Commercial (QS) Core Competencies (Feb 17)

Similar documents
Design-Build Risk and Insurance Table of Contents

JCT 2016 Edition of Contracts

Routes to Market: Smart Motorways Alliance Commercial Model Summary

PM024: Contract Risk Management & Compliance

Contract Risk Management & Compliance

Tendering Policy United Energy s contestability of connection and augmentation guideline

Schedule 10. Part 2 from Subcontractors to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [NAME OF SUBCONTRACTOR] DEED OF WARRANTY

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

The New NZS 3910:2013

سند پیش ارزیابی 2 ) E4 پروژه طرح جامع برق )پروژه

Attachment 14 Handover and Reinstatement Work Procedures

On How Not to Draft Agreements

CONTRACT DATA. Part one Data provided by the Employer CONTRACT DATA PART 1

SURCO TRAINING. presents a series of AND CONTRACT MANAGEMENT TRAINING SEMINARS. for CONSTRUCTION PROFESSIONALSS

Terms and Conditions

Comparison between the Red Book 1999 and the MDB Harmonised Edition 2010

Peter Kerrigan CONTRACTING ON NEC 3 ENGINEERING CONSTRUCTION CONTRACT OPTION A - AN INTRODUCTION.

Short Course on. Construction Law. with particular reference to the. JBCC 2000 Series of Contracts. in particular the application of

SUBCONTRACT FOR LABOUR ONLY ENGINEERING AND CONSTRUCTION WORKS (September 2005) (Second Edition of CIDB document 1016)

Public Private Partnerships (PPPs) Projects

UK-Beverley: construction work 2008/S CONTRACT NOTICE. Works

Contract Management in Offshore & Marine, EPCIC and Shipyard

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

UK-Leeds: construction work 2008/S CONTRACT NOTICE. Works

Schedule 10. Part 1 from Contractor to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [CONTRACTOR] DEED OF WARRANTY

General Conditions of Contract for Civil Works

MDB Harmonised Particular Conditions

N D-0004-LF37

Contractual Awareness Introduction

NEC 3 ABOUT US 27/06/2013 COMPANY PROFILE NEC 3 SOME PROBLEMS EXPOSED AND DISCUSSED. Gary Blackburn Michael Conway Damien Savage

Standard forms of partnering contracts The ultimate contractual commitment? Part 4

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No.

TENDER FOR THE NSLC S THE PORT AT SPRING GARDEN SUPPLY AND INSTALL RETAIL DISPLAY SHELVING

Request for Quotation

NEC4 ENGINEERING & CONSTRUCTION CONTRACT

TENDER FORM DISTRICT... PROVINCE TAX

Skanska s Standard Terms and Conditions for Subcontracting

Intro Public-Private Partnership (P3) Finance Course

ICES. Narrative. Applicant s name

COSCCO016 - SQA Unit Code F Prepare and monitor costs and accounts in construction

standard usage of materials for actual production standard labour time for actual production ( ) x 27,500 = 5,500 (A)

Conditions of Contract for Construction

Professional Services Contract

Nigel White. Profile. Expertise:

MEGAPROJECT Case Study

Cycling South Africa. Invitation to Tender. For. Official Apparel and Team Kit Supplier

Risk Allocation in Underground Construction and the Benefits of the ECI/Portland Model Approach

Experience Sharing on NEC Implementation and its Effectiveness in Hong Kong

SPECIAL TENDER CONDITIONS FOR THE

Terms of Trade relating to Produce and Grocery acquired for sale

ENGINEERING & CONSTRUCTION RISK INSTITUTE

Infrastructure ESG policy guidelines

1 July Guideline for Municipal Competency Levels: Chief Financial Officers

REQUEST FOR BIDS. Installation of 6 Chain Link Fence & Gates. Bids Due: December 12th, 2016 at 10:00 A.M.

Blending EU grants with PPPs in the next financial perspective ( ) François Gaudet 25 th October, Zagreb

Best Practice Procurement Liability & Insurance Workshop

General Assembly. United Nations A/CN.9/WG.I/XIII/CRP.2

Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND SPAWGLASS CONSTRUCTION CORP., CONSTRUCTION MANAGER-AT-RISK

Mini-bid Guidelines For Certain Service & Technology Contracts Established by the State of New York Office of General Services

Front Porch Roof Replacement Scope of Work

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date

HPV Health Purchasing Policy 1. Procurement Governance

General Conditions of Contract for the Hire of Plant With or Without an Operator

CONSTRUCTION LAW AND RISK MANAGEMENT

TENDERING FOR GOODS/SERVICES PROCEDURES

Texas Department of Transportation

Raising Equity for large biomass to power projects

INVITATION TO BID. The Sanitary District of Decatur, Illinois will receive bids as follows:

4. The Division shall receive tenders at a location specified by the Secretary-Treasurer up to the time and date specified on the tender documents.

DIRECTORATE OF ESTATES AND FACILITIES

2 nd Edition September 2005 (Second Edition of CIDB document 1020)

ANNEX VIII a STANDARD FORMATS AND TEMPLATES

RISK MANAGEMENT LECTURE 5. Ahmed Elyamany

Overview of the framework

TRANSNET NATIONAL PORTS AUTHORITY RFP NUMBER TNPA 541 DESCRIPTION OF THE WORKS: PORT OF RICHARDS BAY - CONSTRUCTION OF PORT ENTRANCES AND ACCESS ROADS

London 2012 Risk Management. 12 th May 2011

Proposal Form Professional Indemnity Insurance (Architect & Engineers)

CONTENT OUTLINE LAW AND CONTRACTS FOR THE CONSTRUCTION INDUSTRY

Pricing Cost Assurance and Analysis Service (CAAS) Estimates Constraints

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

AIA Document A201 TM 1997

Conditions of Contract for PLANT and Design-Build

Waste Treatment Plant Project Supply Chain Collaboration Event WTP - EQUITABLE ADJUSTMENT MANAGEMENT (Changes, REAs, Claims)

C R D A Capital Region Development Authority

Form C BINDING UNDERTAKINGS BY FOREIGN SUPPLIER

PURCHASE ORDER CONDITIONS Attachment A

NFF Contract Template Labour Hire

4.3(d) Qualifications and experience of key Staff. Site Management:

GOVERNMENT CONTRACT COSTS, PRICING & ACCOUNTING REPORT

Civil Design Consultants, Inc.

DRAFT STANDARD PROCEDURES DOCUMENT FOR PREPARING FRAMEWORK AGREEMENTS PUBLIC PROCUREMENT REGULATORY AUTHORITY (PPRA) OCTOBER 2018

Steve Ashley. Chair Service Delivery Working Group. Highways Term Maintenance Association

THIRD PARTY INSPECTION AND MONITORING

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

NEWSLETTER. OF THE UNIVERSITY OF GRAZ (Karl-Franzens-Universität, Graz) 101 st SPECIAL ISSUE. ACADEMIC YEAR 2016/17 Issued on 14/06/2017 Bulletin 36.

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Financial Proposal. Part 6

REQUEST FOR BIDS MINOR REPAIRS

Slide 1. Slide 2. Slide 3 LEARNING OBJECTIVES WHAT S THE DIFFERENCE? PERSONAL AND PROFESSIONAL EXCELLENCE

CLIENT-PROFESSIONAL PROJECT AGREEMENT FOR ARCHITECTURAL SERVICES BETWEEN CLIENT AND

Transcription:

01 Financial and commercial processes in civil engineering Optimum Activity Detail of A K E Management of budgets for civil engineering works. Cost forecasting, management and control processes including the use of contract programmes B K E Profitability forecasts, cost/budget/value comparisons and cash flow. C K E Value engineering techniques and their importance in achieving cost effective and safe design, construction and maintenance solutions D K A Design, adaption and continual improvement of processes, procedures, and tools to enable the monitoring and management of key commercial drivers e.g. change, cost, certification etc. including a facility to check and audit

02 ercial management and contract administration on civil engineering projects Optimum Activity Detail of A K E Supply chain procurement and management B K E Administration of contracts and / or subcontracts including payments mechanisms, change procedures, and resolution of contentious issues, final accounts agreement and management. C K K The principles of insurance and the common types of insurance available for usage on civil engineering projects, including professional indemnity insurance and warranties. D K E Identification, recording, notification and negotiation of change in accordance with the contract. Evaluation of change through analysis of rates or compensation methods, and agreement of the effects of change. E K K Employment legislation and its applicability to civil engineering works (e.g. Working Rule Agreement).

03 Contract structure, documentation and the bid process in civil engineering Optimum Activity Detail of A K E How standard forms of contract are used for civil engineering projects, how they deal with key provisions including the rights and obligations of the Parties B K E Determination of the scope of work through interpretation of the contract documents contract provisions, specifications, drawing, schedules, technical etc. C K E Preambles, Bills of Quantities, Activity Schedules and Schedules of Rates. D K K Risk identification, analysis and management E K K The preparation and interpretation of estimates and tender submissions.

04 The principles of contract law and their application within the context of civil engineering Optimum Activity Detail of A K E Contract and other civil law principles applicable to the jurisdiction. B K K Statute law relevant to civil engineering works C K E Advice on contractual matters and formulating contractual / legal correspondence D K K Dispute avoidance and resolution processes available and procedures that apply.

Dispute avoidance and resolution processes available and procedures that apply. 05 Optimum Activity Detail of A K E Various types of programmes used in civil engineering. B K E Use of the programmes for planning and monitoring the works. C K K Use of programmes for analysis and demonstration and delay and disruption and entitlement to extensions of time D K K Use of programmes to support budget and risk management on a project.

06 Techniques and technologies employed in civil engineering works Optimum Activity Detail of A K K Techniques and technologies, their impact on sustainable and safe working practices with particular emphasis on stakeholder involvement in projects with which personally involved B K E The utilisation of labour, plant, equipment, materials and sub-contractors C K K Building Information Modelling (BIM) and similar management tools.