FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-6

Similar documents
FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3

August 29, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

FORTISBC ENERGY CEC ROE 2016 EXHIBIT A-7

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1

September 26, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

Ms. Laurel Ross, Acting Commission Secretary and Director

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1

FORTISBC INC. RECONSIDERATION AND VARIANCE OF ORDER G PHASE 2 EXHIBIT A-4

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3

Diane Roy Director, Regulatory Services

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016

VIA October 27, 2005

Diane Roy Vice President, Regulatory Affairs

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014)

FEI 2017 PRICE RISK MANAGEMENT PLAN EXHIBIT A-6

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision

November 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

BC HYDRO F2017 F2019 REVENUE REQUIREMENTS EXHIBIT A-29

Diane Roy Director, Regulatory Services

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8

June 22, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. V6Z 2N3. Ms. Erica M. Hamilton, Commission Secretary

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012.

For further information, please contact Fred James at or by at

Ms. Laurel Ross, Acting Commission Secretary and Director

STARGAS APPLICATION TO ALTER RATES. Re: Stargas Utilities Ltd. Application to Alter Rates and Refinance

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9

On June 10 and July 5, 2013, FEI and FBC, respectively, filed the Applications as referenced above.

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1

Doug Slater Director, Regulatory Affairs

July 7, 2015 File No.: /14797 BY . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission

Diane Roy Vice President, Regulatory Affairs

For further information, please contact Sylvia von Minden at or by at

FortisBC Inc. Application for an Exempt Residential Rate

Re: Pacific Northern Gas (N.E.) Ltd. Project No /Order G Revenue Requirements Application

For further information, please contact Guy Leroux at

For further information, please contact Fred James at or by at

Terasen Gas Inc. ( Terasen Gas ) Customer Choice Program 2010 Program Summary and Recommendations

For further information, please contact Fred James at or by at

Réponse du Transporteur et du Distributeur à l'engagement 4

FortisBC Energy (Vancouver Island) Inc Revenue Requirements and Rates Application

For further information, please contact Fred James at or by at

November 16, British Columbia Utilities Commission 6th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and

1. Background. March 7, 2014

Creative Energy Vancouver Platforms Inc. Creative NEFC Neighbourhood Energy Agreement Amendments Submission of FortisBC Energy Inc.

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO

January 23, Via Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

Sent via efile FEI 2016 RATE DESIGN EXHIBIT A2-10

BCUC INQUIRY RESPECTING SITE C A-4

FEI Annual Review of 2018 Rates

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

BC HYDRO CONTRACTED GBL EXHIBIT A-6

Terasen Gas Inc. ( Terasen Gas ) Extension of the Multi-Year Performance Based Rate Plan 2007 Annual Review

building trust. driving confidence.

FBC Annual Review of 2016 Rates. Workshop

FORTISBC ENERGY INC. RATE SCHEDULE 46 LIQUEFIED NATURAL GAS SALES, DISPENSING AND TRANSPORTATION SERVICE

Ms. Laurel Ross, Acting Commission Secretary and Director

IN THE MATTER OF FORTISBC ENERGY INC.

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

Re: Project No Pacific Northern Gas (N.E.) Ltd Revenue Requirements Application Update for Fort St. John/Dawson Creek Division

Architectural Services

BRITISH COLUMBIA UTILITIES COMMISSION GENERIC COST OF CAPITAL PROCEEDING EXHIBIT A-40

This is in response to your July 17, 2006 letter (attached) in which you state that

FortisBC Energy Inc. An indirect subsidiary of Fortis Inc. Consolidated Financial Statements For the years ended December 31, 2017 and 2016

September 10, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

FortisBC Energy Inc. (FEI) Project No Demand Side Management Expenditures Plan (the Application) Errata dated September 20, 2018

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

CONDITIONS OF SERVICE AND TARIFF. April 1, 2018

KPL-Rates & Electric Tariff- Exhibit A- 2 Response to Information Request No.1

Maspeth Federal Savings and Loan Association and Subsidiaries

Water Compliance Reporting Manual. Water Services Act 2012

AMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m

AltaGas Utilities Inc.

Note 29: Fair Value of Financial Instruments

Re: Central Heat Distribution Limited 2007 Revenue Requirement Application

FortisBC Energy Inc. An indirect subsidiary of Fortis Inc. Consolidated Financial Statements For the years ended December 31, 2013 and 2012

Securities and Exchange Commission Washington, DC FORM 10-Q

BRITISH COLUMBIA UTILITIES COMMISSION GENERIC COST OF CAPITAL PROCEEDING EXHIBIT A2 5

Further to your May 9, 2016 filing of intervener evidence, enclosed please find Commission Information Request No. 1.

Fasken Martineau DuMoulin LLP * Barristers and Solicitors Patent and Trade-mark Agents

Ms. Erica M. Hamilton, Commission Secretary. FortisBC Energy Utilities ("FEU") Common Delivery Rates Methodology Application, Project No.

10,000 Degrees FINANCIAL STATEMENTS AND INDEPENDENT AUDITORS' REPORT. June 30, 2017

December 11, Mr. John R. Koelmel Chairman New York Power Authority 123 Main Street White Plains, NY

Florida Retirement System Pension Plan

B.C. Utilities Commission File No.: 4.2 (2015) 6 th Floor Howe Street Vancouver, B.C. V6Z 2N3

Laurel Ross Acting Commission Secretary. Website: October 28, 2016

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE

SECTION B ADMINISTRATIVE RULES INDEX

Insurance Corporation of British Columbia (ICBC) 2018 Basic Insurance Rate Design Application Project No ICBC s Reply to TREAD Submission

Alabama Retail Association Workers Compensation Self-Insurance Fund d/b/a Alabama Retail Comp

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017

A Submission From LandlordBC

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C FORM 10-Q

Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN

Transcription:

Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX: (604) 660-1102 Log No. 52394 VIA EFILING April 20, 2016 FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-6 Ms. Diane Roy Director, Regulatory Affairs FortisBC Energy Inc. 16705 Fraser Highway Surrey, BC V4N 0E8 Dear Ms. Roy: Re: FortisBC Energy Inc. Proposal for Depreciation and Net Salvage Rate Changes Application Commission staff submit the following document for the record in this proceeding: Appendix E-3 Asset Loss Report filed in Exhibit B-1 in the FortisBC Energy Utilities 2012-2013 Revenue Requirements and Rates proceeding. Yours truly, Original signed by: Laurel Ross SW/dg Enclosure PF/FEI/PD Net Salvage Rate Changes/A2-6_Appendix E-3 filed in Exhibit B-1_ FEU 2012-13RRA proceeding

A2-6 Appendix E-3

1 ANALYSIS OF ASSET RETIREMENT LOSSES 1.1 Introduction As part of the 2010 Depreciation Study update requested by the BCUC in its decision on FortisBC Energy Inc. s ( FEI ) 2009 RRA, FEI undertook a project to analyze and support the accumulated losses recorded to date. At the end of 2009, the total asset retirement loss balance stood at approximately $149 million with the asset categories, Mains, Services, Regulator and Meter Installation, and Meters accounting for the majority of the losses. The purpose of this report is to provide: An overview of the asset retirement and accounting processes at FEI and how the processes led to the financial gains/losses recorded; and Explanations and reasons for the losses recorded for each of the asset categories noted. 1.2 Overview of Asset Process at FEI Upon retirement of a fixed asset, the Plant Accounting department is notified. For retirement of recurring plant (Mains, Meters, Services), the plant units retired are provided by Field Operations. To calculate the retirement values, original costs per plant unit are used. If original costs are not known, estimates are used to retire specific plant. A plant retirement request form capturing the specifics of the plant being retired is completed and submitted to Plant Accounting. Each specific plant is identified in terms of its physical characteristics, function, location, etc. Upon retirement, the service value (i.e. original cost or estimate) of the retired asset is credited to the appropriate capital account with the associated accumulated depreciation amount debited to the accumulated depreciation account, with the difference (remaining net book value) remaining in a component of accumulated depreciation called accumulated loss. costs (i.e. labour to dismantle the asset) and salvage proceeds (i.e. scrap value) are allocated also to the accumulated loss component of the accumulated depreciation account. The treatment of both the removal costs and the remaining net book value of plant on retirement as a component of Accumulated Depreciation is an accepted regulatory accounting practice in accordance with the BCUC Uniform System of Accounts 1.3 Losses by Asset Category Four asset categories totalling to $138 million account for over 90% of $149 million of the losses recorded to the end of 2009. The $138 million figure includes $54.1 million of removal costs less salvage proceeds. Excluding the removal costs less salvage proceeds, the unrecovered Page 1

losses total to $84.1 million. This represents approximately 4% of the historical cost balance of $2 billion for these four asset categories. The losses by asset class are shown in Table E3-1 below, followed by an analysis of each class. Table E3-1: Four Asset Categories Contribute to Accumulated Losses to end of 2009 Millions $100 $80 $60 $40 $20 Losses on s December 31, 2009 $- House Regulator and Meter Installation Meters Services Mains 1.3.1 REGULATORS AND METER INSTALLATIONS (ASSET CLASS 474) This account includes the cost of regulators, and labour and materials used and expenses incurred in the connection with the original installation of regulators and meters for all customer types including residential, commercial and industrial. At the end of 2009, accumulated losses in this asset class were approximately $32.4 million (excluding removal costs less salvage proceeds of $5.6 million). As a percentage, the $32.4 million accumulated loss represents 22% of the historical cost balance of $148 million. The following graph shows the losses recorded in this asset category for the years 2001 to 2009. Prior to the year 2001, the gains/losses observed for this asset category were minimal. Page 2

Figure E3-1: Losses for Asset Class 474 by Year $ millions $10.00 $9.00 $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 $1.00 $- Meter Install and Regulator Losses 2001 2002 2003 2004 2005 2006 2007 2008 2009 Further analysis of the retirement losses suggest that the attributed losses have been amplified as the result of an overstatement of the historic unit costs used for determining the gains/losses on retirements. Starting in 2001, FEI implemented a process to retire the install labour costs included in this asset category, using the number of meters scrapped and the applicable historical unit costs based on a composite average of the activities being recorded in this account. However, there is a wide disparity in the actual cost for the different types of meter install activities, with a simple residential install costing approximately $60 per install compared to a larger diaphragm meter install for a commercial customer at double or more. For this reason, applying a composite unit cost to determine gains/losses for retirements, particularly a lower cost residential install, has resulted in an overstatement of losses. Analysis of the losses reported for the recent years 2006 to 2009 show that of the approximately 120,000 meters scrapped during this period, over 90% were for smaller diaphragm meters used for residential customers. Yet, the loss reported on a per meter installed basis ranged from $100 to $150 each, significantly higher than the $60 per meter install stated earlier. On a retrospective basis, if a revised historic unit cost ranging from $60 to $100 meter install was used for the period 2006 to 2009, the retirement loss recorded for that period would instead range only from $4 to $7 million compared to the actual reported loss of approximately $15 million. Total rate base would remain unchanged as the losses would be reclassified to accumulated depreciation from the asset loss balance. The preceding analysis suggests that the losses reported of $32 million for the period 2001 to 2009 is likely to be overstated by approximately 50%, reflecting the challenges in coming up with an applicable representative unit cost. This conclusion is corroborated by the $16 million of Page 3

losses recorded in the Meter asset category during the same time period. It is reasonable to expect retirement losses in the Meter Install (474) asset category to follow and be similar to that of the Meter (478) category. Currently, for 2001 to 2009, the retirement losses for the Meter Install asset category exceed that of the Meter asset category by approximately double ($32 million vs. $16 million). All else equal, the overstatement effect for this account will likely even out over time as future retirements are recorded using a lower unit cost based on an understated remaining cost pool. The above analysis highlights the challenges with developing a retirement process for a wide and disparate asset category such as the Meter Install. To address this, Gannett Fleming recommends adopting an approach that records new plant additions for this asset class in a separate account, with depreciation calculated using a whole life rate. The existing meter install costs would remain in the current account and continue depreciating at the current depreciation rate, which includes a factor for recovery of the retirement losses. This recommended approach would simplify the retirement process (i.e. no retirement entries required) while still recording the appropriate level of depreciation expense. 1.3.2 METERS (ASSET CLASS 478) This account includes the cost of meters or devices (including the cost of badging and testing) for use in measuring the quantity of gas delivered to all customer types including residential, commercial and industrial. Consistent with the industry, FEI currently expects the lives of its residential meter assets to currently last no longer than 15 to 20 years. Commercial and industrial meters, comprising approximately 20 25% of the investment in meters however are expected to last beyond 20 years as the larger volume meters are refurbished when they are removed for testing. At the end of 2009, accumulated losses in this asset class were approximately $18.4 million (excluding removal costs less salvage proceeds of ($2.1) million). As a percentage, the $18.4 million accumulated loss represents approximately 9% of the historical cost balance of $205 million. Page 4

The following graph shows the losses recorded in this asset category for the period 2001 to 2009. Figure E3-2: Losses for Asset Class 478 by Year Meter Losses $ millions $10.00 $9.00 $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 $1.00 $- 2001 2002 2003 2004 2005 2006 2007 2008 2009 The following graph shows the numbers of meters retired for the years 2001 to 2009. Figure E3-3: Number of Meters Retired by Year Meter s Meters 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 Meters are retired and scrapped when they have reached the end of their useful lives. After the initial install of meters for new customers, meters subsequently are subject to a meter exchange program where in-service meters are removed and replaced with new or repaired meters to maintain accurate measurement as required by the Electricity and Gas Inspection Act of Canada. Page 5

For residential gas meters, upon installation, a seal with an associated expiry date is attached to the meters. A year prior to the expiration of the seal, the meters must be evaluated to ensure the accuracy is within federally regulated tolerances. A representative sample is extracted from pre-determined groups of meters according to Measurement Canada regulations. The sample meters are tested under strictly controlled conditions in certified test facilities with the test data analyzed using government mandated statistical methods. The test results are then used to determine if the meters from the group of which the sample was withdrawn are legally permitted to remain in service. The greater the level of error observed in the sampled meters, the shorter the time period of the seal extension as directed by the Electricity and Gas Inspection Act of Canada. Where test results fail to meet regulated accuracy requirements, the meter group in question will be removed from the field and replaced, at which time a determination is made whether the removed meters will be retired. Based on the company s meter retirement data, FEI has observed that the average residential meter life has been less than the 25 28 years as previously anticipated. The shorter residential meter life is linked to the increased cost to refurbish residential meters relative to the cost to replace these same meters. In the past, FEI s operating model had residential meters being removed from the field after approximately 14 years in service for refurbishment. The meters were then re-installed with the expectation that these meters would again be removed from the field within another 14 years, for a service life totalling 28 years. However, since then, the cost of labour and materials for retrieval and refurbishment continued to rise with the cost to replace with new meters falling. Consequently, over the last decade, the refurbishment of residential meters has been become uneconomical. As a result, to maximize the full value of these meters, these meters have been allowed to remain in the field until such time they are replaced with a new meter. Recent FEI sampling results indicate that on average residential meters approach the maximum allowable error limit at approximately the 20 year mark. To a lesser extent, another reason for the early retirement of meters is due to inferior residential meters, arising from manufacturing issues. A notable example is the planned removal of batches of meters installed during the late 1990s, with sample testing showing loss of accuracy at much faster rates than expected. FEI expects that these meters will be required to be removed from service in accordance with ongoing meter sample test results to prevent large scale unscheduled failures. It is expected that the current 20 year life expectancy for residential meters will continue in the foreseeable future. As such, FEI will continue to require that a certain portion of the meter fleet be exchanged every year (i.e. 1 / 20 years or 5% of the meter fleet). Finally, in 2005, Measurement Canada began the process of rewriting a number of specifications to reflect a change in approach toward regulation of organizations using custody transfer meters from being less prescriptive to more performance based, with a greater focus upon enforcement. Most recently, Specification SS06 came into effect January 1, 2011 with a Page 6

required date for full implementation no later than January 1, 2014. This specification is designed to meet Measurement Canada`s goal of greater assurance of compliance with the Electricity and Gas Inspection Regulations among organizations which choose to apply compliance sampling in order to extend the use of their meters. At this time, FEI believes its existing meter fleet management practices will ensure the company remains in compliance with the increased rigor of this specification. 1.3.3 SERVICES (ASSET CLASS 473) The assets in this class consist of installations of various service pipes for new and existing customers including: new and conversion distribution pressure (DP) and intermediate pressure (IP) services to single and multi-family dwellings; pre-installed service stubs from mains; services extended from stubs; vertical header subdivisions (a vertical service line system within a building such as a high-rise); DP and IP new or conversion service header mains (distribution mains installed on private property such as multi-family strata owned complexes); and DP and IP service header laterals. FEI expects the lives of its distribution services assets to be within the range of its industry peers, with typical service lives ranging from 40 to 65 years. At the end of 2009, accumulated losses in this asset class were approximately $27.8 million (excluding removal costs less salvage proceeds of $45.8 million). As a percentage, the $27.8 million accumulated loss represents only 4% of the historical cost balance of $664 million. Reasons that services may be retired earlier than their expected lives and contribute to the retirement losses recorded to date can be classified into two categories - Customer and Safety. The table below provides a summary of the services retired in recent years 2006 to 2009 with the length of the service pipe retired and the associated retirement costs separated into the categories Customer and Safety. Page 7

Reasons for Table E3-2: Most Services Retired Due to Customer Requests Services Retired 2006 2007 2008 2009 Services Services Services Retired Retired Retired Customer 76,958 $ 4,079,701 76,893 $ 4,235,239 68,959 $ 4,913,276 72,817 $ 4,906,138 Safety 11,303 $ 584,850 30,733 $ 311,291 45,852 $ 471,291 10,811 $ 499,975 Total 88,261 $ 4,664,551 107,626 $ 4,546,530 114,811 $ 5,384,566 83,628 $ 5,406,113 The data above indicates that the majority of retirements expressed in metres of pipe retired and the retirement costs incurred were the result of customer initiated requests. Customer requests to retire services originate as a result of land development activities and specific requirements of customers. As the demand for housing in the more densely populated regions (i.e. Lower Mainland) increases, existing housing and land are being redeveloped with larger plots of land being subdivided and existing housing demolished to make way for multifamily housing (i.e. townhouses, condos). This is contributing to a shorter useful life observed than originally anticipated. Other customer driven requests include those resulting from homeowners performing building modifications and landscaping activities that often require the retirement of service line assets. To mitigate the rate impact to all customers, FEI seeks to recover the retirement costs from the customer that initiates the work wherever possible. The other contributor to early service retirements is safety. FEI has a service retirement program to remove inactive services. An inactive service to a premise is a live gas service or meter with no existing customer. These assets continue to attract regular maintenance but are not presently being used for gas delivery. Inactive services are often forgotten by the property owner and represent a significant risk of third party damage. Removal of inactive services initiated by FEI improves the safety of the public, the natural gas delivery system and its employees. 1.3.4 MAINS (ASSET CLASS 475) This asset class consists of the installation and material costs of new and replacement intermediate pressure and distribution pressure mains from the pressure regulator station to the customer service line including: Main extensions and tie-ins to serve new customers; Gas main additions or replacements (i.e. system improvements) and tie-ins needed to service increasing demands placed on the system; Replacements (i.e. renewals) of portions of existing mains to remove corroded or damaged sections; and Page 8

Replacement of pipe that has been identified as non-compliant due to geographical location (close to highways or bridges) or pipe configuration. FEI expects the lives of its distribution mains assets to be within the range of its industry peers with typical service lives for mains ranging from 50 to 65 years. At the end of 2009, accumulated losses in this asset class were approximately $5.5 million (excluding removal costs less salvage proceeds of $4.8 million). As a percentage, the $5.5 million accumulated loss represents only 0.6% of the historical cost balance of $861 million. Reasons that distribution mains may be retired earlier than their expected lives and that contribute to the retirement losses recorded to date can be classified into two categories, Customer and Safety/Reliability. The table below provides a summary of the distribution mains retired in recent years 2006 to 2009 with the length of the mains pipe retired and the associated retirement costs separated into Customer and Safety/Reliability. Reasons for Table E3-3: Most Mains Retired for Safety and Reliability Reasons Main Retired 2006 2007 2008 2009 Main Retired Main Retired Main Retired Customer 1,048 $ 22,981 - $ 6,083 - $ - 15 $ 535 Safety/Reliability 26,169 $ 513,060 54,548 $ 525,600 53,832 $ 474,834 21,107 $ 591,413 Total 27,217 $ 536,041 54,548 $ 531,683 53,832 $ 474,834 21,122 $ 591,948 The data above indicates that the majority of retirements, expressed in metres of pipe retired and correlated to the retirement costs are primarily the result of safety/reliability related reasons. FEI is committed to ensure the safety and reliability of the distribution system. To achieve this, FEI regularly assesses and monitors the health of its distribution mains system, noting factors such as the age and condition of the pipe installed, identified leaks, effectiveness of corrosion prevention and condition of coatings on the pipe. Where warranted, the Company replaces the distribution mains earlier than expected in order to maintain the integrity of the pipe. Where the opportunity permits, FEI schedules mains pipe replacement to coincide with municipal or road construction activities in order to minimize the costs. In the past, high failure rates leading to early retirement of distribution mains have resulted from leaks caused by corrosion in mains installed prior to 1980. Prior construction practices, use of coal tar and asphalt enamel pipe coatings from 1930 to 1970, and use of tape coatings in the 1970s have been contributing factors to earlier retirements. Customer requests to relocate distribution mains may also lead to earlier retirement than expected. Highway construction, municipality activities and private industry development may result in FEI having to retire and relocate an existing main. To mitigate the rate impact to all Page 9

customers, FEI seeks to recover the related costs wherever possible from the initiator of the request. 1.4 Conclusion As the above analysis and explanations indicate, FEI s recorded retirement losses for the asset categories mains, meters and services are reasonable and reflective of the regulations it faces and the environment which it operates in as a natural gas utility. Page 10