CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING PERMIT FEES SERVICE PROPOSED FEE RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation $18.00 Building Permit $501-$2,000 Valuation $18 + $2.40 for each $100 over $500 Building Permit $2,001-$25,000 Valuation $54 + $10.80 for each $1,000 over $2,000 Building Permit $25,001-$50,000 Valuation $302.40 + $7.80 for each $1,000 over $25,000 Building Permit $50,001-$100,000 Valuation $481.80 + $5.40 for each $1,000 over $50,000 Building Permit $100,001-$500,000 Valuation $751.80 + $4.20 for each $1,000 over $100,000 Building Permit $500,001-$1,000,000 Valuation $2,431.80 + $3.60 for each $1,000 over $500,000 Building Permit Over $1,000,000 Valuation $4,231.80 + $3 for each $1,000 over $1,000,000 RESIDENTIAL BUILDING PLAN CHECK Building Plan Check Under $500 Valuation $9.00 Building Plan Check $501-$2,000 Valuation $9 + $1.20 for each $100 over $500 Building Plan Check $2,001-$25,000 Valuation $27 + $5.40 for each $1,000 over $2,000 Building Plan Check $25,001-$50,000 Valuation $151.20 + $3.90 for each $1,000 over $25,000 Building Plan Check $50,001-$100,000 Valuation $248.70 + $2.70 for each $1,000 over $50,000 Building Plan Check $100,001-$500,000 Valuation $383.70 + $2.10 for each $1,000 over $100,000 Building Plan Check $500,001-$1,000,000 Valuation $1,223.70 + $1.80 for each $1,000 over $500,000 Building Plan Check Over $1,000,000 Valuation $2,123.70 + $1.50 for each $1,000 over $1,000,000
CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING PERMIT FEES SERVICE PROPOSED FEE NON-RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation $24.00 Building Permit $501-$2,000 Valuation $24 + $3.60 for each $100 over $500 Building Permit $2,001-$25,000 Valuation $78 + $14.40 for each $1,000 over $2,000 Building Permit $25,001-$50,000 Valuation $409.20 + $10.80 for each $1,000 over $25,000 Building Permit $50,001-$100,000 Valuation $679.20 + $7.20 for each $1,000 over $50,000 Building Permit $100,001-$500,000 Valuation $1,039.20 + $6 for each $1,000 over $100,000 Building Permit $500,001-$1,000,000 Valuation $3,439.20 + $4.80 for each $1,000 over $500,000 Building Permit Over $1,000,000 Valuation $5,839.20 + $3.60 for each $1,000 over $1,000,000 NON-RESIDENTIAL BUILDING PLAN CHECK Building Plan Check Under $500 Valuation $36.96 Building Plan Check $501-$2,000 Valuation $36.96 + $5.54 for each $100 over $500 Building Plan Check $2,001-$25,000 Valuation $120.06 + $22.18 for each $1,000 over $2,000 Building Plan Check $25,001-$50,000 Valuation $630.20 + $16.63 for each $1,000 over $25,000 Building Plan Check $50,001-$100,000 Valuation $1,045.95 + $11.09 for each $1,000 over $50,000 Building Plan Check $100,001-$500,000 Valuation $1,600.45 + $9.24 for each $1,000 over $100,000 Building Plan Check $500,001-$1,000,000 Valuation $5,296.45 + $7.39 for each $1,000 over $500,000 Building Plan Check Over $1,000,000 Valuation $8,991.45 + $5.54 for each $1,000 over $1,000,000
CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING PERMIT FEES SERVICE COMBO PERMITS (only applies to Single Family Residential): Electrical Permit Plumbing Permit Mechanical Permit PROPOSED FEE 8% of the Building Permit Fee 8% of the Building Permit Fee 8% of the Building Permit Fee MISCELLANEOUS: Duplicate Inspection Card $21.00 Duplicate Certificate of Occupancy $21.00 Temporary Certificate of Occupancy $333 + $10,000 deposit refunded at time of Final C of O Other Inspections not specified Overtime Inspection (4 hour minimum) OT Additional Plan Review Expedited Plan Review in addition to regular Plan Review Fee OT Overtime is 120% of the Regular
ELECTRICAL PERMITS Single Family Multi-Family and Dwelling Commercial Permit Issuance $28.00 $28.00 Supplemental Permit Issuance $21.00 $21.00 Electrical Plan Check Based on Schedule B-1 Residential Appliances, up to 1 hp $14.00 $28.00 Non-Residential Appliances, up to 1 hp $28.00 Electrical Sign $133.00 Power Apparatus (Ratings in HP, KW, KVA, or KVAR) up to 5 $75.00 $75.00 5-20 $75.00 $75.00 21-50 $75.00 $75.00 51-100 $75.00 $75.00 100 + $188.00 $188.00 Temporary Power Pole $37.00 $37.00 Services, Switchboards, Control Centers, & Panels up to 600 volts up to 200 amps SFR $28.00 $56.00 Non-SFR $133.00 201-400 amps SFR $28.00 $56.00 Non-SFR $133.00 401-1,200 amps $315.00 over 1,200 amps $315.00 greater than 600 volts $342.00 Switchboards First Section Standing Panel $35.00 Additional Sections $30.00 Fire Warning Communication Control Panel $14.00 $14.00 Over 600 Volt Section $60.00 Additional Sections $55.00 Receptacle, Switch, and Lighting Outlet, per fixture $3.50 $7.00 Lighting Fixture, per fixture $3.50 $7.00 Pole or Platform Mounted Fixtures, per fixture $19.00 $19.00 Swimming Pool $55.50 $111.00 Meter Change $37.00 $37.00 Page 1 of 5
ELECTRICAL PERMITS Single Family Multi-Family and Dwelling Commercial Miscellaneous Conduits and Conductors (per 100 linear feet) $30.00 $30.00 Inspections not specified Reinspections After Hours Inspection (4 hour minimum) OT OT Overtime is 120% of the Regular Page 2 of 5
PLUMBING PERMITS Single Family Dwelling Multi-Family and Commercial Permit Issuance $28.00 $28.00 Supplemental Permit Issuance $21.00 $21.00 Plumbing Plan Check Fee Based on Schedule B-1 Plumbing Fixtures and Vents SFR $11.00 Non-SFR $27.00 Repair or Alteration of Drainage or Vent Piping $14.00 $28.00 Grease Interceptor $125.00 Piping Single Family Residential (per dwelling unit) $18.50 $37.00 Multi Family Residential (per dwelling unit) $114.00 Repipe Single Family Residential (per dwelling unit) $28.00 Multi Family Residential (per dwelling unit) $56.00 Lawn Sprinklers, Vacuum Breakers, and Backflow Protection Dev. Each Lawn Sprinkler System per Valve $9.00 $9.00 Each Vacuum Breaker or Backflow Protection Device $9.00 $9.00 Backflow Protection Device greater than 6" $167.00 $167.00 Gas System For Each System Less than 2" $28.00 $56.00 2" or more $133.00 $133.00 For Each Outlet over 5 $5.50 $11.00 Water Heater $14.00 $28.00 Solar Water Heating system $28.00 $56.00 Sewer 0-25 linear feet $28.00 $28.00 each additional 100 linear feet $28.00 $28.00 Swimming Pool $83.00 $83.00 In-Ground Spa $37.00 $37.00 Pool/Spa Heater $28.00 $28.00 Miscellaneous $56.00 $56.00 Inspections not specified Reinspections After Hours Inspection (4 hour minimum) OT OT Overtime is 120% of the Regular Page 3 of 5
MECHANICAL PERMITS Single Family Dwelling Multi-Family and Commercial Permit Issuance $28.00 $28.00 Supplemental Permit Issuance $21.00 $21.00 Mechanical Plan Check Fee Based on Schedule B-1 Forced-Air or Gravity-Type Furnace or Burner $23.50 $47.00 Floor Furnace - Installation or Relocation $18.50 $37.00 Suspended/Recessed Wall/Floor Mounted Heater - Install/Reloc $37.00 $37.00 Fireplace $38.00 $76.00 Appliance Vents per each Inlet/Outlet $6.50 $13.00 Air Handling Units SFR $28.00 Non-SFR $75.00 Single Register Ventilation Fan $9.00 $9.00 Independent Venting System $37.00 $37.00 Hood served by Mechanical Exhaust $133.00 $133.00 Boilers, Compressors, and Absorption Systems 0-3 HP or 0-100,000 Btu/h $75.00 3-15 HP or 100,001-500,000 Btu/h $75.00 15-30 HP or 500,001-1,000,000 Btu/h $100.00 30-50 HP or 1,000,001-1,750,000 Btu/h $125.00 50+ HP or 1,750,001+ Btu/h $150.00 Fire Damper $5.00 Smoke Control Damper $5.00 Thermostat $2.50 Incinerator/Kiln $56.00 Alteration to Duct Work not otherwise noted $10.00 Miscellaneous $56.00 Inspections not specified Reinspections After Hours Inspection (4 hour minimum) OT OT Overtime is 120% of the Regular Page 4 of 5
Miscellaneous Permits Grading Plan Check Based on Schedule B-1 Grading Permit Based on Schedule B-1 Sign Plan Check Based on Schedule B-1 Sign Permit Based on Schedule B-1 Swimming Pool Plan Check Based on Schedule B-1 Swimming Permit Based on Schedule B-1 Demolition Plan Check Based on Schedule B-1 Demolition Permit Based on Schedule B-1 Disabled Access Plan Check Energy Plan Check SUSMP Plan Check Reinspection Fee Page 5 of 5