Financial errors in FP7 How to improve the quality of financial statements?

Similar documents
Financial Rules in FP7 Projects

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

IMI Financial Guidelines

IMI Financial Guidelines

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

European Commission THE FIFTH FRAMEWORK PROGRAMME. This document can be downloaded from URL:

FP7 CERTIFICATION MODALITIES

Audit certificate template for Horizon2020 projects funded by SERI

Administrative, Financial and Operational Aspects of Project Management

MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS

Market Replication: Eco-Innovation F I N A N C I A L G U I D E L I N E S for co-ordinators and co-beneficiaries

Model terms of reference for the certificate on the financial statements

Administrative and financial aspects: recommendations for the preparation of proposals

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules

Tips on Administrative issues and Financial Reporting KOM ANYWHERE Soraya Hidalgo European Projects Office - UPC

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

South East Europe (SEE) SEE Control Guidelines

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement

Model Grant Agreement FINANCIAL ISSUES

Brussels, 11 May FP7 Audit. DG RTD Unit M2

Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174)

University Hospital Basel

Multi-Beneficiary Model Grant Agreement

Model Grant Agreement FINANCIAL ISSUES

Guide for Applicants

Model Grant Agreement FINANCIAL ISSUES

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Certification of Financial Statements for ICT PSP projects

Model Grant Agreement FINANCIAL ISSUES

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS

Legal and Financial Issues in H2020

Model Grant Agreement FINANCIAL ISSUES

Guide to Financial Issues relating to FP7 Indirect Actions

Multi-beneficiary Model Grant Agreement

Legal and financial issues in Horizon Bonn,

Financial Webinar. IMI 2 projects :00 CET

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012

ANNEX A - I. Note: it is important that each tenderer has read the Working Practice and its annexes very carefully.

Multi-Beneficiary Model Grant Agreement

ITN 2010 Finance and Budget

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

Annex VI. Model terms of reference for the Certificate on the Financial Statements

Guide to Financial Issues relating to ICT PSP Grant Agreements

Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines

Important Messages - Grants

Ex-post audit Horizon 2020 Zagreb, 25 April Mr Ekke Van Vliet Common Audit Service (CAS)

This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is

Eligibility of costs in the Horizon 2020 funded EUROfusion project

The Hitchhiker s Guide to the Financial Rules and Management of Horizon 2020 Projects

Communication campaign

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting

The Marie Curie Actions FP7 Financial Guidelines

Disclaimer. The present document is made available only for advance information.

Project Development - Rules on eligibility of expenditure

FINAL. FP7 AUDIT MANUAL (Restricted Use)

Belarus, 28 February 2008

Webinar on Other Direct Costs in Horizon 2020

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves

CLEAN SKY FINANCIAL WORKSHOP 18/01/2018 QUESTIONS & ANSWERS

IPA partners seminar. Eligibility of expenditure and specificities of the public procurement. Dubrovnik, 5 th February 2013

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

Financial Reporting What s new?

Financial Reporting. Tempus IV. Kyiv-Mohyla Academy Kiev 16 November Ana Ramon de la Cruz and Giulia Moro

Multi-beneficiary Model Grant Agreement for Members

Audit certificates. Training Seminar Brussels 28 November 2006

FCH 2 JU Grant Agreement.

COMMISSION DECISION. of

Project Administration

Rules. Unofficial translation. - for aid from the EUDP to projects within research, development and demonstration.

Q&A on simplified cost options in programmes. March 2018 Application, control and audit: use of simplified cost options for staff costs

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1

Eligibility of costs in the Horizon 2020 funded EUROfusion project

Overview on the changed articles of H2020 MGAs with retroactive applicability

LIFE Grant Agreement Financial Aspects Highlights

8 th Financial Managers Seminar

ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers

H2020 Annotated Model Grant Agreement (AGA) v 5.0 ( ) track changes

Official Journal of the European Union. (Acts whose publication is not obligatory) COMMISSION

Funding for companies research and development operations Eligible costs and project monitoring

Eligible Costing Rules and Financial Management Guidelines

Audit strategy in H2020. Brussels, 20 March 2017 Vittorio Morelli CAS NCP Academy - CZELO

Department of Enterprise, Trade & Employment

European Maritime and Fisheries Fund Guide for Applicants

Lead Partner Seminar. JS/MA Riga

Marina ZANCHI DG Research Directorate N International scientific cooperation

Community Partnerships Program Eligible Costing Rules and Financial Management Guidelines

UKF Project Monitoring Guidelines Version 4

Investing in your future

Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out

MARIE CURIE INITIAL TRAINING NETWORK

Hercule III Programme. Guide for Applicants. Version 1.0

RULES ON ELIGIBILITY OF COSTS

FP7 Simplification Workshop

FINANCIAL PROVISIONS

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation

Transcription:

Financial errors in FP7 How to improve the quality of financial statements? Oslo, 26 April 2013 Doroteya PETROVA ERC Executive Agency Marcin BARAN European Commission

Introduction This presentation is addressed to beneficiaries of FP7 projects and to the auditors and Competent Public Officers (CPO) who sign Certificates on Financial Statements (CFS). We will present you with typical errors that affect the quality and reliability of cost statements (Forms C) filed with the European Commission. By explaining practical aspects of the application of the underlying legal and financial rules, we will show you how you can detect and avoid these errors. Our presentation will refer to ex ante checks and procedures to be performed by the certifying auditors and documented in Forms D.

Errors. Why do they occur? Misunderstandings of the rules Lack of attention to the detail of the provisions of the FP7 grant agreements

Errors. How can we detect them? Ex ante controls: Ex post audits: EC officers review Forms C before the costs are reimbursed Up to 5 years after the end of the project Certifying auditors perform agreed upon procedures on Forms C and issue Certificates on Financial Statements (Forms D) Concern financial, legal as well as technical issues

The consequences of errors: Beneficiaries Non-optimal use of funding available Delayed payments Liquidated damages Recoveries Extrapolation Bankruptcy European Commission Scrutiny of the Budgetary Authority and ECA Increased error rate Increased ex post audit efforts Corrective measures

The main goals of our campaign To minimise the error rate in cost statements (Forms C); To improve the quality of CFS prepared by certifying auditors/cpo. To help the beneficiaries to better prepare for ex-ante and ex-post checks

What do we pay? General rules for eligibility of costs (1/2) To be considered eligible, the costs must be: Actually incurred (not estimated, budgeted or imputed) When actual costs are not available at the time of establishment of the financial statement, the closest possible estimate may be declared in conformity with the accounting principles of the beneficiary. However, these estimates should be adjusted when the actual costs are available. Incurred by the beneficiary Supporting documents proving occurrence, the bookkeeping and the payment must be kept by the beneficiary Incurred during the duration of the project

What do we pay? General rules for eligibility of costs (2/2) To be considered eligible, the costs must be: Determined according to the usual accounting and management principles and practices of the beneficiary However, the beneficiary must adjust its usual accounting and management practices if they are not in line with the FP7 rules Used for the sole purpose of the project under the principles of economy, efficiency and effectiveness The standard of good housekeeping in spending public money Recorded in the accounts of the beneficiary Exemptions exist for certain cases involving third parties Annex I should include a general description of costs. Some types of costs (such as subcontracts) must be clearly identified in the estimated budget of the project (Annex 1)

Direct and indirect costs Direct costs: Are all those eligible costs which can be attributed directly to the project and are identified by the beneficiary as such in accordance with its accounting principles and its usual internal rules. Indirect costs: Are all those eligible costs which cannot be identified by the beneficiary as being directly attributed to the project, but which can be identified and justified by its accounting system as being incurred in direct relationship with the eligible direct costs attributed to the project.

Personnel costs: underlying principles Only the costs related to participation in the EU cofunded project may be reimbursed, hence the beneficiary has to record time spent by their personnel. Generally, the calculation of personnel costs is based on hourly rates. They are based on all eligible personnel cost elements and the total productive hours. The EU co-finances the projects carried out by the entities with appropriate research resources. Beneficiaries need to demonstrate that the project personnel is in fact their personnel.

Personnel costs: checks and evidence Beneficiary ensures: Staff has employment contracts They are on the payroll Salary related charges appear on the payslip Time records exist The calculation of productive hours reflects reality Beneficiary provides*: Internal rules/legislation (salaries/bonuses/social charges, time recording, working hours/overtime, etc.) Employment Contracts Payslips Time records Productive hours calculation Calculation of hourly rates Bank transfers Certifying Auditor checks and verifies: The calculation of the hourly rate. The number of productive hours used The reliability of the time records The remuneration is calculated in compliance with internal practices and legislation The project personnel is the beneficiary s personnel, hired under valid employment contracts Time spent on the project is justified (based on documents) The certifying auditor reconciles claims to accounts. *The list of evidence is not exhaustive, but reflects good practices and examples

Personnel costs: common errors Issues related to time recording: Time records without the required elements No description of related activity, insufficient detail (e.g. only monthly activities) Not signed Not individual Time records absent or incomplete Not subject to the supervision /authorisation by superiors / project manager Errors in transfer of the data from time records to cost claims Time records not reconciled with HR (e.g. absences). Declared project time includes work hours on another activity

Personnel costs: common errors Issues related to the calculation of the hourly rate: Total remuneration includes ineligible bonus & overheads elements The calculation of the total productive hours does not reflect reality Productive time is incorrectly reduced by "non-billable" time

Personnel costs: common errors Internal control issues: Project personnel not directly employed or paid by the beneficiary (unless use of 3rd party resources fulfilling certain conditions and included in Annex I) Costs reported in project accounts only (not recorded in the statutory accounts) Usual accounting or management principles and practices not applied to the EU project Use of budgeted figures instead of actual costs

Personnel costs: How to get things right PERSONNEL direct costs declared Number of HOURS spent on EC project X HOURLY PERSONNEL RATE

Personnel costs: How to get things right HOURLY PERSONNEL RATE of an employee Total Annual Personnel Costs of an employee ------------------------------------------- Total Annual Productive hours of an employee

Personnel costs: Productive hours Productive hours calculation Total days in a year 365 Less: Weekends 104 Subtotal 261 Less: Annual Holidays 21 Less: Statutory Holidays 15 Less: Illness & Others 15 Productive days per year 210 Hours per day 8,0 Productive hours per year 1.680 If you use standard productive hours ensure that these reflect fairly the reality of your organisation as regards productive time. Do not use billable (commercial hours) as they do not represent the total productive time of the personnel.

Personnel costs: How to get things right Time recording is necessary in order to justify personnel time spent on the project (estimates of hours worked are not allowed) We strongly recommend using full time recording, which allows to identify time spent on all activities (research & non research, EU & non-eu) and makes it easier to reconcile nonproductive time (sick leave, holidays) with HR records. Irrespective of the system chosen for time recording (integrated computerised system, excel or paper timesheets, etc.), the beneficiaries should ensure that the time is recorded and reported regularly, and is verified by the personnel and the supervisor (i.e., the timesheets are signed).

Personnel costs: How to get things right Salary Top-ups/Bonus Payments: Acceptable if part of normal salary and benefits package, and ALL of the following criteria are met: Based on internal regulations Applied to all projects of the same kind (EU and non EU, national and international) Implemented in a consistent manner for the same type of activities/projects Level of remuneration remains consistent with market conditions for same category/grade/experience Recorded in accounts as Personnel cost and subject to taxes and social security charges Paid as part of employees gross remuneration (added to the basic salary for the calculation of the hourly rate)

Personnel costs: in-house consultants How to get things right Eligible as personnel cost if ALL of the below conditions are met: A contract to engage a physical person is in place; The in-house consultant works under the instructions of the beneficiary; The in-house consultant works in the premises of the beneficiary; The result of work belongs to the beneficiary; No excessive costs paid (not significantly different from those of employees of similar category); Personnel cost registered in the accounts.

Personnel costs : Other issues Direct taxes and social charges related to personnel costs "Teleworking Overtime payments Benefits in kind Redundancy payments vs. redundancy provisions Statutory parental leave payments

Average Personnel costs: criteria Changes: the criteria on maximum deviations between averages and individual actual costs do not apply any more No obligation for ex-ante CoMAv (it becomes an option) New criteria (Com 24 Jan 2011): usual accounting practice averages based on actual costs in statutory accounts exclusion of ineligible costs as defined in the FP7 Rules and no double charging of costs productive hours: usual practice, verifiable and reflecting actual working standards

Average Personnel costs: checks The beneficiary provides*: The certifying auditor checks: Internal manuals describing averages List of all average personnel rates Employees groupings Productive hours calculation Accounting records List of all relevant employees (working on EU projects and not working on EU projects) based on which the average personnel rate is calculated The average personnel costs reflect the usual accounting practice Persons are allocated to the appropriate groups No items are claimed twice (e.g. cost centres: indirect costs included in personnel costs and make sure they are not claimed again in indirect costs) Productive hours are calculated based on reality Numerical reconciliation cost claims/account *The list of evidence is not exhaustive, but reflects good practices and examples

Subcontractors and 3rd parties A third party is a legal entity which is not a beneficiary of the ECGA and is not a signatory to it Types of third parties: Third parties making available resources to the beneficiary The resources made available are under the full and direct control of the beneficiary Work carried out is attributed to the beneficiary Resources may be provided free of charge or for remuneration Third parties carrying out part of the work themselves Subcontractors other third parties linked to the Beneficiary (entities identified in the ECGA via special clause 10) Examples: Joint Research Units (JRU), European Economic Interest Grouping (EEIG), Affiliates and Groupings Special cases (foundations, spin-off companies created in order to manage the administrative task of the beneficiary)

Subcontractors and 3rd parties Third parties making available resources to the beneficiary if resources are made available free of charge costs may be declared by the beneficiary in its Form C if those costs were incurred and recorded by the third party in its accounts. if the Beneficiary reimburses the third party costs are eligible if payment recorded by the Beneficiary in its accounts and no profit contained therein Third parties carrying out part of the work themselves and covered by special clause 10 Each third party fills in its costs in an individual Form C and, where necessary, shall provide its individual certificate on financial statements.

Sub-contracting The subcontractor is a type of third party: The responsibility vis-à-vis the EU for the work subcontracted lies fully with the beneficiary Subcontracting between partners of the consortium is not permitted under any circumstances Characteristics: The agreement is based on "business conditions" Work carried out without the direct supervision of the beneficiary The subcontractor's motivation is pecuniary, not the research work itself Usually subcontracts do not concern the research work itself Subcontractors do not carry out a core part of the work Eligibility of costs: Transparent, non-discriminatory selection following best value for money Tasks to be subcontracted and its cost estimation described in Annex I of the GA

Sub-contracting & 3rd parties The beneficiary provides*: Description of the third parties used Contracts with the subcontractor (s) Annex I of the GA Invoices Proof delivery or services The certifying auditor checks: That all claimed 3rd parties/subcontracts are mentioned in Annex I The tendering procedures were performed for each subcontract and a value for money analysis exists If the subcontracting comes from a framework contract that existed prior to the signature of the GA, that such framework contracts exist *The list of evidence is not exhaustive, but reflects good practices and examples

Subcontracting : how to get things right Do not charge for subcontracts between partners of the consortium The Beneficiary must not calculate indirect costs on subcontracting costs (and 3rd parties not working on the premises of the beneficiary). In these cases the overheads are born by the subcontractors or and are deemed to be already included in their remuneration If you receive resources free of charge do not charge the EC the notional value of these. Subcontracts with respect to minor tasks (not identified in Annex I) must follow the same best value for money and transparency principles and be in accordance with the usual practice of the beneficiary

Durable equipment As a rule: Usually the equipment purchased for the project can qualify as eligible (possible to charge equipment bought before the start of the project, but used for the project) Only depreciation charges can be charged to the EC (exceptions exists for certain specific programmes and demonstration equipment) Only the portion used on the project may be charged Leasing costs of equipment may be eligible under specific conditions.

3. Depreciation Project start Acquisition: cost Charge Project end Do not charge Useful life Year 1 Year 2 Year 3 Year 4 Research & Innovation

Durable equipment: checks The beneficiary provides*: Proof of the purchase of the equipment (date and cost) Proof of existence and the use on the EC project(s) Description of the depreciation policy and purchase of durable equipment The certifying auditor checks: The entry of the cost in the accountancy system The use of the equipment on the project (s) VAT is excluded from the cost claim In the case of rented equipment: rental contract Equipment's usage diary/register *The list of evidence is not exhaustive, but reflects good practices and examples

Durable equipment - How to get things right Consider % use during the duration of the project and the equipment's useful economic life Apply your normal depreciation policy Do not charge any residual values

Travel costs Must be needed to the project Must comply with the beneficiary's usual practices and be adequately recorded Must reflect the actual expenses of the beneficiary: the actual travel costs or lump sums/per diems if the latter are used to reimburse travel costs to the personnel Participants may claim daily subsistence costs and accommodation related to travel (but not travel costs itself) based on flat rates approved by the Commission

Travel costs: checks The beneficiary provides*: The certifying auditor checks Internal guidelines/procedures Policy on charging accommodation and subsistence allowances (EC flat rates, actual costs or own flat rates) List and dates of trips by project personnel Proof and reason of the travel (in relation to the project) That the travel has been allocated to the appropriate project Cost were charged in line with beneficiary s policies No identifiable VAT is included in the cost claim *The list of evidence is not exhaustive, but reflects good practices and examples

Travel costs: how to do things right Do not charge costs to travel which is not project specific Do not charge travel for persons not working on the project Keep proof of travel expenses Keep proof of relationship of the travel with the project

Consumables: Must be necessary for the projects If the accounting practice of the beneficiary considers consumables as indirect cost, they cannot be charged as direct cost under the project Eligible cost only if consumables purchased after the start date of the project When charged internally (with or without an internal invoice), no mark-up or profit element can be added to their costs

Consumables: checks The beneficiary provides*: The certifying auditor checks: Procedures for accounting for consumables Invoices with reference to the EU project Inventory register/ledger Costs are in the accounts No VAT is charged Are not inventoried as durable equipment Are not capital expenditure Have short life expectancy Are not charged through indirect costs *The list of evidence is not exhaustive, but reflects good practices and examples

Methods of calculation and reporting of indirect costs Full cost accounting (actual indirect costs) including the simplified method Flat rates (20% and 60%) The beneficiaries who have analytical accounting system that can identify and group their indirect costs have a choice between reporting actual indirect costs or 20% flat rate. The beneficiaries who can only identify indirect costs at the level of the organisation can use the simplified method The beneficiaries who are eligible for the use of 60% flat rate may continue to use it provided they do not have an analytical accounting system

Indirect Costs - Ineligible items When actual indirect costs are calculated all ineligible items have to be removed from the pool of indirect costs. Examples of ineligible items: Marketing & sales costs; Financing costs; Exchange rate losses; Costs declared or reimbursed by another EU project

Indirect costs: checks The beneficiary provides*: Description of the methodology Reconciliation with the profit & loss accounts (P&L)/general ledger Calculation of overhead rates (cost centre/project/personnel) The certifying auditor checks: Use or non use of flat rate The total amount of costs were reconciled to the account Verified eligibility of costs included in overheads Their link to the research activity Allocation keys *The list of evidence is not exhaustive, but reflects good practices and examples

Exchange rates: Check The beneficiary provides*: The certifying auditor checks: List of currencies used Use of the correct exchange rate (ECB) At date of incurring the cost or the first day after the end of reporting period *The list of evidence is not exhaustive, but reflects good practices and examples

Receipts: The beneficiary provides*: The certifying auditor checks: List of income/contributions received Receipts declared in cost statement Reconcile amounts between project account and cost claim. *The list of evidence is not exhaustive, but reflects good practices and examples

Interest on pre-financing According to the new Financial Regulation, as of 1/1/2013 beneficiaries of EU funds will no longer be obliged to open separate interest bearing bank accounts. Furthermore, even if interest is generated, it will not have to be returned to the EU Commission nor counted as revenue of the project. For on-going grants the old rules continued to apply by 31/12/2012.

Interest on pre-financing (accrued by 31/12/2012) An interest bearing account exists Interest is declared: on pre financing by the co-ordinator For mono-partner actions the whole amount paid by the Commission to the beneficiary Exemption from obligation to open interest bearing account if: opening and/or operating an interest-bearing bank account is not in line with the principle of sound financial management and a derogation is requested and obtained from the EC.

VAT For open projects identifiable VAT, whether recoverable or not, is ineligible (Article II.14.3) The change to the Financial Regulation concerning eligibility of non-deductible input VAT does not affect on-going FP7 grants

SME owners SME owners may choose to: Pay themselves a salary For their research work No salary Claim the salary as a cost under the FP7 project Charge Marie Curie flat rates to the FP7 project

The flat rate and lump sum concepts Grants may take any of the following forms: a) Reimbursement of a specific proportion of eligible costs actually incurred; b) Flat rates: i.e. an amount to cover specific categories of expenditures pre-determined in advance by applying a fixed percentage (e.g. 10 % of direct eligible costs) by applying a scale of unit costs (fixed amount: e.g. 700 per researcher/month) c) Lump-sums d) Amount to cover certain costs necessary for carrying out an action overall implementation of an action one or more categories of eligible costs e) A combination of the forms referred in points a), b), c).

People programme Flat rates categories for salary of fellow => to be entirely paid by the host institution to the fellow Flat rates to cover beneficiaries costs => beneficiary are entitled to claim the full flat rate Real costs category for some costs according to different WPs (management, other)

Capacities programme: SMEs invoicing to RTD performer SMEs and SMEs associations pay RTD performer s invoice in order to execute research on their behalf RTD performer is beneficiary of the project RTD invoices are market-price and agreed by both parties at negotiation level SMEs remain owner of IPR rights of research carried out by RTD performers VAT in RTD performer s invoice is not an eligible cost according to FP7 financial rules RTD invoices have to be recorded as any other eligible cost according to GA art. II.14

Key message from today s session Observe the rules and pay attention to the details Ensure collaboration with your certifying auditor/cpo Keep reliable proof your expenses Document the link of your expenses with the FP7 project If in doubt call, inform your Project/Financial officer well in advance

ADDITIONAL INFORMATION How to avoid common errors identified in cost claims In the welcome pack and soon on CORDIS Guide to FP7 Financial Issues http://cordis.europa.eu/europa.eu/pub/fp7/docs/financialguide_en.pdf And in case of doubts, do not forget: RESEARCH HELPDESK http://ec.europa.eu/research/enquiries

Thank you very much for your attention! Open Discussion