Contractual Awareness Introduction
|
|
- Adele George
- 6 years ago
- Views:
Transcription
1 Contractual Awareness Introduction Geraldine Fleming Vice President and Executive Director February 2016 The Global Leader in Managing Construction Risk
2 CORPORATE OVERVIEW Founded in 1973 in Manchester specialising in construction dispute resolution Headquarters at Warrington, Cheshire Additional offices in London, Cumbria and Teesside In September 2006, acquired by Hill International, Inc., one of the largest construction consulting firms in the world providing project management and construction claims services to public and private clients worldwide Access to over 4,000 professionals in 100 offices worldwide, each with a local understanding of their respective markets - the world s largest construction claims practice 2
3 CONSTRUCTION CLAIMS Dispute Avoidance Contractual Advice and Contract Drafting Procurement and Partnering Advice Construction Defects Diagnosis and Technology Seminars and Training Dispute Resolution Adjudication / Mediation / Conciliation / Expert Determination Claim Preparation Delay and Disruption Analysis Expert Witness Testimony Dispute Management Litigation Support Cost and Damages Assessment Project, Risk and Strategic Management 3
4 GERALDINE FLEMING BSc (Hons) Quantity Surveying MRICS Worked for main contractor for 5 years as site QS Completed law degree in 2002 Completed solicitor s exams in 2004 Worked for Knowles for over 18 years Vice President and Executive Director 4
5 Our courses Contractual Awareness Forms of contract (JCT, NEC, bespoke) Credit management We ve done the work, how do we get paid? Delays, extensions of time and liquidated damages Other issues collateral warranties / retention etc 5
6 Some commissions Internal training on NEC contracts to a main contractor Internal training on JCT contracts to a subcontractor Producing a set of terms and conditions for a subcontractor (ensuring that he can agree variation prices before having to do the work) Reviewing an NEC subcontract, and successfully agreeing significant alterations to the form on the subcontractor s behalf Writing supply only terms, including limitation of liability clauses Contractual advice regarding retention release and liability for defects Acting in an adjudication for a main contractor Negotiating an account with a difference of over 700k 6
7 After this course Review your credit management systems Check your own terms vital document for your business Review your current contracts Keep your ear to the ground Find out who is paying and who is not Find out who is involved in problem jobs 7
8 The Contract You need one - unless you enjoy playing poker 8
9 The Contract - suppliers What should it cover? Specification for the goods Delivery Quality Title to the goods Risk to the goods Price / payment (VAT) Suspension / termination Limitation of liability Force majeure Scope of works (testing / commissioning / maintenance?) Drawings (what revision) and specification 9
10 The Contract main / subcontractors What should it cover? Scope of works (testing / commissioning / maintenance?) Drawings (what revision) and specification Payment (incl discount / retention / MOS) Design responsibility Insurance Programme (sectional completion?) Subcontracting Attendances LD s Bonds, warranties, PCG s Limitation of liability clause Retention 10
11 Payment an intro Why are you in business to make money You need to understand the rules of engagement regarding payment 11
12 Payment for suppliers You need clear terms, eg Advance payment Interim payments if the working period is over 28 days You will send interim bills They must pay within days If they disagree, they must challenge within days of receiving the bill with reasons, and must still pay the undisputed items in full 12
13 Payment for main / subcontractors You are in contract with another organisation could be a main contractor, local authority, school or another M&E subbie You are supplying and installing It does include working on a house where you are working directly for a main contractor You need to ensure your contract clearly uses the following terms Due date Final date for payment Payment notice Pay less notice 13
14 Contact Details Knowles Geraldine Fleming Vice President and Executive Director T M geraldine.fleming@jrknowles.com 14
NEC 3 ABOUT US 27/06/2013 COMPANY PROFILE NEC 3 SOME PROBLEMS EXPOSED AND DISCUSSED. Gary Blackburn Michael Conway Damien Savage
NEC 3 NEC 3 SOME PROBLEMS EXPOSED AND DISCUSSED Gary Blackburn Michael Conway Damien Savage 26 June 2013 COMPANY PROFILE UK: Construction Claims & Dispute Avoidance/Resolution, Commercial Management, Project
More informationConstruction traps and solutions for development projects
Construction traps and solutions for development projects Joe Bellhouse BrookStreet des Roches LLP Nick Woodruff Arcadis APS Project Management 15 June 2011 About the speakers Joe Bellhouse Joe Bellhousee
More informationTaking your career to a new level Contract / Procurement / Negotiation Specialist - Professional Development Programme
Contract / Procurement / Negotiation Specialist - Professional Development Programme Contract / Procurement/ Negotiation Specialist - Professional development programme The programme in summary What is
More informationShort Course on. Construction Law. with particular reference to the. JBCC 2000 Series of Contracts. in particular the application of
Short Course on Construction Law with particular reference to the JBCC 2000 Series of Contracts in particular the application of JBCC Principal Building Agreements Edition 5 (2007) and Edition 4.1 (2005),
More informationSAMPLE NET CONTRIBUTION CLAUSES
SAMPLE NET CONTRIBUTION CLAUSES Net contribution clauses have been included in consultants conditions of engagement and collateral warranties for some years. They are included in the standard terms of
More informationCONTRACT DATA. Part one Data provided by the Employer CONTRACT DATA PART 1
CONTRACT DATA Part one Data provided by the Employer Statements given in all contracts Completion of the data in full, according to the Options chosen, is essential to create a complete contract. 1 General
More informationComparison between the Red Book 1999 and the MDB Harmonised Edition 2010
Comparison between the Red Book 1999 and the MDB Harmonised Edition 2010 Please note that this comparison is for guidance only and does not purport to be complete and exhaustive. All corrections and improvements
More informationEmployer s agent services
Corporate Professional Local Employer s agent services For use with the RICS Standard form of consultant s appointment and RICS Short form of consultant s appointment The mark of property professionalism
More informationPeter Kerrigan CONTRACTING ON NEC 3 ENGINEERING CONSTRUCTION CONTRACT OPTION A - AN INTRODUCTION.
CONTRACTING ON NEC 3 ENGINEERING CONSTRUCTION CONTRACT OPTION A - AN INTRODUCTION Peter Kerrigan LL.B (HONS), FRICS, FCIARB, BARRISTER www.kerrigans.net 1 Course Content Introduction and overview of ECC
More informationIntroduction. Construction Contracts. Unit 4: Principle of Contract Administration under JCT 5 SBC/Q 1/15/2016
Introduction R. Sarvananthan ( Sarva) B.Eng, MSc CPM, MIES, MASCE 1 Construction Contracts Unit 1: Introduction to Construction Contracts Unit 2: Standard form of Construction Contracts Unit 3: Managing
More informationCLIENT-PROFESSIONAL PROJECT AGREEMENT FOR ARCHITECTURAL SERVICES BETWEEN CLIENT AND
CLIENT-PROFESSIONAL PROJECT AGREEMENT FOR ARCHITECTURAL SERVICES BETWEEN CLIENT AND PROFESSIONAL ARCHITECT (PrArch) PROFESSIONAL SENIOR ARCHITECTURAL TECHNOLOGIST (PrSArchT) mark applicable registration
More informationGeographical Experience. Home Office: Malaysia.
RODNEY MARTIN Qualifications Degree in Quantity Surveying (BSc) - Westminster University London Degree in Law - (LLB Hons) - Westminster University London Masters in Construction Law & Arbitration (MSc)
More informationAGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)
AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE
More informationThe Essentials of Contracting and Contract Negotiation Training. Europe - North America - Middle East - Asia - Africa
The Essentials of Contracting and Contract Negotiation Training Europe - North America - Middle East - Asia - Africa Introduction The course will help delegates to develop their ability to negotiate contracts
More informationENGINEERING AND CONSTRUCTION CONTRACT
THE NEC 3RD EDITION ENGINEERING AND CONSTRUCTION CONTRACT INTRODUCTION AND CRITICAL APPRAISAL For the HKIS March 23 rd 2010 Ian Heaphy Agenda Engineering and Construction Contract 3rd Edition: Aim of Presentation
More informationBrian Millar - Curriculum Vitae
Brian Millar - Curriculum Vitae Brian specialises in resolving claims and disputes on major projects in the infrastructure, construction, energy and resources sectors. Prior to joining Francis Burt Chambers,
More informationSUBCONTRACT FOR LABOUR ONLY ENGINEERING AND CONSTRUCTION WORKS (September 2005) (Second Edition of CIDB document 1016)
SUBCONTRACT FOR LABOUR ONLY ENGINEERING AND CONSTRUCTION WORKS (September 2005) (Second Edition of CIDB document 1016) Construction Industry Development Board Tel: 012 343 7136 or 012 481 9030 Fax: 012
More informationCURRICULUM VITAE - Roy Pickavance
Reply to: Roy Pickavance, DAQS Limited The Orchards, Oak Tree Court, Tollerton, Nottinghamshire NG12 4HJ Tel: +44(0)115 937 3724; Email: arpdaqs@icloud.com CURRICULUM VITAE - Roy Pickavance Name: Antony
More informationTerms and Conditions
Terms and Conditions SERVICES Taking such steps as are reasonable to enable MFA to be satisfied within the limits of the professional skill and care set out in clause 2-1 that the plans and works comply
More informationUsing a Dispute Avoidance Board for contracts covered by the Housing Grants, Construction and Regeneration Act 1996
NEC4 ECC 5 Using a Dispute Avoidance Board for contracts covered by the Housing Grants, Construction and Regeneration Act 1996 This practice note has been prepared due to feedback from UK based users who
More informationJCT 2016 Edition of Contracts
JCT 2016 Edition of Contracts Welcome to the JCT 2016 Edition of Contracts What are the main new features of the 2016 Edition?... We ve incorporated the provisions of the JCT Public Sector Supplement 2011
More informationCourse agenda. Course agenda. NEC3: Introduction to the Engineering and Construction Contract (ECC)
NEC3: Introduction to the Engineering and Construction Contract (ECC) Course agenda Welcome and Introductions Session 1 elearning review Session 2 the ECC system and contract strategy the Options Session
More informationCommercial (QS) Core Competencies (Feb 17)
01 Financial and commercial processes in civil engineering Optimum Activity Detail of A K E Management of budgets for civil engineering works. Cost forecasting, management and control processes including
More informationSURCO TRAINING. presents a series of AND CONTRACT MANAGEMENT TRAINING SEMINARS. for CONSTRUCTION PROFESSIONALSS
BK SURCO TRAINING presents a series of COMMERCIAL AND CONTRACT MANAGEMENT TRAINING SEMINARS for CONSTRUCTION PROFESSIONALSS BK SURCO Limited Suite 1901-2, 19 th Floor, Hopewell Centre 183 Queen s Road
More information(1) In these sub-contract conditions of agreement, the following words and phrases shall have the following meanings:-
Anti-Bribery & Corruption Policy of Intent STONBURY LIMITED TERMS AND CONDITIONS FOR SUBCONTRACTORS 1. INTERPRETATION (1) In these sub-contract conditions of agreement, the following words and phrases
More informationGUIDANCE FOR PROFESSIONAL CONSULTANTS
Diocese of Westminster Education Service Page 1 MANDATORY DOCUMENTATION GUIDANCE FOR PROFESSIONAL CONSULTANTS RICS Standard Form of Consultant s Appointment RICS Standard Form of Consultant s Appointment
More informationBK SURCO TRAINING. presents a series of COMMERCIAL AND CONTRACT MANAGEMENT TRAINING SEMINARS. for CONSTRUCTION PROFESSIONALS
BK SURCO TRAINING presents a series of COMMERCIAL AND CONTRACT MANAGEMENT TRAINING SEMINARS for CONSTRUCTION PROFESSIONALS Extensions of Time Valuation of Variations Bonds, Guarantees, Collateral Warranties
More informationGeographical Experience: Malaysia, Singapore And United Kingdom. Home Office: Malaysia.
SHAWN CHONG Qualifications: Degree in Building Economics & Quantity Surveying (BSc - Hons) - Heriot Watt University, Edinburgh Post Graduate Diploma in Computer Science (PGDip) - University of North London,
More informationConstruction Management Approach based on FIDIC Conditions of Contract for Construction, st Edition. Dr. Munther M.
Construction Management Approach based on FIDIC Conditions of Contract for Construction, 1999 1st Edition Dr. Munther M. Saket March 2015 1 Traditional Construction Contracts Owner of a construction project
More informationExperience Sharing in the use of the NEC3 Contracts Working with Employer under NEC3 Contract Arrangement
Experience Sharing in the use of the NEC3 Contracts Working with Employer under NEC3 Contract Arrangement Technical Forum on NEC3 Collaborative Contracts 7 March 2012 Ir Ken W. N. Ko 1 Agenda Subletting
More informationMega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia
Mega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia Megaprojects definition A project that costs more than US$1 billion and that attracts
More informationCOSCCO016 - SQA Unit Code F Prepare and monitor costs and accounts in construction
Prepare and monitor costs and accounts in construction Overview This unit is about implementing cost systems, collecting information, analysing information and using information to prepare accounts. You
More informationGARDEN DESIGNER / LANDSCAPER TERMS AND CONDITIONS BUSINESS CLIENTS
This is a sample not the full document Buy full document in Word format from http://www.compactlaw.co.uk GARDEN DESIGNER / LANDSCAPER TERMS AND CONDITIONS BUSINESS CLIENTS 1. Definitions and Interpretations
More informationConstruction Risks. US Construction Practice
US Construction Practice Willis' US Construction Practice provides innovative products and delivers risk management services through its specialist building services teams, addressing the unique needs
More informationImplementing the Construction Supply Chain Payment Charter. January Guidance Note
Implementing the Construction Supply Chain Payment Charter January 2017 Guidance Note Contents Introduction 3 Implementing the Payment Charter 3 Commitments 3 1. We will make correct full payment as and
More informationDRINKWATER ASSOCIATES (UK) LTD. Mechanical, Electrical, Civils & Construction Cost Consultants
DRINKWATER ASSOCIATES (UK) LTD. Mechanical, Electrical, Civils & Construction Cost Consultants Drinkwater Associates (UK) Ltd. Unit 8, Apollo Office Court Radclive Road Gawcott Bucks. MK18 4DF Tel: 01280
More informationNEC4: Evolution not Revolution. Delivering distinctive, high quality projects across the construction and property industry
NEC4: Evolution not Revolution Delivering distinctive, high quality projects across the construction and property industry What is NEC? NEC is a family of contracts that facilitates the implementation
More informationContractor and subcontractor insolvency January 2010
Contractor and subcontractor insolvency January 2010 1 Early warning signs: what sort of behaviour or warning signs might indicate a contractor beginning to get into trouble? 1.1 The contractor's employees
More informationSub Contract Agreement
Sub Contract Agreement In a building project there is always a contractor. There need not be any sub-contractors However there will invariably be sub-contractors. There are two types of sub-contractors
More informationRisk Allocation in Underground Construction and the Benefits of the ECI/Portland Model Approach
Risk Allocation in Underground Construction and the Benefits of the ECI/Portland Model Approach Matt Swinton David A. Hecker Kiewit Infrastructure Group David A. Hecker Kiewit Corporation Group General
More informationForm of Agreement Between the Client And the Quantity Surveyor
Form of Agreement Between the Client And the Quantity Surveyor Second ACQS Edition (May 2009) Contents Agreement 1 Terms of Appointment 1. Quantity Surveyor's obligations 2 2. Client's obligations 2 3.
More informationTRANSNET NATIONAL PORTS AUTHORITY RFP NUMBER TNPA 541 DESCRIPTION OF THE WORKS: PORT OF RICHARDS BAY - CONSTRUCTION OF PORT ENTRANCES AND ACCESS ROADS
C1.2 Contract Data Part one - Data provided by the Employer Clause Statement Data 1 General The conditions of contract are the core clauses and the clauses for main Option B: Priced Contract with Bill
More informationBIDP Standard FORMS & JBCC Minor WORKS Commentary. ARCPE SEMINAR compiled BY FRED PHIRI Arch.BW th NOVEMBER 2017
BIDP Standard FORMS & JBCC Minor WORKS Commentary ARCPE SEMINAR compiled BY FRED PHIRI Arch.BW 01160007 04 th NOVEMBER 2017 Types of Contract Fixed Price Contracts For Specified work for a sum not adjustable
More informationThe Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015
The Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015 Negotiating 8 Key Contract Clauses from the Contractor s Perspective (Part 1 of 2) 1 This is the first of a two-part overview
More informationJohn Nicolson LLM DipArb DipAdj FRICS FCIArb C.Arb MAE
Chartered Quantity Surveyor Chartered Arbitrator Registered Adjudicator Quantum Expert Adjudication Arbitration Expert Witness Quantum Core Skills Extension of Time / Prolongation Claims Termination /
More informationINTERNATIONAL. Plant and Design - Build TRAINING PROGRAMME DECEMBER Conditions of Contract for EPC/Turnkey Projects
INTERNATIONAL TRAINING PROGRAMME 19-22 DECEMBER 2016 THE TRANS LUXURY HOTEL, BANDUNG-INDONESIA 4 DAYS T TWO DAYS TRAINING Conditions of Contract for Plant and Design - Build TWO DAYS TRAINING Conditions
More informationRichard Swan Eur Ing, CEng, FICE, MSc, FCIArb, MAE, Chartered Arbitrator
Richard is a Chartered Civil Engineer and Chartered Arbitrator with military operations, resident engineer and project director experience in the construction, engineering and defence industries, built
More informationDEFENCE INDUSTRY SURVEY 2010
LOGIE-SMITH LANYON LAWYERS AND AUSTRALIAN INDUSTRY & DEFENCE NETWORK Inc DEFENCE INDUSTRY SURVEY 2010 2080592_078.DOC TABLE OF CONTENTS: Defence Industry Survey 2010 Report... 1 Executive Summary:... 2
More informationPayment Act Comparison NJ/DE/PA/MD/NY
Payment Act Comparison NJ/DE/PA/MD/NY Many Remedies Exist for Non- Payment or Untimely Payment: Mechanics Liens Payment Bond Claims Trust Fund Claims Prompt Payment Act Claims Litigation/Arbitration/Mediation
More informationreads: ICEBERG AHEAD! (DEFINED COST UNDER THE NEC3 ENGINEERING AND CONSTRUCTION CONTRACT)
Tenth Edition - October 2013 NEC: DEFINED COST UNDER THE NEC3 ENGINEERING AND CONSTRUCTION CONTRACT reads: The Fee is the sum of the amounts calculated by applying the subcontracted fee percentage to the
More informationCHARTERED INSTITUTE OF ARBITRATORS NEC compensation events A process for all eventualities? April 21 st 2016
CHARTERED INSTITUTE OF ARBITRATORS NEC compensation events A process for all eventualities? April 21 st 2016 SARAH KELLERMAN PARTNER m +44 (0) 7810 850 387 e sarah.kellerman@arcadis.com Arcadis Arcadis,
More informationSchedule 10. Part 2 from Subcontractors to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [NAME OF SUBCONTRACTOR] DEED OF WARRANTY
Schedule 10 Part 2 from Subcontractors to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] (1) and [NAME OF SUBCONTRACTOR] (2) DEED OF WARRANTY in relation to the NEC3 OPTION A TERM SERVICE CONTRACT FOR INTEGRATED
More information4.3(d) Qualifications and experience of key Staff. Site Management:
Qualifications and experience of key Staff 4.3(d) Design Staff: 01 Nr. Mechanical/ Building Service Engineer (Head Office) Chartered Engineer (Mechanical/ Building Service) with 8 years experience and
More informationSubcontracting. Module 7
Subcontracting A guide to the legal implications of the Industry Standard Partnering Agreement for voluntary, community and social enterprise organisations Module 7 Dispute resolution, implications of
More informationNEC4 ENGINEERING & CONSTRUCTION CONTRACT
1. Introduction 1.1 This paper provides an overview of the NEC Engineering & Construction Contract summarising the key features and structure of the NEC family of contracts. The NEC4 (4 th Edition) box
More informationDIRECTORATE OF ESTATES AND FACILITIES
DIRECTORATE OF ESTATES AND FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006
More informationIntroduction to Construction Arbitration
Introduction to Construction Arbitration ASA B40 Spring Seminar, Geneva 8 June 2018 Rebecca Major, White & Case Overview: I. How are construction projects organised? II. III. What are the typical issues
More informationOmar is recommended as a leading junior in the most recent editions of Chambers and Partners and Legal 500.
ENERGY AND NATURAL RESOURCES PROFESSIONAL NEGLIGENCE PFI DISPUTES CONSTRUCTION, ENGINEERING AND INFRASTRUCTURE GENERAL COMMERCIAL Omar Eljadi Call Date: 2009 // oeljadi@atkinchambers.com PRACTICE Omar
More informationConditions of Contract for PLANT and Design-Build
Conditions of Contract for PLANT and Design-Build FOR ELECTRICAL AND MECHANICAL WORKS AND FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE CONTRACTOR General Conditions 1st Edition 1999 FEDERATION INTERNATIONALE
More informationPlain English Commercial and Industrial Building Contract
Plain English Commercial and Industrial Building Contract Date:... /... /.../ This contract is between 1 Limited (we, us, our)(the builder) of and 2 (you, your)(the client) of and (your authorised representative)
More informationPAPER 1: THE ARCHITECTURAL PROFESSIONAL AS PRACTITIONER, AND ARCHITECTURAL SERVICE TO THE CLIENT
PROFESSIONAL PRACTICE EXAM SEPTEMBER 2009 PAPER 1: THE ARCHITECTURAL PROFESSIONAL AS PRACTITIONER, AND ARCHITECTURAL SERVICE TO THE CLIENT Question 1: In terms of the SACAP Code of Conduct what is meant
More informationbuilding blocks issue: winter hot topics the Construction Act: an employer s perspective the contractor's perspective
issue: winter 2011 building blocks hot topics the Construction Act: an employer s www.mills-reeve.com the contractor's a consultant's a subcontractor's festive crossword hello welcome to the winter 2010
More information3. Entry into force of the Contract Entry into force Commencement Date Non-occurrence of the Commencement Date...
FOREWORD 9 I NTRODUCTION 1. The turnkey contract considered in this model... 10 2. The drafting techniques used... 11 3. The entry into force of the contract... 11 4. Shipment of the equipment... 12 5.
More informationCONSTRUCTION LAW AND RISK MANAGEMENT
Course Objective: CONSTRUCTION LAW AND RISK MANAGEMENT The objective of this course is to take an advanced look at the legal principles of construction law and how it applies to engineering and project
More informationInternational Dispute Resolution and Arbitration in the Oil & Gas Industry
An Intensive 5 Day Training Course International Dispute Resolution and Arbitration in the Oil & Gas Industry 18-22 Sep 2017, London 11-JUN-17 This course is Designed, Developed, and will be Delivered
More informationTHE COLD WAR: JCT AND ADVERSE WEATHER CONDITIONS
Date Posted: 02 December 2011 ramskill martin s previous article The Cold War: NEC and Adverse Weather Conditions explained the NEC s strict contractual rules for assessing when adverse weather is a Compensation
More informationRegulations for consumer rights and remedies in relation to residential building work
In Confidence Office of the Minister for Building and Construction Cabinet Economic Growth and Infrastructure Committee Regulations for consumer rights and remedies in relation to residential building
More informationG E N E R A L C O N D I T I O N S O F P U R C H A S E. 1 General Provisions Scope
G E N E R A L C O N D I T I O N S O F P U R C H A S E 1 General Provisions Scope (1) All our purchases are subject to our General Conditions of Purchase, we shall not acknowledge any deviating or contrary
More informationAustralian Standard. Subcontract conditions for design and construct. AS (Incorporating Amendment No. 1) AS
AS 4903 2000 (Incorporating Amendment No. 1) AS 4903 2000 Australian Standard Subcontract conditions for design and construct This Australian Standard was prepared by Committee OB-003, General Conditions
More informationMark McGeoch. Mark helped the parties understand the risks. We chose him among the different mediators because of his robust style.
CEDR Accreditation: CEDR Panel Member Since: 1999 2003 Languages: Location: English Singapore Mark helped the parties understand the risks. We chose him among the different mediators because of his robust
More informationThe New NZS 3910:2013
The New NZS 3910:2013 Introduction On the 1 st of October 2013, NZS 3910:2013 Conditions of Contract for Building and Civil Engineering Construction was released by New Zealand Standards. This is the first
More informationGeneral Sales and Delivery Terms Version: February I. Scope, exclusion of purchase terms
General Sales and Delivery Terms Version: February 2018 I. Scope, exclusion of purchase terms (1.) The following term definitions apply in these terms and conditions: Contractor refers to itp GmbH; customer
More information2 nd Edition September 2005 (Second Edition of CIDB document 1020)
Supply of Goods (Short Contract) 2 nd Edition September 2005 (Second Edition of CIDB document 1020) CIDB Supply of Goods (Short Contract) September 2005, Second Edition of CIDB document 1020 SUPPLY OF
More informationA Simple Guide to applying the Security of Payments Act 2009 (Vic)
A Simple Guide to applying the Security of Payments Act 2009 (Vic) March 12, 2018 Written by JHK Legal Lawyer- Isabella Matassoni Anyone working within the building and construction industry is aware of
More informationSub-consultant 2010 (2012 revision)
Conditions of Appointment for a Sub-consultant 2010 (2012 revision) Incorporating Amendment 1, September 2011 This and the following nine pages (numbered 2 10) are the Conditions of Appointment for a Sub-consultant
More informationAppendix K Model Letters for Use by the Engineer
175 Model Letters for Use by the Engineer Introduction This Appendix provides model letters for use by the Engineer primarily for formal correspondence with the Contractor. These model letters do not distinguish
More informationContract Management in Offshore & Marine, EPCIC and Shipyard
An Intensive 5 Day Training Course Contract Management in Offshore & Marine, EPCIC and Shipyard 18-22 Nov 2018, Dubai 28 Apr - 02 May 2019, Dubai 17-21 Nov 2019, Dubai 18-JUL-18 This course is Designed,
More informationConstruction Contracts Issues and Practical Solutions. Shahram Safai Partner Afridi & Angell
Construction Contracts Issues and Practical Solutions Shahram Safai Partner Afridi & Angell About Afridi & Angell is one of the most established law firms in the UAE. The firm conducts a general corporate,
More informationTHE HONG KONG INSTITUTE OF SURVEYORS
PART II ASSESSMENT 2013 DAY 2 Wednesday, 18 th September, 2013 NOTES TO CANDIDATES A. Headings to questions are for ease of identification only and do not form part of the questions. B. The number of main
More informationSoh Lieh Sieng BEng(Hons) MSc(Construction Law & Arbitration) FCIOB FCIArb FCABE FACostE FAE FSIArb FMIArb FMSAdj
CURRICULUM VITAE Name Position Soh Lieh Sieng BEng(Hons) MSc(Construction Law & Arbitration) FCIOB FCIArb FCABE FACostE FAE FSIArb FMIArb FMSAdj Managing Partner, Contract Solutions i PLT (LLP) Contact
More informationPROPOSED SHARED SAVINGS (VALUE ENGINEERING) CLAUSE FOR GPO CONTRACTS OVER $100,000 OR NEW TECHNOLOGY. Prepared by Fred Antoun, Jr.
PROPOSED SHARED SAVINGS (VALUE ENGINEERING) CLAUSE FOR GPO CONTRACTS OVER $100,000 OR NEW TECHNOLOGY. Prepared by Fred Antoun, Jr. (a) General. The Contractor is encouraged to develop, prepare, and submit
More informationJOHN HUNTER BSc FRICS MCIArb MAPM
JOHN HUNTER BSc FRICS MCIArb MAPM HUNTER CONSULTING TEL: 0141 942 8215 Suite 1 FAX: 0141 942 7387 Kirk House 4 Kirk Road Bearsden GLASGOW G61 3RG DATE OF BIRTH: 24 February 1959 PRESENT POSITION: Principal,
More informationCLIENT and CONTRACTOR
STANDARD TERMS OF CONSTRUCTION CONTRACT FOR RENOVATION AND SMALL PROJECTS (STCC-RSP 2015) between CLIENT and CONTRACTOR Tingkat 10, Menara Dato Onn, Pusat Dagangan Dunia Putra, No. 45, Jalan Tun Ismail,
More informationICES. Narrative. Applicant s name
ICES Narrative Applicant s name CM Core 1 QS Financial and commercial processes in civil engineering Management of the budget is a key element of a successful project; increasingly the employer has a fixed
More informationREGISTER TODAY FOR 2018 SIGN UP FOR. Advanced Contracts Management. Training Dates : Refer in Our Training Plan 2018 Brochure. Building LAUNCHING
Building a future with an oppotunity, LAUNCHING REGISTER TODAY FOR 2018 SIGN UP FOR Advanced Contracts Management Your career into new heights Training Dates : Refer in Our Training Plan 2018 Brochure
More informationConstruction Law Survival Manual. Credit Management Contract Terms.
1 Credit Management Contract Terms Presented by James D. Fullerton www.fullertonlaw.com JFullerton@FullertonLaw.com James D. Fullerton Fullerton & Knowles, P.C. 12642 Chapel Rd. Clifton, VA 20124 (703)
More informationJPL Telecom Limited Conditions of Sale. The customer's attention is drawn in particular to the provisions of clause 9.
JPL Telecom Limited Conditions of Sale. The customer's attention is drawn in particular to the provisions of clause 9. 1. INTERPRETATION 1.1 Definitions. Business Day: a day (other than a Saturday, Sunday
More informationProfessional Services Contract
Professional Services Contract Revising the programme 32 32.1 The Consultant shows on each revised programme. the actual progress achieved on each operation and its effect upon the timing of the reing
More informationTABLE OF CONTENTS. (i) Page
TABLE OF CONTENTS Clause Description Page PREFACE (iii) 1.0 GENERAL 1 2.0 BUILDING WORK, ENGINEERING WORK, MANAGEMENT AND SUPPLEMENTARY SERVICES 1 2.1 General 1 2.2 Basic fee 2 2.3 Appropriate percentage
More informationNEC 3: How to claim as the main
SECOND EDITION FEBRUARY 2016 NEC 3: How to claim as the main contractor for compensation events arising from subcontracted work under main options A (Priced Contract with Activity Schedule) and B (Priced
More informationNEC3 ECC Introductory Training
NEC3 ECC Introductory Training John Rayner House Keeping and Safety Fire Alarm Toilets Mobile phones Please remember to switch all mobile phones to silent 1 Introductions John Rayner Name: NEC3 Knowledge:
More informationPROFESSIONAL SERVICES AGREEMENT For Project Description, Project #
PROFESSIONAL SERVICES AGREEMENT For Project Description, Project #00-00-0000 Page 1 Contract # THIS AGREEMENT, made and entered into this day of, 2014, by and between SPOKANE AIRPORT, by and through its
More informationEMP Commercial Terms and Conditions AS AT DECEMBER 2015 ENERGY DONE BRIGHT
EMP Commercial Terms and Conditions AS AT DECEMBER 2015 ENERGY DONE BRIGHT 1. Definitions of terms 1. Goods and services means all goods and services we supply to you. It includes advice and recommendations.
More informationAdvanced Business & Contract Law This course can be presented in-house for you on a date of your choosing
Advanced Business & Contract Law This course can be presented in-house for you on a date of your choosing The Banking and Corporate Finance Training Specialist Course Objectives Participants will: Be introduced
More informationNigel White. Profile. Expertise:
Nigel White Profile 40 years experience in the construction industry with specialist experience in dispute resolution, commercial management, and risk management. Tel: +971 50 427 2595 nigelwhite@whiteconsulting-me.com
More informationLitigation & Claims Facts & Figures
Litigation & Claims Facts & Figures Paul Lomas-Clarke FRICS FCIArb FCIOB CEDR Accredited Mediator Executive Director 2011 The Global Leader in Managing Construction Risk The reasons claims arise Inadequate
More informationCONSTRUCTION NEGOTIATIONS
CONSTRUCTION NEGOTIATIONS I. Contracts November 6, 2017 Presented by: Bryan Thomas Bradley Arant Boult Cummings LLP Attorney-Client Privilege. Agenda Construction Negotiations I. Contracts Know the Deal
More informationHe has broad experience of all methods of dispute resolution with expertise in domestic and international arbitration, mediation and adjudication.
CONSTRUCTION, ENGINEERING AND INFRASTRUCTURE PROFESSIONAL NEGLIGENCE ENERGY, NATURAL RESOURCES AND UTILITIES INFORMATION TECHNOLOGY AND TELECOMMUNICATIONS GENERAL COMMERCIAL Nicholas Collings Call Date:
More informationHOUSING, ALTERATIONS AND SMALL BUILDINGS CONTRACT
NEW ZEALAND STANDARD HOUSING, ALTERATIONS AND SMALL BUILDINGS CONTRACT ISBN 1-86975-015-2 NOTES CONTENTS PAGE Committee representation... IFC Copyright... IFC Referenced documents... 6 Latest revisions...
More information2 THE EMPLOYER Provision of Site 2.2 Permits and Licenses 2.3 Employer s Instructions 2.4 Approvals
GENERAL CONDITIONS 1 GENERAL PROVISIONS.................................... 1 1.1 Definitions The Contract Persons Dates, Times and Periods Money and Payments Other Definitions 1.2 Interpretation 1.3 Priority
More information