First level control report including checklist

Similar documents
Annex 3 First level control report including checklist

South East Europe (SEE) SEE Control Guidelines

Guidance on management verifications Cooperation Programme Interreg V-A Greece - Italy

Lead Partner Seminar. JS/MA Riga

FLC Guidance. Page 1. Version. September *Disclaimer: This is a living document and further content will be developed at a later stage.

Interreg V-A Latvia Lithuania Programme

GUIDE FOR PROJECT IMPLEMENTATION

Interreg Nord

Project Development - Rules on eligibility of expenditure

ELIGIBILITY OF EXPENSES: APPLICABLE RULES

PROGRAMME RULES ON ELIGIBILITY OF EXPENDITURES

CHECK-LIST FOR CONTROLLERS/AUDITORS

Project Implementation. Project Implementation Seminar Monika Balode, Project Coordinator September 2018 Tallinn & Stockholm

How to plan your budget and project management?

Eligibility Rules of Expenditures

Follow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine

Knowledge and Innovation Consultants. Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011

First Level Controller MANUAL

SMALL PROJECT CONSOLIDATED PROGRESS REPORT FORM including guidelines

1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version

CONSOLIDATED PROGRESS REPORT FORM including guidelines

Financial rules and procedures in Interreg Europe - second call projects

Version 4: 29 th June 2017

Fact Sheet 14 - Partnership Agreement

ERDF SUBSIDY CONTRACT NO...

8 th Financial Managers Seminar

First Level Control of finance and activities: The Programme rules

Partnership Agreement between the Lead Partner and the other project partners

TABLE OF CONTENTS PREFACE 0 GENERAL PROVISIONS 1 STAFF COSTS 2 OFFICE AND ADMINISTRATIVE EXPENDITURE 3 TRAVEL AND ACCOMMODATION COSTS

Investing in your future

Control Guidelines for INTERREG IPA CBC Programmes

Budget & Finances. Interreg Europe Secretariat. 23 March 2016 Lead applicant workshop. Sharing solutions for better regional policies

FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE

IPA partners seminar. Eligibility of expenditure and specificities of the public procurement. Dubrovnik, 5 th February 2013

First Level Control of finance and activities: The Programme rules

Seed Money Facility. Lead Applicants seminar Budapest, 11 April 2016

CENTRAL EUROPE Control and Audit Guidelines TABLE OF CONTENTS

INTERREG V-A GREECE-ITALY PROGRAMME PATRA 24/04/2018 PREVEZA 26/04/2018

INTERREG 2 Seas Mers Zeeën First Level Control Manual

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Guidance for reporting

Guidance Note 14 Micro Project scheme

Financial rules and procedures

SELECTION CRITERIA. for applications submitted to the INTERREG V-A Austria-Hungary Programme

ADRION 2 call for proposals Priority Axis 2 Financial aspects. Tirana, 11 April 2018

1st Level Control in the North Sea Region Programme

Table of contents. Introduction Regulatory requirements... 3

Project Progress Report User Guide

Audit certificate template for Horizon2020 projects funded by SERI

PROCUREMENT OF SERVICES OPEN CALL FOR TENDERS (Article 29 decree No of 30/12/2005) FRAMEWORK CONTRACT

Project Implementation. Project Implementation Seminar Monika Balode, Project Coordinator September 2018 Tallinn & Stockholm

Mono-Beneficiary Model Grant Agreement

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Central Baltic INTERREG V A Cross-border Co-operation Programme

Guidance for Member States on the Drawing of Management Declaration and Annual Summary

Eligibility rules, Financial control, Procurement

MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS

MED PROGRAMME. First Level Control in practice. Most common mistakes - Follow-up measures

COMMISSION DECISION. of ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA. (only the English text is authentic)

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Official Journal of the European Union

Financial Control. Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und.

ESF Certifying Authority, Department of Education and Skills Circular 1/2016 (replacing Circular 1/2015)

TERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTION OF THE EUROPEAN UNION -

Multi-beneficiary Model Grant Agreement

Project Implementation Seminar

INTERREG Baltic Sea Region

Eligibility of expenditures in Structural Funds Trainer: Marco Lopriore, EIPA

Model terms of reference for the certificate on the financial statements

Eligibility principles and sound financial management

Q&A on simplified cost options in programmes. March 2018 Application, control and audit: use of simplified cost options for staff costs

Guidance on Simplified Cost Options (SCOs):

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

ESF Certifying Authority, Department of Education and Skills Circular 1/2015

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

or institution which in turn is a member of the International Federation of Accountants (IFAC).

ELIGIBILITY OF EXPENDITURES: FOCUS ON THE ITALIAN BENEFICIARIES

An overview of the eligibility rules in the programming period

FINANCIAL REGULATION

INTERREG III B CADSES. Payment Claim Manual

Full Application Form

Reporting and First Level Control of Finance and Activities

GUIDELINES FOR FIRST LEVEL CONTROL on CBC Programmes, co-financed by IPA BULGARIA - SERBIA BULGARIA - MACEDONIA BULGARIA - TURKEY

COMMISSION DELEGATED REGULATION (EU)

Mono-Beneficiary Model Grant Agreement

EU School Scheme. Points for clarification to assist Member States in implementing the school scheme

Implementation Manual. Version 2.1 December 2016

Multi-beneficiary Model Grant Agreement for Members

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

*This circular was reissued in October 2015 to reflect minor clarifications to Rules 4 and 14.9

GUIDE FOR FILLING IN THE APPLICATION FORM 4TH CALL. Central Baltic Programme Version 4.0 ( )

Preparatory support... 4 Q. In the context of multi-funded CLLD, can preparatory support be funded by one Fund only?. 4

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

PAC Guidelines for Project Progress Report

EUROPEAN COMMISSION. EGESIF_ final 22/02/2016

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES

GUIDELINES FOR FIRST LEVEL CONTROL ON INTERREG-IPA BULGARIA SERBIA, BULGARIA TURKEY AND BULGARIA FORMER YUGOSLAV REPUBLIC OF MACEDONIA CBC PROGRAMMES

Guidelines for the AF DSP call for proposals

Project Administration

ESF MANAGING AUTHORITY

Transcription:

First level control report including checklist Project title Project acronym Project number Report Number 1. Project and progress report Name 2. Project Partner Name Organisation Job title Division/Unit/Department Address Country Telephone E-mail 3. Designated first level controller 4. Methodology of the Verification Gerneral methodology desk-based on-the-spot other Sampling was applied Yes No Date of receipt of the progress report start of control work Date(s) of requests for clarifications Date of receipt of satisfactory clarifications End of the control work Travel and accommodation External expertise and services 5. Expenditure declared and certified by budget line Declared (A) (total amount declared) Certified (B) (total amount certified) Difference (C=A-B) (total amount deducted) Certified in % of Declared [B/A]*100 EUR 0.00 EUR 0.00 EUR 0.00 100.00 % EUR 0.00 EUR 0.00 EUR 0.00 100.00 % Total expenditure EUR 0.00 EUR 0.00 EUR 0.00 100.00 % Net Revenue EUR 0.00 EUR 0.00 EUR 0.00 0.00 % Total eligible expenditure EUR 0.00 EUR 0.00 EUR 0.00 100.00 % Part of the expenditure was incurred outside (the Union part of) the programme area Yes No Page 1 of 11

6.a. Description of finding, observation and limitations n.a. 6.b. Conclusions and recommendations n.a. 6.c. Follow-up measures for the next progress report n.a. Purpose of the Control, Responsibilities, Legal Basis and Methodology Purpose of the control report and addresses We performed a verification of the above mentioned report. We prepared this independent first level control report in order to provide the project partner with information on the control work carried out by us, the errors detected, the conclusions drawn and the recommendations and measures identified. This control report refers solely to the partner report identified above and does not constitute a confirmation of the controlled entity s other statements and accounts. This control report is primarily for the attention of the controlled partner. It will furthermore be made available to the managing authority, the joint secretariat of the programme and managing authority, as well as authorised third parties such as the audit authority and the European Commission upon request. Responsibility of the Project Partner The partner is responsible for the preparation of the partner report in accordance with the reporting provisions outlined in the subsidy contract. The partner is furthermore responsible for executing internal control in order to enable the preparation of partner reports that are free from material misstatement, including those due to fraud or error. Responsibility of the Lead Partner Responsibilities of the Lead Partner are outlined in Article 13 of Reg. (EU) No 1299/2013. Responsibility of the Managing Authority/Joint Secretariat MA/JS carry out the functions according to Article 125 of (EU) No 1303/2013 and Article 23 of (EU) No 1299/2013. The MA/JS take the responsibility for monitoring overall project progress. Responsibility of First Level Control FLC is responsible for verifying expenditure declared in the partner report based on the verifications carried out according to Article 23 of (EU) No 1299/2013. Legal basis and guidelines Reg. (EU) No 1303/2013 ; Reg. (EU) No 1301/2013; Reg. (EU) No 1299/2013 Commission Delegated Regulations (EU) No 481/2014, (EU) No 480/2014 Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds, the Cohesion Fund and the EMFF for the 2014-2020 programming period Operational Programme Programme Manual 9. Controller's signature Name & Date Stamp 23 janv. 2017 15:20:32 Page 2 of 11

Checklists NWE Project FLC checklist 1. General Information 1.1 Accounting System Question Answer Comment The project partner uses for accounting purposes - a separate accounting system No - an adequate accounting code No In case the project partner has sub partners, does each sub partner have: - a separate accounting system No - an adequate accounting code No Does the combined sub partner expenditure not exceed the costs of the partner s share Double-financing is excluded by: e.g., invoices are stamped, marked; on-the-spot inspection of originals, etc. 1.2 VAT The partner organisation has the right to recover VAT. Please provide comments if partially is ticked. - yes No - partially No - no No 1.3 Bank Account The correct IBAN and BIC is communicated to the Lead Partner and the account belongs to the project partner s organization. 1.4 Format of documents Documents were made available to FLC in the following format (tick all that apply): No - originals No - copy No - electronic No 2. Audit Trail General considerations / eligibility criteria Are the following documents available for the controller: 1. Subsidy contract; 2. Application form; 3. Partnership agreement Costs are directly related to the project and necessary for the development or implementation of the project. e.g. Verified that costs: have been initially planned in the application form under this budget line OR a written agreement of these costs exists from the JS. Costs are correctly allocated to the right budget line e.g. Inspected list of expenditures. Page 3 of 11

Costs are declared only once. e.g. Inspected the list of expenditure and verified that expenditures have not been declared twice in different budget lines or in previous reporting periods. Expenditure was incurred and paid within the eligibility period of the project. (NOT needed for flat rates, lump sums, or in-kind contributions). e.g. Implementation expenditure is incurred and paid within the starting date of the project set in the subsidy contract and the end of the relevant reporting period. Expenditure is supported by invoices or documents of equivalent probative value, which are correct in content and accounting terms. (NOT needed for Flat rates, lump sums or in-kind contributions) Expenditure is supported by a proof of payment (bank account statements, bank transfer confirmations, cash receipts, etc.). NOT needed for Flat rates, lump sums or in-kind contributions Recoverable VAT was deducted. The part of the expenditure incurred outside (the Union part of) the programme area and is eligible according to Art 20(2)(3) of Reg. (EU) No 1299/2013] and programme rules? (in case expenditure was incurred outside the eligible programme area). e.g. verified that the costs are outlined in the AF OR have been approved by the programme bodies prior to their occurring For project partners from the Euro zone travelling outside the Euro zone: Have the organisations internals rules been implemented and the costs claimed in Euros? The co-financed products and services were delivered or are in progress to be delivered. e.g. Inspected project evidence provided with the partner report, in particular agendas and signed attendance lists of meetings, written outputs, pictures, etc; OR performed own research, in particular search on the internet, OR obtained external confirmation of the project s existence, in particular from... or Inspected the project partner and activities on the spot. Partner has received the ERDF share from the previous periods. Page 4 of 11

The partner total budget, budget per budget line and budget per work package was respected. If not, did the partner have the LP s approval for overspending the budget? e.g. Verified that accumulated partner expenditure is within the partner budget of the latest version of the approved Application Form. If not, differences have been covered by the budget flexibility or explained / approved by the Lead Partner Net revenue has been deducted from the total eligible expenditure. e.g., Inspected information on conferences, events, website, etc. for evidence of potential generation of net revenue and verified that project-related net revenues have been declared by the project partner. Verified that declared net revenues have been calculated correctly and can be attributed to the project. ; NOTE: deductions (if any) are allocated to the relevant budget lines 3. Advance payments and preparation costs The partner asked for the advance payment in the application form. The partner fulfils the definition of a micro-enterprise or a micro-ngo. The preparation costs have been paid to the partner according to the rules stated in the partnership agreement. ; NOTE: deductions (if any) are allocated to the relevant budget lines 4.On the spot verifications Documents submitted match the originals. Documents are correctly archived. ; NOTE: deductions (if any) are allocated to the relevant budget lines 5.Eligibility along budget lines 5.1 General questions Have all cost items claimed been used for their intended purpose? Are all items described in the approved application form? 5.2 Staff Costs Have staff costs been claimed? Page 5 of 11

Are the costs calculated according to the following options: 1) Full gross employment costs; 2) Fixed percentage of gross employment costs; 3) Flexible percentage; 4) Hourly basis; 5) Country specific method Persons declared as staff costs are employees of the project partner or work under a contract considered as an employment contract. Are the following documents available: 1) Work contracts; 2) Payslips (or similar); 3) Timesheets (where applicable) If overtime is claimed are related costs actually incurred and in compliance with the applicable programme rules? Is a document available fixing the percentage worked on the project and is this percentage correctly applied to the actual gross employment costs? (only in case of fixed percentage of time worked per month) The number of hours worked on the project is documented in a time Registration system. (only in case of flexible shares varying from one month to the other or hourly rates) If national rules are available, have those been complied to? see programme manual for Chapter 5, Section 5.2 for available national rules. If a person works in several projects financed by NWE or other sources of funding, is it ensured that the total number of working hours declared does not exceed the total eligible working time of the employee (no double-financing)? Staff cost are calculated correctly. e.g. FIXED PERCENTAGE: verified that the percentage was correctly applied to the gross employment costs for each person declaring staff costs under this option. FLEXIBLE SHARES: verified that staff cost are correctly calculated by multiplying the number of hours worked on the project with the hourly gross employment cost. Hourly rate calculated either 1) by dividing the monthly gross employment cost by the monthly working time fixed in the employment/work contract expressed in hours, or 2) by dividing the latest documented annual gross employment cost by 1720 hours (Art 68(2) of Reg. (EU) No 1303/2013). HOURLY RATES: Verified that staff cost are correctly calculated by multiplying the number of hours worked on the project with the hourly rate agreed in the employment/work contract. Page 6 of 11

. (for real costs only): For each ineligible / deducted cost item: Clear identification of the ineligible cost item, i.e. unique accounting number/invoice OR indicate where this information can be found (e.g., in the database, the list of expenditures, etc.) For all ineligible / deducted costs: Clear specification of how much was deducted and reason why it was deducted OR indicate where this information can be found. Any issues and observation and concerns even if no deductions were made. 5.3 Office and Administration There is no double declaration of cost items covered by the flat rate in other budget lines. (such as stationery, photocopying, mailing, telephone, fax and internet, heating, electricity, office furniture, maintenance, office rent). 5.4. Travel and Accommodation Have travel and accommodation costs been claimed? Are the trips that these costs refer to justified by the project s activities? Travel and accommodation costs relate to staff of the partner organisation or natural persons working under work contracts considered as employment contracts of the partner organisation Costs are in line with applicable EU, programme national and internal rules of the partner organisation. Are trips limited to the 8 countries represented in the Interreg NWE programme? In case of trips outside the NWE countries, where they explicitly mentioned and justified in the approved application form or by the joint secretariat?. 5.5. External Expertise and Services Have external expertise and services been reported? (if yes) please also refer to Section 4 for verifying public procurements. Providers of services or expertise are external to the project partnership. The types of costs listed under the budget line are eligible according to EU and programme rules. No Page 7 of 11

Invoices or documents of equivalent probative value are in line with the contract(s) or where applicable- with the selected offerin terms of amount and nature (In case of experts or services that are NOT exclusively used for the project) The share allocated to the project is plausible, i.e. calculated according to a fair, equitable and verifiable method. Deliverables or other evidence of the work carried out by the provider are available. Have the travel and accommodation expenses of external service providers been recorded under the external services and experts budget line (i.e. and not under travel and accommodation). 5.6. Equipment Has new equipment been reported? (if yes) please also refer to Section 4 for verifying public procurements. The types of costs listed under the budget line are eligible according to EU and programme rules. Invoices or documents of equivalent probative value are in line with the contract(s) or were applicable- the selected offer in terms of amount and nature. The method to calculate equipment expenditure (full costs, pro rata, depreciation) is correctly applied. Equipment is available, physically exists.. 5.7 Infrastructure and works Have new infrastructure and works been reported? (if yes) please also refer to Section 4 for verifying public procurements. Providers of infrastructure and works are external to the project partnership. Invoices or documents of equivalent probative value are in line with the contract(s) or were applicable- the selected offer in terms of amount and nature. Infrastructure and works exists or evidence of work in progress is available.. No No Page 8 of 11

6. Compliance with public procurement rules. (if yes) please refer to the FLC section of the NWE homepage http://www.nweurope.eu/help-sup port/first-level-control/ for the checklist on public procurement and attach it in the ems after finalising the controls. 7. Compliance with information and publicity requirements Information and publicity rules of the EU and the programme were complied with. (In case of projects exceeding a total public contribution of EUR 500.000 and consisting of the financing of infrastructure or construction projects) A temporary billboard of a significant size, readily visible to the public has been installed. (In case of projects not falling under the specification above) At least one poster with information about the project (minimum size A3), including the financial support from the Union at a location readily visible to the public, such as the entrance area of the building. 8. Compliance with other EU rules The FLC is asked here for a professional judgement as a controller based on experience and training, but not for an expertise of EU policies on sustainable development, equal opportunities and non-discrimination, equality between men and women, or state aid. The FLC is asked to confirm, that you have not come across anything that mad you doubt that the EI horizontal principals are not adhered to. There is no evidence that the project activities do not comply with the EU horizontal objectives of sustainable development. There is no evidence that equipment purchased does not comply with EU and national legislation in terms of environmental impacts, required permits, etc. There is no evidence that infrastructure and works do not comply with EU and national legislation in terms of environmental impacts, required permits, etc. No Page 9 of 11

[according to Articles 4 and 7 of Reg. (EU) No 1303/2013] There is no evidence that the project activities do not comply with the EU horizontal objectives of equality between men and women and non-discrimination. Have any limitations on state aid (de minimis, GBER or notification) been identified for the partner? If no, do you think that state aid should have been highlighted? If state aid limitations have been highlighted, please fill in the relevant sections: De minimis - the threshold for de minimis was not exceeded De minimis: In case of downstream de minimis, did the partner collected self-declarations and issued notification letters? If state aid limitations have been highlighted, please fill in the relevant sections: GBER - 1) Activities are not excluded from the scope of the schemes (export activities and sectoral coverage) GBER - 2) The partner is neither in difficulty nor subject to an outstanding recovery order GBER - 3) The partner is a small / medium sized / large company (whichever applicable) GBER - 4) The maximum intensity rate corresponds to the requirements of the article applied GBER - 5) The specific eligibility rules were respected (if applicable GBER - 6) The relevant ceilings were respected 9. Shared Costs A written agreement on shared costs exists between the partners sharing the costs, including division key, implementing partner, specification of types of costs shared, expenditure incurred. (in case of a project partner reimbursing another partner) Costs have been certified by the FLC of the partner incurring the costs. There are not costs included that were invoiced by a different partner. 10. In-kind Contributions In-kind contribution(s) declared is/are eligible according to EU and programme rules. Page 10 of 11

In-kind contribution(s) relate(s) to the project. In-kind contribution(s) is/are foreseen in the approved application form. In-kind contribution(s) is/are documented. The in-kind amount declared is plausible. i.e. based on a fair, equitable and verifiable calculation method. 11. External public contribution (in case of external contributions) The controlled entity received external (public) contribution for the previous report. (if yes) The total public contribution has not been exceeded. (if yes) The contribution does not come from other EU financial instruments. 12. Lead Partner-specific verifications (filled-in in the case of Lead Partners only) The Lead Partner forwarded ERDF shares for the previous report to the project partners without unnecessary delays and in full. The documents presented by the project partners are complete and have been validated by the partner FLC. The information provided by the partner FLCs in the checklists is sufficient. Controller s signature Location Date Name Page 11 of 11