CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

Similar documents
BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

Rock Chalk Park - Infrastructure Report. July 2013

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

TOTAL QUANTITY UNIT COST UNIT

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

CITY OF SAN MARCOS ENGINEERING DIVISION

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TABULATION BID REQUEST NO

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Engineer's Preliminary Estimate - 100% Submittal

Department of Public Works Engineering

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

SUBDIVISION IMPROVEMENTS AGREEMENT

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

BID TABULATION PAGE 1 OF 8

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.


OKLAHOMA TURNPIKE AUTHORITY

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

RFB Addendum 3

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

PART A ROADWAY - BASE BID

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

ADDENDUM No. 1 January 29, Paving Program Village of Milford

BID TABULATION PAGE 1 OF 6

LETTING : CALL : 056 COUNTIES : MILLE LACS

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

PROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project

2001 Average Bid Tabs

Utility Committee Meeting AGENDA. October 3, 2017

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

SAN RAFAEL CITY COUNCIL AGENDA REPORT

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

Reviax Constracting Corp. DeSantis Construction

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

OKLAHOMA TURNPIKE AUTHORITY

Public Works Maintenance STORMWATER AND

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

BID TABULATION. Engineer's Estmated Opinion of Costs

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015

APPROVED 9 LOT TENTATIVE TRACT MAP - NEAR FINAL MAP

Addendum 1 Downtown North CRA Sidewalks

OKLAHOMA TURNPIKE AUTHORITY


ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

CITY OF TAMPA ADDENDUM 2. April 18, 2018

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

REPLACEMENT OF MERCER COUNTY BRIDGE

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

CITY OF DEERFIELD BEACH Request for City Commission Agenda

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time


SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Pflugerville, TX St. Hedwig, TX 78152

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

CONTRACT TIME DETERMINATION

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

Market Street Gateway Improvements Phase 1

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02


REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

Transcription:

RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement Removal $ 100.00 $ LS Excavation (Clean Material) (5% of Construction Cost) 5% $ CY Imported Common Fill (Incl. Compaction) $ 34.00 $ SF Preparation of Subgrade $ 1.00 $ PCC 8" Curb & 24" Gutter $ 23.00 $ PCC Curb Only $ 20.00 $ 8" A.C. Berm $ 20.00 $ SF 8" PCC Cross Gutter $ 11.00 $ SF 4" PCC Sidewalk $ 5.80 $ SF 6" PCC Thick Drive Approach $ 7.40 $ SF 8" PCC Thick Drive Approach $ 9.00 $ 2" x 6" Redwood Header $ 5.00 $ EA Street Sign $ 475.00 $ EA Traffic Sign and Post $ 400.00 $ EA Reflector Sign and Post $ 175.00 $ EA Painted Legend $ 6.50 $ SF Prime or Tack Coat $ 0.05 $ TON AC Variable <300T $ 90.00 $ TON AC Variable >300T $ 80.00 $ EngCostEstimate Page 1 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 STREETS TON CAB Variable <300T $ 75.00 $ TON CAB Variable >300T $ 65.00 $ EA Adjust Sewer Manhole to Grade $ 665.00 $ LS Mobilization 5% $ EA Adjust Sewer Cleanout to Grade $ 350.00 $ EA Adjust Water Valve to Grade $ 265.00 $ EA Street Light (City Owner) $ 6,700.00 $ EA Lot Monument Setting Fee $ 550.00 $ Sawcut A.C. $ 3.00 $ Sawcut Concrete $ 3.00 $ SF Cold Plan A.C (5 foot wide) $ 0.28 $ Signing & Striping for Arterial $ 19.00 $ Collector $ 13.00 $ Local $ 7.00 $ EA Traffic Signal (8 Phase Controller) $ 250,000.00 $ EA Modify existing Traffic Signal per Quadrant $ 50,000.00 $ EA Chain Link Fence 4 foot Residential Grade (Add $7.00/ for Removal of Existing Fence) $ 25.00 $ 6 foot School fence (Add $9.00/ for Removal of Existing Fence) $ 35.00 $ Utility Poles Transmission $ 11,500.00 $ Distribution $ 8,000.00 $ Service $ 3,000.00 $ EngCostEstimate Page 2 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 STREETS Landscape (Including shrubs, Hardscape, Irrigation, Ground Cover, Lighting, Installation Labor and Connection SF to Existing Systems) $ 10.00 $ 14 foot Median with Landscape, Irrigation, Lighting, Hardscape, Curb, Gutter & Pavement $ 300.00 $ LS Rail Road Crossing Safety Equipment (Complete Including Crossing Gates, Signs, and Lights) $ 400,000.00 $ SF Track Crossing (Concrete) $ 150.00 $ SF Approach $ 2.25 $ EA S.W. Ramps (A.D.A. Compliant) $ 4,000.00 $ EA Traffic Signal Loops $ 400.00 $ STREET SUBTOTAL $ PROJECT ADDITIVES Project Contingencies 10% $ Construction Staking 3% $ Soils Testing 1% $ Material Testing 1% $ Construction Inspection 2% $ Contract Administration 1% $ GRAND TOTAL STREETS ONLY $ EngCostEstimate Page 3 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 WATER LS Traffic Control (5% of Construction Cost) 5% $ Trench Support/Shoring (6 foot depth) $ 15.00 $ CY Pipe Bedding (Imported) $ 45.00 $ 6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 60.00 $ 8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ 75.00 $ 10" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 80.00 $ 12" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 90.00 $ 16" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 105.00 $ EA 6" Gate Valve $ 1,500.00 $ EA 8" Gate Valve $ 2,000.00 $ EA 10" Gate Valve $ 2,400.00 $ EA 12" Gate Valve $ 2,800.00 $ EA 16" Gate Valve $ 3,500.00 $ EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ EA Blowoff Assembly 6" per City Std. $ 4,500.00 $ EA 2" Air Relief Assembly $ 4,500.00 $ EA 1" Water Service/Meter $ 3,500.00 $ EA 2" Water Service/Meter $ 4,500.00 $ EngCostEstimate Page 4 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 WATER WATER SUBTOTAL $ PROJECT ADDITIVES Project Contingencies 10% $ Construction Staking 3% $ Soils Testing 1% $ Material Testing 1% $ Construction Inspection 2% $ Contract Administration 1% $ GRAND TOTAL WATER ONLY $ EngCostEstimate Page 5 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 RECYCLED WATER LS Traffic Control (5% of Construction Cost) 5% $ Trench Support/Shoring (6 foot depth) $ 15.00 $ CY Pipe Bedding (Imported) $ 45.00 $ 6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 60.00 $ 8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ 75.00 $ 10" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 80.00 $ 12" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 90.00 $ 16" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ 105.00 $ EA 6" Gate Valve $ 1,500.00 $ EA 8" Gate Valve $ 2,000.00 $ EA 10" Gate Valve $ 2,400.00 $ EA 12" Gate Valve $ 2,800.00 $ EA 16" Gate Valve $ 3,800.00 $ EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ EA Blowoff Assembly 6" per City Std. $ 4,500.00 $ EA 2" Air Relief Assembly $ 4,500.00 $ EA 1" Water Service/Meter $ 3,500.00 $ EA 2" Water Service/Meter $ 4,500.00 $ EngCostEstimate Page 6 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 RECYCLED WATER RECYCLED WATER SUBTOTAL $ PROJECT ADDITIVES Project Contingencies 10% $ Construction Staking 3% $ Soils Testing 1% $ Material Testing 1% $ Construction Inspection 2% $ Contract Administration 1% $ GRAND TOTAL RECYCLED WATER ONLY $ EngCostEstimate Page 7 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 SEWER LS Traffic Control (5% of Construction cost) 5% $ Trench Support/Shoring $ 15.00 $ 8" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $ 92.00 $ 10" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration $ 98.00 $ 12" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration $ 104.00 $ 15" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration $ 110.00 $ 18" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration $ 140.00 $ 21" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration $ 150.00 $ 24" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration $ 170.00 $ EA Sewer Saddle $ 450.00 $ EA Wyes 4" x 8" Typical $ 225.00 $ EA 48" Sewer Manhole $ 5,000.00 $ EA 60" Sewer Manhole $ 6,400.00 $ EA Sewer Cleanout $ 1,800.00 $ EngCostEstimate Page 8 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 SEWER SEWER SUBTOTAL $ PROJECT ADDITIVES Project Contingencies 10% $ Construction Staking 3% $ Soils Testing 1% $ Material Testing 1% $ Construction Inspection 2% $ Contract Administration 1% $ GRAND TOTAL SEWER ONLY $ EngCostEstimate Page 9 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 STORM DRAIN LS Traffic Control (5% of Construction Cost) 5% $ 24" X 36" C.M.P.A. (10 Gauge) $ 230.00 $ 27" x 43" C.M.P.A (10 Gauge) $ 250.00 $ EA Storm Drain Manhole #1 $ 5,000.00 $ EA Junction Structure #2 (24" or larger) $ 4,400.00 $ EA Junction Structure #4 (24" or smaller) $ 2,500.00 $ EA Outlet Structure $ 5,000.00 $ EA Catch Basin 3.5' Width $ 5,500.00 $ EA Catch Basin 7' Width/L.D. $ 6,100.00 $ EA Catch Basin 10' Width/L.D. $ 7,000.00 $ EA Catch Basin 14' Width/L.D. $ 8,000.00 $ EA Catch Basin 21' Width/L.D. $ 10,000.00 $ 18 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 130.00 $ 24 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 150.00 $ 27 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 160.00 $ 30 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 175.00 $ 33 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 190.00 $ 36 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 240.00 $ 39 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 260.00 $ 42 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 275.00 $ EngCostEstimate Page 10 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 STORM DRAIN 45 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 280.00 $ 48 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 300.00 $ 51 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 325.00 $ 54 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 350.00 $ 60 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 360.00 $ 63 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 370.00 $ 66 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 400.00 $ 72 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 460.00 $ 78 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 470.00 $ 81 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 490.00 $ 84 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 510.00 $ 90 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 540.00 $ 96 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 570.00 $ 102 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 610.00 $ 108 inch RCP Installed, including excavation, bedding, backfill and pavement restoration $ 640.00 $ 7' x 6' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 700.00 $ 7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 820.00 $ 7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 870.00 $ 8' x 11' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 1,000.00 $ 8' x 13' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 1,100.00 $ 9' x 9' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 1,000.00 $ 9' x 12' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 1,100.00 $ 4' x 6' RCB Installed, including excavation, bedding, backfill and pavement restoration $ 680.00 $ EngCostEstimate Page 11 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 STORM DRAIN STORM DRAIN SUBTOTAL $ PROJECT ADDITIVES Project Contingencies 10% $ Construction Staking 3% $ Soils Testing 1% $ Material Testing 1% $ Construction Inspection 2% $ Contract Administration 1% $ GRAND TOTAL STORM DRAIN ONLY $ EngCostEstimate Page 12 of 13 Effective Date: January 1, 2016

RESOLUTION NO 2015078 ENGINEER'S ESTIMATE GRAND TOTAL $ BY ENGINEER Prepared R.C.E. Number: Expiration: Place R.C.E. Stamp Here BY CITY Faithful Performance Bond (100% of Construction Cost) $ Labor & material Bond (50% of Construction Cost) $ Warranty Bond (10% of Construction Cost) $ EngCostEstimate Page 13 of 13 Effective Date: January 1, 2016