.23 C2113975C1 04 19 FDOT PAY 0715 1 12 LIGHTING CONDUCTORS (F&I) INSULATED NO.8 to 6 335 linear foot $ 2.80 $ 938.00 $ 3.00 $ 1,005.00 $ 1.90 $ 636.50 $ 2.00 $ 670.00 $ 1.52 $ 509.20 C2113975C1 04 20 FDOT PAY 0715 7 11 LOAD CENTER (F&I) SECONDARY VOLTAGE 1 each $ 12,880.00 $ 12,880.00 $ 3,700.00 $ 3,700.00 $ 3,318.00 $ 3,318.00 $ 12,500.00 $ 12,500.00 $ 14,062.17 $ 14,062.17 1 each $ 1,120.00 $ 1,120.00 $ 250.00 $ 250.00 $ 209.90 $ 209.90 $ 1,100.00 $ 1,100.00 $ 1,237.47 $ 1,237.47 C2113975C1 04 21 FDOT PAY 0715 11 111 LUMINAIRE (F&I) ROADWAY COBRA HEAD Total $137,454.80 $138,376.00 $124,209.40 $137,746.00 $149,034.28

Page 6 of 8 Lot: Landscaping C2113975C1 05 01 TREE REMOVAL CANOPY TREES LESS THAN 20 FOOT IN HT 7 each $ 280.00 $ 1,960.00 $ 500.00 $ 3,500.00 $ 250.00 $ 1,750.00 $ 600.00 $ 4,200.00 $ 562.49 $ 3,937.43 C2113975C1 05 02 TREE REMOVAL CANOPY TREES MORE THAN 20 FOOT IN HT 49 each $ 1,008.00 $ 49,392.00 $ 2,000.00 $ 98,000.00 $ 522.70 $ 25,612.30 $ 900.00 $ 44,100.00 $ 562.49 $ 27,562.01 C2113975C1 05 03 TREE REMOVAL PALM TREES 15 each $ 280.00 $ 4,200.00 $ 500.00 $ 7,500.00 $ 250.00 $ 3,750.00 $ 600.00 $ 9,000.00 $ 449.99 $ 6,749.85 C2113975C1 05 04 ROOT BARRIER 18 INCH PANEL 705 linear foot $ 25.20 $ 17,766.00 $ 17.00 $ 11,985.00 $ 16.70 $ 11,773.50 $ 15.00 $ 10,575.00 $ 16.87 $ 11,893.35 C2113975C1 05 05 ACER RUBRUM RED MAPLE 14 FOOT to 16 FOOT x 8 FOOT SPR. 45 G 9 each $ 504.00 $ 4,536.00 $ 745.00 $ 6,705.00 $ 675.00 $ 6,075.00 $ 675.00 $ 6,075.00 $ 759.36 $ 6,834.24 C2113975C1 05 06 BURSERA SIMARUBA GUMBO LIMBO 14 FOOT to 16 FOOT x 8 FOOT SPR. 65 G 27 each $ 672.00 $ 18,144.00 $ 635.00 $ 17,145.00 $ 575.00 $ 15,525.00 $ 575.00 $ 15,525.00 $ 646.86 $ 17,465.22 C2113975C1 05 07 CONOCARPUS ERECTUS GREEN BUTTONWOOD 12 FT to 14 FT x 6 FT SPR. 3 INCH CAL. 13 each $ 672.00 $ 8,736.00 $ 685.00 $ 8,905.00 $ 625.00 $ 8,125.00 $ 625.00 $ 8,125.00 $ 703.11 $ 9,140.43 C2113975C1 05 08 CONOCARPUS ERECTUS SERICEUS SILVER BUTTONWOOD 10 FOOT to 12 FOOT x 6 FOOT SPR. 29 each $ 483.84 $ 14,031.36 $ 469.00 $ 13,601.00 $ 425.00 $ 12,325.00 $ 425.00 $ 12,325.00 $ 478.11 $ 13,865.19 C2113975C1 05 09 JACARANDA MIMOSIFOLIA JACARANDA 12 FOOT to 14 FOOT x 6 FOOT SPR. FG 11 each $ 672.00 $ 7,392.00 $ 680.00 $ 7,480.00 $ 620.00 $ 6,820.00 $ 620.00 $ 6,820.00 $ 697.48 $ 7,672.28 C2113975C1 05 10 QUERCUS VIRGINIANA LIVE OAK 14 FOOT to 18 FOOT x 8 FOOT FG 89 each $ 840.00 $ 74,760.00 $ 1,265.00 $ 112,585.00 $ 1,150.00 $ 102,350.00 $ 1,150.00 $ 102,350.00 $ 1,293.72 $ 115,141.08 C2113975C1 05 11 PERSEA BORBONIA FLORIDA RED BAY 10 FOOT to 12 FOOT x 6 FOOT SPR. 45 G 11 each $ 588.00 $ 6,468.00 $ 770.00 $ 8,470.00 $ 700.00 $ 7,700.00 $ 700.00 $ 7,700.00 $ 787.48 $ 8,662.28 C2113975C1 05 12 TAXODIUM DISTICHUM BALD CYPRESS 14 FOOT to 18 FOOT x 8 FOOT FG 18 each $ 554.40 $ 9,979.20 $ 577.50 $ 10,395.00 $ 525.00 $ 9,450.00 $ 525.00 $ 9,450.00 $ 590.61 $ 10,630.98 C2113975C1 05 13 BISMARCKIA NOBILIS SILVER BISMARCK PALM 10 FOOT CT SINGLE TRUNK 26 each $ 1,736.00 $ 45,136.00 $ 1,760.00 $ 45,760.00 $ 1,600.00 $ 41,600.00 $ 1,600.00 $ 41,600.00 $ 1,799.96 $ 46,798.96 C2113975C1 05 14 ROYSTONEA REGIA FLORIDA ROYAL PALM 10 FOOT GRAY WOOD MATCHED 25 each $ 1,344.00 $ 33,600.00 $ 1,430.00 $ 35,750.00 $ 1,300.00 $ 32,500.00 $ 1,300.00 $ 32,500.00 $ 1,462.47 $ 36,561.75 137 each $ 252.00 $ 34,524.00 $ 469.00 $ 64,253.00 $ 425.00 $ 58,225.00 $ 425.00 $ 58,225.00 $ 478.11 $ 65,501.07 C2113975C1 05 15 SABAL PALMETTO SABAL PALM 14 FOOT to 22 FOOT STAGGERED HTS. BOOTED Total $330,624.56 $452,034.00 $343,580.80 $368,570.00 $388,416.12

Page 7 of 8 Lot: Payment and Performance Bond C2113975C1 06 01 Payment and Performance Bond Premium 1 lump sum $ 30,000.00 $ 30,000.00 $ 20,000.00 $ 20,000.00 $ 45,000.00 $ 45,000.00 $ 61,500.00 $ 61,500.00 $ 37,164.03 $ 37,164.03

Page 8 of 8 Lot: Insurance C2113975C1 07 01 Insurance Bond Premium 1 lump sum $ 8,500.00 $ 8,500.00 $ 5,000.00 $ 5,000.00 $ 3,000.00 $ 3,000.00 $ 15,000.00 $ 15,000.00 $ 10,984.77 $ 10,984.77