Technical Information

Similar documents
ClassNK Technical Information No. TEC International Ballast Water Management Certificate (IBWM Certificate) Full Term IBWM Certificate will be

Technical Information

Technical Information

Technical Information

Technical Information

Technical Information

ShipRight Design and Construction

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-345

Application for Certification of EU MRV

ACS activities and future direction related to IMO

For certification. Handbook on Inspection of Seafarers Working and Living Conditions. Based on the MLC, 2006 (Maritime Labour Convention, 2006)

NO X CONFORMITY OF PRODUCTION PROCEDURE 2002 V07. Lloyd's Register of Shipping, 71 Fenchurch Street, London EC3M 4BS, UK

P&I Condition Survey Part A

Annex VI to. General authorisation from the Norwegian Maritime Authority to Classification Society for Mobile Offshore Units (MOUs).

ACS activities and future direction related to IMO

ANNEX 1 RESOLUTION MEPC.161(56) Adopted on 13 July 2007

Specific CME Strategies and Principles under BWM Convention and. Risk Assessment CME

Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances

ACS and its activity

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-131

Proposals for the Effective Implementation of the Ballast Water Management Convention

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

Procedure for Class Entry of Ships not subject to PR1A or PR1B

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-131. Authorized Recognized Security Organizations (RSO). Reports and Fees.

For certification. Handbook on Inspection of Seafarers Working and Living Conditions. Based on the MLC, 2006 (Maritime Labour Convention, 2006)

1. Each Participant will provide that the Certificate of Origin referred to in Article of the Agreement is:

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

EU RO Framework Document for the Mutual Recognition of Type Approval

IMO WORK PROGRAMME. Damage stability verification of oil, chemical and gas tankers

Warranty Information. Fax: Mail: Attn: Customer Care Center/POP Radio Systems Corporation PetSafe Way Knoxville TN 37932

SUFFOLK COUNTY WATER AUTHORITY RULES & REGULATIONS SECTION 15 SERVICE CLASSIFICATION NO. 2 PRIVATE FIRE PROTECTION SERVICE

STATEMENT OF LIMITED WARRANTY FIXTURES/ PRODUCTS

Letter of Access for referral. Letter of Access for the registration of the substance Zn XXX under REACH Regulation 1907/2006/EC.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM. (Five Year Period: )

Appendix FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM. (Five Year Period: )

REGULATION ON IMPLEMENTATION OF INTERNATIONAL SAFETY MANAGEMENT CODE FOR TURKISH FLAGGED VESSELS AND THEIR MANAGEMENT COMPANIES PART ONE

Marine Protection Rules Part 103: Notifications Oil and Noxious Liquid Substances

INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS

INGHAM COUNTY ROAD DEPARTMENT NOTICE TO BIDDERS CN/GTW RAILROAD. CON:TNB 1 of

Notice to Mariners No. 71

ShipRight. Hull Planned Maintenance. Linked Supporting Service. Changes incorporated in June 2006 version. Design and construction

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-131. Authorized Recognized Security Organizations (RSO). Reports and Fees.

IMAP is equal to 68% of GTL MSRP. Example: $100 = MSRP per GTL $68 = IMAP. Global Tech LED IMAP File

REGIONAL DISTRICT of OKANAGAN-SIMILKAMEEN

Addendum Clauses referred to in Charterers Certificates of Entry or Endorsement Slips.

HOW TO DOCUMENT TAX-EXEMPT SALES

American National Standard for Electric Lamps Reference Ballasts for Fluorescent Lamps

HOW TO DOCUMENT TAX-EXEMPT SALES

Maritime Rules Part 21: Safe Ship Management Systems

RESOLUTION OF THE GOVERNMENT OF THE REPUBLIC OF KAZAKHSTAN

Objective. Extent of consultation. Entry into force

DUE DILIGENCE FOR FUNERAL HOMES UTILIZING THIRD PARTY CREMATORIES

HUNTER WATER CORPORATION AND. [INSERT Developer: NAME OF DEVELOPER(S)] DEVELOPER WORKS DEED ROUTINE MAJOR WORKS [INSERT LOCATION] Development Site:

GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V.

March (ex YM March) 5,576 Gearless Post-Panamax 2004 Koyo Dockyard Co., Ltd., Hiroshima, Japan Nippon Kaiji Kyokai (NK)

Report on Concrete Sawing or Drilling Industry

Maritime Labour Convention 2006 Declaration of Maritime Labour Compliance Part 1

SALES AND USE TAX EXEMPTIONS

The 6 th ASEF Meeting Guangzhou, China 22/23 November Association of Asian Classification Societies

General Conditions of Contract for Civil Works

Programme. Contract. way. order: a) This letter; the possession of. both parties. Annex III. 2. Obligations of the Contractor. have.

Industrial Accident Risk Assessment Procedures and Risk Reduction Measures

ALABAMA TAS PROVIDER EQUIPMENT AGREEMENT

REPUBLIC OF THE MARSHALL ISLANDS

Ballast Water Management Convention

FEDL7582B-06 Issue Date: Jun. 21, 2012 MSM7582B. π/4 Shift QPSK MODEM 1/29

MULTNOMAH COUNTY, OREGON

CHAPTER FOUR ORIGIN PROCEDURES

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS

GENERAL TERMS AND CONDITIONS OF PURCHASE applicable in Bury sp. z o.o. with its registered office in Mielec (Poland).

CDR Pompe S.r.l. Via R. Sanzio, Bollate (MI) Pompe S.r.l Tel Fax ISO 9001 Cert. n. 1295

Materials and Qualification Procedures for Ships

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

Update on EU Maritime Policy

Cross Dock Service Agreement

PORT QASIM AUTHORITY. Condition of Use for LNG CARRIERS

PART VII CONTRACT DELIVERABLES

1. APPLICATION OF THESE CONDITIONS

CONSOLIDATED FINANCIAL REPORT FOR THE NINE MONTHS ENDED DECEMBER 31, 2017 <Japanese GAAP>

NORIBACHI COMMITMENT TO EXCELLENCE STANDARD FIVE YEAR LIMITED WARRANTY FOR HIGH LUMEN OUTPUT LED BULBS AND FIXTURES

V RSM = 400 V, I F(AV) = 2.0 A General-Purpose Rectifier Diode. Description. Package. Features. Applications (1) (2) (1) Cathode (2) Anode

ANNEX II SAMPLE FORM OF CONTRACT

V RM = 600 V, I F(AV) = 1.0 A General-Purpose Rectifier Diode. Description. Package. Features. Applications

PUBLIC LIABILITY INSURANCE

An act to add and repeal Division 36 (commencing with Section 71200) of the Public Resources Code, relating to ballast water.

Fartygsklassificering

GIBRALTAR MARITIME ADMINISTRATION

Legal Framework. Milos Palecek, Occupational Safety Research Institute MOLDOVA 2007

Tel: Fax:

V RSM = 30 V, I F(AV) = 2.0 A Schottky Diode. Description. Package. Features. Applications (1) (2) (1) Cathode (2) Anode

FIRSTENERGY INTERCONNECTION AGREEMENT

SHIPPING IN MALTA. a strategic location since time immemorial. UHY BUSINESS ADVISORY SERVICES LIMITED Malta

BUNKERING LICENCE. Name of Licensed Operator:. Registered physical address from where principal business is carried on: ...

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

Vessel Registration and Mortgage Recordation

SFPP, L.P. CONNECTION POLICY

Supplemental Government Terms and Conditions

one of the factories belonging to the TELE-FONIKA KABLE GROUP TELE-FONIKA KABLE or one of its subsidiaries belonging to the TELE-FONIKA KABLE GROUP.

Hazardous Substances (Importers and Manufacturers) Notice 2015 EPA CONSOLIDATION 6 SEPTEMBER 2018

Transcription:

Subject Initial survey for the Ballast Water Management Convention after satisfaction the requirements for entry into force of the Convention To whom it may concern Technical Information No. TEC-1086 Date 8 September 2016 As previously informed in ClassNK Technical Information No. TEC-1085, the International Convention for the Control and Management of Ship's Ballast Water and Sediments, 2004 (Hereinafter referred to "the BWM Convention") satisfied the requirements for entry into force on 8 September 2016. This means that the BWM Convention will officially enter into force one year later on 8 September 2016. Although the installation of Ballast Water Management System (Hereinafter referred to "BWMS") (Regulation D-2 of the BWM Convention) which satisfy the relevant Ballast water performance standard will be required according to the compliance schedule for BWMS after the BWM Convention enters into force, the use of Ballast water exchange standard (Regulation D-1 of the BWM Convention) will continue to be accepted up until the compliance date for the installation of BWMS. The approval of a Ballast water management plan and proper maintenance of a Ballast water record book is, however, required regardless of whether Regulation D-1 or Regulation D-2 is applied. Once the BWM Convention enters into force, all ships of 400 gross tonnage and above to which the BWM Convention applies should have International Ballast Water Management Certificate for the BWM Convention (Hereinafter referred to "the Certificate") on board. Accordingly, ClassNK has launched to issue the Certificate following initial survey subject to the authorization from administration. The plans and documents required to be submitted for approval, which need to be performed prior to that carrying out of initial survey, are as listed below. Plans and documents required to be submitted for approval which were previously submitted or approved during the classification approval process do not need to be re-submitted. 1. Approval plans, documents and initial survey (1) Ships applied with Ballast water exchange standard (Ships applied with only Regulation D-1) (i) Approval plans and documents Ballast water management plan (Total 2 sets) is to be submitted to ClassNK Machinery Department. NOTES: ClassNK Technical Information is provided only for the purpose of supplying current information to its readers. ClassNK, its officers, employees and agents or sub-contractors do not warrant the accuracy of the information contained herein and are not liable for any loss, damage or expense sustained whatsoever by any person caused by use of or reliance on this information. Back numbers are available on ClassNK Internet Homepage (URL: www.classnk.or.jp).

(ii) Initial survey Applications for initial survey for the BWM Convention should be submitted to the ClassNK site office responsible for carrying out the survey. It is to be confirmed an approved Ballast water management plan and a proper maintained Ballast water record book are kept on board. (2) Ships applied with Ballast water performance standard (Ships applied with both Regulation D-1 and Regulation D-2, or only Regulation D-2) (i) Approval plans and documents Following plans and documents for each 3 sets are to be submitted to ClassNK Machinery Department. For existing ships, in case modifications for BWMS installation will be conducted, it is necessary to be submitted revised plans and documents clearly indicated modified parts. However, regarding(m) On board test procedure, it is to be submitted to the ClassNK site office. (A) A copy of the Type Approval Certificate of BWMS(issued by flag administration or organization which is considered as appropriate by ClassNK in accordance with IMO Resolution MEPC.174(58): "Guidelines for Approval of Ballast Water Management Systems (G8)" (Including future amendment) (B) Drawing of BWMS (C) BWMS arrangement drawing (D) Arrangement of ballast water piping (E) Arrangement of construction of sampling points (Detailed drawing described position and construction of sampling points) (F) Wiring diagram of main (power) circuit (G) Wiring diagram of control and instrument (H) Arrangement of electric apparatus (I) Electric power table (J) Short circuit current analysis (K) List of explosion-proof type electric equipment and arrangement (If applicable) (L) Ballast water management plan (M) On board test procedure (Please submit to ClassNK site office) (N) Other drawings considered necessary by ClassNK 2

(ii) Initial survey Applications for initial survey for the BWM Convention should be submitted to the ClassNK site office responsible for carrying out the survey. Following matters are to be confirmed on board. In addition, it is to be confirmed an approved Ballast water management plan and a proper maintained Ballast water record book are kept on board. (A) Actual layout of ballast water piping system, including ballast pumps and BWMS as well as sampling facilities with reference to approved plans and documents (B) Operation test of BWMS(In general, this test should include both ballast and de-ballast operation tests under rating capacity) (C) Confirmation of proper storage and maintenance of chemical substances used for BWMS (D) Confirmation of onboard BWMS is corresponding to its Type Approval Certificate (E) For BWMS which use chemical substances for treatment, confirmation of the type to clarify its compliance to "IMO Resolution MEPC. 169(57): Procedure for Approval of Ballast Water Management Systems that Make Use of Active Substances (G9)" (including future amendment) (F) Necessary stocks of consumables for the control and monitoring devices for operation test and the record of its result, if the ballast water management recording device is installed (G) For BWMS that produce residual products such as sediments in its operation, storage of facilities exclusively used for these substances. (H) Other inspections considered necessary by ClassNK (iii) Documents which are to be kept on board It is to be confirmed that the following documents are to be kept on board. (A) A copy of the Type Approval Certificate of BWMS(issued by flag administration or organization which is considered as appropriate by ClassNK in accordance with IMO Resolution MEPC.174(58): "Guidelines for Approval of Ballast Water Management Systems (G8)" (Including future amendment) (B) A Statement to confirm that the electrical and electronic components of the BWMS have been type-tested in accordance with above mentioned G8 which is the specified for environmental testing (C) Equipment manuals for major components of the BWMS (D) An operations and technical manual for the BWMS specific to the ship (E) Installation specifications (F) Installation commissioning procedures (G) Initial calibration procedures (H) Other documents considered necessary by ClassNK 3

2. Ships possessing a Statement of Fact for installation of BWMS (Ships applied with both Regulation D-1 and Regulation D-2, or only Regulation D-2) Ships possessing a Statement of Fact for installation of BWMS, which verifies that a BWMS has already been installed on board which have initial survey for Statement of Fact carried out, are to attach a copy of the relevant Statement of Fact to their application of initial survey, if you request, and submit the application to the ClassNK site office responsible for the survey. The site office will refer to the Statement of Fact when it carries out the initial survey and issue the Certificate upon completion. In addition, please contact ClassNK Machinery Department separately regarding any cases where a "Note" has been attached to the Statement of Fact (either Note is mentioned at the bottom or on the back) because modification may be required to be made as necessary. 3. Ships affixed with the classification notation "BWTS" The Certificate will be issued to ships affixed with the classification notation "BWTS", which have initial survey for the notation "BWTS" carried out, are to submit the application to the ClassNK site office responsible for the survey, if you request. The site office will carry out the initial survey and issue the Certificates upon completion. Plan approval is, in principle, not required because it has been already carried out when the notation "BWTS" is affixed. However plan approval is required prior to the survey being carried out in cases where modifications were made to the relevant equipment after the notation "BWTS" is affixed. 4

For any questions about the above, please contact: [For general questions] NIPPON KAIJI KYOKAI (ClassNK) Machinery Department, Administration Center Annex, Head Office Tel.: +81-3-5226-2023 Fax: +81-3-5226-2024 E-mail: mcd@classnk.or.jp [For questions on survey] Survey Department, Administration Center Annex, Head Office Tel.: +81-3-5226-2027 Fax: +81-3-5226-2029 E-mail: svd@classnk.or.jp [For questions relevant to type approval of BWMS] Material and Equipment Department, Administration Center Annex, Head Office Tel.: +81-3-5226-2020 Fax: +81-3-5226-2057 E-mail: eqd@classnk.or.jp 5