May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00 $ 11,000.00 $ 11,000.00 221(C) - TEMPORARY SILT FENCE - LF 59,777.00 $ 1.40 $ 83,687.80 $ 0.95 $ 56,788.15 221(D) - TEMPORARY SEDIMENT FILTER - EA 23.00 $ 1.40 $ 32.20 $ 165.08 $ 3,796.84 230(A) - SOLID SLAB SODDING - SY 18,237.00 $ 2.50 $ 45,592.50 $ 1.27 $ 23,160.99 307(K) - STABILIZED SUBGRADE - SY 308,732.00 $ 3.50 $ 1,080,562.00 $ 3.50 $ 1,080,562.00 310(B) - SUBGRADE, METHOD B - SY 4,441.00 $ 4.00 $ 17,764.00 $ 0.54 $ 2,398.14 317 - CEMENT TREATED BASE - SY 295,490.00 $ 8.50 $ 2,511,665.00 $ 5.50 $ 1,625,195.00 325 - SEPARATOR FABRIC - SY 295,490.00 $ 0.90 $ 265,941.00 $ 1.79 $ 528,927.10 402(E) - TRAFFIC BOUND SURFACE COURSE TYPE E - TON 9,716.00 $ 18.00 $ 174,888.00 $ 8.54 $ 82,974.64 407(B) - TACK COAT - GAL 3,331.00 $ 4.00 $ 13,324.00 $ 2.13 $ 7,095.03 408 - PRIME COAT - GAL 3,085.00 $ 6.00 $ 18,510.00 $ 3.20 $ 9,872.00 411(C) - SUPERPAVE, TYPE S4 (PG 64-22 OK) - TON 7,343.00 $ 57.00 $ 418,551.00 $ 61.32 $ 450,272.76 412 - COLD MILLING PAVEMENT - SY 20,276.00 $ 1.50 $ 30,414.00 $ 1.35 $ 27,372.60 413(D) - RUMBLE STRIP-METHOD PCC-CON - LF 122,383.00 $ 0.25 $ 30,595.75 $ 0.19 $ 23,252.77 414(A) - P.C. CONCRETE PAVEMENT (PLACEMENT) - SY 102,853.00 $ 7.50 $ 771,397.50 $ 5.30 $ 545,120.90 414(B) - DOWEL JOINTED P.C. CONCRETE PAVEMENT (PLACEM 180,481.00 $ 10.00 $ 1,804,810.00 $ 6.97 $ 1,257,952.57 414(G) - P.C. CONCRETE FOR PAVEMENT - CY 74,811.00 $ 90.00 $ 6,732,990.00 $ 84.50 $ 6,321,529.50 430 - PAVEMENT SMOOTHNESS (NON-BIDDABLE) - LSUM 1.00 501(F) - GRANULAR BACKFILL - CY 54.00 $ 10.00 $ 540.00 $ 50.95 $ 2,751.30 504(E) - 42" F-SHAPED PARAPET - LF 119.00 $ 80.00 $ 9,520.00 $ 140.84 $ 16,759.96 509(A) - CLASS AA CONCRETE - CY 287.00 $ 450.00 $ 129,150.00 $ 295.55 $ 84,822.85 509(D) - CLASS C CONCRETE - CY 69.00 $ 380.00 $ 26,220.00 $ 323.93 $ 22,351.17 511(A) - REINFORCING STEEL - LB 562.00 $ 2.00 $ 1,124.00 $ 1.78 $ 1,000.36 511(B) - EPOXY COATED REINFORCING STEEL - LB 31,155.00 $ 2.00 $ 62,310.00 $ 1.19 $ 37,074.45 601(B) - TYPE I-A PLAIN RIPRAP - TON 31.00 $ 60.00 $ 1,860.00 $ 47.37 $ 1,468.47 601(C) - TYPE I-A FILTER BLANKET - TON 15.00 $ 45.00 $ 675.00 $ 44.56 $ 668.40 609(A) - CONCRETE CURB (4" MNTBLE-INTEGRAL) - LF 6,964.00 $ 3.00 $ 20,892.00 $ 8.00 $ 55,712.00
610(B) - 8" CONCRETE DRIVEWAY - SY 96.00 $ 8.00 $ 768.00 $ 57.46 $ 5,516.16 611(G) - SPECIAL INLET DRAIN - EA 22.00 $ 9,675.00 $ 212,850.00 $ 11,744.00 $ 258,368.00 611(G) - INLET CI DES. 2 (STD) - EA 20.00 $ 3,400.00 $ 68,000.00 $ 3,527.43 $ 70,548.60 611(G) - INLET CI DES. 3 (STD) - EA 1.00 $ 5,554.37 $ 5,554.37 $ 6,209.81 $ 6,209.81 611(G) - INLET (SMD-TYPE 2) - EA 1.00 $ 2,800.00 $ 2,800.00 $ 2,022.85 $ 2,022.85 611(G) - INLET (SMD-TYPE 2B) - EA 1.00 $ 2,900.00 $ 2,900.00 $ 1,796.05 $ 1,796.05 611(H) - ADD'L DEPTH IN INLET CI DES. 2 - VF 36.00 $ 400.00 $ 14,400.00 $ 31.88 $ 1,147.68 611(H) - ADD'L DEPTH IN INLET CI DES. 3 - VF 2.00 $ 450.00 $ 900.00 $ 159.38 $ 318.76 613(A) - 18" R.C. PIPE CLASS III - LF 1,626.00 $ 55.00 $ 89,430.00 $ 38.03 $ 61,836.78 613(B) - 21" X 15" CORR. GALV. STEEL PIPE ARCH - LF 826.00 $ 30.00 $ 24,780.00 $ 19.21 $ 15,867.46 613(L) - 21" X 15" PREFAB. CULVERT END SECTION, ARCH - EA 1.00 $ 500.00 $ 500.00 $ 436.88 $ 436.88 613(L) - 18" PREFAB. CULVERT END SECTION, ROUND - EA 15.00 $ 500.00 $ 7,500.00 $ 1,040.63 $ 15,609.45 613(M) - TYPE A4 CULVERT END TREATMENT - EA 6.00 $ 1,000.00 $ 6,000.00 $ 1,305.03 $ 7,830.18 613(S) - STANDARD BEDDING MATERIAL, CLASS B - CY 838.00 $ 50.00 $ 41,900.00 $ 68.48 $ 57,386.24 613(T) - STANDARD BEDDING MATERIAL, CLASS C - CY 40.00 $ 46.00 $ 1,840.00 $ 96.34 $ 3,853.60 613(V) - TRENCH EXCAVATION - CY 1,033.00 $ 5.00 $ 5,165.00 $ 21.34 $ 22,044.22 619(A) - REMOVAL OF STRUCTURES & OBSTRUCTIONS - LSUM 1.00 $ 15,000.00 $ 15,000.00 $ 19,574.54 $ 19,574.54 619(B) - REMOVAL OF CONCRETE PAVEMENT - SY 171,639.00 $ 5.00 $ 858,195.00 $ 3.39 $ 581,856.21 619(B) - REMOVAL OF ASPHALT PAVEMENT - SY 119,299.00 $ 3.00 $ 357,897.00 $ 2.24 $ 267,229.76 619(B) - REMOVAL OF GUARDRAIL - LF 7,512.00 $ 3.00 $ 22,536.00 $ 0.31 $ 2,328.72 619(B) - REMOVAL OF CONCRETE MEDIAN BARRIER - LF 1,681.00 $ 50.00 $ 84,050.00 $ 5.90 $ 9,917.90 619(B) - REMOVAL OF CABLE BARRIER - LF 650.00 $ 8.00 $ 5,200.00 $ 11.37 $ 7,390.50 619(C) - SAWING PAVEMENT - LF 63,068.00 $ 3.00 $ 189,204.00 $ 0.85 $ 53,607.80 623(A) - BEAM GUARDRAIL W-BEAM SINGLE - LF 13,688.00 $ 17.00 $ 232,696.00 $ 16.77 $ 229,547.76 623(F) - GUARDRAIL TRAIL END TURNDOWN (31") - EA 19.00 $ 800.00 $ 15,200.00 $ 772.13 $ 14,670.47 623(G) - GUARDRAIL END TREATMENT (31") - EA 26.00 $ 2,200.00 $ 57,200.00 $ 2,183.25 $ 56,764.50 623(I) - GUARDRAIL BRIDGE CONN-THRIE BEAM (31") - EA 17.00 $ 1,800.00 $ 30,600.00 $ 1,491.00 $ 25,347.00 627(A) - CONCRETE LONGITUDINAL BARRIER, DESIGN 1 - LF 1,547.00 $ 52.00 $ 80,444.00 $ 42.36 $ 65,530.92 627(I) - CONCRETE LONGITUDINAL BARRIER, DESIGN 1 REPAIR 100.00 $ 100.00 $ 10,000.00 $ 399.92 $ 39,992.00 627(I) - CONCRETE LONGITUDINAL BARRIER, REFINISH - LF 30,528.00 $ 8.00 $ 244,224.00 $ 7.05 $ 215,222.40 628(B) - HIGH-TENSION CABLE BARRIER(TL-4) - LF 1,354.00 $ 11.00 $ 14,894.00 $ 11.50 $ 15,571.00 628(C) - END ANCHORS - EA 3.00 $ 2,300.00 $ 6,900.00 $ 6,922.50 $ 20,767.50 628(E) - CABLE BARRIER TENSION METER - EA 1.00 $ 3,000.00 $ 3,000.00 $ 3,408.00 $ 3,408.00 853.0 - GUARDRAIL DELINEATORS (TYPE 1, CODE 1) - EA 362.00 $ 20.00 $ 7,240.00 $ 13.31 $ 4,818.22
870(A) - SAND FILLED IMPACT ATTENUATION MODULE - EA 38.00 $ 300.00 $ 11,400.00 $ 340.80 $ 12,950.40 870(C) - REMOVAL OF EXISTING IMPACT ATTENTUATION MODU 38.00 $ 5,000.00 $ 190,000.00 $ 26.63 $ 1,011.94 871(A) - (SP) IMPACT ATTENUATOR - EA 1.00 $ 20,000.00 $ 20,000.00 $ 33,749.85 $ 33,749.85 Part A Bid - ROADWAY $ 17,426,359.12 $ 14,770,799.14 PART A SIGNING AND STRIPING - BASE BID 805(A) - REMOVAL OF SIGN FOOTING - EA 18.00 $ 75.00 $ 1,350.00 $ 213.00 $ 3,834.00 805(A) - (PL) REMOVAL OF EXISTING SIGNS - EA 23.00 $ 65.51 $ 1,506.73 $ 90.53 $ 2,082.19 805(D) - (PL) REMOVE & RESET EXISTING SIGNS - EA 5.00 $ 153.65 $ 768.25 $ 106.50 $ 532.50 805(D) - (PL) REMOVE & RESET GROUND MOUNTED SIGN - EA 5.00 $ 1,500.00 $ 7,500.00 $ 213.00 $ 1,065.00 850(A) - SHEET ALUMINUM SIGNS - SF 136.00 $ 23.71 $ 3,224.56 $ 31.95 $ 4,345.20 851(C) - 2" SQUARE TUBE POST - LF 198.00 $ 8.45 $ 1,673.10 $ 6.39 $ 1,265.22 853 - DELINEATORS (TYPE 1, CODE 1, FLEXIBLE) - EA 118.00 $ 49.50 $ 5,841.00 $ 38.34 $ 4,524.12 853 - BARRIER DELINEATORS - EA 710.00 $ 35.00 $ 24,850.00 $ 9.59 $ 6,808.90 856(A) - TRAFFIC STRIPE (MULTI-POLY.)(6" WIDE) - LF 165,820.00 $ 0.40 $ 66,328.00 $ 0.62 $ 102,808.40 856(A) - TRAFFIC STRIPE (MULTI-POLY.)(8" WIDE) - LF 640.00 $ 1.60 $ 1,024.00 $ 1.70 $ 1,088.00 856(A) - TRAFFIC STRIPE (MULTI-POLY.)(12" WIDE) - LF 225.00 $ 2.59 $ 582.75 $ 2.13 $ 479.25 Part A Bid - SIGNING AND STRIPING $ 114,648.39 $ 128,832.78 PART A TRAFFIC CONTROL - BASE BID 857(A) - CONSTRUCTION TRAFFIC STRIPE (PAINT)(4" WIDE) - LF 271,457.00 $ 0.04 10,858.28 $ 0.09 $ 24,431.13 857(F) - PAVEMENT MARKING REMOVAL (TRAFFIC STRIPE) - LF 124,388.00 $ 0.06 $ 7,463.28 $ 0.15 $ 18,658.20 871(B) - (SP) CONST. ZONE IMPACT ATTEN. - SD 673.00 $ 10.19 $ 6,857.87 $ 6.39 $ 4,300.47 871(C) - RELOCATION OF CONSTRUCTION ZONE IMPACT ATTE 16.00 $ 2,750.00 $ 44,000.00 $ 798.75 $ 12,780.00 876(A) - TRUCK MOUNTED ATTENUATOR - SD 260.00 $ 12.22 $ 3,177.20 $ 4.26 $ 1,107.60 877(B) - DELIVER PORTABLE LONGITUDINAL BARRIER - LF 23,050.00 $ 13.42 $ 309,331.00 $ 15.00 $ 345,750.00 877(C) - RELOCATION OF PORTABLE LONGITUDINAL BARRIER 46,100.00 $ 4.15 $ 191,315.00 $ 6.00 $ 276,600.00 878(B) - MODULAR GLARE SCREEN (REMPORARY) - SD 36,400.00 $ 0.09 $ 3,276.00 $ 0.05 $ 1,820.00 880(A) - (SP) ARROW DISPLAY (TYPE C) - SD 554.00 $ 1.28 $ 709.12 $ 10.65 $ 5,900.10
880(J) - (SP) CONSTRUCTION TRAFFIC CONTROL - LSUM 1.00 $ 31,000.00 $ 31,000.00 $ 132,565.88 $ 132,565.88 880(K) - (SP) SURVEILLANCE OF TRAFFIC CONTROL - SD 260.00 $ 334.84 $ 87,058.40 $ 340.80 $ 88,608.00 882(A) - (SP) CHANGEABLE MESSAGE SIGN - SD 520.00 $ 10.70 $ 5,564.00 $ 19.17 $ 9,968.40 883(B) - (SP) SMART WORK ZONE SYSTEM PORTABLE CHANGE 3,120.00 $ 15.00 $ 46,800.00 $ 21.30 $ 66,456.00 883(E) - (SP) SMART WORK ZONE SYSTEM WEBSITE SYSTEM ( 260.00 $ 12.00 $ 3,120.00 $ 95.85 $ 24,921.00 Part A Bid - TRAFFIC CONTROL $ 750,530.15 $ 1,013,866.78 PART A CONSTRUCTION - BASE BID 106 - QUALITY CONTROL AND ACCEPTANCE - LSUM 1.00 $ 30,000.00 $ 30,000.00 $ 132,510.33 $ 132,510.33 220 - SWPPP DOCUMENTATION & MGMT - LSUM 1.00 $ 5,000.00 $ 5,000.00 $ 544.46 $ 544.46 641 - MOBILIZATION - LSUM 1.00 $ 860,000.00 $ 860,000.00 $ 930,000.00 $ 930,000.00 642 (A) - CONSTRUCTION STAKING - LSUM 1.00 $ 3,000.00 $ 3,000.00 $ 36,119.05 $ 36,119.05 Part A Bid - CONSTRUCTION $ 898,000.00 $ 1,099,173.84 Total Base Bid Part A $ 19,189,537.66 $ 17,012,672.54 Part B Project Site Rental Price Days Days 645 (A) Project Site Rental $/PSRD $3,000.00 260 $ 780,000.00 315 $ 945,000.00 Total Base Bid Part A + Part B $ 19,969,537.66 $ 17,957,672.54 ALTERNATE NO. 1 PART A ROADWAY - ALTERNATE NO. 1 202(A) - UNCLASSIFIED EXCAVATION - CY 5,151.00 $ 6.00 $ 30,906.00 $ 7.98 $ 41,104.98 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 3,750.00 $ 3,750.00 $ 678.01 $ 678.01 221(C) - TEMPORARY SILT FENCE - LF 11,000.00 $ 1.40 $ 15,400.00 $ 1.07 $ 11,770.00 230(A) - SOLID SLAB SODDING - SY 1,425.00 $ 2.50 $ 3,562.50 $ 2.29 $ 3,263.25
307(K) - STABILIZED SUBGRADE - SY 54,387.00 $ 3.50 $ 190,354.50 $ 3.50 $ 190,354.50 317.0 - CEMENT TREATED BASE - SY 51,943.00 $ 8.50 $ 441,515.50 $ 5.50 $ 285,686.50 325.0 - SEPARATOR FABRIC - SY 51,943.00 $ 0.90 $ 46,748.70 $ 1.81 $ 94,016.83 402(E) - TRAFFIC BOUND SURFACE COURSE TYPE E - TON 1,751.00 $ 18.00 $ 31,518.00 $ 8.54 $ 14,953.54 407(B) - TACK COAT - GAL 596.00 $ 4.00 $ 2,384.00 $ 2.13 $ 1,269.48 408.0 - PRIME COAT - GAL 629.00 $ 6.00 $ 3,774.00 $ 3.20 $ 2,012.80 411(C) - SUPERPAVE, TYPE S4 (PG 64-22 OK) - TON 1,435.00 $ 57.00 $ 81,795.00 $ 61.32 $ 87,994.20 412.0 - COLD MILLING PAVEMENT - SY 3,973.00 $ 1.50 $ 5,959.50 $ 1.35 $ 5,363.55 413(D) - RUMBLE STRIP-METHOD PCC-CON - LF 22,000.00 $ 0.25 $ 5,500.00 $ 0.16 $ 3,520.00 414(A) - P.C. CONCRETE PAVEMENT (PLACEMENT) - SY 17,721.00 $ 7.50 $ 132,907.50 $ 4.91 $ 87,010.11 414(B) - DOWEL JOINTED P.C. CONCRETE PAVEMENT (PLACEM 31,778.00 $ 10.00 $ 317,780.00 $ 6.80 $ 216,090.40 414(G) - P.C. CONCRETE FOR PAVEMENT - CY 13,419.00 $ 90.00 $ 1,207,710.00 $ 84.50 $ 1,133,905.50 430.0 - PAVEMENT SMOOTHNESS (NON-BIDDABLE) - LSUM 1.00 $ - $ - 619(A) - REMOVAL OF STRUCTURES & OBSTRUCTIONS - LSUM 1.00 $ 3,500.00 $ 3,500.00 $ 2,723.00 $ 2,723.00 619(B) - REMOVAL OF CONCRETE PAVEMENT - SY 29,520.00 $ 5.00 $ 147,600.00 $ 3.20 $ 94,464.00 619(B) - REMOVAL OF ASPHALT PAVEMENT - SY 20,921.00 $ 3.00 $ 62,763.00 $ 2.24 $ 46,863.04 619(B) - REMOVAL OF GUARDRAIL - LF 1,639.00 $ 3.00 $ 4,917.00 $ 0.31 $ 508.09 619(C) - SAWING PAVEMENT - LF 11,000.00 $ 3.00 $ 33,000.00 $ 1.40 $ 15,400.00 623(A) - BEAM GUARDRAIL W-BEAM SINGLE - LF 3,500.00 $ 17.00 $ 59,500.00 $ 16.77 $ 58,695.00 623(F) - GUARDRAIL TRAIL END TURNDOWN (31") - EA 4.00 $ 800.00 $ 3,200.00 $ 804.08 $ 3,216.32 623(G) - GUARDRAIL END TREATMENT (31") - EA 4.00 $ 2,200.00 $ 8,800.00 $ 2,183.25 $ 8,733.00 627(I) - CONCRETE LONGITUDINAL BARRIER, REFINISH - LF 5,500.00 $ 8.00 $ 44,000.00 $ 7.05 $ 38,775.00 853.0 - GUARDRAIL DELINEATORS (TYPE 1, CODE 1) - EA 82.00 $ 20.00 $ 1,640.00 $ 13.31 $ 1,091.42 Total Part A - ROADWAY ALTERNATE NO. 1 $ 2,890,485.20 $ 2,449,462.52 PART A SIGNING AND STRIPING - ALTERNATE NO. 1 805(A) - REMOVAL OF SIGN FOOTING - EA 2.00 $ 75.00 $ 150.00 $ 213.00 $ 426.00 805(A) - (PL) REMOVAL OF EXISTING SIGNS - EA 2.00 $ 65.51 $ 131.02 $ 90.53 $ 181.06 805(D) - (PL) REMOVE & RESET EXISTING SIGNS - EA 2.00 $ 153.65 $ 307.30 $ 106.50 $ 213.00 805(D) - (PL) REMOVE & RESET GROUND MOUNTED SIGN - EA 2.00 $ 1,500.00 $ 3,000.00 $ 213.00 $ 426.00 850(A) - SHEET ALUMINUM SIGNS - SF 8.00 $ 23.55 $ 188.40 $ 53.25 $ 426.00 851(C) - 2" SQUARE TUBE POST - LF 20.00 $ 8.45 $ 169.00 $ 9.59 $ 191.80
853 - DELINEATORS (TYPE 1, CODE 1, FLEXIBLE) - EA 22.00 $ 49.50 $ 1,089.00 $ 38.34 $ 843.48 853 - BARRIER DELINEATORS - EA 131.00 $ 35.00 $ 4,585.00 $ 9.59 $ 1,256.29 856(A) - TRAFFIC STRIPE (MULTI-POLY.)(6" WIDE) - LF 29,636.00 $ 0.37 $ 10,965.32 $ 0.62 $ 18,374.32 Total Part A - SIGNING AND STRIPING ALTERNATE NO. 1 $ 20,585.04 $ 22,337.95 PART A TRAFFIC - ALTERNATE NO.1 857(A) - CONSTRUCTION TRAFFIC STRIPE (PAINT)(4" WIDE) - LF 48,508.00 $ 0.04 $ 1,940.32 $ 0.12 $ 5,820.96 857(F) - PAVEMENT MARKING REMOVAL (TRAFFIC STRIPE) - LF 22,226.00 $ 0.06 $ 1,333.56 $ 0.19 $ 4,222.94 871(B) - (SP) CONST. ZONE IMPACT ATTEN. - SD 75.00 $ 10.19 $ 764.25 $ 26.63 $ 1,997.25 876(A) - TRUCK MOUNTED ATTENUATOR - SD 45.00 $ 12.22 $ 549.90 $ 4.26 $ 191.70 877(C) - RELOCATION OF PORTABLE LONGITUDINAL BARRIER 11,000.00 $ 4.15 $ 45,650.00 $ 6.00 $ 66,000.00 878(B) - MODULAR GLARE SCREEN (REMPORARY) - SD 6,300.00 $ 0.09 $ 567.00 $ 0.05 $ 315.00 880(A) - (SP) ARROW DISPLAY (TYPE C) - SD 90.00 $ 15.33 $ 1,379.70 $ 10.65 $ 958.50 880(K) - (SP) SURVEILLANCE OF TRAFFIC CONTROL - SD 45.00 $ 334.84 $ 15,067.80 $ 585.75 $ 26,358.75 882(A) - (SP) CHANGEABLE MESSAGE SIGN - SD 90.00 $ 10.70 $ 963.00 $ 6.39 $ 575.10 883(B) - (SP) SMART WORK ZONE SYSTEM PORTABLE CHANGE 540.00 $ 15.00 $ 8,100.00 $ 0.01 $ 5.40 883(E) - (SP) SMART WORK ZONE SYSTEM WEBSITE SYSTEM ( 45.00 $ 12.00 $ 540.00 $ 0.01 $ 0.45 Total Part A - TRAFFIC ALTERNATE NO. 1 $ 76,855.53 $ 106,446.05 PART A CONSTRUCTION - ALTERNATE NO. 1 642 (A) - CONSTRUCTION STAKING - LSUM 1.00 $ 500.00 $ 500.00 $ 5,359.09 $ 5,359.09 Total Part A Bid - ALTERNATE NO. 1 $ 2,988,425.77 $ 2,583,605.61 Part B Project Site Rental Price Days Days 645 (A) Project Site Rental $/PSRD $3,000.00 45 $ 135,000.00 71 $ 213,000.00 Total Base Bid Part A + Part B - ALTERNATE NO. 1 $ 3,123,425.77 $ 2,796,605.61
ALTERNATE NO. 2 PART A ROADWAY - ALTERNATE NO. 2 202(A) - UNCLASSIFIED EXCAVATION - CY 5,791.00 $6.00 $ 34,746.00 $ 7.98 $ 46,212.18 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $3,750.00 $ 3,750.00 $ 793.62 $ 793.62 221(C) - TEMPORARY SILT FENCE - LF 10,285.00 $1.40 $ 14,399.00 $ 1.07 $ 11,004.95 230(A) - SOLID SLAB SODDING - SY 1,668.00 $2.50 $ 4,170.00 $ 2.29 $ 3,819.72 307(K) - STABILIZED SUBGRADE - SY 51,629.00 $3.50 $ 180,701.50 $ 3.50 $ 180,701.50 310(B) - SUBRADE, METHOD B - SY 1,107.00 $4.00 $ 4,428.00 $ 0.54 $ 597.78 317 - CEMENT TREATED BASE - SY 49,318.00 $8.50 $ 419,203.00 $ 5.50 $ 271,249.00 325 - SEPARATOR FABRIC - SY 49,318.00 $0.90 $ 44,386.20 $ 1.81 $ 89,265.58 402(E) - TRAFFIC BOUND SURFACE COURSE TYPE E - TON 1,655.00 $18.00 $ 29,790.00 $ 8.54 $ 14,133.70 407(B) - TACK COAT - GAL 401.00 $4.00 $ 1,604.00 $ 2.13 $ 854.13 408 - PRIME COAT - GAL 711.00 $6.00 $ 4,266.00 $ 3.20 $ 2,275.20 411(C) - SUPERPAVE, TYPE S4 (PG 64-22 OK) - TON 1,213.00 $57.00 $ 69,141.00 $ 61.32 $ 74,381.16 412 - COLD MILLING PAVEMENT - SY 2,668.00 $1.50 $ 4,002.00 $ 1.35 $ 3,601.80 413(D) - RUMBLE STRIP-METHOD PCC-CON - LF 20,800.00 $0.25 $ 5,200.00 $ 0.16 $ 3,328.00 414(A) - P.C. CONCRETE PAVEMENT (PLACEMENT) - SY 17,786.00 $7.50 $ 133,395.00 $ 4.96 $ 88,218.56 414(B) - DOWEL JOINTED P.C. CONCRETE PAVEMENT (PLACEM 30,045.00 $10.00 $ 300,450.00 $ 6.80 $ 204,306.00 414(G) - P.C. CONCRETE FOR PAVEMENT - CY 12,971.00 $90.00 $ 1,167,390.00 $ 84.50 $ 1,096,049.50 430 - PAVEMENT SMOOTHNESS (NON-BIDDABLE) - LSUM 1.00 $ - $ - $ - 509(A) - CLASS AA CONCRETE - CY 33.00 $450.00 $ 14,850.00 $ 312.94 $ 10,327.02 509(D) - CLASS C CONCRETE - CY 17.00 $380.00 $ 6,460.00 $ 230.30 $ 3,915.10 511(A) - REINFORCING STEEL - LB 281.00 $2.00 $ 562.00 $ 1.78 $ 500.18 511(B) - EPOXY COATED REINFORCING STEEL - LB 5,020.00 $2.00 $ 10,040.00 $ 1.19 $ 5,973.80 619(A) - REMOVAL OF STRUCTURES & OBSTRUCTIONS - LSUM 1.00 $2,500.00 $ 2,500.00 $ 2,723.00 $ 2,723.00 619(B) - REMOVAL OF CONCRETE PAVEMENT - SY 27,916.00 $5.00 $ 139,580.00 $ 3.29 $ 91,843.64 619(B) - REMOVAL OF ASPHALT PAVEMENT - SY 19,968.00 $3.00 $ 59,904.00 $ 2.24 $ 44,728.32 619(B) - REMOVAL OF GUARDRAIL - LF 2,330.00 $3.00 $ 6,990.00 $ 0.31 $ 722.30 619(C) - SAWING PAVEMENT - LF 10,508.00 $3.00 $ 31,524.00 $ 1.39 $ 14,606.12 623(A) - BEAM GUARDRAIL W-BEAM SINGLE - LF 3,438.00 $17.00 $ 58,446.00 $ 16.77 $ 57,655.26 623(F) - GUARDRAIL TRAIL END TURNDOWN (31") - EA 6.00 $800.00 $ 4,800.00 $ 772.13 $ 4,632.78 623(G) - GUARDRAIL END TREATMENT (31") - EA 8.00 $2,200.00 $ 17,600.00 $ 2,183.25 $ 17,466.00
623(I) - GUARDRAIL BRIDGE CONN-THRIE BEAM (31") - EA 2.00 $1,800.00 $ 3,600.00 $ 1,491.00 $ 2,982.00 627(I) - CONCRETE LONGITUDINAL BARRIER, REFINISH - LF 5,208.00 $8.00 $ 41,664.00 $ 7.05 $ 36,716.40 853.0 - GUARDRAIL DELINEATORS (TYPE 1, CODE 1) - EA 90.00 $20.00 $ 1,800.00 $ 13.31 $ 1,197.90 870(A) - SAND FILLED IMPACT ATTENUATION MODULE - EA 19.00 $300.00 $ 5,700.00 $ 346.13 $ 6,576.47 870(C) - REMOVAL OF EXISTING IMPACT ATTENTUATION MODU 19.00 $5,000.00 $ 95,000.00 $ 26.63 $ 505.97 Total Bid Part A - ROADWAY ALTERNATE NO. 2 $ 2,922,041.70 $ 2,393,864.64 PART A SIGNING AND STRIPING - ALTERNATE 2 805(A) - REMOVAL OF SIGN FOOTING - EA 3.00 $ 75.00 $ 225.00 $ 213.00 $ 639.00 805(A) - (PL) REMOVAL OF EXISTING SIGNS - EA 4.00 $ 65.51 $ 262.04 $ 133.13 $ 532.52 805(D) - (PL) REMOVE & RESET EXISTING SIGNS - EA 2.00 $ 153.65 $ 307.30 $ 319.50 $ 639.00 805(D) - (PL) REMOVE & RESET GROUND MOUNTED SIGN - EA 2.00 $ 1,500.00 $ 3,000.00 $ 266.25 $ 532.50 850(A) - SHEET ALUMINUM SIGNS - SF 24.00 $ 23.55 $ 565.20 $ 22.37 $ 536.88 851(C) - 2" SQUARE TUBE POST - LF 32.00 $ 8.45 $ 270.40 $ 9.59 $ 306.88 853 - DELINEATORS (TYPE 1, CODE 1, FLEXIBLE) - EA 20.00 $ 49.50 $ 990.00 $ 38.34 $ 766.80 853 - BARRIER DELINEATORS - EA 110.00 $ 35.00 $ 3,850.00 $ 9.59 $ 1,054.90 856(A) - TRAFFIC STRIPE (MULTI-POLY.)(6" WIDE) - LF 27,933.00 $ 0.37 $ 10,335.21 $ 0.62 $ 17,318.46 Total Bid Part A - SIGNING AND STRIPING ALTERNATE NO. 2 $ 19,805.15 $ 22,326.94 PART A TRAFFIC CONTROL - ALTERNATE 2 857(A) - CONSTRUCTION TRAFFIC STRIPE (PAINT)(4" WIDE) - LF 45,710.00 $ 0.04 $ 1,828.40 $ 0.12 $ 5,485.20 857(F) - PAVEMENT MARKING REMOVAL (TRAFFIC STRIPE) - LF 20,944.00 $ 0.06 $ 1,256.64 $ 0.19 $ 3,979.36 871(B) - (SP) CONST. ZONE IMPACT ATTEN. - SD 45.00 $ 10.19 $ 458.55 $ 26.63 $ 1,198.35 876(A) - TRUCK MOUNTED ATTENUATOR - SD 45.00 $ 12.22 $ 549.90 $ 4.26 $ 191.70 877(C) - RELOCATION OF PORTABLE LONGITUDINAL BARRIER 10,350.00 $ 4.15 $ 42,952.50 $ 6.00 $ 62,100.00 878(B) - MODULAR GLARE SCREEN (REMPORARY) - SD 6,300.00 $ 0.09 $ 567.00 $ 0.05 $ 315.00 880(A) - (SP) ARROW DISPLAY (TYPE C) - SD 90.00 $ 15.33 $ 1,379.70 $ 10.65 $ 958.50 880(K) - (SP) SURVEILLANCE OF TRAFFIC CONTROL - SD 45.00 $ 334.84 $ 15,067.80 $ 585.75 $ 26,358.75 882(A) - (SP) CHANGEABLE MESSAGE SIGN - SD 90.00 $ 10.70 $ 963.00 $ 6.39 $ 575.10
883(B) - (SP) SMART WORK ZONE SYSTEM PORTABLE CHANGE 540.00 $ 15.00 $ 8,100.00 $ 0.01 $ 5.40 883(E) - (SP) SMART WORK ZONE SYSTEM WEBSITE SYSTEM ( 45.00 $ 12.00 $ 540.00 $ 0.01 $ 0.45 Total Bid Part A - TRAFFIC CONTROL ALTERNATE NO. 2 $ 73,663.49 $ 101,167.81 PART A CONSTRUCTION - ALTERNATE 2 642 (A) - CONSTRUCTION STAKING - LSUM 1.00 $ 500.00 $ 500.00 $ 5,359.09 $ 5,359.09 Total Part A Bid - ALTERNATE NO. 2 $ 3,016,010.34 $ 2,522,718.48 Part B Project Site Rental Price Days 645 (A) Project Site Rental $/PSRD $3,000.00 45 $ 135,000.00 $ 75.00 $ 225,000.00 Total Base Bid Part A + Part B - ALTERNATE NO. 2 $ 3,151,010.34 $ 2,747,718.48 Total Bid = BASE + ALTERNATE NO. 1 + ALTERNATE NO. 2 $ 26,243,973.77 $ 23,501,996.63 0