SCHEDULE OF FEES FOR CITY OF LONGWOOD BUILDING DIVISION As Updated by Resolution 16-1418, Effective February 3, 2017 Method for Determining Value of Buildings. Construction Cost / Valuation will be calculated using the most current published edition of the Building Valuation Data chart as published by the International Code Council, or the contracted price. In those instances in which valuation is based on the contractor s estimate, the contractor shall provide such verification as the Building Official may require, such as the written contract between contractor and owner. If the contractor fails to provide such verification, the Building Official may, in his or her sole discretion, determine the valuation based on the value of of proposed work. Fifty percent of the permit fee will be paid in advance for plan review and shall be subject to the refund policy. All permits are subject to a State Certification Surcharge and a State DBPR Surcharge which is a minimum of $4.00 per permit or 3% of the permit valuation. Plans: A minimum of two sets of drawings shall be submitted with all applications. Digital copies of all as-builts shall be submitted prior to issuance of a certificate of occupancy. Other fees and charges: The applicant is responsible for other related fees and charges not enumerated in this Chapter prior to receiving building permits as required by law. These include, but are not limited to, City utility impact fees and Seminole County impact fees. If a permit is not renewed prior to the expiration date, the applicant will be required to resubmit plans and specifications for the appropriate category and pay the appropriate fees. In the event the code changes editions then the re-submission of the expired application will be based on the most current code edition. Penalties: Any person commencing work without a permit shall be subject to a fee in the amount of double the permit fee. Refunds: For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that have begun shall not be eligible for a refund. The application fee is nonrefundable. City of Longwood Fee Schedule Page 1 of 7
Group I Residential Interior Alterations 1. Application Fee: $30 (Non-refundable) 2. Permit Fee: 1.2% of the documented value of the with a $45 minimum 3. Plan Review Fee.04% of the documented value of the (with a $45 minimum) 34. Education & Technology Fee: 0.07% of the documented value of the 5. State surcharge: 0.03% of the documented valuation or $4 whichever is greater. Fences, Sheds $15 (plus application fee) Pools, Screen Enclosures $25 (plus application fee) Additional plan review/revisions $5/page (with a $25 minimum) Reinspections $35 for first/$50 for each thereafter Re-stamp approved set of plans $25 $5.00/page (with a $25.00 minimum) Change any or all subs $25 Pre power $75 $50hr/$100 minimum (subject to weekday/weekend time rule) Reissue of permit to new contractor $25 Renewal of expired permit 30% of original fee/$75 minimum (same code cycle) Duplicate of permit (lost, stolen, etc) $10 Master file engineering $50 Group II Commercial Interior Alterations 1. Application Fee: $30.00 (Non-refundable) 2. Plan Review Fee.03% of the documented value of the (with a $90.00 minimum) City of Longwood Fee Schedule Page 2 of 7
3. Permit Fee: 1.6% of the documented value of the with a $90.00 minimum 3. 4. Education & Technology Fee: 0.07% of the documented value of the 5. State surcharge: 0.03% of the documented valuation or $4.00 Fences, Sheds $15 (plus application fee) Pools, Screen Enclosures $25 (plus application fee) Additional plan review/revisions $5.00/page with a $50.00 minimum Reinspections $35 for first/$50 each thereafter Re-stamp plans $5.00/page (with a $25.00 minimum) Change any or all subs $25 Pre power $75 $50hr/$100 minimum (subject to weekday/weekend rule) Reissue of permit to new contractor $25 Renewal of expired permit 30% of original fee/$75 minimum Duplicate of permit (lost, stolen, etc) $10 Master file engineering $50 Group III New Building Construction - Commercial 1. Application Fee: $30.00 2. Plan Review: 0.45% of the documented value of structural 3. Permit Fee: 1.2% of the documented value of the structural 4. Education & Technology Fee: 0.07% of the documented value of the 5. State surcharge: 0.03% of the documented valuation or $4.00 Revisions $35 Resubmittals 50% costs of original submittal City of Longwood Fee Schedule Page 3 of 7
Cursory Plan Review $100 Re-inspections $35 for first/$50 each thereafter Re-stamp plans $5/page Change any or all subs $25 Pre power $100 $50 hr/ $100 minimum (subject to weekday/weekend rule) Reissue of permit to new contractor $25 Renewal of expired permit 30% of original fee/$75 minimum Duplicate of permit (lost, stolen, etc) $10 Temporary CO $100 Master file engineering $50 New Building Construction - Residential 1. Application Fee: $30.00 2. Plan Review: 0.45% of the documented value of structural 3. Permit Fee: 1.0% of the documented value of the structural 4. Education & Technology Fee: 0.07% of the documented value of the 5. State surcharge: 0.03% of the documented valuation or $4.00 Digital copies of all as-builts shall be submitted prior to issuance of a certificate of occupancy. Revisions 30% of original fee/$75.00 minimum Resubmittals $10.00 Cursory Plan Review as dictated by state statute Re-inspections $100.00 Re-stamp plans $50.00 Change any or all subs $25.00 Pre power $75.00 $50 hr/ $100 minimum (subject to weekday/weekend rule) Reissue of permit to new contractor $25.00 City of Longwood Fee Schedule Page 4 of 7
Renewal of expired permit 30% of original fee/$75.00 minimum Duplicate of permit (lost, stolen, etc) $10.00 Temporary CO $100.00 Master file engineering $50.00 Group IV Stand-Alone Installations 1. Plumbing Permit Fees: $50.00 plus 1.6% of the documented plumbing valuation, ($50.00 minimum) 2. Mechanical Permit Fees: $50.00 plus 1.5% of the documented mechanical valuation, ($50.00 minimum) 3. Electrical Permit Fees: $50.00 plus 1.5% of the documented electrical valuation, ($50.00 minimum) 4. Roof/Reroof Permit Fees: $50.00 plus 1.28% of the documented roof valuation, ($50.00 minimum) 5. Fuel Gas Permit Fee: $50.00 plus 1.5% of the documented valuation of State surcharge/dbpr Surcharge:.03% of the documented valuation or $4.00 Fire Sprinkler/Suppression Permit Fee Group V Fire Fees Application Fee: Plumbing Permit Fee: Education & Technology Fee: $30.00 (non- refundable) $50.00 plus 1.6% of the documented valuation (with a $50.00 minimum). 0.07% of the documented valuation of. Additional Fees: State Surcharge/DBPR Surcharge:.03% of the documented valuation or $4.00 City of Longwood Fee Schedule Page 5 of 7
Fire Alarm Fee: Application Fee: Electrical Permit Fee: $30.00 (non-refundable) $50.00 plus 1.5% of the documented valuation (with a $50.00 minimum). Education & Technology Fee: 0.07% of documented valuation of. Additional Fees: State surcharge/dbpr Surcharge:.03% of the documented valuation or $4.00 City of Longwood Fee Schedule Page 6 of 7