Financial situation by the end of Table 1. ECPGR Contributions for Phase IX received by 31 December 2017 (in Euro)...3

Similar documents
Financial situation by the end of Table 1. ECPGR Contributions for Phase IX received by 31 December 2016 (in Euro)...3

Spain France. England Netherlands. Wales Ukraine. Republic of Ireland Czech Republic. Romania Albania. Serbia Israel. FYR Macedonia Latvia

Economic and Social Council

Approach to Employment Injury (EI) compensation benefits in the EU and OECD

Borderline cases for salary, social contribution and tax

NOTE. for the Interparliamentary Meeting of the Committee on Budgets

InnovFin SME Guarantee

The way to Eurostars II

Enterprise Europe Network SME growth outlook

Comparing pay trends in the public services and private sector. Labour Research Department 7 June 2018 Brussels

Double Tax Treaties. Necessity of Declaration on Tax Beneficial Ownership In case of capital gains tax. DTA Country Withholding Tax Rates (%)

Slovenia Country Profile

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

Using health spending to achieve fiscal consolidation objectives?

Enterprise Europe Network SME growth forecast

Macroeconomic overview SEE and Macedonia

EUREKA Programme A European Research Programme. > Not an EU-Programme (but complementarity and co-operation - ERA)

The Eureka Eurostars Programme

Coach Plus Breakdown Insurance

Report Penalties and measures imposed under the UCITS Directive in 2016 and 2017

EU-28 RECOVERED PAPER STATISTICS. Mr. Giampiero MAGNAGHI On behalf of EuRIC

EU BUDGET AND NATIONAL BUDGETS

APA & MAP COUNTRY GUIDE 2017 CROATIA

Quarterly Gross Domestic Product of Montenegro 3 rd quarter 2017

For further information, please see online or contact

Quarterly Gross Domestic Product of Montenegro 2st quarter 2016

THE INVERTING PYRAMID: DEMOGRAPHIC CHALLENGES TO THE PENSION SYSTEMS IN EUROPE AND CENTRAL ASIA

BULGARIAN TRADE WITH EU IN THE PERIOD JANUARY - APRIL 2017 (PRELIMINARY DATA)

BULGARIAN TRADE WITH EU IN THE PERIOD JANUARY - MAY 2017 (PRELIMINARY DATA)

Performance of EBRD Private Equity Funds Portfolio Data to 31 st December EBRD 2011, all rights reserved

11 th Economic Trends Survey of the Impact of Economic Downturn

FINANCIAL PLAN for CONSTRUCTION and EXPLOITATION PHASE

European Advertising Business Climate Index Q4 2016/Q #AdIndex2017

Performance of Private Equity Funds in Central and Eastern Europe and the CIS

Macroeconomic scenarios for skill demand and supply projections, including dealing with the recession

Croatia Country Profile

Quarterly Gross Domestic Product of Montenegro for period 1 st quarter rd quarter 2016

The Architectural Profession in Europe 2012

This document explains the methodology underlying Roche s EFPIA disclosure

Fiscal rules in Lithuania

Katharina Lehmeier San Sebastian > EUREKA. ProFactory2 Brokerage Event. Doing business through technology

Live Long and Prosper? Demographic Change and Europe s Pensions Crisis. Dr. Jochen Pimpertz Brussels, 10 November 2015

EU State aid: Guidelines on State aid for environmental protection and energy making of -

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation

Statistics Brief. Inland transport infrastructure investment on the rise. Infrastructure Investment. August

EIOPA Statistics - Accompanying note

DEVELOPMENT AID AT A GLANCE

FCCC/SBI/2010/10/Add.1

TAXATION OF TRUSTS IN ISRAEL. An Opportunity For Foreign Residents. Dr. Avi Nov

FAQs. 1. Event registration. Dear participants,

June 2014 Euro area international trade in goods surplus 16.8 bn 2.9 bn surplus for EU28

EP UNEP/OzL.Pro.WG.1/36/INF/1

Quarterly Gross Domestic Product of Montenegro 4 th quarter 2018 (p)

34 th Associates Meeting - Andorra, 25 May Item 5: Evolution of economic governance in the EU

United Nations Environment Programme

Electricity & Gas Prices in Ireland. Annex Business Electricity Prices per kwh 2 nd Semester (July December) 2016

The Eurostars Programme

EIOPA Statistics - Accompanying note

DG TAXUD. STAT/11/100 1 July 2011

EUA MEMBER CONSULTATION A CONTRIBUTION TO THE ERASMUS+ MID-TERM REVIEW

Performance of Private Equity Funds in Central and Eastern Europe and the CIS Data to 31 December 2008

EIOPA Statistics - Accompanying note

FY18 Campaign Terms. CAMPAIGN AGREEMENT ( Campaign Agreement ) FOR CEE DYNAMICS 365 CSP CAMPAIGN ( Program )

How to complete a payment application form (NI)

BULGARIAN TRADE WITH EU PRELIMINARY DATA

Statistics Brief. Investment in Inland Transport Infrastructure at Record Low. Infrastructure Investment. July

Lowest implicit tax rates on labour in Malta, on consumption in Spain and on capital in Lithuania

May 2012 Euro area international trade in goods surplus of 6.9 bn euro 3.8 bn euro deficit for EU27

EUROPA - Press Releases - Taxation trends in the European Union EU27 tax...of GDP in 2008 Steady decline in top corporate income tax rate since 2000

January 2014 Euro area international trade in goods surplus 0.9 bn euro 13.0 bn euro deficit for EU28

Programme for Government Joe Reynolds Director Programme for Government and Delivering Social Change

First estimate for 2011 Euro area external trade deficit 7.7 bn euro bn euro deficit for EU27

RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS

BTSF FOOD HYGIENE AND FLEXIBILITY. Notification To NCPs

Online Insurance Europe: BEST PRACTICES & TRENDS

Information Leaflet No. 5

Features offered by BU for the Network for inbound parcels - December 2016

June 2012 Euro area international trade in goods surplus of 14.9 bn euro 0.4 bn euro surplus for EU27

Corrigendum. OECD Pensions Outlook 2012 DOI: ISBN (print) ISBN (PDF) OECD 2012

TRADE IN GOODS OF BULGARIA WITH EU IN THE PERIOD JANUARY - JUNE 2018 (PRELIMINARY DATA)

Latvia Country Profile

PEUGEOT OPEN EUROPE Assistance 24/24 7/7 From France: From abroad:

Lithuania Country Profile

Courthouse News Service

STAT/12/ October Household saving rate fell in the euro area and remained stable in the EU27. Household saving rate (seasonally adjusted)

Burden of Taxation: International Comparisons

Table of Contents. 1 created by

Aim Higher EUROSTARS. Funding excellence in innovation. Eligibility guidelines for applications. December 2015 Version 2.0

Statistics Brief. OECD Countries Spend 1% of GDP on Road and Rail Infrastructure on Average. Infrastructure Investment. June

Slovakia Country Profile

great place to live and to locate you business Ministry of Economy of the Republic of Moldova

Global Assessment of Environmental-Economic Accounting and Supporting Statistics

IN AN EMERGENCY / 2015

COMMISSION STAFF WORKING DOCUMENT Accompanying the document

Gross domestic product of Montenegro in 2016

FOREWORD. Estonia. Services provided by member firms include:

CANADA EUROPEAN UNION

Finland Country Profile

EMPLOYMENT RATE Employed/Working age population (15-64 years)

Constraints on Exchange Rate Flexibility in Transition Economies: a Meta-Regression Analysis of Exchange Rate Pass-Through

Transcription:

European Cooperative Programme for Plant Genetic Resources (ECPGR) Phase IX (2014 2018) 2017 Financial Report CONTENTS Financial situation by the end of 2017...2 Table 1. ECPGR Contributions for Phase IX received by 31 December 2017 (in Euro)...3 Table 2. ECPGR Phase IX 2017 Contributions and Expenses (in Euro)...5 Table 3. Breakdown of expenditures of Working Group Activities funds (in Euro)...8 Table 4. Breakdown of expenditures of carry-over funds (in Euro)...8 ECPGR Secretariat c/o Bioversity International, Via dei Tre Denari 472/a, 00057 Maccarese, Italy Tel: (39) 06 6118251 Email: bioversity-ecpgr@cgiar.org Website: www.ecpgr.cgiar.org

Financial situation by the end of 2017 Contributions received for Phase IX (Table 1) At 31 December 2017, the total regular contributions received for Phase IX amounted to 1 871 669. It should be specified that both Israel (2015-18) and Poland (2014-18) contributions are no longer considered receivable as the two countries have not signed the Letter of Agreement to join ECPGR during Phase IX. Consequently, the overall outstanding contributions for Phase IX amounted to 148 801. Of these outstanding contributions, payments from Albania, Bosnia and Herzegovina and Italy are expected to be simply delayed, but are not considered at risk. In the case of Spain, internal bureaucratic procedures might have jeopardized the possibility to contribute for the past years. Also the case of Azerbaijan is uncertain, since the Secretariat has not been informed about the intention to pay, although the country has formally joined ECPGR at the beginning of Phase IX. As of 1 January 2018, member countries that are ineligible to receive ECPGR funds, owing to their twoyear (or more) outstanding contributions are Azerbaijan, Bosnia and Herzegovina and Spain. A voluntary contribution from Germany was received in 2017 ( 218 654, advance payment of a total pledge of 333 152) and earmarked to specific Grant Scheme Activities, EURISCO Taxonomy project and Public Private Partnerships project). Phase IX Budget (Table 2) The original budget for Phase IX ( 2 551 250), agreed at the 13th Steering Committee meeting in Vienna (December 2012), was subsequently incremented by funds carried over from the previous Phase ( 245 618), as well as by additional contributions related to previous Phases received in 2014 ( 86 800), by a further addition corresponding to the 5-year pledge from Portugal ( 60 000), which joined ECPGR in 2014, by voluntary contributions from Finland ( 750) in 2015 and from Germany ( 82 469) in 2016. However, a deduction of 44 000 was implemented in 2016 to the total budget due to Israel withdrawing from the list of member countries. The total budget, as set at the end of 2016 ( 2 982 887), was then increased in 2017 owing to additional voluntary contributions pledged from Germany ( 250 683). However, a deduction of 62 500 was also implemented due to the withdrawal of Poland from the list of member countries. The latter deduction affected the budget line Working Group Activities, which was reduced by 52 899 (net of overheads) from 283 809 to 230 910. The overall grand total budget at the end of 2017 was therefore set at 3 171 070 (compared to 2 982 887 at the end of 2016). s (Tables 2 to 4) At the end of 2017, Phase IX expenditures for Secretariat staff and travel and for Steering Committee and ExCo meetings and travel costs were lower than originally estimated. Combined under expenditures in this regard amount to ca. 43 000. The budget for AEGIS project coordination which was foreseen to be spent in three years (2016-2018), has been entirely spent in 2016 instead, following an arrangement agreed by the ExCo to employ Jan Engels for more time in 2016, and then to discontinue this collaboration in the following years. The budget for Working Group Activities has been used as detailed in Table 3. Carry-over funds from previous Phases, which are charged with a lower overhead (13%), have also been used in part to cover the meetings held by the Grant Scheme Activities. All the expenditures charged to carry-over funds are detailed in Table 4. Conclusion Compared to the budget ( 2,8M) agreed at the beginning of Phase IX, during the first four years of Phase IX, considering new pledges, past Phase outstanding contributions received and voluntary contributions, less the withdrawals of Israel and Poland from Phase IX, ECPGR has secured an additional income of ca. 328 000 (net of overhead). However, the receipt of outstanding contributions from Azerbaijan (5 years = 13750) and Spain (4 years = 88 000) is uncertain and equivalent to 101 750 (net of overheads = 86 119). The latter possible missed income can be partially counterbalanced by the above mentioned under expenditures (ca. 43 000, net of overheads), should this figure be reconfirmed at the end of 2018. The cash balance at the end of 2017 was positive, amounting to 389 233. 2

Table 1. ECPGR Contributions for Phase IX received by 31 December 2017 (in Euro) Participating country Annual pledge 2014 2015 2016 2017 2018 TOTAL Outstanding Albania 2,750 2,750 2,750 2,750 0 0 8,250 2,750 Austria 12,500 12,500 12,500 12,500 12,500 0 50,000 0 Azerbaijan 2,750 0 0 0 0 0 0 11,000 Belarus 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Belgium 19,000 19,000 19,000 19,000 19,000 0 76,000 0 Bosnia and Herzegovina 2,750 2,750 2,750 0 0 5,500 2,750 * Bulgaria 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Croatia 6,500 6,500 6,500 6,500 6,500 0 26,000 0 Cyprus 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Czech Republic 11,000 11,000 11,000 11,000 11,000 0 44,000 0 Denmark 12,000 12,000 12,000 12,000 12,000 0 48,000 0 Estonia 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Finland 12,000 12,000 12,000 12,000 12,000 0 48,000 0 France 52,000 52,000 52,000 52,000 52,000 0 208,000 0 Germany 52,000 52,000 52,000 52,000 52,000 0 208,000 0 Greece 12,000 12,000 12,000 12,000 12,000 0 48,000 0 Hungary 11,000 11,000 11,000 11,000 11,000 0 44,000 0 Iceland 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Ireland 12,000 12,000 12,000 12,000 12,000 0 48,000 0 Israel 11,000 11,000 11,000 0 ** Italy 52,000 52,000 52,000 52,000 0 0 156,000 52,000 Latvia 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Lithuania 6,500 6,500 6,500 6,500 6,500 0 26,000 0 Macedonia FYR 2,750 2,750 2,750 2,750 2,750 0 11,000 0 Montenegro 2,750 2,750 2,750 2,750 2,750 0 11,000 0 Netherlands 20,000 20,000 20,000 20,000 20,000 0 80,000 0 Norway 12,500 12,500 12,500 12,500 12,500 0 50,000 0 Poland 12,500 0 0 ** Portugal 12,000 12,000 12,000 12,000 0 0 36,000 12,000 Romania 7,500 7,500 7,500 7,500 7,500 0 30,000 0 Serbia 3,500 3,500 3,500 3,500 3,500 0 14,000 0 Slovakia 7,500 7,500 7,500 7,500 7,500 7,500 37,500 0 Slovenia 6,500 6,500 6,500 6,500 6,500 0 26,000 0 Spain 22,000 22,000 449 0 0 0 22,449 65,551 Sweden 19,000 19,000 19,000 19,000 19,000 0 76,000 0 Switzerland 19,000 19,000 19,000 19,000 19,000 0 76,000 0 Turkey 12,000 12,000 12,000 12,000 12,000 0 48,000 0 United Kingdom 52,000 52,000 52,000 52,000 52,000 7,000 215,000 0 522,250 507,000 474,449 471,250 404,500 14,500 1,871,699 146,051 * The 2016 contribution ( 2,750) was provided as "in-kind" by offering part of expenses for the hosting of the ECPGR Steering Committee meeting in Bosnia and Herzegovina in 2016. ** Israel (2016) and Poland (2017) were withdrawn from the list of member countries as they did not sign the Letter of Agreement to join Phase IX of ECPGR. 3

Table 1 (continued). ECPGR Contributions for Phase IX received by 31 December 2017 (in Euro) ECPGR Voluntary contributions Participating country 2014 2015 2016 2017 2018 TOTAL Finland 750 750 Germany (PPP project) 82,469 67,424 149,893 Germany (EURISCO Taxonomy) 78,225 78,225 Germany (European genetic resources) 73,005 73,005 750 82,469 218,654 301,873 Contributions Phase IX 2,173,572 outstanding contributions Phase IX 146,051 4

Table 2. ECPGR Phase IX 2017 Contributions and Expenses (in Euro) Budget s Description budget 2014-2018 2014 2015 2016 2017 2014 2015 2016 2017 expenditures for 2014-2017 Balance for 2014-2017 Staff costs Secretary at Bioversity International (100%) 579,675 109,184 112,460 115,834 119,309 110,686 114,726 121,684 115,062 462,158-5,371 Secretariat administrative support 297,005 55,942 57,621 59,349 61,130 54,376 55,247 57,371 63,722 230,716 3,326 Steering Committee, ExCo and travel Secretariat staff travel 35,000 7,000 7,000 7,000 7,000 4,958 4,307 7,696 6,911 23,872 4,128 Steering Committee meetings 96,000 0 0 48,000 0 0 0 18,335 5,024 23,359 24,641 ExCo meetings 12,375 4,125 0 4,125 0 3,153 2,945 1,637 1,748 9,483-1,233 ExCo Chair's travel 15,000 3,000 3,000 3,000 3,000 301 1,563 2,117 3,745 7,726 4,274 ExCo Chair's compensation 75,000 15,000 15,000 15,000 15,000 15,224 15,000 15,000 15,000 60,224-224 Working Group Activities Working Group Activities (1) 230,910 25,072 48,615 68,571 43,577 0 51,434 43,843 28,421 123,698 62,136 WG operations - Scientific assistance 232,486 43,790 45,103 46,457 47,850 39,083 37,856 40,523 52,199 169,661 13,539 AEGIS project coordination 84,257 45,714 23,543 5,000 5,000 48,785 23,693 15,000 0 87,478-8,221 expenses 1,657,708 308,827 312,342 372,336 301,866 276,567 306,770 323,206 291,832 1,198,375 96,996 Overhead (18.15%) 300,874 56,052 56,690 67,579 54,789 50,197 55,679 58,662 52,968 217,505 17,605 expenses including overhead 1,958,582 364,879 369,032 439,915 356,654 326,764 362,449 381,868 344,799 1,415,880 114,600 Facilities, IT, communications, office consumables 81,443 16,288 16,288 16,288 16,289 17,825 15,385 16,888 17,313 67,411-2,257 Maintenance and development of EURISCO at IPK 448,725 87,400 88,555 89,727 90,917 66,298 84,206 67,174 89,166 306,843 49,756 TOTAL BUDGET 2,488,750 468,567 473,875 545,930 463,861 410,886 462,040 465,930 451,278 1,790,134 162,099 s chargeable to carry-over Phases VII and VIII 217,361 43,472 43,472 43,472 43,472 28,469 40,012 7,347 58,446 134,274 39,615 Overhead (13%) 28,257 5,651 5,651 5,651 5,651 3,701 5,202 955 7,598 17,456 5,150 GRAND TOTAL BUDGET 2,734,368 517,691 522,999 595,054 512,984 443,057 507,253 474,232 517,322 1,941,864 206,864 5

Table 2 (continued). ECPGR Phase IX 2017 Contributions and Expenses (in Euro) Budget s Description budget 2014-2018 2014 2015 2016 2017 2014 2015 2016 2017 expenditures for 2014-2017 Balance for 2014-2017 s chargeable to additional contributions received for Phase VII and Phase VIII during Phase IX 76,814 15,363 15,363 15,363 15,363 0 0 0 0 0 61,451 Overhead (13%) 9,986 1,997 1,997 1,997 1,997 0 0 0 0 0 7,989 s chargeable to voluntary contribution from Finland (2015) and additional contributions pledged by Portugal for Phase IX less contributions initially planned for Israel ( 44k) no longer expected to be received. 14,177 2,708 3,343 2,708 2,708 0 0 0 0 0 11,468 Overhead (18.15%) 2,573 492 607 492 492 0 0 0 0 0 2,082 additional budget added in 2014-2015 (2) 103,550 20,560 21,310 20,560 20,560 0 0 0 0 0 82,990 s chargeable to voluntary contribution from Germany PPP Workshop 126,866 0 0 69,800 57,066 0 0 0 69,711 69,711 57,155 Grant scheme activities GenR 2017-3 88,900 0 0 0 88,900 0 0 0 33,934 33,934 54,965 Overhead (18.15%) 39,161 0 0 12,669 26,493 0 0 0 18,812 18,812 20,350 Eurisco Taxonomy 74,500 0 0 0 74,500 0 0 0 49,940 49,940 24,560 Overhead (5%) 3,725 0 0 0 3,725 0 0 0 2,497 2,497 1,228 additional budget added in 2016 and 2017 (3) 333,152 0 0 82,469 250,683 0 0 0 174,893 174,893 158,259 GRAND TOTAL AT 31.12.2017 3,171,070 538,251 544,309 698,083 784,228 443,057 507,253 474,232 692,216 2,116,757 448,113 (1) The WG Activities' budget has been decreased by 52,899 (excluding overheads) due to missed contribution from Poland during Phase IX. (2) The Grand budget has been increased by 103,550 representing the contributions received in 2014 from Israel ( 12,100) for Phase VII and from Denmark ( 18,200), Greece ( 22,000), Israel ( 22,000), Romania ( 7,000) and Serbia ( 5,500) for Phase VIII, voluntary contribution received from Finland in 2015 ( 750) and by 60,000 representing the pledge made by Portugal to participate in Phase IX (the contribution from Portugal was not included in the original budget agreed in Vienna in December 2012). In 2016 and 2017, a budget reduction has been made by 44,000 due to missing contributions from Israel during phase IX. (3) During 2016 and 2017 the total budget was further increased by 333,152 representing the voluntary contribution from Germany for three different activities as indicated in the budget table. 6

Table 2 (continued). ECPGR Phase IX 2017 Contributions and Expenses (in Euro) Phase IX regular contributions received 1,871,699 receipts Voluntary contribution received from Finland 750 Finland receipts Additional funds from Germany 301,123 additional receipts 2017 Funds balance as at 31-12-2013 245,618 Carry-over contributions received for Phase VII and Phase VIII during Phase IX 86,800 received 2,505,990 expenditure 2,116,757 Balance of Phase IX (as at 31.12.17) 389,233 7

Table 3. Breakdown of expenditures of Working Group Activities funds (in Euro) Description 2014 2015 Working Group Activities under the Activity Grant Scheme 2016 2017 expenditure 2014-2017 - s First Call - 51,434 6,462-57,896 - s Second Call - - 25,472 9,786 35,258 - s Third Call - - 11,910 18,635 30,545 Sub-total expenditures - 51,434 43,843 28,421 123,698 Overhead (18.5%) - 9,335 7,958 5,158 22,451 expenditures Working Group Activities - 60,770 51,801 33,579 146,150 Table 4. Breakdown of expenditures of carry-over funds (in Euro) Description 2014 Working Group activities under the Activity Grant Scheme 2015 2016 2017 expenditure 2014-2017 - s First Call - 34,373 4,529-38,902 - s Second Call - - - 11,818 11,818 - s Third Call - - - 24,297 24,297 - s Fourth Call - - - 25,844 25,844 Working Group activities under Activity Grant Scheme Other expenditures - Return of unspent funds on LOAs year 2013 (AEGIS project) - Consortium fee for Horizon 2020 proposal - 34,373 4,529 61,959 100,861 - - - (3,513) -3,513 1,525 1,000 - - 2,525 - Return of funds AEGIS potato project (5,994) - - - -5,994 - Documentation and Information Workshop Prague - Return of funds from Crop Trust (Nov2014) 22,745 - - - 22,745 (5,237) - - - -5,237 - Corrections reimbursements 2015 - (116) - - -116 - On-farm Workshop - 4,756 - - 4,756 - EURISCO Migration to IPK 15,429 - - - 15,429 - EURISCO Advisory Committee meeting October 2016 - - 2,818-2,818 'Other expenditures' 28,468 5,640 2,818 (3,513) 33,413 Sub-total expenditures of carry-over funds 28,468 40,013 7,347 58,446 134,274 Overhead (13%) 3,701 5,202 955 7,598 17,456 expenditures carry-over funds 32,169 45,215 8,302 66,044 151,730 8